Show Job Controls
Bid Cobra

ATASCOSA IH0037 (6412-73-001)

Items: 18

County: ATASCOSA
Length: N/A
Highway: IH0037
District: SAN ANTONIO
Control Number: 6412-73-001
DBE Goal: N/A
Project: BPM - 641273001
Guaranty: N/A
Time: 21 W
Engineer's Estimate: $93,640.93
Date: 04/19/2023 (3 years ago)
Contract Number: N/A
Type: EROSION REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (6)
E
Engineer's Estimate
$93,640.93
$86,000.71
Over/Under Est: -8.16% -$7,640.22
Over/Under Est: -1.55% -$1,450.93
Amt Left: 7.2% $6,189.29
Over/Under Est: 4.08% $3,819.07
Amt Left: 13.32% $11,459.29
Delta: -5.72% -$5,270.00
Over/Under Est: 6.93% $6,491.07
Amt Left: 16.43% $14,131.29
Delta: -2.74% -$2,672.00
Over/Under Est: 17.01% $15,927.07
Amt Left: 27.4% $23,567.29
Delta: -9.42% -$9,436.00
Over/Under Est: 32.09% $30,052.07
Amt Left: 43.83% $37,692.29
Delta: -12.89% -$14,125.00

Bid Items & Bid Tabulations

18 Total 0 of 18
ATASCOSA  |  IH0037  |  SAN ANTONIO  |  6412-73-001  |  04/19/2023  |  $93,640.93  |  BPM - 641273001  |  EROSION REPAIR  |  21 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
SCOUT 5 CONSTRUCTION LLC
MB WESTERN INDUSTRIAL CONTRACTING COMPANY
GARRET SHIELDS INFRASTRUCTURE
TALBRAN ENTERPRISES LLC
SJ&J CONSTRUCTION, LLC
BECK-REIT & SONS, LTD.
REMOVING CONC (MISC)
SY 80.000 $43.630 $56.250 $50.000 $50.000 $90.000 $24.000 $150.000
EXCAVATION (CHANNEL)
CY 75.000 $240.690 $120.000 $100.000 $40.000 $110.000 $12.000 $100.000
COMPOST MANUF TOPSOIL (4")
SY 250.000 $15.370 $2.000 $5.000 $10.000 $10.000 $6.000 $10.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 250.000 $2.570 $2.000 $2.000 $1.000 $1.000 $2.000 $5.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 250.000 $7.060 $2.000 $3.000 $3.000 $6.000 $6.000 $5.000
FLOWABLE BACKFILL
CY 10.000 $383.110 $1,100.000 $250.000 $600.000 $680.000 $220.000 $400.000
RIPRAP (CONC)(4 IN)
CY 26.000 $644.210 $730.770 $750.000 $600.000 $680.000 $900.000 $800.000
GABION MATTRESSES (GALV)(12 IN)
SY 57.000 $135.120 $84.210 $200.000 $100.000 $225.000 $140.000 $250.000
GABIONS (3' X 3')(GALV)
CY 25.000 $266.500 $240.000 $350.000 $400.000 $445.000 $300.000 $300.000
GABIONS (5'X 3')(GALV)
CY 39.000 $273.630 $230.770 $350.000 $500.000 $445.000 $300.000 $310.000
MOBILIZATION
LS 1.000 $6,000.000 $12,000.000 $10,000.000 $10,000.000 $7,500.000 $30,000.000 $28,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 2.000 $1,500.000 $100.000 $2,000.000 $3,000.000 $1.000 $7,000.000 $4,500.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 112.000 $36.440 $17.860 $30.000 $20.000 $1.000 $8.000 $10.000
CONSTRUCTION EXITS (REMOVE)
SY 112.000 $3.640 $8.930 $15.000 $10.000 $1.000 $6.000 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 50.000 $7.630 $12.000 $10.000 $6.000 $60.000 $3.500 $5.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 50.000 $3.640 $8.000 $5.000 $2.000 $12.000 $1.500 $1.000
TREE AND BRUSH REMOVAL
AC 0.100 $4,500.000 $50,000.000 $5,000.000 $20,000.000 $33,000.000 $15,000.000 $20,000.000
TMA (STATIONARY)
DAY 21.000 $272.850 $0.010 $100.000 $400.000 $1.000 $150.000 $1.000
Totals: $93,640.930 $86,000.710 $92,190.000 $97,460.000 $100,132.000 $109,568.000 $123,693.000