ATASCOSA SH0016 (6342-37-001)

Items: 31

County: ATASCOSA
Length: N/A
Highway: SH0016
District: SAN ANTONIO
Control Number: 6342-37-001
DBE Goal: N/A
Project: RMC - 634237001
Guaranty: N/A
Time: 64 CALENDAR DAYS
Engineer's Estimate: $1,618,901.25
Date: 05/07/2019 (7 years ago)
Contract Number: N/A
Type: GUARDRAIL REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$1,618,901.25
$1,471,267.82
Over/Under Est: -9.12% -$147,633.43
$1,549,072.42
Over/Under Est: -4.31% -$69,828.83
Amt Left: 5.29% $77,804.60
Over/Under Est: -4.09% -$66,156.75
Amt Left: 5.54% $81,476.68
Delta: -0.24% -$3,672.08
$2,444,497.25
Over/Under Est: 51% $825,596.00
Amt Left: 66.15% $973,229.43
Delta: -57.43% -$891,752.75
$2,635,105.50
Over/Under Est: 62.77% $1,016,204.25
Amt Left: 79.1% $1,163,837.68
Delta: -7.80% -$190,608.25

Bid Items & Bid Tabulations

31 Total 0 of 31
ATASCOSA  |  SH0016  |  SAN ANTONIO  |  6342-37-001  |  05/07/2019  |  $1,618,901.25  |  RMC - 634237001  |  GUARDRAIL REPAIR  |  64 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
K-BAR SERVICES, INC.
RELMCO, INC.
TALBRAN ENTERPRISES LLC
VANN/ELLI, INC.
3LW CIVIL LLC
REMOVING CONC (MISC)
SY 10.000 $28.400 $20.000 $50.000 $100.000 $200.000 $100.000
REMOVING CONCRETE(MOW STRIP)
LF 3,920.000 $8.820 $5.000 $12.000 $9.000 $38.000 $30.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
CY 9.000 $85.000 $20.000 $100.000 $100.000 $2,000.000 $50.000
COMPOST MANUF TOPSOIL (4")
SY 25,837.000 $1.500 $4.500 $5.000 $3.500 $10.000 $7.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 25,837.000 $0.900 $1.300 $0.180 $0.500 $0.750 $3.000
VEGETATIVE WATERING
MG 402.000 $12.500 $50.000 $20.000 $25.000 $100.000 $160.000
SOIL RETENTION BLANKETS (CL 2) (TY G)
SY 25,837.000 $3.400 $3.000 $2.470 $4.000 $10.000 $8.000
RIPRAP (MOW STRIP)(4 IN)
CY 987.000 $545.000 $450.000 $405.000 $475.000 $610.000 $700.000
RAIL (TY T631)
LF 450.000 $95.000 $100.000 $105.000 $110.000 $102.000 $200.000
MOBILIZATION
LS 1.000 $155,000.000 $56,587.220 $160,000.000 $200,000.000 $200,000.000 $250,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $15,000.000 $6,000.000 $30,000.000 $4,000.000 $15,000.000 $25,000.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,900.000 $6.250 $4.500 $5.750 $7.000 $10.000 $5.910
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,900.000 $1.250 $0.500 $1.100 $4.000 $3.000 $1.760
ONE-WAY TRAF CONT (FLAGGER CONT)
HR 480.000 $150.000 $100.000 $85.000 $25.000 $95.000 $200.000
MTL W-BEAM GD FEN (TIM POST)
LF 10,025.000 $22.000 $24.000 $21.000 $17.000 $24.000 $30.000
MTL W-BEAM GD FEN (STEEL POST)
LF 300.000 $30.000 $40.000 $62.000 $65.000 $75.000 $32.480
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 3.000 $1,850.000 $2,000.000 $1,720.000 $1,850.000 $3,000.000 $2,300.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 1,500.000 $18.000 $9.000 $12.000 $15.000 $24.000 $18.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 18.000 $1,200.000 $1,500.000 $1,075.000 $1,500.000 $1,200.000 $1,500.000
MTL BM GD FEN TRANS (NON - SYM)
EA 3.000 $800.000 $500.000 $900.000 $1,500.000 $1,500.000 $1,500.000
REMOVE METAL BEAM GUARD FENCE
LF 7,562.500 $2.500 $2.000 $2.150 $5.000 $3.000 $5.000
REMOVE TERMINAL ANCHOR SECTION
EA 65.000 $200.000 $300.000 $172.000 $200.000 $200.000 $350.000
GUARDRAIL END TREATMENT (INSTALL)
EA 56.000 $2,750.000 $3,000.000 $2,690.000 $2,200.000 $3,500.000 $3,500.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 6.000 $1,418.000 $1,200.000 $1,650.000 $1,800.000 $2,500.000 $1,800.000
GUARDRAIL END TREATMENT (REMOVE)
EA 15.000 $250.000 $250.000 $270.000 $200.000 $200.000 $500.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 311.000 $29.000 $60.000 $25.000 $26.000 $42.000 $40.000
TREE REMOVAL (30" - 36" DIA)
EA 2.000 $600.000 $2,000.000 $1,500.000 $625.000 $5,000.000 $1,000.000
TREE REMOVAL (48" - 60" DIA)
EA 2.000 $1,000.000 $2,500.000 $2,000.000 $985.000 $15,000.000 $1,500.000
TREE TRIMMING AND BRUSH REMOVAL
LF 1,000.000 $20.000 $4.750 $15.000 $15.000 $15.000 $30.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 120.000 $125.000 $100.000 $200.000 $250.000 $300.000 $200.000
TMA (STATIONARY)
DAY 120.000 $250.000 $200.000 $200.000 $350.000 $400.000 $400.000
Totals: $1,618,901.250 $1,471,267.820 $1,549,072.425 $1,552,744.500 $2,444,497.250 $2,635,105.500