ATASCOSA FM 1333 (1740-03-019)

Items: 97

County: ATASCOSA
Length: N/A
Highway: FM 1333
District: SAN ANTONIO
Control Number: 1740-03-019
DBE Goal: N/A
Project: STP 2023(525)
Guaranty: N/A
Time: 109 WORKING DAYS
Engineer's Estimate: $5,877,527.34
Date: 03/08/2023 (3 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
CHRISTEN LONGORIA
FRANCES MERECKA
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (8)
E
Engineer's Estimate
$5,877,527.34
Over/Under Est: -31.51% -$1,852,191.35
$4,397,598.34
Over/Under Est: -25.18% -$1,479,929.00
Amt Left: 9.25% $372,262.35
Over/Under Est: -23.76% -$1,396,280.10
Amt Left: 11.33% $455,911.25
Delta: -1.90% -$83,648.90
Over/Under Est: -18.99% -$1,116,188.44
Amt Left: 18.28% $736,002.91
Delta: -6.25% -$280,091.66
Over/Under Est: -18.4% -$1,081,755.54
Amt Left: 19.14% $770,435.81
Delta: -0.72% -$34,432.90
Over/Under Est: -16.29% -$957,503.96
Amt Left: 22.23% $894,687.39
Delta: -2.59% -$124,251.58
Over/Under Est: -9.03% -$530,531.58
Amt Left: 32.83% $1,321,659.77
Delta: -8.68% -$426,972.38
Over/Under Est: -8.43% -$495,313.38
Amt Left: 33.71% $1,356,877.97
Delta: -0.66% -$35,218.20
Subcontractor Percentage Amount
A K FUQUAY CONSTRUCTION 2.87% $119,932.69
FLASHER EQUIPMENT COMPANY 2.33% $97,366.96
KING GEORGE TRAFFIC SOLUTIONS LLC 0.20% $8,357.68
WEST TEXAS ROCK RESOURCES, LLC 0.11% $4,596.72
Total: 5.51% $230,254.05

Bid Items & Bid Tabulations

97 Total 0 of 97
ATASCOSA  |  FM 1333  |  SAN ANTONIO  |  1740-03-019  |  03/08/2023  |  $5,877,527.34  |  STP 2023(525)  |  HAZARD ELIM & SAFETY  |  109 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
CK NEWBERRY, LLC
TEXAS MATERIALS GROUP, INC.
HUNTER INDUSTRIES, LTD.
ANDERSON COLUMBIA CO., INC.
ACME BRIDGE COMPANY, INC.
JORDAN FOSTER CONSTRUCTION, LLC
BRANNAN PAVING CO., LTD.
PREPARING ROW
STA 160.000 $2,000.000 $136.440 $500.000 $250.000 $1,621.700 $815.000 $1,130.000 $1,002.560 $77.000
REMOVING CONC (RIPRAP)
SY 96.000 $20.850 $18.560 $100.000 $30.000 $14.000 $24.000 $36.000 $181.000 $60.000
REMOVING STAB BASE & ASPH PAV (0-6")
SY 45,661.000 $3.500 $2.520 $4.500 $2.600 $1.440 $3.000 $2.450 $2.100 $4.500
EXCAVATION (ROADWAY)
CY 3,290.000 $13.750 $10.380 $20.000 $13.400 $23.600 $21.000 $14.300 $24.000 $22.190
EXCAVATION (CHANNEL)
CY 55.000 $17.000 $58.660 $150.000 $56.000 $192.500 $30.000 $31.000 $180.000 $150.000
EMBANKMENT (FINAL)(DENS CONT)(TY A)
CY 4,992.000 $35.150 $8.080 $16.000 $16.600 $16.400 $11.000 $44.700 $33.000 $34.120
EMBANKMENT (FINAL)(ORD COMP)(TY D)
CY 30.000 $20.000 $53.540 $25.000 $34.400 $216.500 $28.000 $69.600 $360.000 $80.000
FURNISHING AND PLACING TOPSOIL (4")
SY 79,628.000 $1.170 $1.750 $0.500 $1.150 $1.200 $0.800 $1.600 $2.450 $3.250
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 79,628.000 $0.280 $0.320 $0.220 $0.290 $0.290 $0.320 $0.310 $0.290 $0.200
DRILL SEED (TEMP)(WARM OR COOL)
SY 79,628.000 $0.170 $0.240 $0.110 $0.220 $0.220 $0.240 $0.230 $0.220 $0.130
VEGETATIVE WATERING
MG 1,242.000 $22.250 $17.990 $15.000 $24.000 $21.000 $30.000 $27.100 $33.000 $30.000
PROOF ROLLING
HR 16.000 $160.000 $77.170 $100.000 $140.000 $237.600 $120.000 $82.500 $210.000 $150.000
FLBS (CMP IN PLC)(TY D GR 1-2 OR 5)(8")
SY 64,963.000 $17.200 $13.410 $15.000 $15.250 $15.850 $16.000 $18.150 $16.300 $19.100
REWORK BS MTL (TY C)(4")(ORD COMP)
SY 66,710.000 $2.000 $0.590 $1.000 $1.840 $1.560 $2.600 $1.000 $2.000 $1.130
CEMENT
TON 991.000 $235.000 $256.770 $205.000 $229.000 $236.500 $210.000 $267.000 $250.000 $210.340
CEMENT TREAT (SUBGRADE)(12")
SY 66,710.000 $2.000 $1.860 $1.300 $2.750 $2.700 $3.000 $1.880 $3.000 $4.770
ASPH (RC-250)
GAL 12,993.000 $6.720 $6.030 $5.000 $4.500 $6.460 $5.000 $4.700 $4.450 $5.000
AGGR(TY-B GR-5 SAC-B)
CY 464.000 $146.000 $120.470 $150.000 $111.000 $95.780 $125.000 $100.000 $95.000 $98.000
CEM STABIL BKFL
CY 75.000 $325.000 $142.090 $200.000 $150.000 $208.850 $128.000 $134.000 $260.000 $225.000
FLOWABLE BACKFILL
CY 25.000 $350.000 $175.270 $250.000 $150.000 $251.690 $166.000 $175.000 $280.000 $525.000
RIPRAP (CONC)(5 IN)
CY 86.000 $425.000 $656.590 $550.000 $480.000 $530.150 $530.000 $558.000 $550.000 $900.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 70.000 $150.000 $213.500 $160.000 $300.000 $276.260 $205.000 $215.000 $580.000 $250.000
RIPRAP (MOW STRIP)(4 IN)
CY 20.000 $585.000 $924.810 $575.000 $900.000 $583.700 $550.000 $579.000 $590.000 $900.000
CMP AR (GAL STL DES 3)
LF 14.000 $110.000 $279.250 $130.000 $165.000 $133.880 $122.000 $129.000 $460.000 $150.000
CONC BOX CULV (3 FT X 2 FT)
LF 52.000 $320.000 $441.320 $400.000 $450.000 $455.180 $415.000 $438.000 $820.000 $800.000
CONC BOX CULV (4 FT X 2 FT)
LF 101.000 $350.000 $525.940 $475.000 $600.000 $581.560 $450.000 $473.000 $730.000 $900.000
RC PIPE (CL III)(18 IN)
LF 388.000 $47.030 $104.290 $100.000 $95.000 $95.320 $80.000 $84.700 $150.000 $75.000
RC PIPE (CL III)(24 IN)
LF 17.000 $98.000 $243.180 $120.000 $375.000 $131.740 $106.000 $112.000 $450.000 $220.000
RC PIPE (CL III)(30 IN)
LF 58.000 $118.000 $154.480 $150.000 $400.000 $166.010 $138.000 $145.000 $500.000 $300.000
RC PIPE (CL III)(36 IN)
LF 47.000 $147.000 $254.450 $200.000 $700.000 $192.780 $190.000 $201.000 $590.000 $365.000
RC PIPE (CL III)(48 IN)
LF 66.000 $309.250 $334.010 $300.000 $700.000 $262.400 $294.000 $309.000 $600.000 $455.000
SET (TY I)(S=3 FT)(HW=3FT)(3:1)(C)
EA 2.000 $7,130.000 $8,635.870 $10,000.000 $8,300.000 $4,819.580 $7,560.000 $7,960.000 $15,000.000 $8,000.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(3:1) (C)
EA 3.000 $7,375.000 $8,792.630 $10,500.000 $7,000.000 $5,033.790 $7,460.000 $7,860.000 $9,400.000 $9,000.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
EA 1.000 $3,362.000 $9,418.660 $9,000.000 $6,500.000 $5,033.790 $7,830.000 $8,250.000 $9,600.000 $11,500.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 18.000 $2,013.410 $1,366.420 $2,500.000 $1,700.000 $1,670.790 $1,630.000 $1,720.000 $3,300.000 $1,500.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 2.000 $3,000.000 $1,661.420 $2,000.000 $2,000.000 $2,088.490 $1,740.000 $1,830.000 $3,600.000 $1,800.000
SET (TY II) (30 IN) (RCP) (3: 1) (C)
EA 8.000 $4,088.000 $2,419.470 $3,200.000 $3,000.000 $2,570.440 $2,440.000 $2,570.000 $3,900.000 $3,500.000
SET (TY II) (36 IN) (RCP) (3: 1) (C)
EA 10.000 $4,200.000 $4,356.160 $5,000.000 $3,500.000 $3,105.950 $3,500.000 $3,690.000 $5,000.000 $4,500.000
SET (TY II) (DES 3) (CMP) (4: 1) (C)
EA 2.000 $3,200.000 $4,488.950 $2,500.000 $1,800.000 $2,249.140 $1,472.000 $1,550.000 $3,600.000 $3,500.000
CLEAN EXIST CULVERTS
EA 6.000 $2,500.000 $2,181.280 $3,000.000 $1,500.000 $2,677.550 $3,330.000 $3,510.000 $4,200.000 $2,500.000
REMOV STR (PIPE)
LF 178.000 $26.000 $19.280 $25.000 $35.000 $23.560 $111.000 $117.000 $25.000 $80.000
MOBILIZATION
LS 1.000 $441,838.940 $253,273.600 $425,000.000 $430,490.000 $418,612.730 $475,000.000 $400,000.000 $529,352.600 $410,450.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $3,000.000 $1,052.690 $10,000.000 $7,000.000 $2,839.030 $1,880.000 $5,650.000 $12,000.000 $5,858.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 320.000 $49.000 $35.440 $25.000 $33.200 $33.200 $37.000 $35.100 $33.000 $24.000
ROCK FILTER DAMS (REMOVE)
LF 320.000 $11.500 $8.260 $10.000 $6.500 $6.480 $7.000 $6.900 $6.500 $6.500
CONSTRUCTION EXITS (INSTALL) (TY 2)
SY 156.000 $29.000 $52.440 $15.000 $48.800 $48.800 $54.000 $51.600 $49.000 $50.000
CONSTRUCTION EXITS (REMOVE)
SY 156.000 $2.800 $21.780 $10.000 $19.600 $19.600 $22.000 $20.700 $19.500 $20.000
BACKHOE WORK (EROSION & SEDMT CONT)
HR 8.000 $77.000 $87.320 $150.000 $117.000 $211.200 $80.000 $141.000 $119.000 $100.000
FRNT END LOADER WORK (ERSN & SEDM CONT)
HR 8.000 $81.250 $112.870 $200.000 $117.000 $211.200 $80.000 $186.000 $135.000 $150.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 15,227.000 $2.350 $3.540 $2.500 $3.250 $3.250 $3.600 $3.450 $3.250 $2.250
TEMP SEDMT CONT FENCE (REMOVE)
LF 15,227.000 $0.750 $0.320 $0.750 $0.250 $0.250 $0.300 $0.260 $0.250 $0.500
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 400.000 $6.100 $5.980 $6.000 $5.250 $5.250 $6.000 $5.600 $5.250 $5.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 400.000 $1.000 $1.280 $1.000 $1.000 $1.000 $1.100 $1.050 $1.000 $0.500
ONE-WAY TRAF CONT (FLAGGER CONT)
HR 48.000 $150.000 $73.840 $125.000 $80.000 $211.200 $140.000 $72.300 $210.000 $125.000
DRIVEWAYS (ACP)
SY 1,188.000 $84.000 $46.500 $60.000 $65.000 $41.400 $75.000 $83.200 $68.000 $46.150
RUMBLE STRIPS (SHOULDER)
LF 31,491.000 $0.250 $0.190 $0.200 $0.170 $0.310 $0.250 $0.110 $0.100 $0.210
RUMBLE STRIPS (CENTERLINE)
LF 15,756.000 $0.250 $0.270 $0.250 $0.250 $0.340 $0.250 $0.110 $0.100 $0.240
MTL W-BEAM GD FEN (TIM POST)
LF 300.000 $29.200 $26.560 $30.000 $26.500 $28.360 $33.000 $27.900 $30.000 $26.350
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,272.000 $2,356.670 $3,500.000 $3,225.000 $3,469.910 $3,820.000 $3,400.000 $3,400.000 $3,220.000
RELOCATE EXISTING MAILBOX
EA 10.000 $430.000 $298.080 $400.000 $275.000 $350.000 $940.000 $370.000 $280.000 $550.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 18.000 $595.000 $665.580 $750.000 $625.000 $725.000 $800.000 $766.000 $630.000 $725.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 4.000 $770.000 $865.080 $850.000 $815.000 $835.000 $926.000 $882.000 $820.000 $835.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $1,090.000 $980.580 $1,100.000 $925.000 $1,025.000 $1,140.000 $1,080.000 $930.000 $1,025.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 1.000 $1,465.000 $1,111.830 $1,400.000 $1,050.000 $1,250.000 $1,380.000 $1,320.000 $1,050.000 $1,250.000
IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL)
EA 1.000 $1,465.000 $1,269.330 $1,300.000 $1,200.000 $1,150.000 $1,280.000 $1,220.000 $1,200.000 $1,150.000
REMOVE SM RD SN SUP&AM
EA 26.000 $130.000 $135.330 $100.000 $120.000 $80.000 $90.000 $84.500 $120.000 $80.000
INSTL OM ASSM (OM-2X)(WC)GND
EA 16.000 $82.000 $77.580 $100.000 $65.000 $90.000 $100.000 $95.100 $65.000 $90.000
INSTL OM ASSM (OM-3L)(TWT)GND
EA 2.000 $345.000 $403.080 $500.000 $375.000 $475.000 $530.000 $502.000 $380.000 $475.000
INSTL OM ASSM (OM-3R)(TWT)GND
EA 2.000 $345.000 $403.080 $500.000 $375.000 $475.000 $530.000 $502.000 $380.000 $475.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 10.000 $33.000 $35.580 $40.000 $40.000 $35.000 $38.000 $37.000 $25.000 $40.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 16,196.000 $0.650 $0.880 $0.850 $0.850 $0.850 $1.000 $0.900 $0.830 $0.650
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 94.000 $5.550 $13.310 $12.000 $12.000 $12.000 $13.000 $12.700 $11.000 $9.800
WK ZN PAV MRK REMOV (Y)4"(BRK)
LF 1,800.000 $0.850 $0.990 $0.850 $0.850 $0.850 $1.000 $0.900 $0.890 $0.700
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 3,415.000 $0.650 $0.900 $0.850 $0.850 $0.850 $1.000 $0.900 $0.830 $0.650
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 3,257.000 $2.000 $1.550 $0.500 $1.100 $1.600 $1.500 $1.550 $2.500 $1.750
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 1,344.000 $2.000 $1.730 $0.500 $1.100 $1.600 $1.500 $1.550 $2.500 $1.750
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,389.000 $1.750 $1.690 $0.500 $1.200 $1.600 $1.500 $1.550 $2.500 $1.750
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 304.000 $1.250 $1.900 $1.000 $0.880 $0.880 $1.000 $0.930 $1.200 $2.800
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 22.000 $10.000 $13.550 $17.000 $16.000 $16.000 $18.000 $16.900 $8.850 $9.800
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 2.000 $200.000 $202.340 $175.000 $150.000 $150.000 $166.000 $159.000 $148.000 $160.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 2.000 $200.000 $234.620 $250.000 $225.000 $225.000 $250.000 $238.000 $179.000 $160.000
PAVEMENT SEALER 6"
LF 41,429.000 $0.240 $0.450 $0.200 $0.180 $0.180 $0.200 $0.190 $0.420 $0.350
PAVEMENT SEALER 8"
LF 304.000 $0.600 $1.420 $0.300 $0.300 $0.300 $0.330 $0.320 $0.770 $0.900
PAVEMENT SEALER 24"
LF 22.000 $3.000 $8.910 $6.000 $6.000 $6.000 $7.000 $6.300 $4.450 $3.000
PAVEMENT SEALER (ARROW)
EA 2.000 $72.000 $121.540 $65.000 $65.000 $65.000 $72.000 $68.700 $71.000 $60.000
PAVEMENT SEALER (WORD)
EA 2.000 $72.000 $135.870 $85.000 $85.000 $85.000 $95.000 $89.800 $85.000 $60.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 31,571.000 $0.650 $0.810 $0.700 $0.670 $0.670 $0.750 $0.710 $0.760 $0.420
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 3,380.000 $0.720 $0.830 $0.700 $0.660 $0.660 $0.750 $0.700 $0.760 $0.450
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 6,478.000 $0.720 $0.810 $0.700 $0.660 $0.660 $0.750 $0.700 $0.760 $0.450
REFL PAV MRKR TY I-C
EA 16.000 $6.500 $13.160 $5.000 $4.500 $4.500 $5.000 $4.750 $7.000 $3.800
REFL PAV MRKR TY II-A-A
EA 244.000 $6.500 $5.040 $4.000 $3.850 $3.850 $4.000 $4.050 $4.450 $3.800
FULL - WIDTH MOWING
CYC 2.000 $4,267.390 $2,019.780 $1,500.000 $2,150.000 $2,800.000 $2,500.000 $4,860.000 $3,100.000 $6,000.000
LITTER REMOVAL
CYC 2.000 $1,415.500 $3,388.620 $2,000.000 $1,723.000 $2,281.820 $1,740.000 $3,670.000 $1,290.000 $2,000.000
SP MIXES SP-C SAC-B PG76-22
TON 10,904.000 $186.000 $101.960 $100.000 $101.000 $114.000 $113.000 $107.000 $101.000 $117.680
TACK COAT
GAL 6,516.000 $1.760 $3.970 $3.250 $3.000 $3.540 $4.300 $3.150 $3.000 $3.300
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $14,600.000 $14,898.460 $25,000.000 $6,200.000 $11,255.090 $8,000.000 $9,610.000 $30,000.000 $15,000.000
TMA (STATIONARY)
DAY 18.000 $250.000 $293.540 $250.000 $200.000 $243.560 $175.000 $125.000 $470.000 $250.000
Totals: $5,877,527.340 $4,025,335.990 $4,397,598.340 $4,481,247.240 $4,761,338.900 $4,795,771.800 $4,920,023.380 $5,346,995.760 $5,382,213.960