Show Job Controls
Bid Cobra

ATASCOSA SH 16 (0517-01-048)

Items: 76

County: ATASCOSA
Length: 0.6570 MILES
Highway: SH 16
District: SAN ANTONIO
Control Number: 0517-01-048
DBE Goal: 0.0%
Project: C 517-1-48
Guaranty: $51,000.00
Time: 177 WORKING DAYS
Engineer's Estimate: $2,547,613.00
Date: 09/06/2024 (1 year ago)
Contract Number: 9243224
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Project ID: A00184941
Project Description: CONSTRUCT 6' SIDEWALKS AND PEDESTRIAN INFRASTRUCTURE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (7)
E
Engineer's Estimate
$2,547,613.00
$2,484,607.39
Over/Under Est: -2.47% -$63,005.61
$2,570,492.04
Over/Under Est: 0.9% $22,879.04
Amt Left: 3.46% $85,884.65
$2,625,807.40
Over/Under Est: 3.07% $78,194.40
Amt Left: 5.68% $141,200.01
Delta: -2.15% -$55,315.36
$2,700,423.87
Over/Under Est: 6% $152,810.87
Amt Left: 8.69% $215,816.48
Delta: -2.84% -$74,616.47
$2,819,796.77
Over/Under Est: 10.68% $272,183.77
Amt Left: 13.49% $335,189.38
Delta: -4.42% -$119,372.90
Over/Under Est: 10.79% $274,963.42
Amt Left: 13.6% $337,969.03
Delta: -0.10% -$2,779.65
$2,904,150.06
Over/Under Est: 13.99% $356,537.06
Amt Left: 16.89% $419,542.67
Delta: -2.89% -$81,573.64
Subcontractor Percentage Amount
C3 ENVIRONMENTAL SPECIALTIES MANAGEMENT, LLC 4.84% $125,361.18
TRAFFIC SIGNS & LINES, LLC 1.92% $49,730.06
PRO-LINE PAVING, LLC 1.06% $27,455.13
MB PRIME LLC 0.77% $19,943.82
SOUTH TEXAS TRAFFIC ALLIANCE INC. 0.47% $12,173.50
Total: 9.06% $234,663.69

Bid Items & Bid Tabulations

76 Total 0 of 76
ATASCOSA  |  SH 16  |  SAN ANTONIO  |  0517-01-048  |  09/06/2024  |  $2,547,613.00  |  C 517-1-48  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  177 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
E-Z BEL CONSTRUCTION, LLC
TI-ZACK CONCRETE, LLC
ROSS SA ENTERPRISE LLC
3LW CIVIL LLC
ACEE CONSTRUCTION LLC.
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
MAKO CONTRACTING, LLC
REMOV CONC (RIPRAP)
SY 9.000 $25.000 $1.000 $78.530 $26.600 $100.000 $55.000 $113.860 $52.000
REMOV CONC (MEDIANS)
SY 75.000 $20.000 $1.000 $18.850 $22.000 $50.000 $10.000 $33.320 $75.000
REMOV CONC (DRIVEWAYS)
SY 1,043.000 $25.000 $1.000 $45.000 $22.000 $30.000 $25.000 $24.200 $45.000
RMV (4"-10") TRT/UNTRT BASE & ASPH PAV
SY 1,070.000 $7.000 $15.000 $33.000 $20.000 $12.500 $5.150 $18.830 $25.000
EXCAV (SPECIAL)
CY 150.000 $30.000 $22.000 $47.120 $25.000 $45.000 $35.000 $56.010 $500.000
EMBANK (FNL)(OC)(TY B)
CY 75.000 $60.000 $18.000 $94.240 $110.000 $40.000 $42.500 $63.660 $100.000
COMPOST MANUF TOPSOIL (4")
SY 3,897.000 $7.000 $9.000 $3.000 $6.000 $6.770 $6.000 $6.080 $6.880
BLOCK SODDING
SY 3,897.000 $10.000 $10.000 $7.000 $8.000 $7.430 $12.950 $8.280 $12.000
RDSIDE AMENITY (WHEEL STOP)
EA 10.000 $500.000 $63.000 $137.500 $250.000 $137.500 $282.400 $148.240 $150.000
D-GR HMA TY-C PG64-22
TON 50.000 $200.000 $250.000 $330.000 $75.000 $572.000 $195.000 $271.770 $500.000
D-GR HMA TY-D PG70-22
TON 32.000 $200.000 $300.000 $330.000 $83.000 $726.000 $225.000 $383.660 $882.000
PLANE & TEXT ASPH CONC PAV(0" TO 2")
SY 274.000 $200.000 $6.000 $27.500 $12.000 $33.000 $7.800 $31.280 $40.000
CUT & RESTORING PAV
SY 6.000 $190.000 $135.000 $150.000 $150.000 $750.000 $140.000 $501.980 $500.000
CL A CONC (MISC)
CY 7.000 $1,750.000 $2,800.000 $1,000.000 $895.000 $675.000 $750.000 $949.620 $750.000
CL A CONC (COLLAR)
EA 1.000 $2,000.000 $100.000 $1,000.000 $2,000.000 $1,250.000 $1,100.000 $2,111.430 $1,500.000
RIPRAP (CONC)(4 IN)
CY 3.500 $725.000 $650.000 $1,000.000 $1,000.000 $655.000 $676.250 $1,743.930 $750.000
RIPRAP (CONC)(5 IN)
CY 92.000 $705.000 $500.000 $1,000.000 $750.000 $655.000 $525.000 $682.440 $550.000
RAIL (HANDRAIL)(TY B)
LF 154.000 $180.000 $117.000 $129.200 $130.000 $129.500 $180.000 $130.500 $175.000
INLET (COMPL)(ARMOR CURB SLOT)
EA 4.000 $10,000.000 $4,304.000 $1,013.330 $7,100.000 $6,845.640 $7,750.000 $10,297.280 $4,500.000
INLET (COMP)(TY SIDEWALK BRIDGE)
EA 7.000 $20,000.000 $15,000.000 $9,000.000 $10,000.000 $15,862.200 $19,750.000 $17,249.430 $10,500.000
GRATE & FRAME
EA 92.000 $1,600.000 $1,500.000 $1,500.000 $1,500.000 $2,750.000 $2,850.000 $1,146.570 $1,800.000
ADJUSTING MANHOLES
EA 2.000 $1,600.000 $1,083.000 $353.400 $10,000.000 $750.000 $2,359.000 $2,592.870 $4,000.000
ADJUSTING MANHOLES & INLETS
EA 1.000 $2,000.000 $1,083.000 $706.800 $5,000.000 $2,000.000 $1,611.400 $2,926.760 $4,000.000
REMOVE STR (BOLLARD)
EA 1.000 $225.000 $306.000 $706.800 $250.000 $500.000 $350.000 $755.560 $250.000
MOBILIZATION
LS 1.000 $170,000.000 $150,000.000 $230,000.000 $50,000.000 $205,000.000 $215,000.000 $316,016.080 $135,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $12,000.000 $1,100.000 $1,650.000 $8,250.000 $4,352.720 $5,000.000 $3,193.660 $2,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $12,200.000 $234.000 $0.100 $950.000 $12,500.000 $17,500.000 $22,209.730 $10,000.000
TMA (STATIONARY)
DAY 259.000 $250.000 $200.000 $0.100 $1,500.000 $185.000 $375.000 $192.910 $300.000
CONSTRUCTION PERIMETER FENCE
LF 4,575.000 $5.000 $1.000 $0.100 $4.000 $0.010 $5.000 $8.460 $4.680
SANDBAGS FOR EROSION CONTROL
EA 50.000 $3.750 $18.000 $0.100 $5.000 $0.010 $15.950 $31.740 $10.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 9,150.000 $9.000 $4.000 $0.100 $8.000 $0.010 $5.150 $5.340 $5.700
BIODEG EROSN CONT LOGS (REMOVE)
LF 9,150.000 $3.000 $1.000 $0.100 $1.500 $0.010 $1.200 $1.150 $2.000
CONC CURB (TY I)
LF 2,070.000 $22.000 $21.000 $65.000 $20.000 $27.460 $16.200 $23.480 $30.000
CONC CURB (MONO) (TY II)
LF 50.000 $35.000 $21.000 $65.000 $20.000 $27.460 $24.000 $72.560 $30.000
CONC CURB (TY C1)
LF 221.000 $75.000 $30.000 $260.000 $21.000 $93.870 $67.500 $66.570 $85.000
CONC CURB (TY F1)
LF 228.000 $300.000 $30.000 $300.000 $20.000 $120.850 $70.000 $119.780 $80.000
CONC CURB & GUTTER (ARMOR CURB)
LF 42.000 $475.000 $320.000 $400.000 $105.000 $300.000 $415.000 $384.350 $225.000
DRIVEWAYS (CONC)
SY 2,052.000 $115.000 $120.000 $145.000 $100.000 $156.390 $140.000 $114.820 $120.000
CONC SIDEWALKS (4")
SY 5,264.000 $75.000 $70.000 $130.000 $90.000 $85.690 $57.500 $80.660 $90.000
CONC SIDEWALKS (5")
SY 82.000 $85.000 $80.000 $140.000 $100.000 $88.560 $85.000 $160.330 $100.000
CONC SIDEWALKS (6")
SY 102.000 $100.000 $85.000 $140.000 $100.000 $92.630 $95.000 $150.820 $100.000
CURB RAMPS (TY 1)
EA 16.000 $2,200.000 $2,700.000 $1,000.000 $2,900.000 $1,746.600 $2,235.100 $2,063.700 $2,500.000
CURB RAMPS (TY 2)
EA 4.000 $2,500.000 $2,400.000 $1,000.000 $3,000.000 $1,746.600 $2,665.000 $2,217.150 $2,500.000
CURB RAMPS (TY 3)
EA 3.000 $3,600.000 $2,500.000 $1,000.000 $3,967.000 $1,746.600 $2,336.600 $2,712.650 $2,750.000
CURB RAMPS (TY 6)
EA 3.000 $2,200.000 $2,800.000 $1,000.000 $2,750.000 $1,746.600 $2,364.600 $2,889.250 $2,750.000
CURB RAMPS (TY 7)
EA 341.000 $1,000.000 $2,500.000 $1,000.000 $1,500.000 $1,746.600 $2,100.000 $1,973.900 $2,250.000
CURB RAMPS (TY 10)
EA 3.000 $3,000.000 $3,500.000 $1,000.000 $3,000.000 $1,746.600 $2,347.400 $1,745.810 $2,750.000
CURB RAMPS (TY 20)
EA 2.000 $2,750.000 $3,500.000 $1,000.000 $3,000.000 $1,910.000 $3,004.750 $2,334.340 $2,750.000
CONC MEDIAN
SY 49.000 $750.000 $80.000 $200.000 $100.000 $87.500 $110.000 $245.710 $90.000
RELOCATE EXISTING MAILBOX
EA 3.000 $300.000 $225.000 $495.000 $500.000 $291.500 $290.000 $283.310 $270.000
CONDT (PVC) (SCH 40) (2")
LF 162.000 $23.000 $24.000 $20.900 $20.000 $22.000 $23.850 $21.560 $22.800
ELEC CONDR (NO.8) BARE
LF 30.000 $3.000 $2.000 $2.750 $20.000 $3.300 $2.700 $6.330 $3.000
ELEC CONDR (NO.6) BARE
LF 20.000 $3.000 $2.000 $3.080 $20.000 $3.850 $3.000 $8.450 $3.360
GROUND BOX TY D (162922)
EA 1.000 $2,500.000 $1,159.000 $1,870.000 $500.000 $1,650.000 $2,396.550 $1,977.430 $2,040.000
GROUND BOX TY D (162922)W/APRON
EA 9.000 $1,700.000 $1,900.000 $1,760.000 $800.000 $1,760.000 $1,818.050 $1,771.940 $1,920.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 3.000 $800.000 $750.000 $825.000 $500.000 $825.000 $1,168.750 $835.740 $900.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 23.000 $660.000 $450.000 $495.000 $500.000 $495.000 $690.650 $505.580 $540.000
RELOCATE SM RD SN SUP&AM TY S80
EA 1.000 $800.000 $450.000 $495.000 $250.000 $495.000 $796.900 $505.740 $120.000
REMOVE SM RD SN (FOUNDATION ONLY)
EA 1.000 $5,000.000 $155.000 $110.000 $1,500.000 $25.000 $100.000 $217.430 $540.000
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 944.000 $12.000 $14.000 $15.400 $17.000 $15.400 $14.900 $15.510 $17.500
ELIM EXT PM & MRKS (4")
LF 24.000 $5.000 $3.000 $3.300 $20.000 $3.300 $3.200 $7.780 $3.750
ELIM EXT PM & MRKS (8")
LF 9.000 $5.000 $3.000 $3.300 $20.000 $3.300 $3.200 $15.240 $3.750
ELIM EXT PM & MRKS (24")
LF 649.000 $5.000 $3.000 $3.300 $10.000 $3.300 $3.200 $3.470 $3.750
INSTALL HWY TRF SIG (UPGRADE)
EA 1.000 $3,500.000 $1,864.390 $39,050.000 $20,000.000 $16,500.000 $41,437.500 $39,157.430 $54,600.000
PED SIG SEC (LED)(COUNTDOWN)
EA 8.000 $750.000 $766.000 $660.000 $525.000 $990.000 $711.300 $713.720 $720.000
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
LF 80.000 $2.750 $3.000 $3.030 $2.500 $2.750 $2.950 $4.370 $3.300
TRF SIG CBL (TY A)(14 AWG)(2 CONDR)
LF 80.000 $2.000 $2.000 $2.200 $2.500 $2.200 $2.150 $3.540 $2.400
PED POLE ASSEMBLY
EA 5.000 $3,000.000 $2,000.000 $2,640.000 $3,500.000 $3,300.000 $2,668.050 $2,747.430 $2,880.000
RELOCATE PED POLE ASSEMBLY
EA 3.000 $3,000.000 $1,700.000 $2,750.000 $3,850.000 $2,310.000 $2,803.850 $2,857.430 $3,000.000
PED DETECT PUSH BUTTON (APS)
EA 8.000 $1,000.000 $1,300.000 $935.000 $1,100.000 $715.000 $976.950 $988.720 $1,020.000
PED DETECTOR CONTROLLER UNIT
EA 2.000 $3,000.000 $4,200.000 $4,097.500 $4,300.000 $2,750.000 $4,253.000 $4,204.930 $4,470.000
REPLACE OF GROUND BOXES
EA 5.000 $700.000 $1,200.000 $1,567.500 $1,000.000 $1,760.000 $1,632.150 $1,610.470 $1,710.000
REMOVAL OF PEDESTRIAN PUSH BUTTONS
EA 1.000 $200.000 $452.000 $27.500 $600.000 $110.000 $26.600 $134.930 $30.000
REMOV PED SIG LED TRAF SIG LAMP UNIT
EA 1.000 $400.000 $400.000 $27.500 $500.000 $110.000 $26.600 $134.930 $30.000
REROUTE CABLES
LF 205.000 $5.000 $9.000 $4.840 $20.000 $0.550 $4.700 $5.360 $5.280
RELOCATE OF PEDESTRIAN PUSH BUTTON
EA 3.000 $205.000 $450.000 $165.000 $1,000.000 $110.000 $159.400 $272.430 $180.000
Totals: $2,547,613.000 $2,484,607.390 $2,570,492.040 $2,625,807.400 $2,700,423.870 $2,819,796.775 $2,822,576.425 $2,904,150.060