ATASCOSA FM 99 (0348-07-018)

Items: 129

County: ATASCOSA
Length: N/A
Highway: FM 99
District: SAN ANTONIO
Control Number: 0348-07-018
DBE Goal: N/A
Project: C 348-7-18
Guaranty: N/A
Time: 743 WORKING DAYS
Engineer's Estimate: $15,639,089.74
Date: 12/02/2021 (4 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (4)
E
Engineer's Estimate
$15,639,089.74
$15,357,877.23
Over/Under Est: -1.8% -$281,212.51
Over/Under Est: 10.95% $1,712,113.85
Amt Left: 12.98% $1,993,326.36
Over/Under Est: 22.06% $3,450,577.15
Amt Left: 24.3% $3,731,789.66
Delta: -10.02% -$1,738,463.30
$20,717,135.24
Over/Under Est: 32.47% $5,078,045.50
Amt Left: 34.9% $5,359,258.01
Delta: -8.53% -$1,627,468.35
Subcontractor Percentage Amount
TERRA CONSTRUCTION LLC 3.47% $532,918.34
INTERSTATE BARRICADES & MARKINGS, INC. 2.48% $380,875.36
LONE STAR EROSION CONTROL 1.90% $291,799.67
HIGHWAY BARRICADES AND SERVICES, LLC 0.87% $133,613.53
ROADWAY SPECIALTIES, INC. 0.76% $116,719.87
E-Z BEL CONSTRUCTION, LLC 0.51% $78,325.17
EGGEMEYER LAND CLEARING, LLC 0.14% $21,501.03
PROFESSIONAL TRAFFIC CONTROL LLC 0.13% $19,965.24
WEST TEXAS ROCK RESOURCES, LLC 0.09% $13,822.09
PINNACLE GRINDING AND GROOVING LLC 0.07% $10,750.51
LOZANO CONSTRUCTION COMPANY, INC. 0.00% $0.00
ALAMO CRANE SERVICE, INC. 0.00% $0.00
Total: 10.42% $1,600,290.81

Bid Items & Bid Tabulations

129 Total 0 of 129
ATASCOSA  |  FM 99  |  SAN ANTONIO  |  0348-07-018  |  12/02/2021  |  $15,639,089.74  |  C 348-7-18  |  REHAB EXIST ROADWAY  |  743 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
TEXAS MATERIALS GROUP, INC.
AUSTIN BRIDGE & ROAD SERVICES, LP
A. L. HELMCAMP, INC.
PREPARING ROW
STA 502.000 $1,000.000 $310.830 $475.000 $1,800.000 $300.000
EXCAVATION (ROADWAY)
CY 12,700.000 $9.000 $8.370 $15.000 $16.000 $12.000
SUBGRADE WIDENING (ORD COMP)
STA 502.000 $375.000 $561.050 $260.000 $200.000 $270.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 12,611.000 $11.000 $8.370 $18.000 $16.000 $13.000
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 163,682.000 $0.150 $0.160 $0.180 $0.150 $0.160
VEGETATIVE WATERING
MG 2,551.000 $20.000 $9.990 $20.000 $30.000 $30.000
FL BS (CIP)(TY A GR 1-2 OR 5) FINAL POS
CY 31,994.000 $45.000 $59.760 $68.000 $75.000 $69.000
REWORK BS MTL (TY B) (8") (ORD COMP)
SY 144,913.000 $3.000 $1.820 $1.800 $4.000 $2.100
CEMENT
TON 2,323.000 $175.000 $164.850 $166.000 $164.230 $165.000
CEMENT TREAT (MX EXST MTL & NW BS)(8")
SY 198,533.000 $2.500 $1.880 $1.600 $3.000 $3.650
PRIME COAT(MC-30 OR AE-P)
GAL 36,805.000 $3.500 $3.830 $4.000 $3.780 $6.000
CEM STABIL BKFL
CY 136.000 $110.000 $155.580 $150.000 $150.000 $130.000
CUT & RESTORING PAV
SY 1,802.000 $200.000 $71.700 $68.000 $48.740 $75.000
TRENCH EXCAVATION PROTECTION
LF 92.000 $3.500 $6.360 $25.000 $5.880 $20.000
TEMPORARY SPL SHORING
SF 1,664.000 $18.000 $19.620 $44.000 $50.000 $45.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 56.000 $300.000 $358.880 $358.000 $325.000 $350.000
CL C CONC (RAIL FOUNDATION)
CY 22.000 $390.000 $530.000 $600.000 $727.610 $2,400.000
RIPRAP (MOW STRIP)(4 IN)
CY 93.000 $440.000 $540.000 $540.000 $482.510 $680.000
RAIL (TY T223)
LF 66.000 $90.000 $200.000 $260.000 $206.370 $200.000
GABION MATTRESSES (GALV)(12 IN)
SY 95.000 $90.000 $94.500 $118.000 $123.960 $95.000
GABION (1.5' X 3')(GALV)
CY 19.000 $400.000 $498.750 $462.000 $311.910 $490.000
CMP (GAL STL 30 IN)
LF 36.000 $150.000 $134.820 $220.000 $153.790 $105.000
CMP (GAL STL 42 IN)
LF 100.000 $100.000 $165.000 $280.000 $151.170 $135.000
CONC BOX CULV (6 FT X 3 FT)
LF 48.000 $355.000 $630.000 $770.000 $750.000 $690.000
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
LF 8.000 $600.000 $1,380.000 $1,300.000 $850.000 $2,200.000
CONC BOX CULV (6 FT X 2 FT) (EXTEND)
LF 7.000 $750.000 $1,000.000 $950.000 $850.000 $2,200.000
RC PIPE (CL III)(48 IN)
LF 144.000 $200.000 $260.000 $250.000 $300.000 $200.000
RC PIPE (CL IV)(18 IN)
LF 4.000 $100.000 $90.920 $750.000 $150.000 $220.000
RC PIPE (CL IV)(24 IN)
LF 502.000 $105.000 $110.000 $130.000 $200.000 $100.000
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 2.000 $6,200.000 $9,500.000 $9,300.000 $10,000.000 $6,900.000
HEADWALL (CH - PW - 0) (DIA= 42 IN)
EA 2.000 $9,000.000 $13,500.000 $14,400.000 $18,000.000 $13,000.000
HEADWALL (CH - PW - 0) (DIA= 48 IN)
EA 2.000 $11,000.000 $13,200.000 $14,400.000 $20,000.000 $16,000.000
WINGWALL (PW - 1) (HW=4 FT)
EA 2.000 $10,000.000 $13,500.000 $9,000.000 $10,000.000 $14,000.000
WINGWALL (PW - 1) (HW=5 FT)
EA 1.000 $13,000.000 $17,500.000 $9,000.000 $15,000.000 $18,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 4.000 $2,000.000 $1,750.000 $1,900.000 $2,000.000 $900.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 24.000 $1,500.000 $2,100.000 $1,900.000 $2,500.000 $1,200.000
CLEAN EXIST CULVERTS
EA 15.000 $1,800.000 $2,400.000 $1,900.000 $1,500.000 $1,900.000
REMOV STR (SET)
EA 4.000 $450.000 $480.000 $1,000.000 $600.000 $370.000
REMOV STR (HEADWALL)
EA 16.000 $1,400.000 $1,800.000 $1,500.000 $1,500.000 $1,100.000
REMOV STR (PIPE)
EA 12.000 $800.000 $730.000 $750.000 $1,000.000 $560.000
REMOVE STR (RAIL)
LF 25.000 $38.000 $80.000 $150.000 $20.000 $45.000
MOBILIZATION
LS 1.000 $1,487,604.980 $1,127,000.000 $1,700,000.000 $1,813,518.350 $2,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 35.000 $7,000.000 $5,012.000 $2,800.000 $1,977.900 $15,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 3,096.000 $27.000 $25.200 $37.000 $24.000 $25.000
ROCK FILTER DAMS (REMOVE)
LF 3,096.000 $8.000 $8.400 $8.600 $8.000 $9.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 2,442.000 $18.000 $14.170 $21.000 $13.500 $14.000
CONSTRUCTION EXITS (REMOVE)
SY 2,442.000 $6.500 $2.100 $6.000 $2.000 $2.000
FRNT END LOADER WORK (ERSN & SEDM CONT)
HR 488.000 $63.000 $91.200 $50.000 $100.880 $70.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 44,585.000 $2.500 $1.990 $2.970 $1.900 $2.100
TEMP SEDMT CONT FENCE (REMOVE)
LF 44,585.000 $0.500 $0.680 $0.280 $0.650 $0.700
CONSTRUCTING DETOURS
SY 39,187.000 $50.000 $52.440 $55.000 $75.500 $74.000
ONE-WAY TRAF CONT (PILOT CAR)
HR 240.000 $80.000 $114.000 $120.000 $125.000 $130.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 30.000 $4,000.000 $2,600.000 $4,500.000 $1,800.000 $5,000.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 90.000 $32.000 $85.000 $120.000 $55.000 $100.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 4,660.000 $24.000 $18.000 $37.000 $50.000 $70.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 280.000 $35.000 $18.000 $37.000 $50.000 $70.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 93,470.000 $5.000 $8.500 $6.000 $4.000 $20.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 3,220.000 $9.000 $13.000 $6.000 $4.000 $20.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 4,660.000 $6.000 $12.000 $13.000 $8.000 $24.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 280.000 $8.000 $18.000 $13.000 $8.000 $24.000
DRIVEWAYS (CONC)
SY 195.000 $80.000 $90.000 $88.000 $143.400 $130.000
DRIVEWAYS (ACP)
SY 3,557.000 $50.000 $39.420 $40.000 $92.330 $35.000
TURNOUTS (ACP)
SY 152.000 $55.000 $65.700 $70.000 $100.640 $65.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 96,058.000 $0.250 $0.130 $0.150 $0.080 $0.170
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 47,755.000 $0.300 $0.150 $0.170 $0.090 $0.170
MTL W-BEAM GD FEN (TIM POST)
LF 1,020.000 $20.000 $25.670 $26.000 $28.500 $28.000
MTL W-BEAM GD FEN (STEEL POST)
LF 80.000 $32.000 $76.860 $77.000 $75.000 $68.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,700.000 $2,006.700 $2,040.000 $2,800.000 $2,200.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,280.000 $1,452.980 $1,480.000 $1,900.000 $1,400.000
REMOVE METAL BEAM GUARD FENCE
LF 275.000 $2.000 $2.460 $2.500 $3.000 $4.000
REMOVE TERMINAL ANCHOR SECTION
EA 3.000 $225.000 $289.190 $295.000 $300.000 $290.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 3.000 $250.000 $189.190 $193.000 $300.000 $290.000
RM MTL BM GD FEN TRANS (T101)
EA 1.000 $250.000 $223.700 $228.000 $300.000 $2,500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 5.000 $2,500.000 $3,334.690 $3,400.000 $3,800.000 $3,300.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 2.000 $20,000.000 $25,272.000 $26,000.000 $33,500.000 $27,000.000
MAILBOX INSTALL-D (TWG-POST) TY 1
EA 5.000 $275.000 $225.000 $240.000 $300.000 $240.000
CONDT (PVC) (SCH 80) (2")
LF 52.000 $16.000 $16.560 $16.300 $15.000 $16.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 38.000 $33.000 $27.610 $67.000 $25.000 $26.000
CONDT (PVC) (SCH 80) (3")
LF 104.000 $21.000 $27.610 $36.000 $25.000 $26.000
CONDT (PVC) (SCH 80) (3") (BORE)
LF 76.000 $33.000 $37.540 $69.000 $34.000 $36.000
ELEC CONDR (NO.6) BARE
LF 300.000 $1.700 $2.210 $2.300 $2.000 $2.200
TRAY CABLE (4 CONDR) (12 AWG)
LF 680.000 $2.350 $2.210 $2.800 $2.000 $2.200
GROUND BOX TY A (122311)W/APRON
EA 1.000 $1,100.000 $883.410 $1,300.000 $800.000 $850.000
GROUND BOX TY D (162922)W/APRON
EA 1.000 $1,000.000 $1,325.110 $1,700.000 $1,200.000 $1,300.000
ZINC-COAT STL WIRE STRAND (3/16")
LF 350.000 $4.800 $4.420 $5.600 $4.000 $4.300
ZINC-COAT STL WIRE STRAND (5/16")
LF 350.000 $4.800 $4.420 $5.600 $4.000 $4.300
ELC SRV TY D 120/240 070(NS)AL(E)TP(O)
EA 1.000 $5,000.000 $6,073.430 $7,200.000 $5,500.000 $5,800.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 122.000 $500.000 $525.000 $530.000 $547.000 $560.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 26.000 $575.000 $750.000 $760.000 $750.000 $800.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 8.000 $825.000 $850.000 $860.000 $850.000 $900.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 12.000 $800.000 $1,050.000 $1,070.000 $1,050.000 $1,100.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 3.000 $950.000 $150.000 $1,500.000 $1,500.000 $1,600.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 3.000 $975.000 $1,650.000 $1,680.000 $1,650.000 $1,700.000
REMOVE SM RD SN SUP&AM
EA 131.000 $95.000 $70.000 $70.000 $70.000 $75.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 65.000 $20.000 $20.000 $20.000 $20.000 $32.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 116.000 $90.000 $85.000 $85.000 $85.000 $90.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 188,258.000 $0.300 $0.250 $0.250 $0.380 $0.400
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 89,530.000 $0.250 $0.250 $0.250 $0.400 $0.420
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 189,125.000 $0.550 $0.650 $0.650 $0.420 $0.440
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 374.000 $8.000 $5.000 $5.000 $10.000 $10.500
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 218.000 $0.500 $0.650 $0.660 $1.000 $1.050
PAVEMENT SEALER 4"
LF 77,012.000 $0.130 $0.150 $0.150 $0.180 $0.190
PAVEMENT SEALER 6"
LF 99,995.000 $0.240 $0.200 $0.200 $0.250 $0.260
PAVEMENT SEALER 24"
LF 263.000 $2.500 $4.000 $4.000 $2.000 $2.100
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 99,995.000 $0.600 $0.450 $0.450 $0.500 $0.530
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 5,855.000 $0.750 $0.300 $0.300 $0.400 $0.420
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 71,157.000 $0.500 $0.300 $0.300 $0.380 $0.400
PREFAB PAV MRK TY B (W)(24")(SLD)
LF 263.000 $22.000 $12.000 $12.000 $28.000 $30.000
REFL PAV MRKR TY II-A-A
EA 1,197.000 $3.250 $3.000 $3.000 $4.500 $4.800
ELIM EXT PAV MRK & MRKS (4")
LF 3,701.000 $0.350 $0.250 $0.250 $0.500 $0.530
INSTALL HWY TRF SIG (FLASH BEACON)
EA 1.000 $5,500.000 $1,656.390 $4,600.000 $1,500.000 $1,600.000
VEH SIG SEC (12")LED(YEL)
EA 12.000 $300.000 $276.060 $370.000 $250.000 $260.000
VEH SIG SEC (12")LED(RED)
EA 4.000 $240.000 $276.060 $370.000 $250.000 $260.000
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
LF 1,390.000 $2.000 $2.210 $2.450 $2.000 $2.200
INS TRF SIG PL AM (S)STR(TY B)
EA 2.000 $4,800.000 $7,288.110 $6,800.000 $6,600.000 $6,900.000
INS TRF SIG PL AM (S)STR(TY B)LUM
EA 2.000 $5,500.000 $8,281.950 $7,400.000 $7,500.000 $7,900.000
FULL - WIDTH MOWING
CYC 12.000 $3,500.000 $5,000.000 $2,500.000 $3,505.910 $3,100.000
LITTER REMOVAL
CYC 35.000 $1,800.000 $2,000.000 $1,000.000 $3,219.660 $1,800.000
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
CYC 35.000 $500.000 $1,260.000 $1,400.000 $685.640 $1,200.000
D-GR HMA TY-B PG64-22
TON 4,580.000 $65.000 $70.560 $108.000 $76.020 $93.000
D-GR HMA TY-C SAC-B PG64-22
TON 26,453.000 $74.000 $74.240 $92.000 $81.150 $88.000
D-GR HMA TY-D PG64-22 (LEVEL-UP)
TON 10,395.000 $88.000 $75.860 $98.000 $89.980 $113.000
TACK COAT
GAL 19,752.000 $2.800 $3.380 $3.200 $2.900 $3.100
SP MIXES SP-C SAC-B PG70-22
TON 21,118.000 $80.000 $85.300 $93.000 $89.720 $90.000
UNDERSEAL COURSE
GAL 36,726.000 $3.500 $3.170 $3.200 $2.850 $3.100
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $10,000.000 $7,000.000 $10,000.000 $18,250.000 $15,000.000
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 784.000 $31.000 $25.000 $25.000 $8.000 $8.500
TMA (STATIONARY)
DAY 93.000 $190.000 $250.000 $175.000 $134.000 $218.000
TMA (MOBILE OPERATION)
DAY 15.000 $200.000 $300.000 $250.000 $134.000 $218.000
Totals: $15,639,089.740 $15,357,877.230 $17,351,203.590 $19,089,666.890 $20,717,135.240