ATASCOSA SH 97 (0328-04-044)

Items: 152

County: ATASCOSA
Length: N/A
Highway: SH 97
District: SAN ANTONIO
Control Number: 0328-04-044
DBE Goal: N/A
Project: C 328-4-44
Guaranty: N/A
Time: 278 WORKING DAYS
Engineer's Estimate: $4,009,478.90
Date: 06/05/2018 (8 years ago)
Contract Number: N/A
Type: GRADING, BASE, SURFACE, PAVEMENT MARKINGS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$4,009,478.90
$4,231,471.53
Over/Under Est: 5.54% $221,992.63
Over/Under Est: 15.47% $620,190.40
Amt Left: 9.41% $398,197.77
Over/Under Est: 16.07% $644,234.57
Amt Left: 9.98% $422,241.94
Delta: -0.52% -$24,044.17
Over/Under Est: 17.05% $683,724.06
Amt Left: 10.91% $461,731.43
Delta: -0.85% -$39,489.49

Bid Items & Bid Tabulations

152 Total 0 of 152
ATASCOSA  |  SH 97  |  SAN ANTONIO  |  0328-04-044  |  06/05/2018  |  $4,009,478.90  |  C 328-4-44  |  GRADING, BASE, SURF, PAVMT MRK  |  278 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
CAPITAL EXCAVATION COMPANY
DEAN WORD COMPANY, LTD.
ANGEL BROTHERS HOLDINGS CORP.
PREPARING ROW
STA 41.950 $500.000 $1,665.000 $3,000.000 $1,108.844 $600.000
REMOVING CONC (RIPRAP)
SY 107.000 $20.000 $7.800 $12.000 $17.950 $17.000
REMOVING CONC (SIDEWALKS)
SY 32.000 $20.000 $23.490 $19.000 $17.950 $17.000
REMOVING CONC (DRIVEWAYS)
SY 2,459.000 $20.000 $9.990 $17.000 $19.449 $17.000
REMOVING CONC (CURB)
LF 6,454.000 $1.500 $4.470 $5.000 $4.689 $8.000
REMOVING CONC (CURB AND GUTTER)
LF 194.000 $12.500 $6.660 $11.490 $4.775 $8.000
REMOVING CONC (WHEELCHAIR RAMP)
SY 18.000 $20.000 $16.650 $36.930 $17.950 $17.000
REMOVING CONC (FLUME)
SY 193.000 $25.000 $8.850 $13.780 $17.950 $17.000
REMOVING STAB BASE & ASPH PAV (4"-12")
SY 60.000 $25.000 $109.890 $29.110 $7.913 $14.000
REMOVING STAB BASE & ASPH PAV(15"-16")
SY 35.000 $15.000 $109.890 $55.590 $15.920 $15.000
EXCAVATION (ROADWAY)
CY 8,472.000 $7.500 $16.650 $12.000 $23.365 $21.500
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 1,624.000 $8.000 $16.650 $7.000 $10.138 $17.000
COMPOST MANUF TOPSOIL (4")
SY 20,243.000 $0.850 $0.840 $4.500 $3.006 $1.600
BLOCK SODDING
SY 20,243.000 $3.000 $4.570 $3.560 $3.677 $4.950
DRILL SEED (TEMP)(WARM OR COOL)
SY 20,243.000 $0.100 $0.100 $0.200 $0.155 $0.110
VEGETATIVE WATERING
MG 318.000 $12.000 $36.630 $34.610 $23.922 $25.000
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 20,243.000 $0.850 $1.150 $0.790 $0.968 $1.250
PROOF ROLLING
HR 50.000 $70.000 $85.500 $69.870 $58.618 $85.000
REWORK BS MTL(TY B)(6"-10")(ORD COMP)
SY 30,780.000 $4.000 $3.950 $5.000 $6.828 $2.250
CEMENT
TON 201.000 $140.000 $139.650 $160.000 $156.140 $195.000
CEMENT TREAT (EXIST MATL) (6")
SY 30,780.000 $1.500 $1.820 $3.000 $1.844 $1.950
ASPH(AC-15P,AC-20-5TR,AC-20XP,AC10-2TR)
GAL 8,292.000 $3.000 $3.430 $3.500 $3.218 $4.250
AGGR (TY-PB GR-4)
CY 346.000 $50.000 $71.500 $108.000 $79.817 $110.000
D-GR HMA (SQ) TY-D PG64_22(LEVEL-UP)
TON 1,770.000 $80.000 $75.120 $95.000 $69.842 $85.000
D-GR HMA TY-B PG64-22
TON 15,980.000 $51.000 $70.830 $75.000 $69.401 $81.000
SUPERPAVE MIXTURES SP-C SAC-A PG76-22
TON 4,760.000 $70.000 $85.440 $102.000 $75.679 $99.990
PLANE ASPH CONC PAV(0" TO 2")
SY 10,507.000 $1.500 $1.490 $1.750 $2.408 $1.800
PLANE ASPH CONC PAV (4")
SY 30,780.000 $2.350 $2.540 $4.250 $3.319 $2.200
CEM STABIL BKFL
CY 8.000 $105.000 $134.450 $156.170 $206.000 $125.000
CL C CONC (RAIL FOUNDATION)
CY 27.000 $500.000 $376.470 $493.530 $415.520 $420.000
RIPRAP (CONC)(4 IN)
CY 6.000 $450.000 $484.030 $561.290 $772.500 $425.000
RIPRAP (STONE COMMON)(DRY)(6 IN)
CY 9.000 $80.000 $193.650 $193.650 $250.760 $175.000
RIPRAP (CONC)(FLUME)
CY 56.000 $500.000 $376.470 $456.120 $489.250 $420.000
RIPRAP (MOW STRIP)(4 IN)
CY 30.000 $450.000 $376.470 $531.410 $535.350 $385.000
RAIL (TY C223)
LF 176.000 $200.000 $123.700 $129.280 $165.109 $125.000
CMP (GAL STL 24 IN)
LF 9.000 $150.000 $96.810 $139.420 $180.250 $125.000
CMP (GAL STL 36 IN)
LF 15.000 $200.000 $134.450 $193.620 $206.000 $145.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 3.000 $800.000 $645.370 $2,125.500 $1,030.000 $850.000
INLET (COMP) (TY SIDEWALK BRIDGE)
EA 20.000 $7,800.000 $5,378.110 $7,638.200 $5,665.000 $6,000.000
INLET (COMPL)(TY C)
EA 1.000 $2,200.000 $4,033.590 $7,657.230 $6,695.000 $5,800.000
INLET (COMPL)(ARMOR CURB SLOT)
EA 20.000 $5,000.000 $3,226.870 $3,836.680 $3,193.000 $2,900.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 2.000 $2,000.000 $1,613.430 $1,479.650 $1,545.000 $1,200.000
SET (TY II) (36 IN) (CMP) (6: 1) (P)
EA 2.000 $2,500.000 $2,689.060 $1,832.500 $2,575.000 $2,000.000
ADJUSTING MANHOLES (SANITARY)
EA 3.000 $3,000.000 $2,400.000 $2,148.240 $1,390.500 $1,000.000
CLEAN EXIST CULVERTS
EA 5.000 $1,500.000 $2,689.060 $2,634.530 $1,339.000 $2,000.000
REMOV STR (INLET)
EA 1.000 $800.000 $3,226.870 $1,388.740 $772.500 $750.000
MOBILIZATION
LS 1.000 $294,900.000 $344,129.420 $300,000.000 $465,348.252 $435,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 14.000 $6,000.000 $2,154.340 $1,000.000 $8,435.940 $6,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 95.000 $25.000 $25.320 $25.320 $23.690 $26.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 90.000 $40.000 $43.330 $43.330 $46.350 $44.000
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 75.000 $35.000 $30.000 $30.000 $25.750 $31.000
ROCK FILTER DAMS (REMOVE)
LF 260.000 $8.000 $6.000 $6.000 $10.300 $6.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 222.000 $20.000 $20.660 $20.660 $14.420 $21.000
CONSTRUCTION EXITS (REMOVE)
SY 222.000 $6.000 $6.000 $6.000 $2.060 $6.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,236.000 $2.000 $2.350 $2.350 $1.854 $2.400
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,236.000 $0.500 $0.250 $0.250 $0.618 $0.250
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 322.000 $4.000 $3.000 $3.000 $4.635 $3.100
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 156.000 $4.500 $3.500 $3.500 $5.150 $3.600
BIODEG EROSN CONT LOGS (REMOVE)
LF 478.000 $1.000 $2.000 $2.000 $1.030 $2.050
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 2,300.000 $40.000 $16.000 $12.000 $10.780 $20.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 560.000 $40.000 $16.000 $12.000 $12.825 $20.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 3,160.000 $7.500 $7.000 $5.000 $6.160 $5.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 560.000 $12.000 $7.000 $5.000 $7.190 $5.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 2,300.000 $6.000 $9.000 $12.000 $10.015 $9.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 560.000 $6.000 $9.000 $12.000 $10.015 $9.000
CONC CURB (TY I)
LF 4,935.000 $12.000 $13.450 $11.500 $21.115 $14.750
CONC CURB (TY IV)
LF 125.000 $18.000 $21.510 $33.000 $20.600 $23.000
INTERSECTIONS (ACP)
SY 879.000 $40.000 $28.470 $41.180 $32.517 $39.750
DRIVEWAYS (ACP)
SY 3,778.000 $30.000 $28.470 $55.000 $30.550 $34.000
DRIVEWAYS (CONC) (FAST TRACK)
SY 2,703.000 $65.000 $60.230 $70.000 $72.100 $85.000
CONC SIDEWALKS (4")
SY 3,195.000 $50.000 $44.100 $40.000 $61.800 $48.000
CURB RAMPS (TY 2)
EA 1.000 $2,200.000 $1,613.430 $1,619.190 $1,854.000 $1,600.000
CURB RAMPS (TY 7)
EA 5.000 $1,350.000 $1,613.430 $1,179.960 $1,854.000 $1,600.000
CURB RAMPS (TY 10)
EA 13.000 $1,580.000 $1,613.430 $2,500.000 $2,060.000 $1,600.000
MTL W-BEAM GD FEN (TIM POST)
LF 75.000 $25.000 $21.150 $21.150 $21.785 $21.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,000.000 $1,845.000 $1,345.000 $1,807.650 $1,350.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 300.000 $24.000 $21.850 $21.850 $22.506 $22.000
REMOVE METAL BEAM GUARD FENCE
LF 600.000 $4.000 $1.000 $1.000 $1.030 $1.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 2.000 $200.000 $150.000 $150.000 $154.500 $155.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $500.000 $200.000 $200.000 $206.000 $205.000
GDRAIL END TRT(INST)(WOOD POST)(TY I)
EA 4.000 $2,800.000 $2,496.000 $2,496.000 $2,570.880 $2,500.000
MAILBOX INSTALL-S (TWG-POST) TY 1
EA 1.000 $250.000 $175.000 $175.000 $159.650 $205.000
CONDT (PVC) (SCH 80) (3")
LF 195.000 $30.000 $20.000 $20.200 $20.600 $20.000
CONDT (PVC) (SCH 80) (3") (BORE)
LF 565.000 $20.000 $45.000 $50.510 $51.500 $45.000
ELEC CONDR (NO.6) BARE
LF 1,018.000 $2.000 $2.150 $1.210 $1.236 $2.150
GROUND BOX TY D (162922)W/APRON
EA 4.000 $1,000.000 $1,200.000 $893.940 $911.550 $1,200.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 21.000 $500.000 $430.000 $430.000 $390.370 $500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 12.000 $570.000 $450.000 $450.000 $453.200 $510.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $485.000 $510.000 $510.000 $547.960 $575.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 3.000 $580.000 $680.000 $680.000 $777.650 $850.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 1.000 $1,500.000 $695.000 $695.000 $811.640 $750.000
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
EA 6.000 $1,200.000 $715.000 $715.000 $963.050 $800.000
REMOVE SM RD SN SUP&AM
EA 43.000 $100.000 $40.000 $40.000 $74.160 $65.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 8.000 $40.000 $22.000 $22.000 $15.450 $12.500
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 13.000 $60.000 $58.000 $58.000 $48.410 $40.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 3,525.000 $0.500 $0.160 $0.160 $0.165 $0.160
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 26,810.000 $0.500 $0.160 $0.160 $0.165 $0.160
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 1,710.000 $0.500 $0.630 $0.630 $0.649 $0.630
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 40.000 $0.500 $6.000 $6.000 $6.180 $6.000
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 2,530.000 $1.000 $0.160 $0.160 $0.165 $0.160
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 35,300.000 $0.500 $0.160 $0.160 $0.165 $0.160
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 10,830.000 $3.000 $0.480 $0.480 $0.494 $0.480
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 13,020.000 $0.500 $0.450 $0.450 $0.464 $0.450
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 36.000 $4.500 $6.000 $6.000 $6.180 $6.000
WK ZN PAV MRK REMOV (Y)4"(BRK)
LF 5,400.000 $1.500 $0.480 $0.480 $0.494 $0.480
WK ZN PAV MRK REMOV (Y)4"(DOT)
LF 100.000 $1.500 $0.480 $0.480 $0.494 $0.480
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 13,020.000 $1.500 $0.450 $0.450 $0.464 $0.450
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 21,150.000 $2.000 $1.250 $0.500 $1.239 $0.500
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 9,555.000 $2.000 $1.250 $0.500 $1.239 $0.500
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 25.000 $1.000 $1.000 $1.000 $1.030 $1.000
REFL PAV MRK TY I (W)8"(LNDP)(100MIL)
LF 40.000 $1.500 $2.000 $2.000 $2.060 $2.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,710.000 $1.000 $0.670 $0.670 $0.690 $0.670
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,197.000 $8.000 $5.000 $5.000 $5.150 $5.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 13.000 $135.000 $83.000 $83.000 $85.490 $83.000
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
EA 2.000 $135.000 $155.000 $155.000 $159.650 $155.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 13.000 $165.000 $111.000 $111.000 $114.330 $111.000
PAVEMENT SEALER 4"
LF 22,475.000 $0.200 $0.100 $0.100 $0.103 $0.100
PAVEMENT SEALER 8"
LF 1,750.000 $0.350 $0.440 $0.440 $0.453 $0.440
PAVEMENT SEALER 24"
LF 1,197.000 $3.000 $2.440 $2.440 $2.513 $2.440
PAVEMENT SEALER (ARROW)
EA 13.000 $30.000 $63.000 $63.000 $64.890 $63.000
PAVEMENT SEALER (WORD)
EA 13.000 $60.000 $63.000 $63.000 $64.890 $63.000
PAVEMENT SEALER (DBL ARROW)
EA 2.000 $100.000 $111.000 $111.000 $114.330 $111.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 3,525.000 $1.000 $0.550 $0.550 $0.567 $0.550
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 2,410.000 $1.000 $0.550 $0.550 $0.567 $0.550
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 2,530.000 $1.000 $0.550 $0.550 $0.567 $0.550
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 13,985.000 $1.000 $0.380 $0.380 $0.391 $0.380
REFL PAV MRKR TY I-C
EA 266.000 $5.000 $4.000 $4.000 $4.120 $4.000
REFL PAV MRKR TY II-A-A
EA 412.000 $4.500 $4.000 $4.000 $4.120 $4.000
ELIM EXT PAV MRK & MRKS (4")
LF 10,890.000 $0.500 $0.650 $0.900 $0.721 $1.250
ELIM EXT PAV MRK & MRKS (24")
LF 36.000 $4.000 $6.000 $40.000 $8.240 $5.000
ELIM EXT PAV MRK & MRKS (ARROW)
EA 4.000 $45.000 $60.000 $250.000 $66.950 $75.000
PAV SURF PREP FOR MRK (4")
LF 3,790.000 $0.500 $0.200 $0.200 $0.206 $0.200
PED SIG SEC (LED)(COUNTDOWN)
EA 8.000 $600.000 $700.000 $505.050 $515.000 $700.000
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
LF 1,241.000 $2.000 $3.000 $1.820 $1.854 $3.000
TRF SIG CBL (TY C)(14 AWG)(2 CONDR)
LF 1,194.000 $2.000 $2.000 $1.310 $1.339 $2.000
PED POLE ASSEMBLY
EA 1.000 $1,640.000 $2,700.000 $2,020.200 $2,060.000 $2,700.000
PED DETECT PUSH BUTTON (APS)
EA 8.000 $1,500.000 $790.000 $904.040 $921.850 $790.000
PED DETECTOR CONTROLLER UNIT
EA 1.000 $3,500.000 $3,500.000 $3,535.350 $3,605.000 $3,500.000
REMOVAL OF CABLES
LF 792.000 $1.000 $1.000 $1.010 $1.030 $1.000
REMOVAL OF SIGNAL HEAD ASSM
EA 6.000 $100.000 $100.000 $101.010 $103.000 $100.000
REMOVAL OF SIGNAL RELATED SIGNS
EA 10.000 $28.000 $50.000 $50.510 $51.500 $50.000
INSTALL OF SIGNAL RELATED SIGNS
EA 12.000 $250.000 $400.000 $303.030 $309.000 $400.000
REMOVAL OF PEDESTRIAN PUSH BUTTONS
EA 6.000 $70.000 $50.000 $65.660 $66.950 $50.000
REMOVE VID IMAGE VEH DET SYS (VIVDS)
EA 2.000 $510.000 $300.000 $186.870 $190.550 $300.000
SPOT MOWING
AC 4.000 $150.000 $500.000 $1,030.510 $1,030.000 $170.000
LITTER REMOVAL
CYC 2.000 $2,200.000 $3,178.710 $3,442.660 $1,545.000 $1,400.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $15,000.000 $7,036.250 $8,303.800 $13,755.000 $5,500.000
RADAR PRESENCE DETECTOR
EA 8.000 $6,800.000 $8,500.000 $6,186.870 $6,308.750 $8,500.000
RADAR PRESENCE DETECTOR COMM CABLE
LF 1,634.000 $3.500 $4.000 $2.780 $2.833 $4.000
CONDUIT (PREPARE)
LF 1,600.000 $3.000 $2.000 $5.050 $5.150 $2.000
GROUND BOX (PREPARE)
EA 7.000 $390.000 $150.000 $404.040 $412.000 $150.000
TMA (STATIONARY)
DAY 568.000 $250.000 $178.610 $26.620 $95.940 $75.000
Totals: $4,009,478.900 $4,231,471.530 $4,629,669.300 $4,653,713.600 $4,693,202.960