County: ANGELINA Highway: US0059 Date: 08/16/2023 (1 year ago) Engineer's Estimate: $198,733 Control Number: 6442-72-001
Project: RMC - 644272001 District: LUFKIN Time: 365 CALENDAR DAYS Type: METAL BEAM GUARD FENCE REPAIR - ANGELINA
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12
Plans

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $198,733.00
AUSTIN BARRICADE COMPANY, L.L.C.   $154,770.00 1
-22.12% | -$43,963.00
CATOCON, INC.   $289,370.00 2
45.61% | $90,637.00
86.97% | $134,600.00
SJ&J CONSTRUCTION, LLC   $322,320.00 3
62.19% | $123,587.00
108.26% | $167,550.00
11.39% | $32,950.00

Bid Items

Items: 25, 0 filtered
ANGELINA US0059  |  LUFKIN  |  6442-72-001  |  08/16/2023  |  $198,733  |  RMC - 644272001  |  METAL BEAM GUARD FENCE REPAIR - ANGELINA  |  365 CALENDAR DAYS
Item code Description Unit Quantity Engineer's Estimate AUSTIN BARRICADE COMPANY, L.L.C. CATOCON, INC. SJ&J CONSTRUCTION, LLC
429 6007 CONC STR REPAIR (VERTICAL & OVERHEAD) SF 20.000 $200.000 $50.000 $1.000 $175.000
429 6009 CONC STR REPAIR (STANDARD) SF 50.000 $302.000 $50.000 $40.000 $175.000
500 6033 MOBILIZATION (CALLOUT) EA 12.000 $250.000 $1.000 $1,000.000 $3,500.000
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 500.000 $28.000 $30.000 $44.000 $34.000
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 4.000 $2,300.000 $500.000 $1,800.000 $2,000.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 450.000 $2.900 $10.000 $5.000 $4.000
542 6004 RM MTL BM GD FENCE TRANS (THRIE-BEAM) EA 4.000 $255.000 $1.000 $50.000 $500.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 4.000 $3,250.000 $2,500.000 $5,000.000 $4,500.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 18.000 $18.500 $50.000 $25.000 $40.000
770 6001 REPAIR RAIL ELEMENT (W - BEAM) LF 50.000 $22.000 $100.000 $100.000 $25.000
770 6010 REM / REPL TIMBER/STL POST W/O CONC FND EA 50.000 $50.000 $150.000 $100.000 $70.000
770 6011 REM / REPL TIMBER / STL POST W/CONC FND EA 20.000 $75.000 $150.000 $200.000 $100.000
770 6019 REMOVE & REPLACE BLOCKOUT EA 10.000 $25.000 $500.000 $100.000 $30.000
770 6021 REPLACE SINGLE GDRAIL TERMINAL RAIL LF 25.000 $35.000 $400.000 $100.000 $48.000
770 6022 REPLACE SINGLE GDRAIL TERMINAL POST EA 2.000 $75.000 $350.000 $250.000 $75.000
770 6027 REMOVE GDRAIL END TRT / REPL WITH SGT EA 7.000 $5,000.000 $4,750.000 $6,000.000 $4,500.000
770 6028 REPL SINGLE GDRAIL TERM IMPACT HEAD EA 20.000 $110.000 $1.000 $900.000 $1,900.000
770 6029 REM & RESET SGT IMPACT HEAD EA 1.000 $200.000 $1,000.000 $250.000 $500.000
770 6060 REMOVE AND REPLACE DAT EA 5.000 $1,400.000 $1,000.000 $1,300.000 $2,000.000
774 6001 REMOVE AND REPLACE (TRACC) EA 1.000 $20,000.000 $3,500.000 $17,000.000 $28,000.000
774 6028 REPAIR (QUAD) (N) (BAY) EA 15.000 $1,500.000 $100.000 $1,000.000 $2,000.000
774 6059 REPAIR (TRACC) (BAY) EA 26.000 $600.000 $50.000 $3,000.000 $1,700.000
776 6020 REPAIR (TY T101RC) LF 50.000 $50.000 $40.000 $100.000 $300.000
778 6001 CONCRETE RAIL REPAIR (IN-KIND) LF 50.000 $500.000 $100.000 $50.000 $250.000
6185 6002 TMA (STATIONARY) DAY 7.000 $200.000 $5,012.000 $3,000.000 $350.000
Totals: $198,733.00 $154,770.00 $289,370.00 $322,320.00