Show Job Controls
Bid Cobra

ANGELINA US0059 (6411-51-001)

Items: 33

County: ANGELINA
Length: N/A
Highway: US0059
District: LUFKIN
Control Number: 6411-51-001
DBE Goal: N/A
Project: RMC - 641151001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $319,280.00
Date: 08/03/2022 (3 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (3)
E
Engineer's Estimate
$319,280.00
$341,053.00
Over/Under Est: 6.82% $21,773.00
Over/Under Est: 13.14% $41,959.00
Amt Left: 5.92% $20,186.00
Over/Under Est: 21.4% $68,325.00
Amt Left: 13.65% $46,552.00
Delta: -7.30% -$26,366.00

Bid Items & Bid Tabulations

33 Total 0 of 33
ANGELINA  |  US0059  |  LUFKIN  |  6411-51-001  |  08/03/2022  |  $319,280.00  |  RMC - 641151001  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ACE CONTRACTORS, INC.
BK FIELD OPERATIONS LLC
CROSS PLUS CONSTRUCTION, LLC
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 50.000 $165.000 $1.000 $500.000 $220.000
CONC STR REPAIR (STANDARD)
SF 25.000 $400.000 $500.000 $600.000 $550.000
MOBILIZATION (CALLOUT)
EA 10.000 $1,500.000 $1,500.000 $1.000 $2,200.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,800.000 $40.000 $40.000 $36.000 $50.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $2,350.000 $2,000.000 $1,500.000 $4,400.000
MTL BEAM GD FEN TRANS (T101)
EA 2.000 $550.000 $1,500.000 $2,000.000 $4,400.000
REMOVE METAL BEAM GUARD FENCE
LF 1,800.000 $4.000 $4.000 $2.000 $6.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 1.000 $400.000 $200.000 $2,000.000 $110.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $4,900.000 $4,500.000 $3,500.000 $4,400.000
GUARDRAIL END TREATMENT (REMOVE)
EA 1.000 $550.000 $1,000.000 $2,000.000 $110.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 4.000 $55.000 $50.000 $20.000 $110.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 200.000 $19.000 $35.000 $30.000 $50.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 50.000 $95.000 $55.000 $80.000 $110.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 85.000 $100.000 $75.000 $100.000 $110.000
REPAIR STEEL POST WITH BASE PLATE
EA 5.000 $130.000 $150.000 $80.000 $220.000
REMOVE & REPLACE BLOCKOUT
EA 100.000 $25.000 $30.000 $40.000 $28.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 100.000 $32.000 $60.000 $38.000 $28.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 5.000 $90.000 $100.000 $80.000 $110.000
REPLACE TERMINAL ANCHOR POSTS
EA 2.000 $130.000 $1.000 $100.000 $2,200.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 15.000 $3,700.000 $5,500.000 $5,500.000 $3,300.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 2.000 $1,000.000 $1,250.000 $1,200.000 $2,200.000
REM & RESET SGT IMPACT HEAD
EA 2.000 $150.000 $200.000 $50.000 $1,650.000
REMOVE AND REPLACE DAT
EA 2.000 $2,000.000 $1,500.000 $1,600.000 $2,200.000
REMOVE AND REPLACE (TRACC)
EA 1.000 $20,000.000 $5,000.000 $28,000.000 $11,000.000
REMOVE AND REPLACE (WIDE TRACC)
EA 1.000 $15,500.000 $1.000 $25,000.000 $22,000.000
REPAIR (REACT)
EA 1.000 $4,600.000 $4,000.000 $6,000.000 $3,300.000
REMOVE AND REPLACE (NARROW QUAD)
EA 1.000 $17,000.000 $5,000.000 $23,000.000 $22,000.000
REPAIR REACT (N) (CYLINDERS)
EA 1.000 $5,800.000 $5,000.000 $3,500.000 $3,300.000
REPAIR (QUAD) (N) (BAY)
EA 5.000 $500.000 $3,000.000 $1,100.000 $1,925.000
REPAIR (TRACC) (BAY)
EA 10.000 $1,000.000 $2,500.000 $600.000 $220.000
REPAIR (TY T101RC)
LF 85.000 $50.000 $75.000 $85.000 $110.000
CONCRETE RAIL REPAIR (IN-KIND)
LF 25.000 $500.000 $750.000 $600.000 $440.000
TMA (STATIONARY)
DAY 24.000 $500.000 $750.000 $1.000 $880.000
Totals: $319,280.000 $341,053.000 $361,239.000 $387,605.000