Show Job Controls
Bid Cobra

ANGELINA FM 2680 (2750-01-005)

Items: 72

County: ANGELINA
Length: N/A
Highway: FM 2680
District: LUFKIN
Control Number: 2750-01-005
DBE Goal: N/A
Project: STP 2023(393)HES
Guaranty: N/A
Time: 114 WORKING DAYS
Engineer's Estimate: $1,932,663.00
Date: 03/08/2023 (3 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (2)
E
Engineer's Estimate
$1,932,663.00
Over/Under Est: 37.64% $727,364.39
Over/Under Est: 159.43% $3,081,211.57
Amt Left: 88.49% $2,353,847.18
Subcontractor Percentage Amount
A R BROTHERS CONSTRUCTION SERVICES, INC. 20.90% $556,574.78
AMERICAN REMEDIATION OPTIONS, INC. 2.31% $61,516.16
STRIPING TECHNOLOGY, L.P. 1.90% $50,597.71
TEX OP CONSTRUCTION, LP 0.89% $23,701.03
NEXT CONSTRUCTION SOLUTIONS LLC 0.55% $14,646.70
PANOLA SIGN & BARRICADE, INC. 0.47% $12,516.27
Total: 27.02% $719,552.65

Bid Items & Bid Tabulations

72 Total 0 of 72
ANGELINA  |  FM 2680  |  LUFKIN  |  2750-01-005  |  03/08/2023  |  $1,932,663.00  |  STP 2023(393)HES  |  HAZARD ELIM & SAFETY  |  114 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DREWERY CONSTRUCTION COMPANY, INCORPORATED
PINTO CONSTRUCTION CO., INC.
SUBGRADE WIDENING (ORD COMP)
STA 59.000 $500.000 $925.000 $2,500.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
CY 190.000 $30.000 $28.000 $80.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 806.000 $70.000 $26.000 $80.000
BLADING
STA 59.000 $225.000 $325.000 $757.250
SPEC EXCAV WORK (HYD EXCAVATOR)
HR 36.000 $95.000 $105.000 $225.000
BLOCK SODDING
SY 1,614.000 $5.500 $9.000 $14.880
BROADCAST SEED (TEMP) (WARM)
SY 5,343.000 $0.150 $0.160 $0.490
BROADCAST SEED (TEMP) (COOL)
SY 5,342.000 $0.150 $0.160 $0.490
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 10,684.000 $0.700 $1.000 $1.630
VEGETATIVE WATERING
MG 459.900 $20.000 $0.010 $0.010
CEM TRT(PLNT MX)(CL N)(TY D)(GR 4)(10")
SY 5,125.000 $75.000 $91.000 $148.950
FOG SEAL (SS-1 OR CSS-1)
GAL 257.000 $8.000 $17.000 $120.000
ASPH (RC-250)
TON 6.000 $2,000.000 $1,375.000 $3,225.000
AGGR (TY E OR L, PE OR PL GR 4)
CY 49.000 $200.000 $300.000 $342.000
AGGR (TY E OR L GR 5)
CY 37.000 $200.000 $500.000 $300.000
ASPH (AC-15P OR CRS-2P)
TON 43.000 $1,500.000 $1,000.000 $2,575.000
AGGR (TY E OR L, PE OR PL GR 4) (SAC-A)
CY 124.000 $250.000 $325.000 $342.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 500.000 $120.000 $210.000 $305.000
CEM STABIL BKFL
CY 291.000 $165.000 $282.000 $672.500
CUT & RESTORING PAV
SY 96.000 $175.000 $235.000 $475.000
CUT & RESTORE ASPH PAVING
SY 61.000 $100.000 $150.000 $360.000
CUT AND RESTORE PAV (FLEX BASE)
SY 202.000 $55.000 $103.000 $245.000
FLOWABLE BACKFILL
CY 34.000 $270.000 $360.000 $852.500
TRENCH EXCAVATION PROTECTION
LF 60.000 $5.000 $52.000 $125.000
CL C CONC (COLLAR)
EA 2.000 $1,000.000 $1,050.000 $2,500.000
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 10.000 $350.000 $245.000 $582.500
RC PIPE (CL III)(18 IN)
LF 1,270.000 $50.000 $78.000 $167.500
RC PIPE (CL III)(30 IN)
LF 50.000 $120.000 $176.000 $385.000
RC PIPE (CL III)(48 IN)
LF 124.000 $275.000 $405.000 $937.500
HEADWALL (CH - PW - S) (DIA= 54 IN)
EA 2.000 $15,000.000 $28,000.000 $44,500.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 4.000 $675.000 $850.000 $1,877.500
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 106.000 $700.000 $925.000 $2,095.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 4.000 $2,000.000 $2,600.000 $5,522.500
REMOV STR (WINGWALL)
EA 2.000 $1,300.000 $4,000.000 $8,407.500
REMOV STR (PIPE)
EA 51.000 $250.000 $370.000 $875.000
MOBILIZATION
LS 1.000 $175,000.000 $323,000.000 $485,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 14.000 $4,500.000 $8,500.000 $10,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 140.000 $40.000 $37.500 $50.000
ROCK FILTER DAMS (REMOVE)
LF 140.000 $10.000 $12.000 $15.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 112.000 $20.000 $27.500 $50.000
CONSTRUCTION EXITS (REMOVE)
SY 112.000 $8.000 $12.600 $15.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 502.000 $3.100 $3.800 $7.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 502.000 $0.750 $1.100 $2.500
DRIVEWAYS (CONC)
SY 35.000 $125.000 $160.000 $297.500
DRIVEWAYS (ACP)
SY 4,589.000 $45.000 $64.000 $125.750
TURNOUTS (SURF TREAT)
SY 448.000 $50.000 $95.000 $102.500
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 7.000 $500.000 $625.000 $1,572.500
MAILBOX INSTALL-S (WC-POST) TY 3
EA 12.000 $275.000 $330.000 $567.500
MAILBOX INSTALL-D (WC-POST) TY 3
EA 4.000 $260.000 $325.000 $705.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 1.000 $650.000 $775.000 $1,997.500
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
EA 1.000 $1,200.000 $1,500.000 $3,155.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 19.000 $400.000 $455.000 $1,127.500
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 19.000 $460.000 $475.000 $1,185.000
REMOVE SM RD SN SUP&AM
EA 40.000 $100.000 $155.000 $235.000
INSTL OM ASSM (OM-2Z)(WFLX)SRF(BI)
EA 8.000 $162.000 $95.000 $337.500
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 11,531.000 $0.300 $1.600 $3.750
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 2,307.000 $1.250 $1.500 $2.500
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 582.000 $1.550 $2.500 $5.000
PAVEMENT SEALER 6"
LF 1,432.000 $0.200 $1.050 $2.500
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 716.000 $0.600 $2.100 $5.000
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 716.000 $0.500 $2.100 $5.000
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
LF 11,531.000 $0.950 $1.050 $2.500
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
LF 11,531.000 $0.950 $1.050 $2.500
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 134.000 $15.000 $15.750 $37.500
REFL PAV MRKR TY II-A-A
EA 187.000 $4.000 $4.200 $10.000
ELIM EXT PAV MRK & MRKS (4")
LF 1,432.000 $0.350 $2.100 $5.000
ELIM EXT PAV MRK & MRKS (24")
LF 134.000 $3.500 $3.150 $7.500
SP MIXES SP-D PG70-22
TON 1,781.000 $160.000 $182.500 $375.890
BONDING COURSE
GAL 833.000 $6.500 $5.500 $22.500
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $25,000.000 $40,000.000
TMA (STATIONARY)
DAY 164.000 $200.000 $300.000 $1,000.000
TMA (MOBILE OPERATION)
DAY 8.000 $425.000 $1.000 $75.000
Totals: $1,932,663.000 $2,660,027.399 $5,013,874.579