SUBGRADE WIDENING (ORD COMP)
|
STA
|
59.000
|
$500.000
|
$925.000
|
$2,500.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
|
CY
|
190.000
|
$30.000
|
$28.000
|
$80.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
|
CY
|
806.000
|
$70.000
|
$26.000
|
$80.000
|
|
|
BLADING
|
STA
|
59.000
|
$225.000
|
$325.000
|
$757.250
|
|
|
SPEC EXCAV WORK (HYD EXCAVATOR)
|
HR
|
36.000
|
$95.000
|
$105.000
|
$225.000
|
|
|
BLOCK SODDING
|
SY
|
1,614.000
|
$5.500
|
$9.000
|
$14.880
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
5,343.000
|
$0.150
|
$0.160
|
$0.490
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
5,342.000
|
$0.150
|
$0.160
|
$0.490
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
10,684.000
|
$0.700
|
$1.000
|
$1.630
|
|
|
VEGETATIVE WATERING
|
MG
|
459.900
|
$20.000
|
$0.010
|
$0.010
|
|
|
CEM TRT(PLNT MX)(CL N)(TY D)(GR 4)(10")
|
SY
|
5,125.000
|
$75.000
|
$91.000
|
$148.950
|
|
|
FOG SEAL (SS-1 OR CSS-1)
|
GAL
|
257.000
|
$8.000
|
$17.000
|
$120.000
|
|
|
ASPH (RC-250)
|
TON
|
6.000
|
$2,000.000
|
$1,375.000
|
$3,225.000
|
|
|
AGGR (TY E OR L, PE OR PL GR 4)
|
CY
|
49.000
|
$200.000
|
$300.000
|
$342.000
|
|
|
AGGR (TY E OR L GR 5)
|
CY
|
37.000
|
$200.000
|
$500.000
|
$300.000
|
|
|
ASPH (AC-15P OR CRS-2P)
|
TON
|
43.000
|
$1,500.000
|
$1,000.000
|
$2,575.000
|
|
|
AGGR (TY E OR L, PE OR PL GR 4) (SAC-A)
|
CY
|
124.000
|
$250.000
|
$325.000
|
$342.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
|
SY
|
500.000
|
$120.000
|
$210.000
|
$305.000
|
|
|
CEM STABIL BKFL
|
CY
|
291.000
|
$165.000
|
$282.000
|
$672.500
|
|
|
CUT & RESTORING PAV
|
SY
|
96.000
|
$175.000
|
$235.000
|
$475.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
61.000
|
$100.000
|
$150.000
|
$360.000
|
|
|
CUT AND RESTORE PAV (FLEX BASE)
|
SY
|
202.000
|
$55.000
|
$103.000
|
$245.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
34.000
|
$270.000
|
$360.000
|
$852.500
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
60.000
|
$5.000
|
$52.000
|
$125.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
2.000
|
$1,000.000
|
$1,050.000
|
$2,500.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
10.000
|
$350.000
|
$245.000
|
$582.500
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,270.000
|
$50.000
|
$78.000
|
$167.500
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
50.000
|
$120.000
|
$176.000
|
$385.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
124.000
|
$275.000
|
$405.000
|
$937.500
|
|
|
HEADWALL (CH - PW - S) (DIA= 54 IN)
|
EA
|
2.000
|
$15,000.000
|
$28,000.000
|
$44,500.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$675.000
|
$850.000
|
$1,877.500
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
106.000
|
$700.000
|
$925.000
|
$2,095.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$2,000.000
|
$2,600.000
|
$5,522.500
|
|
|
REMOV STR (WINGWALL)
|
EA
|
2.000
|
$1,300.000
|
$4,000.000
|
$8,407.500
|
|
|
REMOV STR (PIPE)
|
EA
|
51.000
|
$250.000
|
$370.000
|
$875.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$175,000.000
|
$323,000.000
|
$485,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
14.000
|
$4,500.000
|
$8,500.000
|
$10,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
140.000
|
$40.000
|
$37.500
|
$50.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
140.000
|
$10.000
|
$12.000
|
$15.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
112.000
|
$20.000
|
$27.500
|
$50.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
112.000
|
$8.000
|
$12.600
|
$15.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
502.000
|
$3.100
|
$3.800
|
$7.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
502.000
|
$0.750
|
$1.100
|
$2.500
|
|
|
DRIVEWAYS (CONC)
|
SY
|
35.000
|
$125.000
|
$160.000
|
$297.500
|
|
|
DRIVEWAYS (ACP)
|
SY
|
4,589.000
|
$45.000
|
$64.000
|
$125.750
|
|
|
TURNOUTS (SURF TREAT)
|
SY
|
448.000
|
$50.000
|
$95.000
|
$102.500
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
7.000
|
$500.000
|
$625.000
|
$1,572.500
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
12.000
|
$275.000
|
$330.000
|
$567.500
|
|
|
MAILBOX INSTALL-D (WC-POST) TY 3
|
EA
|
4.000
|
$260.000
|
$325.000
|
$705.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
1.000
|
$650.000
|
$775.000
|
$1,997.500
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
|
EA
|
1.000
|
$1,200.000
|
$1,500.000
|
$3,155.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
19.000
|
$400.000
|
$455.000
|
$1,127.500
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
19.000
|
$460.000
|
$475.000
|
$1,185.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
40.000
|
$100.000
|
$155.000
|
$235.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)SRF(BI)
|
EA
|
8.000
|
$162.000
|
$95.000
|
$337.500
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
11,531.000
|
$0.300
|
$1.600
|
$3.750
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
2,307.000
|
$1.250
|
$1.500
|
$2.500
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
582.000
|
$1.550
|
$2.500
|
$5.000
|
|
|
PAVEMENT SEALER 6"
|
LF
|
1,432.000
|
$0.200
|
$1.050
|
$2.500
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
|
LF
|
716.000
|
$0.600
|
$2.100
|
$5.000
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
|
LF
|
716.000
|
$0.500
|
$2.100
|
$5.000
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
|
LF
|
11,531.000
|
$0.950
|
$1.050
|
$2.500
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
|
LF
|
11,531.000
|
$0.950
|
$1.050
|
$2.500
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
134.000
|
$15.000
|
$15.750
|
$37.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
187.000
|
$4.000
|
$4.200
|
$10.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
1,432.000
|
$0.350
|
$2.100
|
$5.000
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
134.000
|
$3.500
|
$3.150
|
$7.500
|
|
|
SP MIXES SP-D PG70-22
|
TON
|
1,781.000
|
$160.000
|
$182.500
|
$375.890
|
|
|
BONDING COURSE
|
GAL
|
833.000
|
$6.500
|
$5.500
|
$22.500
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$25,000.000
|
$40,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
164.000
|
$200.000
|
$300.000
|
$1,000.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
8.000
|
$425.000
|
$1.000
|
$75.000
|
|
Totals: |
$1,932,663.000
|
$2,660,027.399
|
$5,013,874.579
|