PREPARING ROW
|
STA
|
39.500
|
$3,000.000
|
$1,800.000
|
$19,500.000
|
$14,000.000
|
$7,600.000
|
$65,000.000
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
94.000
|
$20.000
|
$14.350
|
$47.250
|
$13.000
|
$30.000
|
$20.100
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
2,135.000
|
$15.000
|
$16.650
|
$6.250
|
$17.000
|
$20.000
|
$6.790
|
|
|
REMOVING CONC (CURB)
|
LF
|
2,600.000
|
$5.000
|
$6.100
|
$2.000
|
$5.000
|
$12.000
|
$4.210
|
|
|
REMOVING CONC (CTB)
|
LF
|
2,503.000
|
$15.000
|
$24.300
|
$20.000
|
$17.000
|
$25.000
|
$13.140
|
|
|
REMOVING CONC (MISC)
|
SY
|
50.000
|
$20.000
|
$58.850
|
$90.000
|
$24.000
|
$100.000
|
$40.070
|
|
|
REM STAB BASE & ASPH (6"-12")
|
SY
|
8,180.000
|
$7.000
|
$3.500
|
$4.500
|
$9.000
|
$7.000
|
$4.280
|
|
|
REMOVING STAB BASE & ASPH PAV(12"-27")
|
SY
|
7,527.000
|
$15.000
|
$5.750
|
$7.500
|
$17.000
|
$12.000
|
$7.840
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
54,005.000
|
$7.000
|
$9.150
|
$5.750
|
$11.000
|
$16.000
|
$8.140
|
|
|
SUBGRADE WIDENING (DENS CONT)
|
STA
|
71.500
|
$650.000
|
$945.000
|
$1,025.000
|
$400.000
|
$350.000
|
$3,338.150
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY A)
|
CY
|
23,444.000
|
$6.000
|
$12.000
|
$17.250
|
$20.000
|
$21.000
|
$8.750
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
57,096.000
|
$8.000
|
$12.000
|
$27.500
|
$22.500
|
$21.000
|
$84.020
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
69,157.000
|
$1.500
|
$2.200
|
$2.250
|
$1.850
|
$1.500
|
$1.970
|
|
|
BLOCK SODDING
|
SY
|
69,717.000
|
$3.000
|
$4.620
|
$3.250
|
$3.700
|
$3.500
|
$3.250
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
34,579.000
|
$0.150
|
$0.130
|
$0.210
|
$0.100
|
$0.120
|
$0.090
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
34,579.000
|
$0.150
|
$0.130
|
$0.210
|
$0.100
|
$0.120
|
$0.090
|
|
|
VEGETATIVE WATERING
|
MG
|
1,396.000
|
$20.000
|
$24.200
|
$17.000
|
$7.000
|
$18.000
|
$18.320
|
|
|
LIME (QUICKLIME (SLURRY))
|
TON
|
1,013.000
|
$165.000
|
$297.000
|
$168.000
|
$159.000
|
$170.000
|
$161.000
|
|
|
LIME TRT (EXST MATL) (12")
|
SY
|
39,170.000
|
$2.500
|
$2.100
|
$5.000
|
$8.250
|
$4.500
|
$1.910
|
|
|
CEMENT
|
TON
|
275.000
|
$150.000
|
$186.000
|
$150.000
|
$167.000
|
$155.000
|
$133.000
|
|
|
CEMENT TREAT (SUBGRADE)(12")
|
SY
|
17,722.000
|
$2.750
|
$1.800
|
$3.750
|
$6.150
|
$4.000
|
$2.190
|
|
|
PRIME COAT (MC-30)
|
GAL
|
11,378.000
|
$4.250
|
$4.700
|
$4.250
|
$5.000
|
$5.000
|
$4.000
|
|
|
D-GR HMA(SQ) TY-B PG64-22
|
TON
|
8,619.000
|
$95.000
|
$105.000
|
$104.000
|
$95.000
|
$90.980
|
$93.980
|
|
|
D-GR HMA(SQ) TY-D PG64-22 NON-MOW STRIP
|
SY
|
1,239.000
|
$45.000
|
$48.000
|
$48.000
|
$46.000
|
$41.380
|
$44.380
|
|
|
PFC (ASPHALT) PG76-22
|
TON
|
281.000
|
$30.000
|
$0.010
|
$160.000
|
$155.000
|
$0.010
|
$0.010
|
|
|
PFC-C (AGGREGATE)(PG76 MIX) SAC-A
|
TON
|
3,741.000
|
$130.000
|
$195.000
|
$160.000
|
$155.000
|
$170.000
|
$170.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
|
SY
|
1,000.000
|
$95.000
|
$90.000
|
$95.000
|
$90.000
|
$90.000
|
$58.890
|
|
|
PLANE ASPH CONC PAV(2" TO 4")
|
SY
|
27,373.000
|
$1.100
|
$2.500
|
$2.750
|
$4.000
|
$3.000
|
$1.700
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
1,000.000
|
$2.000
|
$5.000
|
$8.250
|
$13.000
|
$10.000
|
$3.600
|
|
|
CONC PVMT (CONT REINF - CRCP) (10.5")
|
SY
|
35,586.000
|
$55.000
|
$63.000
|
$65.500
|
$70.000
|
$73.000
|
$70.870
|
|
|
CEM STABIL BKFL
|
CY
|
3,747.000
|
$50.000
|
$86.000
|
$90.000
|
$115.000
|
$85.000
|
$142.790
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
4,686.000
|
$2.500
|
$11.500
|
$5.000
|
$5.000
|
$13.000
|
$2.130
|
|
|
TEMPORARY SPL SHORING
|
SF
|
12,724.000
|
$20.000
|
$15.400
|
$31.000
|
$32.000
|
$30.000
|
$14.050
|
|
|
TEMPORARY SPL SHORING (RAILROAD CANT)
|
SF
|
788.000
|
$200.000
|
$127.350
|
$245.000
|
$125.000
|
$72.000
|
$40.660
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
51.000
|
$75.000
|
$163.050
|
$220.000
|
$80.000
|
$120.000
|
$91.880
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
775.000
|
$175.000
|
$265.720
|
$275.000
|
$275.000
|
$230.000
|
$197.690
|
|
|
DRILL SHAFT (NON - REINFORCED) (12 IN)
|
LF
|
7.000
|
$100.000
|
$101.380
|
$164.000
|
$110.000
|
$83.000
|
$130.000
|
|
|
DRILL SHAFT (SIGN MTS) (42 IN)
|
LF
|
84.000
|
$425.000
|
$415.800
|
$439.000
|
$450.000
|
$340.000
|
$315.000
|
|
|
DRILL SHAFT (SIGN MTS) (48 IN)
|
LF
|
25.000
|
$575.000
|
$422.400
|
$414.000
|
$500.000
|
$345.000
|
$320.000
|
|
|
DRILL SHAFT (HIGH MAST POLE) (60 IN)
|
LF
|
25.000
|
$600.000
|
$1,164.240
|
$555.000
|
$600.000
|
$1,000.000
|
$882.000
|
|
|
CL A CONC (MISC)
|
CY
|
18.000
|
$600.000
|
$875.000
|
$1,188.000
|
$800.000
|
$1,200.000
|
$817.430
|
|
|
CL C CONC (ABUT)(EXTEND)
|
CY
|
29.800
|
$1,800.000
|
$1,265.000
|
$1,255.000
|
$1,500.000
|
$1,300.000
|
$961.950
|
|
|
CL C CONC (CAP)
|
CY
|
85.500
|
$800.000
|
$995.000
|
$820.000
|
$900.000
|
$1,000.000
|
$845.890
|
|
|
CL C CONC (COLUMN)
|
CY
|
79.600
|
$800.000
|
$970.000
|
$1,138.000
|
$900.000
|
$1,000.000
|
$815.020
|
|
|
CL C CONC (CRASHWALL)
|
CY
|
358.000
|
$600.000
|
$700.000
|
$450.000
|
$500.000
|
$600.000
|
$568.870
|
|
|
CL C CONC (RAIL FOUNDATION)(HPC)
|
CY
|
956.000
|
$400.000
|
$562.000
|
$235.000
|
$600.000
|
$470.000
|
$425.060
|
|
|
REINF CONC SLAB (EXTEND SLAB)
|
SF
|
17,353.000
|
$23.000
|
$21.280
|
$21.000
|
$24.000
|
$27.000
|
$28.000
|
|
|
APPROACH SLAB (EXTEND)
|
CY
|
72.000
|
$565.000
|
$522.000
|
$528.000
|
$575.000
|
$890.000
|
$478.140
|
|
|
RETAINING WALL (MSE)
|
SF
|
19,307.000
|
$45.000
|
$88.000
|
$38.000
|
$75.000
|
$60.000
|
$39.000
|
|
|
PRESTR CONC GIRDER (TX34)
|
LF
|
2,865.850
|
$125.000
|
$154.420
|
$160.000
|
$150.000
|
$130.000
|
$230.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
186.000
|
$500.000
|
$558.000
|
$550.000
|
$500.000
|
$490.000
|
$381.340
|
|
|
RIPRAP (CONC) (CL B) (4")
|
CY
|
2.600
|
$500.000
|
$775.000
|
$1,100.000
|
$800.000
|
$550.000
|
$741.720
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
32.000
|
$195.000
|
$215.000
|
$175.000
|
$150.000
|
$160.000
|
$217.040
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
455.000
|
$25.000
|
$29.400
|
$45.000
|
$38.000
|
$45.000
|
$20.630
|
|
|
RAIL (TY T221)
|
LF
|
305.100
|
$80.000
|
$87.200
|
$200.000
|
$95.000
|
$120.000
|
$46.860
|
|
|
RAIL (TY T80SS)
|
LF
|
97.000
|
$135.000
|
$90.750
|
$283.000
|
$175.000
|
$250.000
|
$58.300
|
|
|
RAIL (HANDRAIL)(TY E)
|
LF
|
480.000
|
$125.000
|
$171.150
|
$226.000
|
$100.000
|
$75.000
|
$75.080
|
|
|
RETROFIT RAIL (TY T221)
|
LF
|
15.000
|
$500.000
|
$170.000
|
$340.000
|
$200.000
|
$350.000
|
$150.800
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
201.000
|
$80.000
|
$92.000
|
$100.000
|
$85.000
|
$75.000
|
$50.860
|
|
|
TYPE A JOINT
|
LF
|
124.000
|
$35.000
|
$28.000
|
$42.500
|
$75.000
|
$25.000
|
$50.860
|
|
|
CONC BOX CULV (10 FT X 8 FT)
|
LF
|
172.000
|
$950.000
|
$675.000
|
$950.000
|
$825.000
|
$950.000
|
$427.760
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,066.000
|
$45.000
|
$43.250
|
$48.000
|
$45.000
|
$50.000
|
$73.090
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
5,653.000
|
$60.000
|
$56.150
|
$65.000
|
$55.000
|
$90.000
|
$91.510
|
|
|
MANH (COMPL)(PRM)(48IN)
|
EA
|
3.000
|
$4,000.000
|
$3,905.000
|
$4,800.000
|
$5,000.000
|
$4,900.000
|
$3,055.300
|
|
|
INLET (COMPL)(PCO)(5FT)(NONE)
|
EA
|
5.000
|
$4,600.000
|
$4,357.000
|
$6,000.000
|
$6,000.000
|
$7,100.000
|
$4,651.240
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
4.000
|
$5,000.000
|
$4,532.000
|
$4,000.000
|
$5,000.000
|
$4,400.000
|
$3,994.550
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX5FT-3FTX5FT)
|
EA
|
8.000
|
$6,000.000
|
$5,572.000
|
$4,500.000
|
$6,000.000
|
$7,100.000
|
$4,819.550
|
|
|
INLET (COMP) (TY SIDEWALK BRIDGE)
|
EA
|
17.000
|
$10,000.000
|
$5,607.000
|
$10,000.000
|
$6,000.000
|
$9,200.000
|
$8,817.930
|
|
|
WINGWALL (PW - 2) (HW=9 FT)
|
EA
|
1.000
|
$29,500.000
|
$59,195.000
|
$30,000.000
|
$55,000.000
|
$75,000.000
|
$28,314.280
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
30.000
|
$750.000
|
$625.000
|
$600.000
|
$600.000
|
$950.000
|
$1,130.030
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$900.000
|
$710.000
|
$900.000
|
$700.000
|
$1,000.000
|
$913.120
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$1,200.000
|
$780.000
|
$950.000
|
$800.000
|
$1,000.000
|
$966.120
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
12.000
|
$1,500.000
|
$960.000
|
$900.000
|
$1,000.000
|
$1,100.000
|
$1,124.350
|
|
|
REMOV STR (INLET)
|
EA
|
2.000
|
$750.000
|
$1,515.000
|
$500.000
|
$500.000
|
$800.000
|
$443.820
|
|
|
REMOV STR (SET)
|
EA
|
20.000
|
$575.000
|
$155.000
|
$350.000
|
$500.000
|
$700.000
|
$496.730
|
|
|
REMOV STR (HEADWALL)
|
EA
|
1.000
|
$1,500.000
|
$2,697.000
|
$750.000
|
$1,000.000
|
$1,300.000
|
$872.280
|
|
|
REMOV STR (PIPE)
|
EA
|
19.000
|
$700.000
|
$1,871.000
|
$3,600.000
|
$500.000
|
$800.000
|
$493.010
|
|
|
REMOVE STR (RAIL)
|
LF
|
280.000
|
$20.000
|
$104.800
|
$50.000
|
$150.000
|
$120.000
|
$13.140
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,160,000.000
|
$1,250,000.000
|
$2,074,894.230
|
$2,000,000.000
|
$1,825,000.000
|
$2,595,312.210
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
27.000
|
$8,000.000
|
$1,995.000
|
$7,998.330
|
$6,000.000
|
$45,000.000
|
$12,174.530
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
350.000
|
$35.000
|
$37.000
|
$35.630
|
$40.000
|
$41.000
|
$38.200
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
350.000
|
$9.000
|
$10.560
|
$12.540
|
$9.000
|
$13.000
|
$12.740
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
354.000
|
$30.000
|
$33.000
|
$40.590
|
$28.000
|
$25.000
|
$35.220
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
354.000
|
$9.000
|
$10.560
|
$5.000
|
$10.000
|
$5.000
|
$8.650
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,341.000
|
$3.000
|
$3.100
|
$3.000
|
$3.500
|
$2.800
|
$2.480
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,341.000
|
$0.800
|
$1.320
|
$0.400
|
$1.000
|
$0.800
|
$0.720
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
694.000
|
$50.000
|
$63.000
|
$73.500
|
$90.000
|
$65.000
|
$10.940
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
1,286.000
|
$10.000
|
$7.700
|
$11.500
|
$3.000
|
$18.000
|
$10.180
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
694.000
|
$8.000
|
$9.000
|
$11.000
|
$10.000
|
$25.000
|
$12.220
|
|
|
PTB (FRN&INSTL)(F SHAPE)(TY 1) OR (STL)
|
LF
|
9,148.000
|
$40.000
|
$42.000
|
$58.500
|
$70.000
|
$65.000
|
$52.070
|
|
|
PTB (REMOVE)(F SHAPE)(TY 1) OR (STL)
|
LF
|
9,148.000
|
$6.000
|
$8.300
|
$11.500
|
$10.000
|
$13.000
|
$9.060
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
1,006.440
|
$95.000
|
$98.650
|
$98.500
|
$90.000
|
$75.000
|
$88.280
|
|
|
PERM CTB (SGL SLOPE) (MOD)
|
LF
|
3,576.000
|
$75.000
|
$153.000
|
$173.000
|
$165.000
|
$95.000
|
$110.320
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
15,632.000
|
$4.250
|
$10.400
|
$3.400
|
$4.000
|
$7.500
|
$11.120
|
|
|
DRIVEWAYS (CONC)
|
SY
|
3,811.000
|
$75.000
|
$85.900
|
$100.000
|
$85.000
|
$97.000
|
$72.460
|
|
|
DRIVEWAYS (BASE)
|
SY
|
1,988.000
|
$45.000
|
$34.500
|
$20.000
|
$26.000
|
$23.000
|
$18.180
|
|
|
CONC SIDEWALKS (4")
|
SY
|
4,845.000
|
$60.000
|
$51.000
|
$55.000
|
$55.000
|
$60.000
|
$49.900
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
2,650.000
|
$20.000
|
$24.250
|
$22.000
|
$22.000
|
$25.000
|
$23.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
5.000
|
$1,500.000
|
$2,079.000
|
$1,475.000
|
$1,600.000
|
$1,800.000
|
$1,625.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
5.000
|
$1,200.000
|
$1,729.000
|
$1,275.000
|
$1,300.000
|
$1,200.000
|
$1,125.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
LF
|
50.000
|
$25.000
|
$37.000
|
$26.000
|
$25.000
|
$42.000
|
$39.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
3,500.000
|
$2.750
|
$5.000
|
$2.000
|
$3.000
|
$3.500
|
$3.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$250.000
|
$297.000
|
$170.000
|
$200.000
|
$430.000
|
$400.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
6.000
|
$2,500.000
|
$3,135.000
|
$2,660.000
|
$2,600.000
|
$3,000.000
|
$2,750.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$280.000
|
$330.000
|
$225.000
|
$220.000
|
$430.000
|
$400.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
1.000
|
$2,000.000
|
$2,970.000
|
$2,830.000
|
$3,000.000
|
$2,500.000
|
$2,250.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
3.000
|
$1,000.000
|
$1,254.000
|
$1,130.000
|
$1,200.000
|
$2,500.000
|
$950.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
1.000
|
$31,500.000
|
$27,852.000
|
$22,600.000
|
$25,000.000
|
$20,000.000
|
$21,100.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$7,000.000
|
$11,787.000
|
$10,700.000
|
$10,000.000
|
$12,000.000
|
$8,930.000
|
|
|
PIPE UNDERDRAINS (TY 6) (6")
|
LF
|
861.000
|
$20.000
|
$23.300
|
$23.000
|
$35.000
|
$30.000
|
$21.270
|
|
|
MAILBOX INSTALL-S (TIM-POST) TY 5
|
EA
|
12.000
|
$500.000
|
$198.000
|
$260.000
|
$220.000
|
$220.000
|
$200.000
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
10.000
|
$600.000
|
$604.560
|
$870.000
|
$500.000
|
$500.000
|
$458.000
|
|
|
HI MST IL POLE (150 FT)( 80 MPH)
|
EA
|
1.000
|
$35,000.000
|
$34,471.800
|
$50,200.000
|
$30,000.000
|
$28,000.000
|
$26,115.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
20.000
|
$10.000
|
$13.200
|
$21.000
|
$80.000
|
$16.000
|
$14.600
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
60.000
|
$20.000
|
$21.120
|
$19.000
|
$70.000
|
$17.000
|
$16.000
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
160.000
|
$1.750
|
$1.780
|
$1.800
|
$3.000
|
$1.500
|
$1.350
|
|
|
TRAY CABLE (3 CONDR) (12 AWG)
|
LF
|
80.000
|
$2.250
|
$2.510
|
$2.150
|
$4.000
|
$2.000
|
$1.900
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
2.000
|
$1,100.000
|
$947.760
|
$1,140.000
|
$2,000.000
|
$775.000
|
$718.000
|
|
|
ELC SRV TY A 240/480 100(NS)SS(E)SP(O)
|
EA
|
1.000
|
$7,500.000
|
$9,075.000
|
$7,200.000
|
$11,000.000
|
$7,500.000
|
$6,875.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
30.000
|
$25.000
|
$28.050
|
$50.000
|
$55.000
|
$23.000
|
$29.000
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
834.750
|
$25.000
|
$23.360
|
$32.000
|
$33.000
|
$20.000
|
$28.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
7.000
|
$700.000
|
$594.000
|
$800.000
|
$900.000
|
$700.000
|
$645.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
|
EA
|
1.000
|
$700.000
|
$594.000
|
$1,206.000
|
$1,400.000
|
$460.000
|
$425.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$800.000
|
$594.000
|
$882.000
|
$1,200.000
|
$750.000
|
$690.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
3.000
|
$750.000
|
$594.000
|
$870.000
|
$1,100.000
|
$850.000
|
$785.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
11.000
|
$475.000
|
$594.000
|
$555.000
|
$600.000
|
$380.000
|
$350.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
26.000
|
$90.000
|
$100.000
|
$121.000
|
$100.000
|
$80.000
|
$75.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
194.600
|
$10.000
|
$6.470
|
$6.500
|
$12.000
|
$5.500
|
$5.000
|
|
|
INS OH SN SUP(30 FT CANT)
|
EA
|
1.000
|
$23,000.000
|
$32,432.400
|
$27,400.000
|
$25,000.000
|
$26,000.000
|
$24,570.000
|
|
|
INS OH SN SUP(155 FT BRDG)
|
EA
|
1.000
|
$90,000.000
|
$129,868.200
|
$141,000.000
|
$100,000.000
|
$110,000.000
|
$98,385.000
|
|
|
REMOVE OVERHD SIGN SUP
|
EA
|
2.000
|
$8,000.000
|
$7,920.000
|
$4,050.000
|
$10,000.000
|
$14,000.000
|
$12,600.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
6.000
|
$16.500
|
$37.000
|
$17.000
|
$25.000
|
$26.000
|
$28.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
3.000
|
$16.500
|
$37.000
|
$17.000
|
$25.000
|
$26.000
|
$28.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
46.000
|
$14.000
|
$40.000
|
$17.000
|
$25.000
|
$32.000
|
$30.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)SRF
|
EA
|
6.000
|
$85.000
|
$112.000
|
$85.000
|
$100.000
|
$90.000
|
$85.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
45.000
|
$32.000
|
$59.400
|
$28.000
|
$40.000
|
$40.000
|
$45.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
4.000
|
$35.000
|
$59.400
|
$28.000
|
$40.000
|
$40.000
|
$45.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
7,570.000
|
$0.500
|
$0.330
|
$0.280
|
$0.270
|
$0.280
|
$0.250
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
20,360.000
|
$0.200
|
$0.330
|
$0.280
|
$0.270
|
$0.280
|
$0.250
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
19,492.000
|
$0.250
|
$0.330
|
$0.280
|
$0.270
|
$0.280
|
$0.250
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
62.000
|
$20.000
|
$1.700
|
$2.860
|
$2.000
|
$5.000
|
$0.600
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
4,065.000
|
$0.750
|
$0.650
|
$0.960
|
$1.000
|
$1.000
|
$0.850
|
|
REFL PAV MRK TY I (W)(SYMBOL)(090MIL)
|
EA
|
4.000
|
$75.000
|
$528.000
|
$450.000
|
$440.000
|
$450.000
|
$400.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
3,910.000
|
$0.400
|
$0.580
|
$0.500
|
$0.480
|
$0.500
|
$0.440
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
24,954.000
|
$0.300
|
$0.530
|
$0.450
|
$0.440
|
$0.450
|
$0.400
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
24,197.000
|
$0.300
|
$0.530
|
$0.450
|
$0.440
|
$0.450
|
$0.400
|
|
PREFAB PAV MRK TY B (W)(4")(BRK)CNTST
|
LF
|
4,850.000
|
$15.000
|
$9.900
|
$8.480
|
$8.000
|
$8.500
|
$7.500
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
24.000
|
$13.000
|
$15.840
|
$13.570
|
$13.000
|
$13.600
|
$12.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
2.000
|
$200.000
|
$264.000
|
$226.000
|
$220.000
|
$227.000
|
$200.000
|
|
PREFAB PAV MRK TY C (W) (DBL ARROW)
|
EA
|
1.000
|
$375.000
|
$528.000
|
$450.000
|
$440.000
|
$453.000
|
$400.000
|
|
PREFAB PAV MRK TY C (W) (UTURN ARROW)
|
EA
|
1.000
|
$300.000
|
$528.000
|
$450.000
|
$440.000
|
$453.000
|
$400.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
2.000
|
$275.000
|
$396.000
|
$340.000
|
$330.000
|
$340.000
|
$300.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
385.000
|
$3.000
|
$4.750
|
$4.000
|
$4.000
|
$4.100
|
$3.600
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
609.000
|
$3.500
|
$4.750
|
$4.000
|
$4.000
|
$4.100
|
$3.600
|
|
TRAFFIC BUTTON TY Y
|
EA
|
1,010.000
|
$2.750
|
$4.220
|
$3.600
|
$4.000
|
$3.600
|
$3.200
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
48,896.000
|
$0.500
|
$0.400
|
$0.340
|
$0.330
|
$0.350
|
$0.300
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
280.000
|
$1.000
|
$1.320
|
$1.130
|
$1.100
|
$1.100
|
$1.000
|
|
|
MEMBRANE UNDERSEAL
|
GAL
|
9,077.000
|
$2.800
|
$3.550
|
$3.600
|
$3.000
|
$3.100
|
$3.100
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
12,694.000
|
$90.000
|
$107.000
|
$107.000
|
$97.000
|
$93.320
|
$96.320
|
|
|
D-GR HMA TY-C PG64-22 (LEVEL-UP)
|
TON
|
9,388.000
|
$90.000
|
$107.000
|
$105.910
|
$97.000
|
$93.650
|
$93.650
|
|
|
D-GR HMA TY-C PG76-22
|
TON
|
1,984.000
|
$95.000
|
$121.000
|
$120.000
|
$110.000
|
$105.930
|
$108.930
|
|
|
TACK COAT
|
GAL
|
1,252.000
|
$3.500
|
$5.750
|
$5.750
|
$5.000
|
$5.000
|
$5.000
|
|
|
SP MIXES SP-C SAC-A PG70-22
|
TON
|
110.000
|
$95.000
|
$247.000
|
$250.000
|
$220.000
|
$215.000
|
$215.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
7.000
|
$10,000.000
|
$18,000.000
|
$19,500.000
|
$20,000.000
|
$10,000.000
|
$5,937.500
|
|
|
LED HI MST IL ASM (6 FIXT)(SYM)(TY S)
|
EA
|
1.000
|
$25,000.000
|
$26,832.960
|
$46,700.000
|
$45,000.000
|
$22,000.000
|
$20,328.000
|
|
|
TMA (STATIONARY)
|
DAY
|
242.000
|
$185.000
|
$140.000
|
$350.000
|
$300.000
|
$400.000
|
$193.750
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
9.000
|
$100.000
|
$132.000
|
$140.000
|
$300.000
|
$1,000.000
|
$680.110
|
|
Totals: |
$15,921,009.250
|
$19,326,241.385
|
$21,157,182.000
|
$21,797,355.860
|
$21,974,668.220
|
$25,914,306.993
|