ANGELINA US 59 (2553-01-115)

Items: 167

County: ANGELINA
Length: N/A
Highway: US 59
District: LUFKIN
Control Number: 2553-01-115
DBE Goal: N/A
Project: NH 2B20(055)
Guaranty: N/A
Time: 295 WORKING DAYS
Engineer's Estimate: $15,921,009.25
Date: 10/01/2020 (5 years ago)
Contract Number: N/A
Type: CONVERT TO 4 LANE FRWY W/2 LANE NB&SB FRONTAGE RD
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$15,921,009.25
$19,326,241.37
Over/Under Est: 21.39% $3,405,232.12
Over/Under Est: 32.89% $5,236,172.75
Amt Left: 9.47% $1,830,940.63
$21,797,355.86
Over/Under Est: 36.91% $5,876,346.61
Amt Left: 12.79% $2,471,114.49
Delta: -3.03% -$640,173.86
$21,974,668.22
Over/Under Est: 38.02% $6,053,658.97
Amt Left: 13.7% $2,648,426.85
Delta: -0.81% -$177,312.36
Over/Under Est: 62.77% $9,993,297.72
Amt Left: 34.09% $6,588,065.60
Delta: -17.93% -$3,939,638.75
Subcontractor Percentage Amount
MOORE BROTHERS CONSTRUCTION COMPANY 20.98% $4,117,457.99
AMERICAN REMEDIATION OPTIONS, INC. 2.79% $547,555.18
A&J REBAR LLC 2.32% $455,314.71
TRAF-TEX, INC. 1.44% $282,609.13
WEBBER, LLC 1.37% $268,871.18
MATRIX CONCRETE ROAD & BRIDGE, LLC 1.20% $235,507.61
HODGES AND SON CONSTRUCTION COMPANY, INC. 0.71% $139,342.00
STRIPING TECHNOLOGY, L.P. 0.50% $98,128.17
DREWERY CONSTRUCTION COMPANY, INCORPORATED 0.30% $58,876.90
AREA WIDE PROTECTIVE, INC. 0.15% $29,438.45
SOUTH TEXAS PAINTING 0.04% $7,850.25
SOUTHEAST GRINDING AND GROOVING LLC 0.03% $5,887.69
TORO BRAVO CONSTRUCTION, LLC 0.03% $5,887.69
SCOTT DERR PAINTING CO, LLC 0.02% $3,925.13
PRIMATE CONSTRUCTION, LP 0.02% $3,925.13
Total: 31.90% $6,260,577.21

Bid Items & Bid Tabulations

167 Total 0 of 167
ANGELINA  |  US 59  |  LUFKIN  |  2553-01-115  |  10/01/2020  |  $15,921,009.25  |  NH 2B20(055)  |  CONVERT TO 4 LANE FRWY W/2 LANE NB&S...  |  295 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
LONGVIEW BRIDGE AND ROAD, LTD.
SACYR CONSTRUCTION USA LLC
EAST TEXAS BRIDGE, INC.
A. L. HELMCAMP, INC.
JAMES CONSTRUCTION GROUP, L.L.C.
PREPARING ROW
STA 39.500 $3,000.000 $1,800.000 $19,500.000 $14,000.000 $7,600.000 $65,000.000
REMOVING CONC (MEDIANS)
SY 94.000 $20.000 $14.350 $47.250 $13.000 $30.000 $20.100
REMOVING CONC (DRIVEWAYS)
SY 2,135.000 $15.000 $16.650 $6.250 $17.000 $20.000 $6.790
REMOVING CONC (CURB)
LF 2,600.000 $5.000 $6.100 $2.000 $5.000 $12.000 $4.210
REMOVING CONC (CTB)
LF 2,503.000 $15.000 $24.300 $20.000 $17.000 $25.000 $13.140
REMOVING CONC (MISC)
SY 50.000 $20.000 $58.850 $90.000 $24.000 $100.000 $40.070
REM STAB BASE & ASPH (6"-12")
SY 8,180.000 $7.000 $3.500 $4.500 $9.000 $7.000 $4.280
REMOVING STAB BASE & ASPH PAV(12"-27")
SY 7,527.000 $15.000 $5.750 $7.500 $17.000 $12.000 $7.840
EXCAVATION (ROADWAY)
CY 54,005.000 $7.000 $9.150 $5.750 $11.000 $16.000 $8.140
SUBGRADE WIDENING (DENS CONT)
STA 71.500 $650.000 $945.000 $1,025.000 $400.000 $350.000 $3,338.150
EMBANKMENT (FINAL)(DENS CONT)(TY A)
CY 23,444.000 $6.000 $12.000 $17.250 $20.000 $21.000 $8.750
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 57,096.000 $8.000 $12.000 $27.500 $22.500 $21.000 $84.020
COMPOST MANUF TOPSOIL (4")
SY 69,157.000 $1.500 $2.200 $2.250 $1.850 $1.500 $1.970
BLOCK SODDING
SY 69,717.000 $3.000 $4.620 $3.250 $3.700 $3.500 $3.250
BROADCAST SEED (TEMP) (WARM)
SY 34,579.000 $0.150 $0.130 $0.210 $0.100 $0.120 $0.090
BROADCAST SEED (TEMP) (COOL)
SY 34,579.000 $0.150 $0.130 $0.210 $0.100 $0.120 $0.090
VEGETATIVE WATERING
MG 1,396.000 $20.000 $24.200 $17.000 $7.000 $18.000 $18.320
LIME (QUICKLIME (SLURRY))
TON 1,013.000 $165.000 $297.000 $168.000 $159.000 $170.000 $161.000
LIME TRT (EXST MATL) (12")
SY 39,170.000 $2.500 $2.100 $5.000 $8.250 $4.500 $1.910
CEMENT
TON 275.000 $150.000 $186.000 $150.000 $167.000 $155.000 $133.000
CEMENT TREAT (SUBGRADE)(12")
SY 17,722.000 $2.750 $1.800 $3.750 $6.150 $4.000 $2.190
PRIME COAT (MC-30)
GAL 11,378.000 $4.250 $4.700 $4.250 $5.000 $5.000 $4.000
D-GR HMA(SQ) TY-B PG64-22
TON 8,619.000 $95.000 $105.000 $104.000 $95.000 $90.980 $93.980
D-GR HMA(SQ) TY-D PG64-22 NON-MOW STRIP
SY 1,239.000 $45.000 $48.000 $48.000 $46.000 $41.380 $44.380
PFC (ASPHALT) PG76-22
TON 281.000 $30.000 $0.010 $160.000 $155.000 $0.010 $0.010
PFC-C (AGGREGATE)(PG76 MIX) SAC-A
TON 3,741.000 $130.000 $195.000 $160.000 $155.000 $170.000 $170.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 1,000.000 $95.000 $90.000 $95.000 $90.000 $90.000 $58.890
PLANE ASPH CONC PAV(2" TO 4")
SY 27,373.000 $1.100 $2.500 $2.750 $4.000 $3.000 $1.700
PLANE ASPH CONC PAV (2")
SY 1,000.000 $2.000 $5.000 $8.250 $13.000 $10.000 $3.600
CONC PVMT (CONT REINF - CRCP) (10.5")
SY 35,586.000 $55.000 $63.000 $65.500 $70.000 $73.000 $70.870
CEM STABIL BKFL
CY 3,747.000 $50.000 $86.000 $90.000 $115.000 $85.000 $142.790
TRENCH EXCAVATION PROTECTION
LF 4,686.000 $2.500 $11.500 $5.000 $5.000 $13.000 $2.130
TEMPORARY SPL SHORING
SF 12,724.000 $20.000 $15.400 $31.000 $32.000 $30.000 $14.050
TEMPORARY SPL SHORING (RAILROAD CANT)
SF 788.000 $200.000 $127.350 $245.000 $125.000 $72.000 $40.660
DRILL SHAFT (18 IN)
LF 51.000 $75.000 $163.050 $220.000 $80.000 $120.000 $91.880
DRILL SHAFT (36 IN)
LF 775.000 $175.000 $265.720 $275.000 $275.000 $230.000 $197.690
DRILL SHAFT (NON - REINFORCED) (12 IN)
LF 7.000 $100.000 $101.380 $164.000 $110.000 $83.000 $130.000
DRILL SHAFT (SIGN MTS) (42 IN)
LF 84.000 $425.000 $415.800 $439.000 $450.000 $340.000 $315.000
DRILL SHAFT (SIGN MTS) (48 IN)
LF 25.000 $575.000 $422.400 $414.000 $500.000 $345.000 $320.000
DRILL SHAFT (HIGH MAST POLE) (60 IN)
LF 25.000 $600.000 $1,164.240 $555.000 $600.000 $1,000.000 $882.000
CL A CONC (MISC)
CY 18.000 $600.000 $875.000 $1,188.000 $800.000 $1,200.000 $817.430
CL C CONC (ABUT)(EXTEND)
CY 29.800 $1,800.000 $1,265.000 $1,255.000 $1,500.000 $1,300.000 $961.950
CL C CONC (CAP)
CY 85.500 $800.000 $995.000 $820.000 $900.000 $1,000.000 $845.890
CL C CONC (COLUMN)
CY 79.600 $800.000 $970.000 $1,138.000 $900.000 $1,000.000 $815.020
CL C CONC (CRASHWALL)
CY 358.000 $600.000 $700.000 $450.000 $500.000 $600.000 $568.870
CL C CONC (RAIL FOUNDATION)(HPC)
CY 956.000 $400.000 $562.000 $235.000 $600.000 $470.000 $425.060
REINF CONC SLAB (EXTEND SLAB)
SF 17,353.000 $23.000 $21.280 $21.000 $24.000 $27.000 $28.000
APPROACH SLAB (EXTEND)
CY 72.000 $565.000 $522.000 $528.000 $575.000 $890.000 $478.140
RETAINING WALL (MSE)
SF 19,307.000 $45.000 $88.000 $38.000 $75.000 $60.000 $39.000
PRESTR CONC GIRDER (TX34)
LF 2,865.850 $125.000 $154.420 $160.000 $150.000 $130.000 $230.000
RIPRAP (CONC)(4 IN)
CY 186.000 $500.000 $558.000 $550.000 $500.000 $490.000 $381.340
RIPRAP (CONC) (CL B) (4")
CY 2.600 $500.000 $775.000 $1,100.000 $800.000 $550.000 $741.720
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 32.000 $195.000 $215.000 $175.000 $150.000 $160.000 $217.040
CLEANING AND SEALING EXISTING JOINTS
LF 455.000 $25.000 $29.400 $45.000 $38.000 $45.000 $20.630
RAIL (TY T221)
LF 305.100 $80.000 $87.200 $200.000 $95.000 $120.000 $46.860
RAIL (TY T80SS)
LF 97.000 $135.000 $90.750 $283.000 $175.000 $250.000 $58.300
RAIL (HANDRAIL)(TY E)
LF 480.000 $125.000 $171.150 $226.000 $100.000 $75.000 $75.080
RETROFIT RAIL (TY T221)
LF 15.000 $500.000 $170.000 $340.000 $200.000 $350.000 $150.800
ARMOR JOINT (SEALED)
LF 201.000 $80.000 $92.000 $100.000 $85.000 $75.000 $50.860
TYPE A JOINT
LF 124.000 $35.000 $28.000 $42.500 $75.000 $25.000 $50.860
CONC BOX CULV (10 FT X 8 FT)
LF 172.000 $950.000 $675.000 $950.000 $825.000 $950.000 $427.760
RC PIPE (CL III)(18 IN)
LF 1,066.000 $45.000 $43.250 $48.000 $45.000 $50.000 $73.090
RC PIPE (CL III)(24 IN)
LF 5,653.000 $60.000 $56.150 $65.000 $55.000 $90.000 $91.510
MANH (COMPL)(PRM)(48IN)
EA 3.000 $4,000.000 $3,905.000 $4,800.000 $5,000.000 $4,900.000 $3,055.300
INLET (COMPL)(PCO)(5FT)(NONE)
EA 5.000 $4,600.000 $4,357.000 $6,000.000 $6,000.000 $7,100.000 $4,651.240
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 4.000 $5,000.000 $4,532.000 $4,000.000 $5,000.000 $4,400.000 $3,994.550
INLET (COMPL)(PSL)(FG)(3FTX5FT-3FTX5FT)
EA 8.000 $6,000.000 $5,572.000 $4,500.000 $6,000.000 $7,100.000 $4,819.550
INLET (COMP) (TY SIDEWALK BRIDGE)
EA 17.000 $10,000.000 $5,607.000 $10,000.000 $6,000.000 $9,200.000 $8,817.930
WINGWALL (PW - 2) (HW=9 FT)
EA 1.000 $29,500.000 $59,195.000 $30,000.000 $55,000.000 $75,000.000 $28,314.280
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 30.000 $750.000 $625.000 $600.000 $600.000 $950.000 $1,130.030
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 1.000 $900.000 $710.000 $900.000 $700.000 $1,000.000 $913.120
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 1.000 $1,200.000 $780.000 $950.000 $800.000 $1,000.000 $966.120
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 12.000 $1,500.000 $960.000 $900.000 $1,000.000 $1,100.000 $1,124.350
REMOV STR (INLET)
EA 2.000 $750.000 $1,515.000 $500.000 $500.000 $800.000 $443.820
REMOV STR (SET)
EA 20.000 $575.000 $155.000 $350.000 $500.000 $700.000 $496.730
REMOV STR (HEADWALL)
EA 1.000 $1,500.000 $2,697.000 $750.000 $1,000.000 $1,300.000 $872.280
REMOV STR (PIPE)
EA 19.000 $700.000 $1,871.000 $3,600.000 $500.000 $800.000 $493.010
REMOVE STR (RAIL)
LF 280.000 $20.000 $104.800 $50.000 $150.000 $120.000 $13.140
MOBILIZATION
LS 1.000 $1,160,000.000 $1,250,000.000 $2,074,894.230 $2,000,000.000 $1,825,000.000 $2,595,312.210
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 27.000 $8,000.000 $1,995.000 $7,998.330 $6,000.000 $45,000.000 $12,174.530
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 350.000 $35.000 $37.000 $35.630 $40.000 $41.000 $38.200
ROCK FILTER DAMS (REMOVE)
LF 350.000 $9.000 $10.560 $12.540 $9.000 $13.000 $12.740
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 354.000 $30.000 $33.000 $40.590 $28.000 $25.000 $35.220
CONSTRUCTION EXITS (REMOVE)
SY 354.000 $9.000 $10.560 $5.000 $10.000 $5.000 $8.650
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,341.000 $3.000 $3.100 $3.000 $3.500 $2.800 $2.480
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,341.000 $0.800 $1.320 $0.400 $1.000 $0.800 $0.720
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 694.000 $50.000 $63.000 $73.500 $90.000 $65.000 $10.940
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 1,286.000 $10.000 $7.700 $11.500 $3.000 $18.000 $10.180
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 694.000 $8.000 $9.000 $11.000 $10.000 $25.000 $12.220
PTB (FRN&INSTL)(F SHAPE)(TY 1) OR (STL)
LF 9,148.000 $40.000 $42.000 $58.500 $70.000 $65.000 $52.070
PTB (REMOVE)(F SHAPE)(TY 1) OR (STL)
LF 9,148.000 $6.000 $8.300 $11.500 $10.000 $13.000 $9.060
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 1,006.440 $95.000 $98.650 $98.500 $90.000 $75.000 $88.280
PERM CTB (SGL SLOPE) (MOD)
LF 3,576.000 $75.000 $153.000 $173.000 $165.000 $95.000 $110.320
CONC CURB (MONO) (TY II)
LF 15,632.000 $4.250 $10.400 $3.400 $4.000 $7.500 $11.120
DRIVEWAYS (CONC)
SY 3,811.000 $75.000 $85.900 $100.000 $85.000 $97.000 $72.460
DRIVEWAYS (BASE)
SY 1,988.000 $45.000 $34.500 $20.000 $26.000 $23.000 $18.180
CONC SIDEWALKS (4")
SY 4,845.000 $60.000 $51.000 $55.000 $55.000 $60.000 $49.900
MTL W-BEAM GD FEN (TIM POST)
LF 2,650.000 $20.000 $24.250 $22.000 $22.000 $25.000 $23.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 5.000 $1,500.000 $2,079.000 $1,475.000 $1,600.000 $1,800.000 $1,625.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,200.000 $1,729.000 $1,275.000 $1,300.000 $1,200.000 $1,125.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 50.000 $25.000 $37.000 $26.000 $25.000 $42.000 $39.000
REMOVE METAL BEAM GUARD FENCE
LF 3,500.000 $2.750 $5.000 $2.000 $3.000 $3.500 $3.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $250.000 $297.000 $170.000 $200.000 $430.000 $400.000
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $2,500.000 $3,135.000 $2,660.000 $2,600.000 $3,000.000 $2,750.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $280.000 $330.000 $225.000 $220.000 $430.000 $400.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 1.000 $2,000.000 $2,970.000 $2,830.000 $3,000.000 $2,500.000 $2,250.000
CRASH CUSH ATTEN (REMOVE)
EA 3.000 $1,000.000 $1,254.000 $1,130.000 $1,200.000 $2,500.000 $950.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 1.000 $31,500.000 $27,852.000 $22,600.000 $25,000.000 $20,000.000 $21,100.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $7,000.000 $11,787.000 $10,700.000 $10,000.000 $12,000.000 $8,930.000
PIPE UNDERDRAINS (TY 6) (6")
LF 861.000 $20.000 $23.300 $23.000 $35.000 $30.000 $21.270
MAILBOX INSTALL-S (TIM-POST) TY 5
EA 12.000 $500.000 $198.000 $260.000 $220.000 $220.000 $200.000
REMOVE RD IL ASM (TRANS-BASE)
EA 10.000 $600.000 $604.560 $870.000 $500.000 $500.000 $458.000
HI MST IL POLE (150 FT)( 80 MPH)
EA 1.000 $35,000.000 $34,471.800 $50,200.000 $30,000.000 $28,000.000 $26,115.000
CONDT (PVC) (SCH 80) (2")
LF 20.000 $10.000 $13.200 $21.000 $80.000 $16.000 $14.600
CONDT (PVC) (SCH 80) (2") (BORE)
LF 60.000 $20.000 $21.120 $19.000 $70.000 $17.000 $16.000
ELEC CONDR (NO.6) INSULATED
LF 160.000 $1.750 $1.780 $1.800 $3.000 $1.500 $1.350
TRAY CABLE (3 CONDR) (12 AWG)
LF 80.000 $2.250 $2.510 $2.150 $4.000 $2.000 $1.900
GROUND BOX TY D (162922)W/APRON
EA 2.000 $1,100.000 $947.760 $1,140.000 $2,000.000 $775.000 $718.000
ELC SRV TY A 240/480 100(NS)SS(E)SP(O)
EA 1.000 $7,500.000 $9,075.000 $7,200.000 $11,000.000 $7,500.000 $6,875.000
ALUMINUM SIGNS (TY G)
SF 30.000 $25.000 $28.050 $50.000 $55.000 $23.000 $29.000
ALUMINUM SIGNS (TY O)
SF 834.750 $25.000 $23.360 $32.000 $33.000 $20.000 $28.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 7.000 $700.000 $594.000 $800.000 $900.000 $700.000 $645.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
EA 1.000 $700.000 $594.000 $1,206.000 $1,400.000 $460.000 $425.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $800.000 $594.000 $882.000 $1,200.000 $750.000 $690.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 3.000 $750.000 $594.000 $870.000 $1,100.000 $850.000 $785.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 11.000 $475.000 $594.000 $555.000 $600.000 $380.000 $350.000
REMOVE SM RD SN SUP&AM
EA 26.000 $90.000 $100.000 $121.000 $100.000 $80.000 $75.000
INSTALL LRSS (STRUCT STEEL)
LB 194.600 $10.000 $6.470 $6.500 $12.000 $5.500 $5.000
INS OH SN SUP(30 FT CANT)
EA 1.000 $23,000.000 $32,432.400 $27,400.000 $25,000.000 $26,000.000 $24,570.000
INS OH SN SUP(155 FT BRDG)
EA 1.000 $90,000.000 $129,868.200 $141,000.000 $100,000.000 $110,000.000 $98,385.000
REMOVE OVERHD SIGN SUP
EA 2.000 $8,000.000 $7,920.000 $4,050.000 $10,000.000 $14,000.000 $12,600.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 6.000 $16.500 $37.000 $17.000 $25.000 $26.000 $28.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 3.000 $16.500 $37.000 $17.000 $25.000 $26.000 $28.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 46.000 $14.000 $40.000 $17.000 $25.000 $32.000 $30.000
INSTL OM ASSM (OM-2Z)(FLX)SRF
EA 6.000 $85.000 $112.000 $85.000 $100.000 $90.000 $85.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 45.000 $32.000 $59.400 $28.000 $40.000 $40.000 $45.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 4.000 $35.000 $59.400 $28.000 $40.000 $40.000 $45.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 7,570.000 $0.500 $0.330 $0.280 $0.270 $0.280 $0.250
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 20,360.000 $0.200 $0.330 $0.280 $0.270 $0.280 $0.250
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 19,492.000 $0.250 $0.330 $0.280 $0.270 $0.280 $0.250
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 62.000 $20.000 $1.700 $2.860 $2.000 $5.000 $0.600
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 4,065.000 $0.750 $0.650 $0.960 $1.000 $1.000 $0.850
REFL PAV MRK TY I (W)(SYMBOL)(090MIL)
EA 4.000 $75.000 $528.000 $450.000 $440.000 $450.000 $400.000
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 3,910.000 $0.400 $0.580 $0.500 $0.480 $0.500 $0.440
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 24,954.000 $0.300 $0.530 $0.450 $0.440 $0.450 $0.400
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 24,197.000 $0.300 $0.530 $0.450 $0.440 $0.450 $0.400
PREFAB PAV MRK TY B (W)(4")(BRK)CNTST
LF 4,850.000 $15.000 $9.900 $8.480 $8.000 $8.500 $7.500
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 24.000 $13.000 $15.840 $13.570 $13.000 $13.600 $12.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 2.000 $200.000 $264.000 $226.000 $220.000 $227.000 $200.000
PREFAB PAV MRK TY C (W) (DBL ARROW)
EA 1.000 $375.000 $528.000 $450.000 $440.000 $453.000 $400.000
PREFAB PAV MRK TY C (W) (UTURN ARROW)
EA 1.000 $300.000 $528.000 $450.000 $440.000 $453.000 $400.000
PREFAB PAV MRK TY C (W) (WORD)
EA 2.000 $275.000 $396.000 $340.000 $330.000 $340.000 $300.000
REFL PAV MRKR TY I-C
EA 385.000 $3.000 $4.750 $4.000 $4.000 $4.100 $3.600
REFL PAV MRKR TY II-C-R
EA 609.000 $3.500 $4.750 $4.000 $4.000 $4.100 $3.600
TRAFFIC BUTTON TY Y
EA 1,010.000 $2.750 $4.220 $3.600 $4.000 $3.600 $3.200
ELIM EXT PAV MRK & MRKS (4")
LF 48,896.000 $0.500 $0.400 $0.340 $0.330 $0.350 $0.300
ELIM EXT PAV MRK & MRKS (8")
LF 280.000 $1.000 $1.320 $1.130 $1.100 $1.100 $1.000
MEMBRANE UNDERSEAL
GAL 9,077.000 $2.800 $3.550 $3.600 $3.000 $3.100 $3.100
D-GR HMA TY-B PG64-22
TON 12,694.000 $90.000 $107.000 $107.000 $97.000 $93.320 $96.320
D-GR HMA TY-C PG64-22 (LEVEL-UP)
TON 9,388.000 $90.000 $107.000 $105.910 $97.000 $93.650 $93.650
D-GR HMA TY-C PG76-22
TON 1,984.000 $95.000 $121.000 $120.000 $110.000 $105.930 $108.930
TACK COAT
GAL 1,252.000 $3.500 $5.750 $5.750 $5.000 $5.000 $5.000
SP MIXES SP-C SAC-A PG70-22
TON 110.000 $95.000 $247.000 $250.000 $220.000 $215.000 $215.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 7.000 $10,000.000 $18,000.000 $19,500.000 $20,000.000 $10,000.000 $5,937.500
LED HI MST IL ASM (6 FIXT)(SYM)(TY S)
EA 1.000 $25,000.000 $26,832.960 $46,700.000 $45,000.000 $22,000.000 $20,328.000
TMA (STATIONARY)
DAY 242.000 $185.000 $140.000 $350.000 $300.000 $400.000 $193.750
TMA (MOBILE OPERATION)
DAY 9.000 $100.000 $132.000 $140.000 $300.000 $1,000.000 $680.110
Totals: $15,921,009.250 $19,326,241.385 $21,157,182.000 $21,797,355.860 $21,974,668.220 $25,914,306.993