Job Info for 0911-38-069

County: ANGELINA Highway: CR Date: 05/01/2018 (6 years ago) Engineer's Estimate: $357,675 Control Number: 0911-38-069
Project: BR 1702(558) District: LUFKIN Time: 43 WORKING DAYS Type: BRIDGE REPLACEMENT

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $357,674.50
TREVWAY, INC.   $388,000.54 1
8.48% | $30,326.04
STATELINE CONSTRUCTION, LLC   $389,508.00 2
8.9% | $31,833.50
0.39% | $1,507.46
DREWERY CONSTRUCTION COMPANY, INCORPORATED   $394,334.20 3
10.25% | $36,659.70
1.63% | $6,333.66
1.24% | $4,826.20
FNH CONSTRUCTION, LLC   $418,728.00 4
17.07% | $61,053.50
7.92% | $30,727.46
6.19% | $24,393.80
LONGVIEW BRIDGE AND ROAD, LTD.   $440,664.90 5
23.2% | $82,990.40
13.57% | $52,664.36
5.24% | $21,936.90
PIERCE R & B LLC   $445,945.00 6
24.68% | $88,270.50
14.93% | $57,944.46
1.20% | $5,280.10
HODGES AND SON CONSTRUCTION COMPANY, INC.   $450,062.20 7
25.83% | $92,387.70
16% | $62,061.66
0.92% | $4,117.20
EAST TEXAS BRIDGE, INC.   $452,370.00 8
26.48% | $94,695.50
16.59% | $64,369.46
0.51% | $2,307.80

Bid Items

Items: 40, 0 filtered
ANGELINA CR  |  LUFKIN  |  0911-38-069  |  05/01/2018  |  $357,675  |  BR 1702(558)  |  BRIDGE REPL  |  43 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate TREVWAY, INC. STATELINE CONSTRUCTION, LLC DREWERY CONSTRUCTION COMPANY, INCORPORATED FNH CONSTRUCTION, LLC LONGVIEW BRIDGE AND ROAD, LTD. PIERCE R & B LLC HODGES AND SON CONSTRUCTION COMPANY, INC. EAST TEXAS BRIDGE, INC.
100 6002 PREPARING ROW STA 2.850 $3,200.000 $2,000.000 $2,200.000 $5,380.000 $3,000.000 $10,000.000 $3,000.000 $5,000.000 $7,000.000
110 6001 EXCAVATION (ROADWAY) CY 59.000 $10.000 $25.200 $20.000 $28.000 $50.000 $20.000 $40.000 $30.000 $35.000
132 6003 EMBANKMENT (FINAL)(ORD COMP)(TY B) CY 259.000 $30.000 $20.000 $22.000 $35.000 $35.000 $20.000 $30.000 $30.000 $35.000
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY 820.000 $1.000 $7.000 $4.000 $3.500 $2.000 $1.000 $3.000 $5.000 $4.000
164 6003 BROADCAST SEED (PERM) (RURAL) (CLAY) SY 820.000 $1.000 $1.000 $1.250 $0.800 $1.000 $2.000 $1.330 $5.000 $1.350
164 6009 BROADCAST SEED (TEMP) (WARM) SY 820.000 $1.000 $1.000 $0.100 $0.800 $1.000 $0.010 $1.170 $3.000 $1.100
164 6011 BROADCAST SEED (TEMP) (COOL) SY 820.000 $1.000 $1.000 $0.100 $0.800 $1.000 $0.010 $1.150 $3.000 $1.100
168 6001 VEGETATIVE WATERING MG 8.200 $30.000 $100.000 $100.000 $50.000 $80.000 $20.000 $75.000 $1.000 $50.000
169 6002 SOIL RETENTION BLANKETS (CL 1) (TY B) SY 820.000 $3.000 $2.000 $1.650 $1.150 $4.500 $1.200 $1.700 $5.000 $1.750
247 6061 FL BS (CMP IN PLC)(TYA GR1-2) (6") SY 544.000 $30.000 $30.000 $31.000 $25.650 $20.000 $22.000 $23.000 $40.000 $25.000
310 6009 PRIME COAT (MC-30) GAL 109.000 $3.500 $45.000 $12.000 $8.000 $6.000 $12.000 $25.000 $16.000 $20.000
340 6106 D-GR HMA(SQ) TY-D PG64-22 TON 45.000 $150.000 $250.000 $185.000 $257.000 $180.000 $260.000 $300.000 $200.000 $450.000
400 6005 CEM STABIL BKFL CY 40.000 $250.000 $133.000 $200.000 $155.000 $220.000 $175.000 $210.000 $250.000 $215.000
416 6003 DRILL SHAFT (30 IN) LF 369.000 $120.000 $195.000 $189.000 $182.000 $200.000 $227.000 $200.000 $175.000 $200.000
420 6013 CL C CONC (ABUT) CY 26.600 $1,000.000 $600.000 $1,050.000 $1,000.000 $1,100.000 $900.000 $1,000.000 $1,200.000 $950.000
422 6005 REINF CONC SLAB (BOX BEAM) SF 1,560.000 $20.000 $20.000 $16.500 $18.000 $18.000 $14.000 $21.000 $22.000 $18.000
422 6023 SHEAR KEY CY 8.000 $535.000 $150.000 $325.000 $350.000 $500.000 $435.000 $425.000 $800.000 $400.000
425 6001 PRESTR CONC BOX BEAM (4B20) LF 238.000 $200.000 $206.000 $190.000 $174.000 $165.000 $243.000 $195.000 $240.000 $205.000
425 6002 PRESTR CONC BOX BEAM (5B20) LF 119.000 $200.000 $229.000 $220.000 $174.000 $165.000 $243.000 $195.000 $240.000 $205.000
432 6035 RIPRAP (STONE PROTECTION)(24 IN) CY 162.000 $175.000 $161.320 $120.000 $170.000 $100.000 $180.000 $165.000 $200.000 $165.000
450 6019 RAIL (TY T631LS) LF 152.000 $65.000 $55.000 $52.000 $61.000 $115.000 $65.000 $70.000 $60.000 $52.000
464 6007 RC PIPE (CL III)(30 IN) LF 164.000 $115.000 $68.330 $85.000 $69.000 $158.000 $90.000 $125.000 $60.000 $80.000
467 6423 SET (TY II) (30 IN) (RCP) (6: 1) (P) EA 2.000 $2,000.000 $2,147.000 $1,500.000 $1,500.000 $4,351.000 $1,600.000 $4,000.000 $5,000.000 $2,000.000
496 6009 REMOV STR (BRIDGE 0 - 99 FT LENGTH) EA 1.000 $8,000.000 $20,000.000 $17,000.000 $20,000.000 $25,000.000 $10,000.000 $24,000.000 $15,000.000 $25,000.000
500 6001 MOBILIZATION LS 1.000 $25,000.000 $35,000.000 $37,000.000 $40,000.000 $35,000.000 $40,000.000 $44,000.000 $40,000.000 $40,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 4.000 $1,500.000 $822.000 $2,000.000 $1,600.000 $3,500.000 $4,200.000 $2,000.000 $2,000.000 $3,000.000
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 85.000 $30.000 $15.000 $31.000 $31.000 $35.000 $30.000 $32.000 $10.000 $32.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 85.000 $10.000 $5.000 $13.000 $8.400 $10.000 $8.000 $12.000 $10.000 $10.000
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 156.000 $20.000 $12.000 $28.000 $27.300 $10.000 $10.000 $28.000 $1.000 $30.000
506 6024 CONSTRUCTION EXITS (REMOVE) SY 156.000 $10.000 $5.000 $14.000 $7.350 $5.000 $5.000 $13.000 $1.000 $12.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 646.000 $3.000 $3.000 $3.000 $3.150 $4.500 $3.250 $3.150 $2.000 $3.250
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 646.000 $1.000 $1.000 $1.500 $1.050 $1.000 $1.000 $1.290 $1.000 $1.250
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 23.000 $25.000 $73.000 $27.000 $29.000 $28.000 $30.000 $28.600 $25.000 $27.000
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 2.000 $1,000.000 $1,435.680 $1,325.000 $1,050.000 $1,300.000 $1,000.000 $1,248.980 $1,200.000 $1,300.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 2.000 $2,500.000 $2,686.210 $2,850.000 $2,400.000 $3,200.000 $2,500.000 $2,800.000 $2,600.000 $2,900.000
552 6001 WIRE FENCE (TY A) LF 426.000 $8.000 $6.000 $12.000 $7.000 $10.000 $11.750 $15.000 $10.000 $20.000
552 6008 WIRE FENCE (WATER GAP) LF 120.000 $8.000 $22.000 $32.000 $25.000 $10.000 $45.000 $50.000 $20.000 $45.000
644 6076 REMOVE SM RD SN SUP&AM EA 1.000 $90.000 $200.000 $200.000 $70.000 $50.000 $80.000 $246.000 $200.000 $125.000
658 6016 INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI) EA 3.000 $30.000 $5.000 $26.000 $16.000 $8.000 $16.500 $30.000 $50.000 $30.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 3.000 $40.000 $11.000 $42.000 $28.000 $16.000 $30.000 $45.000 $50.000 $50.000
Totals: $357,674.50 $388,000.54 $389,508.00 $394,334.20 $418,728.00 $440,664.90 $445,945.00 $450,062.20 $452,370.00