Job Info for 0911-00-116

County: ANGELINA Highway: VA Date: 09/07/2023 (1 year ago) Engineer's Estimate: $744,361 Control Number: 0911-00-116
Project: BR 2B23(192) District: LUFKIN Time: 283 WORKING DAYS Type: BRIDGE MAINTENANCE
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $744,361.00
GARRET SHIELDS INFRASTRUCTURE   $644,360.00 1
-13.43% | -$100,001.00
AMERICAN INFRASTRUCTURE MAINTENANCE MANAGEMENT LLC   $670,000.00 2
-9.99% | -$74,361.00
3.98% | $25,640.00
ICOS MANAGEMENT, LLC   $909,257.00 3
22.15% | $164,896.00
41.11% | $264,897.00
35.71% | $239,257.00
TRUE ROADS CONSTRUCTION, LLC   $1,341,496.00 4
80.22% | $597,135.00
108.19% | $697,136.00
47.54% | $432,239.00

Bid Items

Items: 22, 0 filtered
ANGELINA VA  |  LUFKIN  |  0911-00-116  |  09/07/2023  |  $744,361  |  BR 2B23(192)  |  BRIDGE MAINT  |  283 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate GARRET SHIELDS INFRASTRUCTURE AMERICAN INFRASTRUCTURE MAINTENANCE MANAGEMENT LLC ICOS MANAGEMENT, LLC TRUE ROADS CONSTRUCTION, LLC
104 6009 REMOVING CONC (RIPRAP) SY 383.000 $50.000 $50.000 $20.000 $220.000 $90.000
132 6019 EMBANKMENT (VEHICLE)(ORD COMP)(TY B) CY 43.000 $100.000 $40.000 $45.000 $110.000 $300.000
164 6001 BROADCAST SEED (PERM) (RURAL) (SANDY) SY 396.000 $1.000 $1.000 $2.000 $1.000 $13.500
400 6005 CEM STABIL BKFL CY 15.000 $350.000 $500.000 $275.000 $990.000 $1,100.000
401 6001 FLOWABLE BACKFILL CY 66.000 $500.000 $1,000.000 $450.000 $275.000 $800.000
420 6011 CL B CONC (FLUME) CY 7.000 $1,300.000 $600.000 $899.000 $1,100.000 $2,800.000
420 6158 CL C CONC(PILE ENCASEMENT) LF 64.000 $1,200.000 $1,000.000 $375.000 $1,320.000 $2,400.000
420 6166 CL C CONC (TIE BEAM) CY 10.300 $2,500.000 $5,000.000 $2,500.000 $5,500.000 $22,500.000
429 6003 CONC STR REPAIR(DECK REP(PART DEPTH)) SF 28.000 $300.000 $100.000 $500.000 $550.000 $450.000
429 6007 CONC STR REPAIR (VERTICAL & OVERHEAD) SF 338.000 $250.000 $200.000 $310.000 $242.000 $250.000
432 6035 RIPRAP (STONE PROTECTION)(24 IN) CY 699.000 $235.000 $250.000 $190.000 $440.000 $450.000
438 6004 CLEANING AND SEALING EXIST JOINTS(CL7) LF 1,110.000 $80.000 $50.000 $100.000 $66.000 $88.000
459 6009 GABIONS (3' X 3')(GALV) CY 30.000 $600.000 $300.000 $275.000 $660.000 $600.000
480 6001 CLEAN EXIST CULVERTS EA 1.000 $1,500.000 $3,094.000 $6,000.000 $6,600.000 $18,000.000
500 6001 MOBILIZATION LS 1.000 $64,000.000 $65,000.000 $62,500.000 $77,000.000 $130,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 25.000 $4,000.000 $1,000.000 $101.000 $1.000 $2,500.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 350.000 $3.500 $4.000 $5.000 $2.000 $12.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 350.000 $1.500 $1.000 $1.000 $1.000 $5.000
778 6001 CONCRETE RAIL REPAIR (IN-KIND) LF 3.000 $1,000.000 $500.000 $1,000.000 $1,100.000 $3,500.000
785 6010 BRIDGE JOINT REPLACEMENT (ARMOR) LF 28.000 $1,000.000 $500.000 $10.000 $1,100.000 $1,400.000
6185 6002 TMA (STATIONARY) DAY 23.000 $300.000 $300.000 $5,000.000 $550.000 $750.000
7000 6001 REML & DISPL DRIFTWOOD & DEBRIS CY 10.000 $150.000 $300.000 $750.000 $880.000 $380.000
Totals: $744,361.00 $644,360.00 $670,000.00 $909,257.00 $1,341,496.00