County: ANGELINA Highway: VA Date: 09/08/2022 (2 years ago) Engineer's Estimate: $520,225 Control Number: 0911-00-113
Project: C 911-00-113 District: LUFKIN Time: 106 WORKING DAYS Type: BRIDGE MAINTENANCE
HCS
Pay Estimates: 1 | 2 | 3
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $520,225.00
THK CONSTRUCTION LLC   $439,626.00 1
-15.49% | -$80,599.00
GARRET SHIELDS INFRASTRUCTURE   $463,875.00 2
-10.83% | -$56,350.00
5.52% | $24,249.00
CROSS PLUS CONSTRUCTION, LLC   $543,481.00 3
4.47% | $23,256.00
23.62% | $103,855.00
17.16% | $79,606.00
B & MS CONSTRUCTION, INC.   $623,343.75 4
19.82% | $103,118.75
41.79% | $183,717.75
14.69% | $79,862.75
BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC   $665,601.00 5
27.94% | $145,376.00
51.4% | $225,975.00
6.78% | $42,257.25
DIGG COMMERCIAL, LLC   $700,701.00 6
34.69% | $180,476.00
59.39% | $261,075.00
5.27% | $35,100.00

Bid Items

Items: 19, 0 filtered
ANGELINA VA  |  LUFKIN  |  0911-00-113  |  09/08/2022  |  $520,225  |  C 911-00-113  |  BRIDGE MAINT  |  106 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate THK CONSTRUCTION LLC GARRET SHIELDS INFRASTRUCTURE CROSS PLUS CONSTRUCTION, LLC B & MS CONSTRUCTION, INC. BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC DIGG COMMERCIAL, LLC
104 6009 REMOVING CONC (RIPRAP) SY 90.000 $15.000 $25.000 $40.000 $55.000 $85.000 $150.000 $200.000
132 6003 EMBANKMENT (FINAL)(ORD COMP)(TY B) CY 20.000 $20.000 $25.000 $100.000 $275.000 $98.000 $75.000 $200.000
401 6001 FLOWABLE BACKFILL CY 24.000 $400.000 $800.000 $500.000 $550.000 $365.000 $300.000 $700.000
429 6007 CONC STR REPAIR (VERTICAL & OVERHEAD) SF 150.500 $250.000 $150.000 $150.000 $220.000 $210.000 $300.000 $500.000
432 6027 RIPRAP (STONE COMMON)(DRY)(24 IN) CY 395.000 $250.000 $200.000 $300.000 $330.000 $402.500 $450.000 $300.000
438 6001 CLEANING AND SEALING EXISTING JOINTS LF 730.000 $25.000 $80.000 $40.000 $39.000 $30.000 $45.000 $65.000
446 6001 CLEAN & PAINT EXIST STR (SYSTEM I) LS 1.000 $30,000.000 $1.000 $1,000.000 $1.000 $45,000.000 $1.000 $1.000
459 6001 GABIONS (GALV) CY 54.000 $750.000 $200.000 $300.000 $385.000 $380.000 $550.000 $300.000
459 6009 GABIONS (3' X 3')(GALV) CY 70.000 $400.000 $200.000 $300.000 $303.000 $425.000 $550.000 $300.000
466 6153 WINGWALL (FW - 0) (HW=6 FT) EA 1.000 $12,500.000 $15,000.000 $10,000.000 $14,300.000 $20,700.000 $40,000.000 $15,000.000
466 6159 WINGWALL (FW - S) (HW=12 FT) EA 2.000 $45,000.000 $20,000.000 $30,000.000 $60,500.000 $32,500.000 $50,000.000 $30,000.000
480 6001 CLEAN EXIST CULVERTS EA 2.000 $2,000.000 $2,000.000 $10,000.000 $11,000.000 $5,000.000 $10,000.000 $10,000.000
500 6001 MOBILIZATION LS 1.000 $70,000.000 $50,000.000 $50,000.000 $55,000.000 $85,000.000 $85,000.000 $40,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 10.000 $5,000.000 $10,000.000 $5,000.000 $3,300.000 $5,175.000 $1,000.000 $4,000.000
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 500.000 $25.000 $5.000 $40.000 $1.000 $63.250 $25.000 $40.000
506 6024 CONSTRUCTION EXITS (REMOVE) SY 500.000 $7.000 $5.000 $20.000 $1.000 $28.750 $10.000 $5.000
778 6021 CONCRETE RAIL REPLACEMENT (TYPE 501) LF 4.000 $500.000 $1,500.000 $1,000.000 $3,300.000 $1,650.000 $3,000.000 $3,000.000
6185 6002 TMA (STATIONARY) DAY 33.000 $250.000 $300.000 $300.000 $550.000 $316.250 $150.000 $5,000.000
7000 6001 REML & DISPL DRIFTWOOD & DEBRIS CY 30.000 $100.000 $100.000 $130.000 $275.000 $57.500 $1,000.000 $300.000
Totals: $520,225.00 $439,626.00 $463,875.00 $543,481.00 $623,343.75 $665,601.00 $700,701.00