County: ANGELINA Highway: SH 103 Date: 03/06/2019 (5 years ago) Engineer's Estimate: $1,217,321 Control Number: 0336-03-071
Project: STP 2019(635) District: LUFKIN Time: 73 WORKING DAYS Type: WIDENING PAVING FOR ADDITIONAL TURNING LANES

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $1,217,321.15
LONGVIEW BRIDGE AND ROAD, LTD.   $1,665,262.77 1
36.8% | $447,941.62
DREWERY CONSTRUCTION COMPANY, INCORPORATED   $1,831,903.40 2
50.49% | $614,582.25
10.01% | $166,640.63
HERITAGE ASPHALT COMPANY LLC   $1,864,465.87 3
53.16% | $647,144.72
11.96% | $199,203.10
1.78% | $32,562.47

Bid Items

Items: 77, 0 filtered
ANGELINA SH 103  |  LUFKIN  |  0336-03-071  |  03/06/2019  |  $1,217,321  |  STP 2019(635)  |  WIDENING PAVING FOR ADDITIONAL TURNING LANES  |  73 WORKING DAYS
Alt Item code Description Unit Quantity Engineer's Estimate LONGVIEW BRIDGE AND ROAD, LTD. DREWERY CONSTRUCTION COMPANY, INCORPORATED HERITAGE ASPHALT COMPANY LLC
100 6002 PREPARING ROW STA 17.000 $1,000.000 $1,950.000 $8,500.000 $750.000
104 6021 REMOVING CONC (CURB) LF 2,124.000 $18.000 $12.500 $11.000 $22.000
105 6016 REMOVING STAB BASE & ASPH PAV(16") SY 4,002.000 $7.500 $10.750 $13.000 $16.000
106 6002 OBLITERATING ABANDONED ROAD SY 412.000 $4.000 $36.000 $10.000 $5.000
112 6001 SUBGRADE WIDENING (ORD COMP) STA 28.100 $300.000 $860.000 $530.000 $750.000
132 6019 EMBANKMENT (VEHICLE)(ORD COMP)(TY B) CY 496.000 $12.000 $19.000 $26.000 $12.000
150 6001 BLADING STA 2.500 $80.000 $1,025.000 $560.000 $231.000
158 6003 SPEC EXCAV WORK (HYD EXCAVATOR) HR 24.000 $130.000 $250.000 $200.000 $160.000
162 6002 BLOCK SODDING SY 214.000 $3.000 $6.600 $5.350 $7.000
164 6009 BROADCAST SEED (TEMP) (WARM) SY 8,716.000 $0.100 $0.280 $0.250 $0.250
164 6011 BROADCAST SEED (TEMP) (COOL) SY 8,716.000 $0.100 $0.280 $0.250 $0.250
164 6025 CELL FBR MLCH SEED(PERM)(URBAN)(SANDY) SY 17,432.000 $0.300 $0.310 $0.250 $1.000
168 6001 VEGETATIVE WATERING MG 701.100 $13.500 $8.300 $1.000 $25.000
275 6001 CEMENT TON 79.000 $145.000 $205.000 $168.000 $140.000
275 6080 CEMENT TREAT (SUBGRADE)(12") SY 5,157.000 $3.500 $3.000 $7.500 $7.000
310 6009 PRIME COAT (MC-30) GAL 1,290.000 $3.000 $5.500 $5.300 $4.000
340 6011 D-GR HMA(SQ) TY-B PG64-22 TON 2,365.000 $100.000 $120.000 $114.000 $102.000
340 6246 D-GR HMA (SQ) TY-D PG64_22(LEVEL-UP) TON 743.000 $75.000 $135.000 $129.000 $102.000
344 6063 SUPERPAVE MIXTURES SP-C SAC-A PG76-22 TON 2,523.000 $85.000 $109.320 $115.000 $135.000
354 6021 PLANE ASPH CONC PAV(0" TO 2") SY 7,090.000 $2.000 $4.650 $2.530 $5.000
400 6005 CEM STABIL BKFL CY 36.000 $120.000 $265.000 $185.000 $100.000
416 6029 DRILL SHAFT (RDWY ILL POLE) (30 IN) LF 16.000 $250.000 $210.000 $200.000 $320.000
464 6003 RC PIPE (CL III)(18 IN) LF 274.000 $50.000 $70.000 $53.000 $100.000
467 6358 SET (TY II) (18 IN) (RCP) (4: 1) (C) EA 2.000 $850.000 $625.000 $670.000 $2,800.000
467 6363 SET (TY II) (18 IN) (RCP) (6: 1) (P) EA 8.000 $675.000 $675.000 $700.000 $2,500.000
496 6016 REMOV STR (PIPE) EA 9.000 $350.000 $425.000 $550.000 $2,000.000
500 6001 MOBILIZATION LS 1.000 $95,000.000 $160,000.000 $275,000.000 $178,207.120
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 7.000 $2,500.000 $3,800.000 $2,900.000 $15,000.000
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 520.000 $30.000 $30.250 $29.000 $40.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 520.000 $8.500 $9.350 $9.000 $15.000
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 278.000 $20.000 $39.000 $38.000 $40.000
506 6024 CONSTRUCTION EXITS (REMOVE) SY 278.000 $7.000 $10.000 $9.500 $15.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 160.000 $2.500 $5.500 $5.350 $6.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 160.000 $0.650 $1.320 $1.070 $2.000
528 6002 COLORED TEXTURED CONC (6") SY 589.000 $80.000 $125.000 $110.000 $56.000
529 6008 CONC CURB & GUTTER (TY II) LF 1,935.000 $50.000 $36.000 $37.000 $20.000
530 6002 INTERSECTIONS (ACP) SY 2,386.000 $40.000 $55.000 $55.000 $75.000
530 6005 DRIVEWAYS (ACP) SY 563.000 $30.000 $54.000 $60.000 $55.000
536 6005 CONCRETE MEDIAN (NOSE) SY 5.000 $85.000 $500.000 $335.000 $110.000
560 6007 MAILBOX INSTALL-S (WC-POST) TY 3 EA 1.000 $180.000 $275.000 $265.000 $1,000.000
610 6004 RELOCATE RD IL ASM (TRANS-BASE) EA 1.000 $1,500.000 $3,100.000 $3,000.000 $4,000.000
610 6009 REMOVE RD IL ASM (TRANS-BASE) EA 2.000 $1,000.000 $1,880.000 $1,800.000 $2,000.000
610 6215 IN RD IL (TY SA) 40T-8-8 (250W EQ) LED EA 2.000 $4,000.000 $5,000.000 $4,700.000 $6,000.000
618 6006 CONDT (HDPE) (2") BORE LF 120.000 $15.000 $26.000 $25.000 $30.000
618 6046 CONDT (PVC) (SCH 80) (2") LF 530.000 $7.000 $9.250 $9.000 $10.000
620 6007 ELEC CONDR (NO.8) BARE LF 670.000 $1.100 $2.850 $2.750 $4.000
620 6008 ELEC CONDR (NO.8) INSULATED LF 1,460.000 $1.500 $3.000 $2.800 $5.000
624 6002 GROUND BOX TY A (122311)W/APRON EA 2.000 $1,000.000 $925.000 $900.000 $1,200.000
644 6030 IN SM RD SN SUP&AM TYS80(1)SA(T) EA 1.000 $800.000 $840.000 $800.000 $1,500.000
644 6033 IN SM RD SN SUP&AM TYS80(1)SA(U) EA 2.000 $850.000 $880.000 $856.000 $1,300.000
644 6060 IN SM RD SN SUP&AM TYTWT(1)WS(P) EA 13.000 $330.000 $360.000 $340.000 $700.000
644 6061 IN SM RD SN SUP&AM TYTWT(1)WS(T) EA 2.000 $400.000 $350.000 $335.000 $700.000
658 6074 INSTL DEL ASSN (OM-2Z)(FLX)(WAP) EA 2.000 $110.000 $105.000 $100.000 $225.000
662 6001 WK ZN PAV MRK NON-REMOV (W)4"(BRK) LF 405.000 $0.150 $1.100 $1.070 $1.250
662 6004 WK ZN PAV MRK NON-REMOV (W)4"(SLD) LF 3,195.000 $0.150 $1.100 $1.070 $1.250
662 6012 WK ZN PAV MRK NON-REMOV (W)8"(SLD) LF 127.000 $0.150 $1.100 $1.070 $1.250
662 6034 WK ZN PAV MRK NON-REMOV (Y)4"(SLD) LF 1,823.000 $0.150 $1.100 $1.070 $1.250
662 6060 WK ZN PAV MRK REMOV (W)4"(BRK) LF 5,354.000 $0.300 $1.100 $1.070 $1.250
662 6063 WK ZN PAV MRK REMOV (W)4"(SLD) LF 6,562.000 $0.300 $1.100 $1.070 $1.250
662 6071 WK ZN PAV MRK REMOV (W)8"(SLD) LF 1,454.000 $0.300 $1.100 $1.070 $1.250
662 6095 WK ZN PAV MRK REMOV (Y)4"(SLD) LF 5,647.000 $0.300 $1.100 $1.070 $1.250
662 6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 308.000 $1.000 $1.500 $1.300 $1.000
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 328.000 $1.000 $1.500 $1.300 $1.000
666 6035 REFL PAV MRK TY I (W)8"(SLD)(090MIL) LF 1,454.000 $0.850 $0.950 $0.920 $1.250
666 6047 REFL PAV MRK TY I (W)24"(SLD)(090MIL) LF 48.000 $5.500 $6.600 $6.420 $7.000
666 6299 RE PM W/RET REQ TY I (W)4"(BRK)(090MIL) LF 1,338.000 $0.400 $1.100 $1.070 $1.250
666 6302 RE PM W/RET REQ TY I (W)4"(SLD)(090MIL) LF 6,050.000 $0.400 $1.100 $1.070 $1.250
666 6314 RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL) LF 5,872.000 $0.400 $1.100 $1.070 $1.250
668 6077 PREFAB PAV MRK TY C (W) (ARROW) EA 10.000 $225.000 $220.000 $214.000 $225.000
668 6085 PREFAB PAV MRK TY C (W) (WORD) EA 10.000 $285.000 $330.000 $321.000 $300.000
672 6009 REFL PAV MRKR TY II-A-A EA 61.000 $2.750 $5.500 $5.350 $6.000
672 6010 REFL PAV MRKR TY II-C-R EA 139.000 $4.000 $5.500 $5.350 $6.000
3002 6001 MEMBRANE UNDERSEAL GAL 4,024.000 $10.860 $0.000 $0.000 $10.000
6185 6001 TMA (STATIONARY) EA 2.000 $9,000.000 $16,500.000 $8,800.000 $15,000.000
6185 6005 TMA (MOBILE OPERATION) DAY 12.000 $45.000 $100.000 $80.000 $125.000
1 316 6400 ASPH (AC-15P OR AC-10-2TR OR CRS-2P) GAL 6,759.000 $3.250 $4.500 $3.830 $3.500
1 316 6416 AGGR (TY E OR L, PE OR PL GR 4) CY 145.000 $150.000 $190.000 $200.000 $150.000
Totals: $1,261,021.79 $1,665,262.77 $1,831,903.40 $1,864,465.87