|
|
|
PREPARING ROW
|
AC
|
60.000
|
$3,000.000
|
$5,000.000
|
$5,500.000
|
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-6")
|
SY
|
357.000
|
$9.000
|
$4.000
|
$16.000
|
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
94,416.000
|
$12.000
|
$11.500
|
$11.000
|
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY A)
|
CY
|
169,129.000
|
$11.000
|
$42.000
|
$9.500
|
|
|
|
BLADING
|
HR
|
100.000
|
$200.000
|
$305.000
|
$400.000
|
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
196,522.000
|
$0.140
|
$0.250
|
$0.120
|
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY C)
|
SY
|
196,522.000
|
$1.000
|
$0.900
|
$1.050
|
|
|
|
PROOF ROLLING
|
HR
|
100.000
|
$130.000
|
$100.000
|
$175.000
|
|
|
|
FL BS (CMP IN PLC)(TY A GR 4) (6")
|
SY
|
26,918.000
|
$14.000
|
$12.000
|
$10.750
|
|
|
|
FL BS (CMP IN PLC)(TY A GR 4)(10")
|
SY
|
91,682.000
|
$17.000
|
$17.000
|
$12.500
|
|
|
|
REWORK BS MTL (TY D)(SURF)(ORD COMP)
|
SY
|
199.000
|
$1.500
|
$20.000
|
$25.000
|
|
|
|
PRIME COAT (AE-P)
|
GAL
|
28,551.000
|
$4.500
|
$4.750
|
$4.750
|
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
493.000
|
$3.000
|
$9.000
|
$14.500
|
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
54,192.000
|
$6.000
|
$5.000
|
$5.320
|
|
|
|
AGGR(TY-PB GR-4 SAC-A)
|
CY
|
1,318.000
|
$140.000
|
$160.000
|
$180.000
|
|
|
|
CEM STABIL BKFL
|
CY
|
551.000
|
$180.000
|
$240.000
|
$330.000
|
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
936.000
|
$600.000
|
$675.000
|
$487.300
|
|
|
|
DRILL SHAFT (SIGN MTS) (12 IN)
|
LF
|
16.000
|
$260.000
|
$125.000
|
$128.700
|
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
370.000
|
$270.000
|
$340.000
|
$434.500
|
|
|
|
CL C CONC (ABUT)
|
CY
|
118.600
|
$1,350.000
|
$2,827.000
|
$1,540.000
|
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
8,400.000
|
$30.000
|
$40.500
|
$30.800
|
|
|
|
APPROACH SLAB (HPC)
|
CY
|
88.000
|
$900.000
|
$1,399.000
|
$880.000
|
|
|
|
RETAINING WALL (MSE)
|
SF
|
100,866.000
|
$45.000
|
$42.500
|
$100.000
|
|
|
|
PRESTR CONC GIRDER (TX70)
|
LF
|
1,196.000
|
$350.000
|
$384.000
|
$380.600
|
|
|
|
EPOXY WATERPROOF FINISH (TY X)
|
SF
|
3,124.000
|
$10.000
|
$10.000
|
$7.430
|
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
774.000
|
$600.000
|
$740.000
|
$627.000
|
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
139.000
|
$465.000
|
$842.000
|
$825.000
|
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
432.000
|
$900.000
|
$800.000
|
$797.500
|
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
204.000
|
$450.000
|
$825.000
|
$770.000
|
|
|
|
RAIL (TY SSTR)(HPC)
|
LF
|
300.000
|
$100.000
|
$160.000
|
$137.500
|
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
112.000
|
$125.000
|
$400.000
|
$287.100
|
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
200.000
|
$195.000
|
$720.000
|
$423.500
|
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
267.000
|
$430.000
|
$968.000
|
$715.000
|
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
234.000
|
$360.000
|
$942.000
|
$907.500
|
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,105.000
|
$65.000
|
$135.000
|
$101.200
|
|
|
|
MANH (COMPL)(PRM)(48IN)
|
EA
|
1.000
|
$3,800.000
|
$10,000.000
|
$6,050.000
|
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
7.000
|
$5,000.000
|
$5,700.000
|
$7,150.000
|
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
|
EA
|
4.000
|
$8,000.000
|
$4,000.000
|
$5,500.000
|
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
6.000
|
$8,000.000
|
$7,800.000
|
$8,250.000
|
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
4.000
|
$8,000.000
|
$7,700.000
|
$9,350.000
|
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$2,300.000
|
$1,615.000
|
$2,750.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (P)
|
EA
|
8.000
|
$1,800.000
|
$1,967.000
|
$3,300.000
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,631,651.960
|
$3,649,000.000
|
$3,000,000.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
32.000
|
$14,000.000
|
$23,000.000
|
$15,000.000
|
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
1,180.000
|
$8.000
|
$9.000
|
$12.000
|
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,180.000
|
$1.750
|
$1.750
|
$6.000
|
|
|
|
CONSTRUCTING DETOURS
|
SY
|
38,224.000
|
$65.000
|
$68.000
|
$77.250
|
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
6,680.000
|
$100.000
|
$134.000
|
$100.760
|
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
12,370.000
|
$0.250
|
$0.350
|
$0.220
|
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
17,200.000
|
$0.200
|
$0.300
|
$0.240
|
|
|
|
CONC DIRECTIONAL ISLAND
|
SY
|
3,838.000
|
$93.000
|
$65.000
|
$137.500
|
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
4,700.000
|
$35.000
|
$35.000
|
$39.600
|
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,800.000
|
$2,750.000
|
$3,135.000
|
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,230.000
|
$2,250.000
|
$1,925.000
|
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
2.000
|
$700.000
|
$1,500.000
|
$1,595.000
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$3,100.000
|
$3,750.000
|
$4,070.000
|
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
2.000
|
$30,000.000
|
$30,000.000
|
$38,500.000
|
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
8.000
|
$1,000.000
|
$1,700.000
|
$330.000
|
|
|
|
IN RD IL (U/P) (TY 2) (150W EQ) LED
|
EA
|
4.000
|
$1,100.000
|
$3,000.000
|
$2,200.000
|
|
|
|
IN RD IL (TY SA) 50T-10 (400W EQ) LED
|
EA
|
37.000
|
$4,200.000
|
$7,000.000
|
$8,800.000
|
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
14,512.000
|
$26.000
|
$6.000
|
$14.300
|
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
543.000
|
$22.000
|
$52.000
|
$46.200
|
|
|
|
CONDT (RM) (1")
|
LF
|
459.000
|
$20.000
|
$51.000
|
$49.500
|
|
|
|
ELEC CONDR (NO.10) BARE
|
LF
|
459.000
|
$1.200
|
$2.300
|
$2.200
|
|
|
|
ELEC CONDR (NO.10) INSULATED
|
LF
|
459.000
|
$1.300
|
$3.000
|
$2.480
|
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
15,815.000
|
$1.500
|
$3.000
|
$3.300
|
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
15,815.000
|
$1.500
|
$4.000
|
$3.580
|
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
34.000
|
$1,100.000
|
$1,650.000
|
$2,200.000
|
|
|
|
REMOVE GROUND BOX
|
EA
|
21.000
|
$200.000
|
$800.000
|
$330.000
|
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
|
EA
|
1.000
|
$6,000.000
|
$10,000.000
|
$13,750.000
|
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
60.000
|
$25.000
|
$45.000
|
$40.700
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
30.000
|
$610.000
|
$1,110.000
|
$977.900
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
23.000
|
$690.000
|
$1,200.000
|
$1,115.400
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
18.000
|
$800.000
|
$1,700.000
|
$1,554.300
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
12.000
|
$950.000
|
$1,800.000
|
$1,689.600
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
4.000
|
$1,000.000
|
$1,745.000
|
$1,672.000
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
47.000
|
$100.000
|
$160.000
|
$200.000
|
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
390.000
|
$5.000
|
$10.000
|
$9.320
|
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
48.000
|
$25.000
|
$35.000
|
$50.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
54.000
|
$25.000
|
$30.000
|
$49.500
|
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
65.000
|
$25.000
|
$30.000
|
$49.500
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
|
EA
|
48.000
|
$95.000
|
$100.000
|
$92.400
|
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
16.000
|
$75.000
|
$105.000
|
$96.800
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
228,000.000
|
$0.200
|
$0.150
|
$0.140
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
114,000.000
|
$0.150
|
$0.150
|
$0.150
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
228,000.000
|
$0.200
|
$0.150
|
$0.140
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
11,400.000
|
$1.300
|
$0.500
|
$2.000
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
11,400.000
|
$1.000
|
$0.500
|
$2.000
|
|
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
140.000
|
$1.000
|
$1.800
|
$1.650
|
|
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
4,866.000
|
$0.900
|
$1.200
|
$1.060
|
|
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
300.000
|
$3.000
|
$4.750
|
$4.400
|
|
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
20,320.000
|
$5.000
|
$5.500
|
$5.500
|
|
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
1,596.000
|
$0.400
|
$1.000
|
$0.940
|
|
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
41,568.000
|
$0.500
|
$0.650
|
$0.650
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
44,878.000
|
$0.500
|
$0.650
|
$0.650
|
|
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
48.000
|
$13.000
|
$22.000
|
$22.000
|
|
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
10.000
|
$210.000
|
$375.000
|
$352.000
|
|
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
18.000
|
$250.000
|
$450.000
|
$440.000
|
|
|
|
REFL PAV MRKR TY I-C
|
EA
|
949.000
|
$3.500
|
$5.000
|
$4.400
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
346.000
|
$3.000
|
$5.000
|
$4.400
|
|
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
270.000
|
$3.000
|
$5.000
|
$4.400
|
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
152,000.000
|
$0.500
|
$0.500
|
$0.500
|
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
760.000
|
$0.750
|
$0.400
|
$0.390
|
|
|
|
REMOV RDSD FLSH BCN AM (SOLAR PWRD)
|
EA
|
6.000
|
$900.000
|
$750.000
|
$605.000
|
|
|
|
REMOVAL OF CABLES
|
LF
|
3,016.000
|
$0.600
|
$3.500
|
$0.550
|
|
|
|
ANTI - GRAFFITI COATNG(PERMNENT-TY III)
|
SF
|
100,866.000
|
$0.900
|
$0.950
|
$0.860
|
|
|
|
D-GR HMA TY-D SAC-B PG64-22
|
TON
|
40.000
|
$150.000
|
$300.000
|
$700.000
|
|
|
|
SP MIXES SP-B SAC-B PG70-22
|
TON
|
49,518.000
|
$115.000
|
$100.000
|
$135.000
|
|
|
|
TACK COAT
|
GAL
|
11,411.000
|
$3.250
|
$6.000
|
$3.740
|
|
|
|
STONE-MTRX-ASPH SMAR-F SAC-A
|
TON
|
11,766.000
|
$150.000
|
$150.000
|
$192.000
|
|
|
|
BONDING COURSE
|
GAL
|
11,437.000
|
$3.500
|
$5.000
|
$4.440
|
|
|
|
THERMO PIPE(24")(PP)(TY S)(TY II)
|
LF
|
124.000
|
$75.000
|
$107.000
|
$88.000
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$10,000.000
|
$13,600.000
|
$19,250.000
|
|
|
|
TMSP RADAR SPEED CONTROL MONITOR
|
EA
|
4.000
|
$9,000.000
|
$13,600.000
|
$16,500.000
|
|
|
|
TMA (STATIONARY)
|
DAY
|
580.000
|
$125.000
|
$196.000
|
$110.000
|
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
540.000
|
$65.000
|
$65.000
|
$93.500
|
|
1
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
124.000
|
$75.000
|
$0.000
|
$0.000
|
|
Totals: |
$29,606,471.590
|
$36,740,466.750
|
$37,953,958.850
|