|
|
PREPARING ROW
|
STA
|
3.000
|
$2,000.000
|
$1,840.250
|
$1,200.000
|
$5,000.000
|
$3,187.780
|
$10,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
9.800
|
$30.000
|
$89.950
|
$85.000
|
$300.000
|
$248.720
|
$150.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
200.000
|
$10.000
|
$9.970
|
$10.000
|
$3.000
|
$20.730
|
$15.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2")
|
SY
|
2,038.000
|
$3.500
|
$3.830
|
$5.150
|
$2.950
|
$3.820
|
$3.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(6"-9")
|
SY
|
210,235.000
|
$5.000
|
$2.580
|
$3.750
|
$3.000
|
$5.470
|
$3.500
|
|
|
OBLITERATING ABANDONED ROAD
|
STA
|
3.900
|
$1,500.000
|
$1,045.570
|
$2,800.000
|
$5,000.000
|
$3,193.860
|
$3,500.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
34,281.000
|
$8.000
|
$7.060
|
$9.000
|
$8.000
|
$9.220
|
$21.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY A)
|
CY
|
15,259.000
|
$14.000
|
$5.340
|
$15.500
|
$11.000
|
$16.760
|
$19.000
|
|
|
BACKFILL (TY B)
|
STA
|
1,105.000
|
$140.000
|
$93.890
|
$120.000
|
$14.000
|
$114.930
|
$425.000
|
|
|
BLADING
|
HR
|
56.000
|
$200.000
|
$90.630
|
$350.000
|
$175.000
|
$160.010
|
$125.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
312,259.000
|
$0.250
|
$0.130
|
$0.160
|
$0.150
|
$0.140
|
$0.170
|
|
|
BONDED FBR MTRX SEED (TEMP)(WARM)
|
SY
|
82,028.000
|
$1.000
|
$0.780
|
$1.180
|
$0.800
|
$0.800
|
$0.840
|
|
|
PROOF ROLLING
|
HR
|
8.000
|
$120.000
|
$76.420
|
$150.000
|
$120.000
|
$129.750
|
$60.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 4) (6")
|
SY
|
31,608.000
|
$11.000
|
$10.900
|
$9.750
|
$9.000
|
$12.150
|
$14.000
|
|
|
FL BS (RDWY DEL) (TY A GR 4) (IN VEH)
|
CY
|
560.000
|
$60.000
|
$52.050
|
$24.500
|
$68.000
|
$50.570
|
$60.000
|
|
|
FL BS (CMP IN PLC) (TY A GR 4) (12.5")
|
SY
|
87,517.000
|
$20.000
|
$12.390
|
$12.750
|
$14.200
|
$16.230
|
$21.500
|
|
|
REWORK BS MTL (TY D) (6") (ORD COMP)
|
SY
|
15,120.000
|
$2.500
|
$1.770
|
$0.420
|
$1.200
|
$1.700
|
$1.500
|
|
|
REWORK BS MTL (TY D)(SURF)(ORD COMP)
|
SY
|
212,273.000
|
$1.000
|
$0.340
|
$0.420
|
$1.000
|
$1.210
|
$0.550
|
|
|
REWORK BS MTL (TY B) (12")(ORD COMP)
|
SY
|
6,756.000
|
$8.000
|
$13.860
|
$14.500
|
$15.000
|
$14.120
|
$4.500
|
|
|
PRIME COAT (AE-P)
|
GAL
|
44,381.000
|
$4.250
|
$2.790
|
$3.790
|
$4.400
|
$5.390
|
$5.500
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
117,072.000
|
$3.000
|
$3.360
|
$3.750
|
$3.900
|
$3.260
|
$3.750
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
249,759.000
|
$3.100
|
$3.660
|
$3.600
|
$3.400
|
$4.070
|
$4.000
|
|
|
AGGR(TY-PB GR-4 SAC-A)
|
CY
|
7,092.000
|
$90.000
|
$126.260
|
$103.000
|
$157.750
|
$124.340
|
$150.000
|
|
|
STONE-MTRX-ASPH SMAR-F SAC-A
|
TON
|
86,059.000
|
$120.000
|
$132.750
|
$126.000
|
$120.000
|
$145.370
|
$186.000
|
|
|
TACK COAT
|
GAL
|
46,831.000
|
$4.000
|
$1.830
|
$3.370
|
$4.750
|
$4.760
|
$5.500
|
|
|
STRUCT EXCAV
|
CY
|
219.400
|
$10.000
|
$13.060
|
$27.450
|
$55.000
|
$26.250
|
$26.000
|
|
|
CEM STABIL BKFL
|
CY
|
32.500
|
$250.000
|
$269.700
|
$543.010
|
$100.000
|
$157.500
|
$180.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
12.000
|
$200.000
|
$164.190
|
$185.110
|
$175.000
|
$181.650
|
$195.000
|
|
|
CL A CONC (COLLAR)
|
EA
|
7.000
|
$1,500.000
|
$630.600
|
$1,247.770
|
$800.000
|
$2,100.000
|
$2,200.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
3.900
|
$600.000
|
$1,278.040
|
$1,949.390
|
$950.000
|
$525.000
|
$1,200.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
3,421.100
|
$600.000
|
$426.880
|
$445.120
|
$443.250
|
$436.800
|
$450.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
|
LF
|
133.000
|
$800.000
|
$592.640
|
$988.680
|
$675.000
|
$787.500
|
$1,000.000
|
|
|
RC PIPE (CL III)(15 IN)
|
LF
|
178.000
|
$100.000
|
$79.650
|
$154.790
|
$90.000
|
$60.900
|
$65.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
102.000
|
$100.000
|
$89.760
|
$163.440
|
$95.000
|
$68.250
|
$75.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
19.000
|
$100.000
|
$197.020
|
$278.440
|
$250.000
|
$194.250
|
$200.000
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
|
EA
|
4.000
|
$8,000.000
|
$7,332.440
|
$7,999.640
|
$8,000.000
|
$9,975.000
|
$10,000.000
|
|
|
SET (TY II) (15 IN) (RCP) (4: 1) (C)
|
EA
|
3.000
|
$2,000.000
|
$1,847.080
|
$3,047.400
|
$1,500.000
|
$945.000
|
$1,000.000
|
|
|
SET (TY II) (15 IN) (RCP) (6: 1) (P)
|
EA
|
3.000
|
$2,000.000
|
$1,322.190
|
$2,433.250
|
$1,750.000
|
$1,050.000
|
$1,100.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$2,500.000
|
$1,299.850
|
$3,047.400
|
$2,000.000
|
$1,312.500
|
$1,400.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
4.000
|
$2,500.000
|
$2,952.310
|
$3,729.020
|
$2,500.000
|
$2,100.000
|
$2,200.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
32.000
|
$2,000.000
|
$2,684.980
|
$2,187.080
|
$2,500.000
|
$1,575.000
|
$1,800.000
|
|
|
REMOV STR (SET)
|
EA
|
19.000
|
$600.000
|
$4,142.430
|
$510.150
|
$400.000
|
$997.500
|
$975.000
|
|
|
REMOV STR (PIPE)
|
EA
|
1.000
|
$1,500.000
|
$4,142.440
|
$3,631.090
|
$600.000
|
$2,100.000
|
$2,200.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$3,362,000.000
|
$1,704,918.730
|
$350,000.000
|
$3,949,000.000
|
$2,600,000.000
|
$4,650,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
19.000
|
$15,000.000
|
$7,684.300
|
$10,000.000
|
$40,000.000
|
$18,375.120
|
$25,000.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
2,160.000
|
$7.000
|
$5.900
|
$13.000
|
$7.000
|
$6.210
|
$9.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,160.000
|
$2.000
|
$1.030
|
$4.000
|
$1.050
|
$2.110
|
$1.750
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
200.000
|
$30.000
|
$47.700
|
$37.450
|
$45.000
|
$105.000
|
$120.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
124,986.000
|
$0.150
|
$0.070
|
$0.160
|
$0.100
|
$0.160
|
$0.150
|
|
|
CABLE BARRIER SYSTEM (TL-4)
|
LF
|
60,262.000
|
$7.500
|
$13.590
|
$13.800
|
$13.150
|
$13.550
|
$15.000
|
|
|
CABLE BARRIER TERMINAL SECTION (TL-4)
|
EA
|
122.000
|
$3,500.000
|
$3,181.090
|
$3,317.000
|
$3,150.000
|
$3,255.000
|
$3,250.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
2.000
|
$250.000
|
$307.850
|
$358.450
|
$350.000
|
$351.750
|
$300.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
10.000
|
$600.000
|
$667.000
|
$695.500
|
$750.000
|
$682.500
|
$650.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
155.000
|
$40.000
|
$30.780
|
$37.450
|
$28.000
|
$36.750
|
$32.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
41.000
|
$50.000
|
$25.650
|
$34.240
|
$27.000
|
$33.600
|
$25.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
258.000
|
$800.000
|
$728.570
|
$700.850
|
$740.000
|
$687.750
|
$715.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
97.000
|
$950.000
|
$831.190
|
$881.680
|
$840.000
|
$865.200
|
$815.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
4.000
|
$1,000.000
|
$1,128.780
|
$1,029.340
|
$1,200.000
|
$1,010.100
|
$1,150.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
40.000
|
$1,000.000
|
$1,231.390
|
$1,198.400
|
$1,300.000
|
$1,176.000
|
$1,250.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
314.000
|
$100.000
|
$102.620
|
$75.000
|
$109.000
|
$119.080
|
$100.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
697.000
|
$12.000
|
$7.180
|
$7.790
|
$7.650
|
$7.640
|
$8.000
|
|
|
REMOVE LRSA
|
EA
|
1.000
|
$1,300.000
|
$1,231.390
|
$1,177.000
|
$1,400.000
|
$1,155.000
|
$1,200.000
|
|
|
INSTL DEL ASSM (D-DY)SZ 1(YFLX)GND
|
EA
|
76.000
|
$110.000
|
$82.090
|
$79.180
|
$87.000
|
$77.700
|
$85.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
16.000
|
$110.000
|
$82.090
|
$81.320
|
$87.000
|
$79.800
|
$85.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
75,666.000
|
$0.250
|
$0.210
|
$0.210
|
$0.250
|
$0.210
|
$0.140
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
303,740.000
|
$0.200
|
$0.160
|
$0.170
|
$0.200
|
$0.170
|
$0.140
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(DOT)
|
LF
|
41,526.000
|
$0.550
|
$0.370
|
$0.390
|
$0.400
|
$0.380
|
$0.270
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
40,821.000
|
$0.550
|
$0.370
|
$0.390
|
$0.400
|
$0.380
|
$0.270
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
1,453.000
|
$4.000
|
$2.050
|
$2.140
|
$2.050
|
$2.100
|
$3.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
380.000
|
$60.000
|
$25.650
|
$26.750
|
$25.500
|
$26.250
|
$50.000
|
|
|
WK ZN PAV MRK NON-REMOV(W)(WORD)
|
EA
|
377.000
|
$80.000
|
$30.780
|
$32.100
|
$30.500
|
$31.500
|
$75.000
|
|
|
WK ZN PAV MRK NON-REMOV(W)36"(YLD TRI)
|
EA
|
1,381.000
|
$20.000
|
$3.590
|
$3.750
|
$3.600
|
$3.680
|
$10.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
6,868.000
|
$0.200
|
$0.300
|
$0.310
|
$0.300
|
$0.300
|
$0.140
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
299,972.000
|
$0.200
|
$0.160
|
$0.170
|
$0.200
|
$0.170
|
$0.140
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
428.000
|
$4.000
|
$5.640
|
$5.890
|
$5.600
|
$5.780
|
$4.500
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
698.000
|
$4.000
|
$5.130
|
$5.350
|
$5.100
|
$5.250
|
$4.500
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-C-R
|
EA
|
8,723.000
|
$3.500
|
$4.100
|
$4.280
|
$4.100
|
$4.200
|
$3.500
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
49,645.000
|
$1.250
|
$1.840
|
$1.500
|
$0.450
|
$2.200
|
$2.500
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
4,321.000
|
$1.250
|
$1.840
|
$1.500
|
$0.500
|
$3.260
|
$2.500
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
20,662.000
|
$1.500
|
$0.770
|
$0.800
|
$0.800
|
$0.790
|
$1.020
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
19,416.000
|
$1.000
|
$1.280
|
$1.340
|
$1.300
|
$1.310
|
$1.020
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
940.000
|
$8.000
|
$8.210
|
$8.560
|
$8.150
|
$8.400
|
$8.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
37,332.000
|
$0.500
|
$0.400
|
$0.420
|
$0.450
|
$0.410
|
$0.510
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
149,571.000
|
$0.500
|
$0.380
|
$0.400
|
$0.400
|
$0.390
|
$0.510
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
3,050.000
|
$0.500
|
$0.460
|
$0.480
|
$0.500
|
$0.470
|
$0.510
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
147,992.000
|
$0.500
|
$0.380
|
$0.400
|
$0.400
|
$0.390
|
$0.510
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
187.000
|
$225.000
|
$205.230
|
$214.000
|
$203.050
|
$210.000
|
$260.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
186.000
|
$275.000
|
$256.540
|
$267.500
|
$253.850
|
$262.500
|
$375.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
691.000
|
$30.000
|
$16.420
|
$17.120
|
$16.250
|
$16.800
|
$35.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
256.000
|
$3.500
|
$5.130
|
$5.350
|
$5.100
|
$5.250
|
$3.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
394.000
|
$3.000
|
$5.130
|
$5.350
|
$5.100
|
$5.250
|
$3.500
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
4,310.000
|
$3.500
|
$3.850
|
$4.010
|
$3.800
|
$3.940
|
$3.000
|
|
|
SP MIXES SP-B SAC-B PG70-22
|
TON
|
68,313.000
|
$85.000
|
$83.080
|
$100.750
|
$73.000
|
$109.270
|
$140.000
|
|
|
SP MIXES SP-C SAC-B PG70-22
|
TON
|
2,805.000
|
$150.000
|
$129.960
|
$188.000
|
$170.000
|
$143.550
|
$230.000
|
|
|
TACK COAT
|
GAL
|
13,385.000
|
$4.000
|
$1.830
|
$3.370
|
$6.000
|
$7.940
|
$10.000
|
|
|
CEMENT
|
TON
|
2,361.000
|
$300.000
|
$212.830
|
$238.590
|
$220.000
|
$218.000
|
$265.000
|
|
|
EMULSION
|
GAL
|
2,846,689.000
|
$2.000
|
$2.510
|
$2.550
|
$2.500
|
$2.600
|
$3.500
|
|
|
EMUL TRTMNT (MX EXST MTRL) 8"
|
SY
|
605,678.000
|
$3.500
|
$1.870
|
$3.100
|
$2.450
|
$3.880
|
$3.500
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
58.000
|
$115.000
|
$81.450
|
$330.000
|
$60.000
|
$97.120
|
$200.000
|
|
|
TMA (STATIONARY)
|
DAY
|
1,350.000
|
$250.000
|
$171.560
|
$50.000
|
$170.000
|
$115.800
|
$200.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
117.000
|
$400.000
|
$635.000
|
$250.000
|
$450.000
|
$393.540
|
$950.000
|
|
Totals: |
$40,055,498.650
|
$37,642,802.471
|
$38,540,785.388
|
$39,976,274.625
|
$44,949,687.490
|
$56,854,240.640
|