PREPARING ROW
|
STA
|
5.600
|
$950.000
|
$4,000.000
|
$2,500.000
|
$7,000.000
|
$15,000.000
|
$5,000.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
461.000
|
$14.000
|
$25.000
|
$22.000
|
$30.000
|
$30.000
|
$10.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
450.000
|
$12.000
|
$11.000
|
$12.000
|
$5.000
|
$10.000
|
$17.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
7,466.000
|
$9.000
|
$9.000
|
$8.000
|
$10.000
|
$9.000
|
$15.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
21,914.000
|
$12.500
|
$13.000
|
$9.000
|
$15.000
|
$25.000
|
$25.000
|
|
|
BACKFILL (TY A)
|
STA
|
95.250
|
$250.000
|
$270.000
|
$280.000
|
$400.000
|
$350.000
|
$325.000
|
|
|
BACKFILL (TY B)
|
STA
|
11.000
|
$175.000
|
$150.000
|
$375.000
|
$400.000
|
$600.000
|
$325.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
95,129.000
|
$2.500
|
$0.400
|
$1.000
|
$1.250
|
$1.250
|
$1.500
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
95,129.000
|
$1.000
|
$0.700
|
$0.750
|
$0.900
|
$0.750
|
$1.000
|
|
|
BONDED FBR MTRX SEED (TEMP)(WARM)
|
SY
|
47,569.000
|
$0.850
|
$0.700
|
$0.750
|
$0.800
|
$0.720
|
$1.000
|
|
|
BONDED FBR MTRX SEED (TEMP)(COOL)
|
SY
|
47,569.000
|
$0.850
|
$0.700
|
$0.750
|
$0.800
|
$0.700
|
$1.000
|
|
|
VEGETATIVE WATERING
|
MG
|
1,046.000
|
$10.000
|
$24.000
|
$2.000
|
$12.000
|
$10.000
|
$1.000
|
|
|
LIME (HYDRATED LIME (DRY))
|
TON
|
237.000
|
$180.000
|
$160.000
|
$220.000
|
$200.000
|
$170.000
|
$165.000
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
11,433.000
|
$3.500
|
$2.500
|
$2.250
|
$3.000
|
$7.000
|
$3.750
|
|
|
CEMENT
|
TON
|
237.000
|
$142.000
|
$150.000
|
$190.000
|
$155.000
|
$135.000
|
$155.000
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
11,433.000
|
$6.000
|
$3.500
|
$2.250
|
$2.500
|
$6.000
|
$3.750
|
|
|
EMULS ASPH (EROSN CONT)(CSS-1)
|
GAL
|
2,870.000
|
$5.000
|
$3.800
|
$4.500
|
$5.000
|
$3.000
|
$5.000
|
|
|
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
|
GAL
|
55,462.000
|
$2.700
|
$3.500
|
$3.300
|
$4.250
|
$3.000
|
$4.000
|
|
|
AGGR (TY-PD GR-3 OR TY-PL GR-3)
|
CY
|
1,321.000
|
$127.000
|
$120.000
|
$125.000
|
$135.000
|
$115.000
|
$125.000
|
|
|
D-GR HMA(SQ) TY-D PG64-22
|
TON
|
28.000
|
$130.000
|
$175.000
|
$240.000
|
$300.000
|
$150.000
|
$150.000
|
|
|
PFC (ASPHALT) PG76-22
|
TON
|
570.000
|
$120.000
|
$119.000
|
$165.000
|
$155.000
|
$1.000
|
$135.000
|
|
|
PFC-C (AGGREGATE)(PG76 MIX) SAC-A
|
TON
|
8,929.000
|
$105.000
|
$119.000
|
$165.000
|
$155.000
|
$148.000
|
$142.000
|
|
|
SUPERPAVE MIXTURES SP-B PG64-22
|
TON
|
11,502.000
|
$90.000
|
$94.000
|
$107.000
|
$105.000
|
$101.000
|
$135.000
|
|
|
SUPERPAVE MIXTURES SP-D PG64-22
|
TON
|
3,316.000
|
$95.000
|
$97.000
|
$107.000
|
$110.000
|
$120.000
|
$135.000
|
|
|
SUPERPAVE MIXTURES SP-D SAC-A PG70-22
|
TON
|
265.000
|
$97.000
|
$130.000
|
$125.000
|
$150.000
|
$140.000
|
$165.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
10,000.000
|
$45.000
|
$48.000
|
$54.000
|
$50.000
|
$47.500
|
$70.000
|
|
|
PLANE CONC PAV(0" TO 1-1/2")
|
SY
|
3,117.000
|
$4.250
|
$3.000
|
$2.650
|
$3.000
|
$6.250
|
$3.000
|
|
|
PLANE ASPH CONC PAV (1.5")
|
SY
|
21,214.000
|
$2.800
|
$2.000
|
$2.250
|
$3.000
|
$4.000
|
$3.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
2.000
|
$200.000
|
$800.000
|
$800.000
|
$500.000
|
$675.000
|
$1,000.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
2,300.000
|
$21.000
|
$26.000
|
$40.000
|
$45.000
|
$30.000
|
$50.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
5.000
|
$715.000
|
$1,100.000
|
$1,150.000
|
$650.000
|
$1,100.000
|
$1,000.000
|
|
|
CL E CONC (SEAL SLAB)
|
CY
|
4.000
|
$400.000
|
$500.000
|
$600.000
|
$400.000
|
$425.000
|
$500.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
4.000
|
$500.000
|
$550.000
|
$565.000
|
$600.000
|
$525.000
|
$1,000.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
42.000
|
$130.000
|
$110.000
|
$240.000
|
$200.000
|
$120.000
|
$200.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
38.000
|
$480.000
|
$550.000
|
$535.000
|
$450.000
|
$525.000
|
$400.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL3)
|
LF
|
200.000
|
$20.000
|
$64.000
|
$45.000
|
$65.000
|
$75.000
|
$70.000
|
|
|
RETROFIT RAIL (TY T223)
|
LF
|
212.000
|
$150.000
|
$200.000
|
$165.000
|
$250.000
|
$125.000
|
$125.000
|
|
|
CONC BOX CULV (8 FT X 6 FT)(EXTEND)
|
LF
|
8.000
|
$650.000
|
$740.000
|
$1,025.000
|
$1,000.000
|
$750.000
|
$500.000
|
|
|
CONC BOX CULV (8 FT X 10 FT) (EXTEND)
|
LF
|
15.000
|
$1,750.000
|
$1,000.000
|
$1,200.000
|
$1,000.000
|
$1,000.000
|
$500.000
|
|
|
CONC BOX CULVERT (4 FT X 5 FT)(EXTEND)
|
LF
|
6.000
|
$550.000
|
$480.000
|
$1,120.000
|
$700.000
|
$500.000
|
$300.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
744.000
|
$48.000
|
$44.000
|
$40.000
|
$40.000
|
$45.000
|
$35.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
458.000
|
$69.000
|
$84.000
|
$70.000
|
$55.000
|
$85.000
|
$55.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
30.000
|
$86.000
|
$160.000
|
$115.000
|
$80.000
|
$160.000
|
$100.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
2.000
|
$3,500.000
|
$3,700.000
|
$4,000.000
|
$4,000.000
|
$3,700.000
|
$3,500.000
|
|
|
WINGWALL (FW - 0) (HW=6 FT)
|
EA
|
1.000
|
$8,400.000
|
$7,400.000
|
$14,000.000
|
$8,000.000
|
$7,400.000
|
$5,000.000
|
|
|
WINGWALL (PW - 2) (HW=11 FT)
|
EA
|
1.000
|
$45,000.000
|
$51,000.000
|
$48,000.000
|
$45,000.000
|
$40,000.000
|
$25,000.000
|
|
|
WINGWALL (PW - 2) (HW=15 FT)
|
EA
|
1.000
|
$60,000.000
|
$92,000.000
|
$75,000.000
|
$90,000.000
|
$60,000.000
|
$45,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
63.000
|
$655.000
|
$740.000
|
$625.000
|
$560.000
|
$750.000
|
$800.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$975.000
|
$780.000
|
$930.000
|
$600.000
|
$800.000
|
$900.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$800.000
|
$850.000
|
$1,030.000
|
$700.000
|
$850.000
|
$800.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
28.000
|
$1,000.000
|
$900.000
|
$825.000
|
$900.000
|
$900.000
|
$950.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$890.000
|
$2,200.000
|
$1,200.000
|
$900.000
|
$2,100.000
|
$1,900.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$1,300.000
|
$2,500.000
|
$1,375.000
|
$1,100.000
|
$2,500.000
|
$1,900.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$2,000.000
|
$3,000.000
|
$1,650.000
|
$1,600.000
|
$2,950.000
|
$2,500.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
5.000
|
$1,500.000
|
$1,300.000
|
$3,000.000
|
$1,000.000
|
$1,300.000
|
$1,000.000
|
|
|
REMOV STR (PIPE)
|
EA
|
45.000
|
$378.000
|
$470.000
|
$285.000
|
$500.000
|
$455.000
|
$1,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$556,100.000
|
$520,000.000
|
$400,000.000
|
$500,000.000
|
$700,000.000
|
$650,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
19.000
|
$4,800.000
|
$7,000.000
|
$1,600.000
|
$6,000.000
|
$3,500.000
|
$4,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
500.000
|
$22.500
|
$35.000
|
$38.500
|
$40.000
|
$30.000
|
$75.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
840.000
|
$26.000
|
$36.000
|
$42.000
|
$45.000
|
$40.000
|
$75.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,340.000
|
$4.550
|
$3.000
|
$22.000
|
$20.000
|
$7.250
|
$5.000
|
|
|
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
|
CY
|
1,000.000
|
$17.000
|
$8.000
|
$11.000
|
$30.000
|
$20.000
|
$50.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
150.000
|
$83.000
|
$65.000
|
$150.000
|
$125.000
|
$110.000
|
$100.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
10,250.000
|
$2.850
|
$2.800
|
$3.100
|
$3.500
|
$2.750
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
10,250.000
|
$0.750
|
$0.500
|
$1.650
|
$1.500
|
$1.580
|
$1.000
|
|
|
TRACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
150.000
|
$150.000
|
$86.000
|
$150.000
|
$200.000
|
$179.840
|
$100.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
420.000
|
$78.000
|
$80.000
|
$90.000
|
$90.000
|
$100.000
|
$70.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
420.000
|
$15.000
|
$11.000
|
$12.000
|
$10.000
|
$12.000
|
$50.000
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
420.000
|
$11.000
|
$25.000
|
$14.500
|
$20.000
|
$30.000
|
$50.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
3,348.000
|
$90.000
|
$58.000
|
$52.000
|
$30.000
|
$40.000
|
$70.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
3,618.000
|
$40.000
|
$28.000
|
$34.000
|
$30.000
|
$34.000
|
$70.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
461.000
|
$90.000
|
$125.000
|
$85.000
|
$90.000
|
$125.000
|
$75.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
33,350.000
|
$0.220
|
$0.250
|
$0.200
|
$0.250
|
$0.190
|
$0.140
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
15,094.000
|
$0.370
|
$0.250
|
$0.200
|
$0.250
|
$0.240
|
$0.160
|
|
|
CONC MEDIAN
|
SY
|
88.000
|
$93.000
|
$110.000
|
$110.000
|
$150.000
|
$105.000
|
$125.000
|
|
|
CONC DIRECTIONAL ISLAND
|
SY
|
128.000
|
$82.000
|
$110.000
|
$105.000
|
$150.000
|
$105.000
|
$125.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
550.000
|
$21.000
|
$21.000
|
$22.000
|
$23.000
|
$21.000
|
$25.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,510.000
|
$1,500.000
|
$1,500.000
|
$1,700.000
|
$1,500.000
|
$1,600.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
504.000
|
$3.600
|
$2.200
|
$2.750
|
$3.000
|
$2.750
|
$6.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,270.000
|
$2,700.000
|
$2,750.000
|
$3,000.000
|
$2,625.000
|
$2,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$265.000
|
$270.000
|
$220.000
|
$300.000
|
$210.000
|
$250.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
2.000
|
$10,500.000
|
$9,000.000
|
$12,500.000
|
$12,000.000
|
$9,700.000
|
$7,000.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,600.000
|
$1,200.000
|
$2,750.000
|
$3,000.000
|
$2,625.000
|
$2,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$850.000
|
$750.000
|
$1,100.000
|
$1,500.000
|
$1,050.000
|
$1,000.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
20.000
|
$200.000
|
$220.000
|
$550.000
|
$550.000
|
$220.000
|
$125.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 2
|
EA
|
2.000
|
$240.000
|
$260.000
|
$575.000
|
$600.000
|
$265.000
|
$250.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$600.000
|
$550.000
|
$395.000
|
$600.000
|
$550.000
|
$478.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
63.000
|
$341.000
|
$320.000
|
$350.000
|
$400.000
|
$320.000
|
$475.000
|
|
|
RELOCATE SM RD SN SUP&AM TY TWT
|
EA
|
4.000
|
$328.000
|
$270.000
|
$405.000
|
$300.000
|
$273.000
|
$500.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
5.000
|
$100.000
|
$80.000
|
$260.000
|
$100.000
|
$80.000
|
$400.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
6.000
|
$34.000
|
$25.000
|
$16.500
|
$30.000
|
$15.750
|
$100.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
51.000
|
$26.000
|
$30.000
|
$22.000
|
$30.000
|
$21.000
|
$100.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
2,834.000
|
$0.140
|
$0.220
|
$0.220
|
$0.220
|
$0.210
|
$0.150
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
44,120.000
|
$0.120
|
$0.140
|
$0.140
|
$0.150
|
$0.140
|
$0.150
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
800.000
|
$0.320
|
$0.550
|
$0.550
|
$0.550
|
$0.530
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (W)18"(SLD)
|
LF
|
52.000
|
$2.000
|
$2.200
|
$2.200
|
$2.200
|
$2.100
|
$15.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
330.000
|
$2.100
|
$2.200
|
$2.200
|
$2.200
|
$2.100
|
$15.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
3,734.000
|
$0.160
|
$0.220
|
$0.220
|
$0.220
|
$0.210
|
$0.150
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
44,420.000
|
$0.160
|
$0.140
|
$0.140
|
$0.150
|
$0.140
|
$0.150
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
LF
|
8,000.000
|
$0.400
|
$0.700
|
$0.900
|
$0.900
|
$0.840
|
$3.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
LF
|
8,000.000
|
$0.400
|
$0.700
|
$0.900
|
$0.900
|
$0.840
|
$3.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
934.000
|
$1.000
|
$0.600
|
$1.450
|
$2.000
|
$1.000
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
3,348.000
|
$1.350
|
$0.600
|
$1.450
|
$2.000
|
$1.000
|
$1.000
|
|
|
WK ZN PAV MRK SHT TERM RMV (W)(4")
|
LF
|
1,010.000
|
$1.150
|
$0.700
|
$1.650
|
$2.000
|
$1.000
|
$2.000
|
|
|
WK ZN PAV MRK SHT TERM RMV (Y)(4")
|
LF
|
11,159.000
|
$0.750
|
$0.700
|
$1.650
|
$2.000
|
$1.000
|
$2.000
|
|
REFL PAV MRK TY I (W)4"(LNDP)(100MIL)
|
LF
|
472.000
|
$1.000
|
$1.100
|
$1.100
|
$1.100
|
$1.050
|
$2.500
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
800.000
|
$0.830
|
$1.100
|
$1.100
|
$1.100
|
$1.050
|
$5.000
|
|
REFL PAV MRK TY I (W)18"(SLD)(100MIL)
|
LF
|
52.000
|
$2.750
|
$5.300
|
$5.500
|
$5.500
|
$5.250
|
$13.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
375.000
|
$5.250
|
$6.000
|
$6.050
|
$6.000
|
$5.780
|
$17.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
2,519.000
|
$0.380
|
$0.550
|
$0.550
|
$0.550
|
$0.530
|
$0.400
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
41,720.000
|
$0.380
|
$0.450
|
$0.440
|
$0.450
|
$0.420
|
$0.400
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
3,734.000
|
$0.440
|
$0.550
|
$0.550
|
$0.550
|
$0.530
|
$0.400
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
45,386.000
|
$0.390
|
$0.450
|
$0.440
|
$0.450
|
$0.420
|
$0.400
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
5.000
|
$180.000
|
$200.000
|
$200.000
|
$200.000
|
$189.000
|
$250.000
|
|
PREFAB PAV MRK TY C (W) (DBL ARROW)
|
EA
|
7.000
|
$265.000
|
$260.000
|
$275.000
|
$300.000
|
$262.500
|
$350.000
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
4.000
|
$350.000
|
$350.000
|
$360.000
|
$400.000
|
$341.250
|
$650.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
5.000
|
$220.000
|
$230.000
|
$235.000
|
$300.000
|
$225.750
|
$300.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
1.000
|
$50.000
|
$110.000
|
$110.000
|
$120.000
|
$105.000
|
$30.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
210.000
|
$3.500
|
$3.400
|
$3.500
|
$4.000
|
$3.500
|
$7.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,722.000
|
$3.500
|
$3.400
|
$3.550
|
$4.000
|
$3.500
|
$7.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
2,400.000
|
$0.500
|
$1.000
|
$0.550
|
$0.550
|
$0.550
|
$0.300
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$9,000.000
|
$10,000.000
|
$18,000.000
|
$20,000.000
|
$18,500.000
|
$100.000
|
|
|
TMA (STATIONARY)
|
EA
|
1.000
|
$6,500.000
|
$20,000.000
|
$20,000.000
|
$30,000.000
|
$7,500.000
|
$14,000.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
40.000
|
$260.000
|
$100.000
|
$27.500
|
$300.000
|
$30.000
|
$35.000
|
|
Totals: |
$6,226,272.250
|
$6,180,316.710
|
$6,692,110.750
|
$7,062,094.160
|
$7,125,911.830
|
$8,143,933.090
|