0913-00-132 |
DEWITT |
YOAKUM |
$572,435 |
VA |
C 913-13-2 |
09/05/2024 |
07/25/2024 |
BRIDGE MAINT |
DIGG COMMERCIAL, LLC($597,546) |
|
0913-00-115 |
DEWITT |
YOAKUM |
$2,108,691 |
VA |
C 913-00-115 |
09/05/2024 |
07/25/2024 |
HAZARD ELIM & SAFETY |
HIGHWAY BARRICADES AND SERVICES, LLC($1,442,562) |
|
0913-26-070 |
COLORADO |
YOAKUM |
$703,938 |
VA |
F 2B24(202) |
06/06/2024 |
04/25/2024 |
ADVANCED TRAF MGT SYSTEM |
THIRD COAST SERVICES LLC($523,697) |
|
0913-00-131 |
DEWITT |
YOAKUM |
$597,420 |
VA |
C 9-13-131 |
06/06/2024 |
04/25/2024 |
BRIDGE MAINT |
GARRET SHIELDS INFRASTRUCTURE($538,360) |
|
0913-00-114 |
DEWITT |
YOAKUM |
$2,014,500 |
VA |
F 2021(772) |
08/05/2021 |
11/15/2023 |
TRAF SIGNAL CABINET AND EQUIPMENT INSTL |
THIRD COAST SERVICES LLC($1,652,900) |
|
0913-28-093 |
FAYETTE |
YOAKUM |
$297,734 |
VA |
STP 2022(738)TAPS |
06/01/2023 |
11/27/2023 |
CONSTRUCT PEDESTRIAN INFRASTRUCT |
3LW CIVIL LLC($286,576) |
|
0913-00-106 |
DEWITT |
YOAKUM |
$1,254,370 |
VA |
STP 2020(044) |
09/06/2019 |
11/15/2023 |
PAVMT MRK |
TRP CONSTRUCTION GROUP, LLC($1,107,842) |
|
0913-00-107 |
DEWITT |
YOAKUM |
$1,007,314 |
VA |
STP 2B20(208) |
11/04/2020 |
11/15/2023 |
STRIPING |
BATTERSON, LLP($783,592) |
|
0913-00-120 |
DEWITT |
YOAKUM |
$663,720 |
VA |
C 913-00-120 |
01/07/2022 |
11/15/2023 |
BRIDGE MAINT |
SCR CIVIL CONSTRUCTION, LLC($573,383) |
|
0913-00-121 |
DEWITT |
YOAKUM |
$509,470 |
VA |
C 913-00-121 |
03/03/2022 |
11/15/2023 |
BRIDGE MAINT |
BECK-REIT & SONS, LTD.($483,368) |
|
0913-09-116 |
WHARTON |
YOAKUM |
$650,044 |
VA |
STP 2022(392)TAPS |
09/07/2022 |
11/15/2023 |
CONSTRUCT PEDESTRIAN INFRASTRUCT |
ENCINO LANDSCAPE, INC.($664,042) |
|
0913-00-108 |
DEWITT |
YOAKUM |
$1,018,409 |
VA |
C 913-00-108 |
09/08/2022 |
11/15/2023 |
TRAF SIGNAL IMPRVS |
TRP CONSTRUCTION GROUP, LLC($665,411) |
|
0913-17-044 |
DEWITT |
YOAKUM |
$127,110 |
VA |
F 2023(173) |
11/02/2022 |
11/15/2023 |
LANDSCAPE DEVELOPMENT |
TEXAS ROAD CONSTRUCTION, LLC($151,104) |
|
0913-00-116 |
DEWITT |
YOAKUM |
$2,287,798 |
VA |
F 2024(051) |
09/06/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
HIGHWAY BARRICADES AND SERVICES, LLC($1,439,927) |
|
0913-00-104 |
DEWITT |
YOAKUM |
$2,474,815 |
VA |
STP 2019(002) |
09/07/2018 |
11/15/2023 |
PAVMT MRK |
PAVEMENT MARKINGS INC.($2,784,234) |
|
0913-00-103 |
DEWITT |
YOAKUM |
$3,021,981 |
VA |
STP 2019(098) |
10/02/2018 |
11/15/2023 |
MILL AND INLAY |
HUNTER INDUSTRIES, LTD.($3,289,679) |
|
0913-00-104 |
DEWITT |
YOAKUM |
$2,508,625 |
VA |
STP 2019(002) |
01/08/2019 |
11/15/2023 |
PAVMT MRK |
BATTERSON, LLP($2,484,165) |
|
0903-00-120 |
WICHITA |
WICHITA FALLS |
$633,165 |
VA |
F 2022(377) |
05/05/2022 |
08/31/2024 |
INSTL ILLUM |
WG ENGINEERING & CONSTRUCTION, LLC($833,159) |
|
0903-00-123 |
WICHITA |
WICHITA FALLS |
$1,422,842 |
VA |
C 903-00-123 |
03/06/2024 |
01/24/2024 |
BRIDGE MAINT |
PATHFIELD INVESTMENTS LLC($1,166,854) |
|
0903-00-122 |
WICHITA |
WICHITA FALLS |
$1,008,862 |
VA |
C 903-00-122 |
05/04/2023 |
11/15/2023 |
BRIDGE MAINT |
SHALOM SERVICES CORPORATION($1,041,194) |
|
0903-06-022 |
CLAY |
WICHITA FALLS |
$1,802,577 |
VA |
C 903-6-22 |
09/07/2022 |
11/15/2023 |
SURF/ROADWAY RESTOR |
DUININCK, INC.($2,547,007) |
|
0903-00-113 |
WICHITA |
WICHITA FALLS |
$1,002,636 |
VA |
C 903-00-113 |
07/08/2020 |
11/15/2023 |
INSTL RUMBLE STRIPS |
STRIPE-A-ZONE, INC.($743,602) |
|
0903-00-088 |
WICHITA |
WICHITA FALLS |
$522,097 |
VA |
STP 2018(583) |
03/06/2018 |
11/15/2023 |
SIGN UPGRADE |
HJC FARMS, INC.($497,864) |
|
0903-00-116 |
WICHITA |
WICHITA FALLS |
$899,939 |
VA |
STP 2B20(038)HES |
07/08/2020 |
11/15/2023 |
INSTL RUMBLE STRIPS |
STRIPE-A-ZONE, INC.($637,259) |
|
0903-00-112 |
WICHITA |
WICHITA FALLS |
$560,654 |
VA |
C 903-00-112 |
07/09/2020 |
11/15/2023 |
INSTL SAFETY ILLUM |
AMERICAN LIGHTING AND SIGNALIZATION, LLC($613,325) |
|
0903-00-119 |
WICHITA |
WICHITA FALLS |
$548,665 |
VA |
F 2022(378) |
05/04/2022 |
08/31/2024 |
INSTL ILLUM |
WG ENGINEERING & CONSTRUCTION, LLC($689,012) |
|
0909-00-089 |
MCLENNAN |
WACO |
$3,582,439 |
VA |
F 2B23(177) |
08/03/2023 |
11/15/2023 |
MAINT & OPERATIONS PROJECT |
D. I. J. CONSTRUCTION, INC.($2,409,826) |
|
0909-00-066 |
MCLENNAN |
WACO |
$924,047 |
VA |
STP 2B24(519)HES |
09/05/2024 |
07/25/2024 |
INTERS IMPRV |
THIRD COAST SERVICES LLC($830,318) |
|
0909-22-219 |
MCLENNAN |
WACO |
$650,130 |
VA |
F 2B24(282) |
07/09/2024 |
05/28/2024 |
INSTL/REPLACE SIGNS |
CROSS PLUS CONSTRUCTION, LLC($598,139) |
|
0909-00-094 |
MCLENNAN |
WACO |
$3,859,563 |
VA |
C 909-00-94 |
05/03/2024 |
03/22/2024 |
HWY IMPRV |
STRIPE-A-ZONE, LLC($2,897,993) |
|
0909-00-065 |
MCLENNAN |
WACO |
$1,646,966 |
VA |
C 909-00-65 |
03/06/2024 |
01/24/2024 |
BRIDGE MAINT |
AMERICAN INFRASTRUCTURE MAINTENANCE MANAGEMENT LLC($1,817,857) |
|
0909-00-068 |
MCLENNAN |
WACO |
$3,282,222 |
VA |
C 909-00-68 |
03/05/2024 |
01/23/2024 |
HAZARD ELIM & SAFETY |
CENTERLINE TECHNOLOGIES, LLC($2,894,300) |
|
0909-22-195 |
MCLENNAN |
WACO |
$280,880 |
VA |
STP 2023(338)HESG |
01/05/2023 |
11/15/2023 |
INSTL REFL BACKPLATES |
THIRD COAST SERVICES LLC($258,695) |
|
0909-00-062 |
MCLENNAN |
WACO |
$1,104,233 |
VA |
C 909-00-62 |
04/07/2022 |
09/24/2024 |
BRIDGE MAINT |
BOEN LANDSCAPING & IRRIGATION, LLC($1,726,900) |
|
0909-00-075 |
MCLENNAN |
WACO |
$1,035,463 |
VA |
F 2024(050) |
10/05/2023 |
11/15/2023 |
INSTL/REPLACE SIGNS |
ODUM SERVICES, LLC($1,018,951) |
|
0909-00-052 |
MCLENNAN |
WACO |
$443,140 |
VA |
STP 2024(049)HES |
09/06/2023 |
11/15/2023 |
INTERS IMPRV |
THIRD COAST SERVICES LLC($436,915) |
|
0909-39-128 |
CORYELL |
WACO |
$691,150 |
VA |
STP 2016(368) |
01/04/2017 |
11/15/2023 |
CONSTRUCT CURB RAMPS |
PROJECT ALLIED RESOURCES, LLC($663,079) |
|
0909-00-049 |
MCLENNAN |
WACO |
$2,089,094 |
VA |
STP 2018(546) |
02/02/2018 |
11/15/2023 |
CNSTR CURB RMPS |
TI-ZACK CONCRETE, INC.($1,647,633) |
|
0909-00-051 |
MCLENNAN |
WACO |
$480,706 |
VA |
STP 2022(792)HES |
08/03/2022 |
11/15/2023 |
INTERS IMPRV |
VACA UNDERGROUND UTILITIES INC($454,340) |
|
0909-00-062 |
MCLENNAN |
WACO |
$3,831,954 |
VA |
C 909-00-62 |
11/03/2022 |
11/15/2023 |
BRIDGE MAINT |
SCR CIVIL CONSTRUCTION, LLC($3,216,349) |
|
0909-00-067 |
MCLENNAN |
WACO |
$2,284,322 |
VA |
C 909-00-67 |
01/06/2023 |
11/15/2023 |
INSTL OF RUMBLE STRIPS |
CENTERLINE TECHNOLOGIES, LLC($1,849,403) |
|
0910-16-185 |
SMITH |
TYLER |
$1,555,500 |
VA |
F 2B24(309), ETC |
11/07/2024 |
10/15/2024 |
TRAF CONTROL DEVICES |
|
|
0910-00-132 |
SMITH |
TYLER |
$610,402 |
VA |
F 2022(579) |
04/07/2022 |
09/24/2024 |
INSTL/UPGRADE ROADWAY LIGHTING |
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC.($402,136) |
|
0910-00-142 |
SMITH |
TYLER |
$4,486,200 |
VA |
BR 2B24(231) |
07/10/2024 |
05/29/2024 |
BRIDGE MAINT |
CROSS PLUS CONSTRUCTION, LLC($4,387,550) |
|
0910-16-180 |
SMITH |
TYLER |
$326,139 |
VA |
STP 2025(155)HES |
11/07/2024 |
09/26/2024 |
INSTL ILLUM |
TEXAS TRAFFIC CONTROL SYSTEMS, INC.($299,533) |
|
0910-00-142 |
SMITH |
TYLER |
$4,536,200 |
VA |
C 910-00-142 |
11/07/2024 |
09/26/2024 |
BRIDGE MAINT |
OLYMPUS PAINTING CONTRACTORS, INC.($3,108,496) |
|
0910-00-106 |
SMITH |
TYLER |
$2,343,971 |
VA |
C 910-00-106 |
01/10/2020 |
09/26/2024 |
THERMOPLASTIC & PROFILE PAVMT MRK |
STRIPE-A-ZONE, INC.($2,074,842) |
|
0910-07-079 |
GREGG |
TYLER |
$309,095 |
VA |
NH 2020(494) |
01/10/2020 |
09/26/2024 |
RECONRCT PIPE ENTRANCE, ADD LNDSCPING & LIGHTIN |
ENCINO LANDSCAPE, INC.($298,629) |
|
0910-16-187 |
SMITH |
TYLER |
$820,888 |
VA |
F 2B24(310) |
11/06/2024 |
09/25/2024 |
CONSTRUCT PEDESTRIAN INFRASTRUCT |
TIGHT LINE CONSTRUCTION, LLC($865,454) |
|
0910-16-185 |
SMITH |
TYLER |
$1,555,500 |
VA |
F 2B24(309) |
11/06/2024 |
09/25/2024 |
TRAF SIGNAL IMPRVS |
3LW CIVIL LLC($1,685,438) |
|
0910-34-037 |
HENDERSON |
TYLER |
$157,492 |
VA |
F 2022(757) |
06/30/2022 |
11/15/2023 |
LANDSCAPE DEVELOPMENT |
TIGHT LINE CONSTRUCTION, LLC($173,162) |
|
0910-00-123 |
SMITH |
TYLER |
$1,721,002 |
VA |
F 2024(958) |
04/04/2024 |
02/22/2024 |
HAZARD ELIM & SAFETY |
STRIPE-A-ZONE, LLC($1,144,488) |
|
0910-16-178 |
SMITH |
TYLER |
$1,658,455 |
VA |
STP 2024(808)VRU |
03/05/2024 |
01/23/2024 |
HAZARD ELIM & SAFETY |
SYNERGY SIGNS & SERVICES LLC($1,451,085) |
|
0910-00-131 |
SMITH |
TYLER |
$2,240,791 |
VA |
C 910-00-131 |
08/04/2022 |
11/15/2023 |
BICYCLE AND PEDESTRIAN IMPRVS |
CROSS PLUS CONSTRUCTION, LLC($2,538,364) |
|
0910-00-121 |
SMITH |
TYLER |
$2,103,159 |
VA |
F 2022(551) |
06/01/2022 |
09/03/2024 |
PREVENT MAINT |
TRP CONSTRUCTION GROUP, LLC($1,937,247) |
|
0910-08-081 |
ANDERSON |
TYLER |
$748,230 |
VA |
STP 2022(533)HES |
05/04/2022 |
08/31/2024 |
HAZARD ELIM & SAFETY |
MARCOM'S MOWING SERVICE, LLC($757,095) |
|
0910-00-136 |
SMITH |
TYLER |
$921,525 |
VA |
STP 2023(518)HES |
03/07/2023 |
08/21/2024 |
HAZARD ELIM & SAFETY |
VACA UNDERGROUND UTILITIES INC($932,150) |
|
0910-16-168 |
SMITH |
TYLER |
$796,631 |
VA |
C 910-16-168 |
12/01/2022 |
09/24/2024 |
STATE PARK IMPRVS |
EAST TEXAS BRIDGE, INC.($921,723) |
|
0910-00-133 |
SMITH |
TYLER |
$419,806 |
VA |
F 2022(963) |
08/03/2022 |
11/15/2023 |
BICYCLE AND PEDESTRIAN IMPRVS |
ENCINO LANDSCAPE, INC.($548,791) |
|
0910-00-107 |
SMITH |
TYLER |
$1,947,371 |
VA |
STP 2019(324) |
01/09/2019 |
11/15/2023 |
THERMOPLASTIC PAVMT MRK |
CENTERLINE TECHNOLOGIES, LLC($1,530,350) |
|
0910-00-120 |
SMITH |
TYLER |
$796,864 |
VA |
F 2021(600) |
06/04/2021 |
11/15/2023 |
HAZARD ELIM & SAFETY |
PROFESSIONAL TRAFFIC CONTROL LLC($471,302) |
|
0910-00-135 |
SMITH |
TYLER |
$653,255 |
VA |
F 2022(965) |
08/03/2022 |
11/15/2023 |
BICYCLE AND PEDESTRIAN IMPRVS |
REYNOLDS & KAY, LTD.($783,828) |
|
0910-00-122 |
SMITH |
TYLER |
$1,908,487 |
VA |
F 2023(724) |
05/05/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
INTERSTATE BARRICADES & MARKINGS, INC.($1,698,785) |
|
0910-36-134 |
CHEROKEE |
TYLER |
$644,986 |
VA |
STP 2B23(066)HES |
08/03/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
GARRET SHIELDS INFRASTRUCTURE($532,753) |
|
0910-16-182 |
SMITH |
TYLER |
$271,182 |
VA |
STP 2024(336)HES |
11/02/2023 |
11/15/2023 |
INSTL ILLUM |
SNOWHILL CONTRACTING LLC($232,606) |
|
0910-00-137 |
SMITH |
TYLER |
$1,774,650 |
VA |
STP 2024(629)VRU |
01/05/2024 |
11/24/2023 |
HAZARD ELIM & SAFETY |
TEXAS TRAFFIC CONTROL SYSTEMS, INC.($1,755,175) |
|
0910-16-181 |
SMITH |
TYLER |
$112,930 |
VA |
STP 2B23(178)HES |
08/02/2023 |
11/15/2023 |
INSTL ILLUM |
TEXAS TRAFFIC CONTROL SYSTEMS, INC.($143,045) |
|
0910-12-141 |
VAN ZANDT |
TYLER |
$472,400 |
VA |
STP 2024(855)HES |
04/04/2024 |
02/22/2024 |
HAZARD ELIM & SAFETY |
MARCOM'S MOWING SERVICE, LLC($450,860) |
|
0910-07-085 |
GREGG |
TYLER |
$359,075 |
VA |
STP 2024(983)HESG |
05/02/2024 |
03/21/2024 |
HAZARD ELIM & SAFETY |
SYNERGY SIGNS & SERVICES LLC($240,950) |
|
0910-07-100 |
GREGG |
TYLER |
$1,555,500 |
VA |
F 2B24(308), ETC |
08/01/2024 |
06/20/2024 |
INTERS & OPERATIONAL IMPRV |
|
|
0910-16-187 |
SMITH |
TYLER |
$820,888 |
VA |
F 2B24(310) |
08/02/2024 |
06/21/2024 |
PEDESTRIAN, SIDEWALKS & CURB RAMPS |
|
|
0910-36-137 |
CHEROKEE |
TYLER |
$180,909 |
VA |
STP 2025(022)HESG |
09/06/2024 |
07/26/2024 |
INSTL/REPLACE SIGNS |
RISE UP CONSTRUCTION LLC($159,987) |
|
0910-16-152 |
SMITH |
TYLER |
$893,749 |
VA |
STP 2B20(142)HES |
08/06/2020 |
11/15/2023 |
REPLACE GUARDRAIL |
3LW CIVIL LLC($833,358) |
|
0910-16-130 |
SMITH |
TYLER |
$2,162,859 |
VA |
STP 1602(439) |
03/08/2017 |
11/15/2023 |
GR,SGNL,ACP BS&SURF,C&G,STM SWR,PED RMP,PV MK |
L. S. EQUIPMENT CO., INC.($2,355,456) |
|
0910-00-113 |
SMITH |
TYLER |
$734,375 |
VA |
STP 2020(891) |
06/04/2020 |
11/15/2023 |
THERMOPLASTIC & PROFILE PAVMT MRK |
STRIPE-A-ZONE, INC.($668,551) |
|
0910-00-127 |
SMITH |
TYLER |
$4,112,570 |
VA |
STP 2B20(022) |
07/08/2020 |
11/15/2023 |
SIDEWALKS & ADA PED RAMPS |
HIGHWAY 19 CONSTRUCTION LLC($3,512,939) |
|
0910-16-151 |
SMITH |
TYLER |
$149,744 |
VA |
C 910-16-151 |
07/09/2020 |
11/15/2023 |
DRAINAGE IMPRVS, STRS, EMBANKMENT & SEEDING |
BAKER & COMPANY CONSTRUCTION, LLC($177,736) |
|
0910-34-032 |
HENDERSON |
TYLER |
$1,447,717 |
VA |
STP 2B20(192)HES |
08/05/2020 |
11/15/2023 |
REPLACE GUARDRAIL |
3LW CIVIL LLC($1,420,616) |
|
0910-07-081 |
GREGG |
TYLER |
$437,735 |
VA |
STP 2B20(194)HES |
08/06/2020 |
11/15/2023 |
REPLACE GUARDRAIL |
ODUM SERVICES, LLC($415,606) |
|
0910-35-038 |
WOOD |
TYLER |
$782,275 |
VA |
STP 2B20(193)HES |
08/06/2020 |
11/15/2023 |
REPLACE GUARDRAIL |
CATOCON, INC.($777,779) |
|
0910-35-037 |
WOOD |
TYLER |
$387,900 |
VA |
C 910-35-37 |
10/01/2020 |
11/15/2023 |
REPL OF MISSING SMALL ROADSIDE SIGNS |
CROSS PLUS CONSTRUCTION, LLC($303,114) |
|
0910-07-077 |
GREGG |
TYLER |
$299,250 |
VA |
C 910-7-77 |
10/02/2020 |
11/15/2023 |
REPL OF MISSING SMALL ROADSIDE SIGNS |
JASCO($220,600) |
|
0910-42-042 |
RUSK |
TYLER |
$167,625 |
VA |
STP 2021(171) |
12/02/2020 |
11/15/2023 |
LANDSCAPING |
TIGHT LINE CONSTRUCTION, LLC($172,336) |
|
0910-00-114 |
SMITH |
TYLER |
$2,585,271 |
VA |
STP 2021(215) |
01/07/2021 |
11/15/2023 |
PREVENT MAINT |
STRIPE-A-ZONE, INC.($2,322,961) |
|
0910-34-033 |
HENDERSON |
TYLER |
$108,760 |
VA |
F 2021(924) |
08/05/2021 |
11/15/2023 |
LANDSCAPE DEVELOPMENT |
TIGHT LINE CONSTRUCTION, LLC($72,072) |
|
0910-00-115 |
SMITH |
TYLER |
$2,453,269 |
VA |
F 2022(095) |
09/01/2021 |
11/15/2023 |
PREVENT MAINT |
TOTAL HIGHWAY MAINTENANCE, LLC($2,493,890) |
|
0910-16-169 |
SMITH |
TYLER |
$157,515 |
VA |
F 2022(028) |
09/02/2021 |
11/15/2023 |
LANDSCAPE DEVELOPMENT |
TIGHT LINE CONSTRUCTION, LLC($157,495) |
|
0910-16-146 |
SMITH |
TYLER |
$39,800 |
VA |
F 2022(021) |
10/08/2021 |
11/15/2023 |
REPL OF MISSING SMALL ROADSIDE SIGNS |
HX FARMS, INC.($34,806) |
|
0910-34-035 |
HENDERSON |
TYLER |
$57,748 |
VA |
C 910-34-35 |
03/03/2022 |
11/15/2023 |
STATE PARK IMPRVS |
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.($110,625) |
|
0910-00-134 |
SMITH |
TYLER |
$435,667 |
VA |
F 2022(964) |
08/03/2022 |
11/15/2023 |
BICYCLE AND PEDESTRIAN IMPRVS |
TI-ZACK CONCRETE, INC.($470,055) |
|
0910-07-084 |
GREGG |
TYLER |
$198,220 |
VA |
STP 2023(371)HES |
01/05/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
H. V. CAVER, INC.($224,592) |
|
0910-08-080 |
ANDERSON |
TYLER |
$1,057,250 |
VA |
C 910-8-80 |
02/01/2023 |
11/15/2023 |
STATE PARK IMPRVS |
BAKER & COMPANY CONSTRUCTION, LLC($958,749) |
|
0910-16-166 |
SMITH |
TYLER |
$1,017,280 |
VA |
STP 2023(729)HES |
05/05/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
CROSS PLUS CONSTRUCTION, LLC($925,714) |
|
0910-16-162 |
SMITH |
TYLER |
$3,104,945 |
VA |
STP 2023(201)TAPS |
08/03/2023 |
11/15/2023 |
CONSTRUCT PEDESTRIAN INFRASTRUCT |
THK CONSTRUCTION LLC($2,988,319) |
|
0910-12-140 |
VAN ZANDT |
TYLER |
$785,460 |
VA |
STP 2B23(065)HES |
08/02/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
MARCOM'S MOWING SERVICE, LLC($671,280) |
|
0910-42-041 |
RUSK |
TYLER |
$130,681 |
VA |
STP 2017(245) |
11/03/2016 |
11/15/2023 |
LANDSCAPE PLANTING |
TIGHT LINE CONSTRUCTION, LLC($145,279) |
|
0910-16-130 |
SMITH |
TYLER |
$1,897,070 |
VA |
STP 1602(439) |
11/04/2016 |
11/15/2023 |
GR,SGNL,ACP BS&SURF,C&G,STM SWR,PED RMP,PV MK |
EAST TEXAS BRIDGE, INC.($2,469,057) |
|
0910-00-105 |
SMITH |
TYLER |
$1,440,422 |
VA |
STP 2016(366) |
12/01/2016 |
11/15/2023 |
CONSTRUCT ADA COMPLIANT CURB RAMPS |
TI-ZACK CONCRETE, INC.($1,419,691) |
|
0910-00-100 |
SMITH |
TYLER |
$311,113 |
VA |
STP 2017(230) |
01/04/2017 |
11/15/2023 |
THERMOPLASTIC STRIPING |
STRIPE-A-ZONE, INC.($209,930) |
|
0910-16-138 |
SMITH |
TYLER |
$141,497 |
VA |
STP 2017(928) |
04/05/2017 |
11/15/2023 |
CONSTRUCT SIDEWALKS & ADA CURB RAMPS |
M & M STRIPING & POWER WASHING, LLC($97,066) |