6355-83-001 |
HAMILTON |
WACO |
$598,163 |
US0084 |
RMC - 635583001 |
06/04/2020 |
11/15/2023 |
BASE FAILURE PAVMT REPAIR |
BIG CREEK CONSTRUCTION, LTD.($429,199) |
|
6330-69-001 |
MCLENNAN |
WACO |
$174,874 |
US0084 |
RMC - 633069001 |
07/17/2018 |
11/15/2023 |
CLEANING AND SWEEPING HWYS |
ELITE WASTE & CONSTRUCTION SERVICES LLC($155,342) |
|
6369-28-001 |
CORYELL |
WACO |
$630,000 |
US0084 |
MMC - 636928001 |
11/05/2020 |
11/15/2023 |
HOT MIX - MATERIAL ONLY |
BIG CREEK CONSTRUCTION, LTD.($555,000) |
|
6369-29-001 |
MCLENNAN |
WACO |
$738,074 |
US0084 |
RMC - 636929001 |
11/05/2020 |
11/15/2023 |
URBAN & RURUAL MOW AND LITTER |
T&L CLEANING SERVICES LLC($747,415) |
|
6380-23-001 |
LIMESTONE |
WACO |
$206,045 |
US0084 |
MMC - 638023001 |
05/06/2021 |
11/15/2023 |
HOT MIX |
BIG CREEK CONSTRUCTION, LTD.($178,000) |
|
6390-84-001 |
LIMESTONE |
WACO |
$289,500 |
US0084 |
MMC - 639084001 |
10/11/2021 |
11/15/2023 |
HOT MIX |
KNIFE RIVER CORPORATION - SOUTH($286,668) |
|
6459-99-001 |
MCLENNAN |
WACO |
$1,363,067 |
US0084 |
RMC - 645999001 |
12/06/2023 |
11/15/2023 |
ILLUM MAINT |
YUNEX LLC($1,402,398) |
|
6306-32-001 |
CORYELL |
WACO |
$264,880 |
US0084 |
RMC - 630632001 |
07/18/2017 |
11/15/2023 |
TREE TRIMMIMG AND TREE RMVL |
KASPARIAN UNDERGROUND, LLC($190,139) |
|
6381-64-001 |
CORYELL |
WACO |
$186,340 |
US0084 |
RMC - 638164001 |
07/29/2021 |
11/15/2023 |
TREE TRIM AND BRUSH RMVL |
BA NEWTON'S ENTERPRISES LLC($163,079) |
|
6390-82-001 |
MCLENNAN |
WACO |
$293,000 |
US0084 |
MMC - 639082001 |
10/11/2021 |
11/15/2023 |
HOT MIX |
KNIFE RIVER CORPORATION - SOUTH($285,647) |
|
6389-01-001 |
CORYELL |
WACO |
$547,987 |
US0084 |
RMC - 638901001 |
02/03/2022 |
11/15/2023 |
MISC. CONC REPAIR |
CROSS PLUS CONSTRUCTION, LLC($462,979) |
|
6457-01-001 |
MCLENNAN |
WACO |
$2,158,100 |
US0084 |
MMC - 645701001 |
12/06/2023 |
11/15/2023 |
FLEXIBLE BASE |
DIGG COMMERCIAL, LLC($2,135,050) |
|
6323-45-001 |
LIMESTONE |
WACO |
$148,874 |
US0084 |
RMC - 632345001 |
11/14/2017 |
11/15/2023 |
TREE TRIM AND RMVL |
C.E.S. CONTRACTOR($137,009) |
|
6393-10-001 |
MCLENNAN |
WACO |
$963,714 |
US0084 |
RMC - 639310001 |
11/02/2023 |
11/15/2023 |
ILLUM MAINT |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.($992,173) |
|
6385-00-001 |
MCLENNAN |
WACO |
$277,451 |
US0084 |
MMC - 638500001 |
10/11/2021 |
11/15/2023 |
DE-ICING SALT |
SOUTHWEST ENVIROTX PARTNERS, LLC($253,215) |
|
6352-98-001 |
MCLENNAN |
WACO |
$487,975 |
US0084 |
RMC - 635298001 |
12/03/2019 |
11/15/2023 |
URBAN & RURAL MOW, LITTER REM |
CROSS PLUS CONSTRUCTION, LLC($446,521) |
|
6418-43-001 |
MCLENNAN |
WACO |
$798,205 |
US0084 |
MMC - 641843001 |
10/06/2022 |
11/15/2023 |
DE-ICING SALT |
NSG LOGISTICS, LLC($707,715) |
|
6399-62-001 |
CORYELL |
WACO |
$690,503 |
US0084 |
RMC - 639962001 |
06/01/2022 |
09/03/2024 |
BASE FAILURE PAVMT REPAIR |
TEXAS MATERIALS GROUP, INC.($632,732) |
|
6418-45-001 |
MCLENNAN |
WACO |
$1,889,826 |
US0084 |
MMC - 641845001 |
12/02/2022 |
11/15/2023 |
FLEXIBLE BASE |
TOUCHSTONE RESOURCES, LLC($1,237,214) |
|
6425-56-001 |
HAMILTON |
WACO |
$1,046,500 |
US0084 |
MMC - 642556001 |
12/01/2022 |
11/15/2023 |
HOT MIX |
BIG CREEK CONSTRUCTION, LTD.($1,009,900) |
|
6427-15-001 |
MCLENNAN |
WACO |
$932,205 |
US0084 |
RMC - 642715001 |
01/05/2023 |
11/15/2023 |
CONC SPALL REPAIR |
CROSS PLUS CONSTRUCTION, LLC($1,527,038) |
|
6428-86-001 |
LIMESTONE |
WACO |
$555,100 |
US0084 |
MMC - 642886001 |
01/06/2023 |
11/15/2023 |
EMULSION |
WRIGHT ASPHALT PRODUCTS COMPANY LLC($423,500) |
|
6393-19-001 |
MCLENNAN |
WACO |
$166,519 |
US0084 |
RMC - 639319001 |
12/14/2021 |
11/15/2023 |
SWEEPING AND DEBRIS RMVL |
SWEEPING CORPORATION OF AMERICA, INC.($297,584) |
|
6396-93-001 |
MCLENNAN |
WACO |
$283,000 |
US0084 |
MMC - 639693001 |
03/15/2022 |
11/15/2023 |
HOT MIX |
BIG CREEK CONSTRUCTION, LTD.($318,250) |
|
6431-38-001 |
MCLENNAN |
WACO |
$1,047,750 |
US0084 |
MMC - 643138001 |
03/07/2023 |
11/15/2023 |
HOT MIX |
KNIFE RIVER CORPORATION - SOUTH($957,300) |
|
6431-32-001 |
CORYELL |
WACO |
$976,250 |
US0084 |
MMC - 643132001 |
03/07/2023 |
11/15/2023 |
HOT MIX |
TEXAS MATERIALS GROUP, INC.($965,375) |
|
6387-66-001 |
MCLENNAN |
WACO |
$471,397 |
US0084 |
MMC - 638766001 |
09/01/2021 |
11/15/2023 |
EMULSION |
ERGON ASPHALT & EMULSIONS, INC.($416,096) |
|
6356-78-001 |
MCLENNAN |
WACO |
$553,785 |
US0084 |
MMC - 635678001 |
03/04/2020 |
11/15/2023 |
EMULSION-MATERIAL ONLY |
ERGON ASPHALT & EMULSIONS, INC.($550,747) |
|
6356-89-001 |
MCLENNAN |
WACO |
$2,836,080 |
US0084 |
MMC - 635689001 |
03/04/2020 |
11/15/2023 |
HOT MIX-MATERIAL ONLY |
TEXAS MATERIALS GROUP, INC.($2,635,350) |
|
6425-50-001 |
MCLENNAN |
WACO |
$1,117,500 |
US0084 |
MMC - 642550001 |
12/02/2022 |
11/15/2023 |
HOT MIX |
KNIFE RIVER CORPORATION - SOUTH($1,016,415) |
|
6336-61-001 |
MCLENNAN |
WACO |
$1,543,968 |
US0084 |
RMC - 633661001 |
01/09/2019 |
11/15/2023 |
SPALL & FULL DEPTH CONC REPAIR |
CROSS PLUS CONSTRUCTION, LLC($1,496,038) |
|
6339-79-001 |
MCLENNAN |
WACO |
$153,058 |
US0084 |
RMC - 633979001 |
12/12/2018 |
11/15/2023 |
MOW AND LITTER PICKUP & DISPOSAL |
T&L CLEANING SERVICES LLC($134,654) |
|
6434-76-001 |
LIMESTONE |
WACO |
$872,500 |
US0084 |
MMC - 643476001 |
03/08/2023 |
11/15/2023 |
HOT MIX |
KNIFE RIVER CORPORATION - SOUTH($840,400) |
|
6427-15-001 |
MCLENNAN |
WACO |
$1,242,131 |
US0084 |
RMC - 642715001 |
05/04/2023 |
11/15/2023 |
CONC SPALL REPAIR |
ROY JORGENSEN ASSOCIATES, INC.($1,892,905) |
|
6443-76-001 |
CORYELL |
WACO |
$1,993,650 |
US0084 |
MMC - 644376001 |
08/02/2023 |
11/15/2023 |
HOT MIX |
TEXAS MATERIALS GROUP, INC.($1,944,975) |
|
6443-82-001 |
MCLENNAN |
WACO |
$1,901,250 |
US0084 |
MMC - 644382001 |
08/03/2023 |
11/15/2023 |
HOT MIX |
TEXAS MATERIALS GROUP, INC.($1,771,123) |
|
6418-25-001 |
LIMESTONE |
WACO |
$289,960 |
US0084 |
MMC - 641825001 |
08/30/2022 |
11/15/2023 |
HOT MIX |
KNIFE RIVER CORPORATION - SOUTH($291,365) |
|
6418-31-001 |
MCLENNAN |
WACO |
$277,550 |
US0084 |
MMC - 641831001 |
08/30/2022 |
11/15/2023 |
EMULSION |
WRIGHT ASPHALT PRODUCTS COMPANY LLC($243,150) |
|
6389-08-001 |
CORYELL |
WACO |
$292,782 |
US0084 |
RMC - 638908001 |
12/02/2021 |
11/15/2023 |
MOW HWY RIGHT OF WAY |
JASCO($364,875) |
|
6384-97-001 |
MCLENNAN |
WACO |
$1,309,768 |
US0084 |
MMC - 638497001 |
08/04/2021 |
11/15/2023 |
FLEXIBLE BASE MATERIAL ONLY |
DIGG COMMERCIAL, LLC($1,077,561) |
|
6369-33-001 |
MCLENNAN |
WACO |
$1,555,000 |
US0084 |
MMC - 636933001 |
11/05/2020 |
11/15/2023 |
HOT MIX - MATERIAL ONLY |
BIG CREEK CONSTRUCTION, LTD.($1,187,500) |
|
6363-17-001 |
MCLENNAN |
WACO |
$1,037,964 |
US0084 |
MMC - 636317001 |
08/06/2020 |
11/15/2023 |
FLBS,AGGR-SURF TREAT,CTB & RR ROCK-MATERIAL ONLY |
BIG CREEK CONSTRUCTION, LTD.($787,158) |
|
6341-73-001 |
HAMILTON |
WACO |
$712,137 |
US0084 |
RMC - 634173001 |
08/07/2019 |
11/15/2023 |
BASE FAILURE PAVMT REPAIR |
BIG CREEK CONSTRUCTION, LTD.($879,594) |
|
6356-87-001 |
LIMESTONE |
WACO |
$2,188,340 |
US0084 |
MMC - 635687001 |
03/04/2020 |
11/15/2023 |
HOT MIX-MATERIAL ONLY |
TEXAS MATERIALS GROUP, INC.($2,010,250) |
|
6469-79-001 |
MCLENNAN |
WACO |
$1,179,886 |
US0084 |
RMC - 646979001 |
09/05/2024 |
08/01/2024 |
METAL BEAM GUARD FENCE REPAIR |
BK FIELD OPERATIONS LLC($700,293) |
|
6356-92-001 |
CORYELL |
WACO |
$583,464 |
US0084 |
MMC - 635692001 |
04/09/2020 |
11/15/2023 |
HOT MIX - MATERIAL ONLY |
BIG CREEK CONSTRUCTION, LTD.($519,000) |
|
6473-41-001 |
MCLENNAN |
WACO |
$1,638,415 |
US0084 |
RMC - 647341001 |
12/04/2024 |
11/10/2024 |
BASE FAILURE PAVMT REPAIR |
|
|
6473-13-001 |
CORYELL |
WACO |
$513,517 |
US0084 |
RMC - 647313001 |
11/13/2024 |
10/02/2024 |
MOW HWY RIGHT OF WAY |
JASCO($408,810) |
|
6467-51-001 |
MCLENNAN |
WACO |
$2,252,250 |
US0084 |
MMC - 646751001 |
08/01/2024 |
06/26/2024 |
HOT MIX |
TEXAS MATERIALS GROUP, INC.($2,213,910) |
|
6467-54-001 |
CORYELL |
WACO |
$1,783,500 |
US0084 |
MMC - 646754001 |
08/01/2024 |
06/25/2024 |
HOT MIX |
BIG CREEK CONSTRUCTION, LTD.($1,892,350) |
|
6443-80-001 |
MCLENNAN |
WACO |
$860,100 |
US0084 |
MMC - 644380001 |
01/04/2024 |
11/30/2023 |
HOT MIX |
BIG CREEK CONSTRUCTION, LTD.($829,225) |
|
6323-05-001 |
CORYELL |
WACO |
$360,938 |
US0084 |
BPM - 632305001 |
11/02/2017 |
11/15/2023 |
BRIDGE PREVENT MAINT |
BECK-REIT & SONS, LTD.($318,825) |
|
6312-44-001 |
MCLENNAN |
WACO |
$676,502 |
US0084 |
RMC - 631244001 |
11/03/2017 |
11/15/2023 |
MBGF, CABLE BARRIERS & BRIDGE RAIL/REP/I |
T&L CLEANING SERVICES LLC($772,842) |
|
6342-36-001 |
MCLENNAN |
WACO |
$812,766 |
US0084 |
RMC - 634236001 |
05/08/2019 |
11/15/2023 |
MBGF, CABLE BARRIER, BRIDGE RAIL REP/INS |
VANN/ELLI, INC.($1,355,400) |
|
6324-94-001 |
MCLENNAN |
WACO |
$737,952 |
US0084 |
RMC - 632494001 |
02/01/2018 |
11/15/2023 |
MISCELLANEOUS CONC REPAIRS |
DBI SERVICES, LLC($648,174) |
|
6354-19-001 |
MCLENNAN |
WACO |
$219,364 |
US0084 |
RMC - 635419001 |
02/11/2020 |
09/26/2024 |
CLEANING AND SWEEPING HWYS |
STAR SWEEPING USA INC.($215,764) |
|
6342-36-001 |
MCLENNAN |
WACO |
$812,766 |
US0084 |
RMC - 634236001 |
08/06/2019 |
11/15/2023 |
MBGF, CABLE BARRIER, BRIDGE RAIL REP/INS |
T&L CLEANING SERVICES LLC($971,242) |
|
6467-56-001 |
LIMESTONE |
WACO |
$837,000 |
US0084 |
MMC - 646756001 |
06/05/2024 |
04/29/2024 |
EMULSION |
WRIGHT ASPHALT PRODUCTS COMPANY LLC($866,350) |
|
6326-49-001 |
MCLENNAN |
WACO |
$326,593 |
US0084 |
RMC - 632649001 |
05/08/2019 |
11/15/2023 |
DISTRICT WIDE MAINT OF ILLUM |
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC.($287,348) |
|
6370-16-001 |
RUSK |
TYLER |
$171,640 |
US0084 |
RMC - 637016001 |
10/06/2020 |
11/15/2023 |
TREE TRIM |
BUSHWACKERS CONTRACTING, LLC($171,640) |
|
6346-94-001 |
CHEROKEE |
TYLER |
$297,283 |
US0084 |
BPM - 634694001 |
12/10/2019 |
11/15/2023 |
BPM |
RED BARON BUILDING COMPANY, L.L.C.($272,953) |
|
6333-25-001 |
SHELBY |
LUFKIN |
$206,735 |
US0084 |
RMC - 633325001 |
09/19/2018 |
11/15/2023 |
CRACK SEAL |
GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY($99,404) |
|
6441-70-001 |
SHELBY |
LUFKIN |
$79,068 |
US0084 |
MMC - 644170001 |
05/11/2023 |
11/15/2023 |
AGGREGATE GRADE 3 & 4 |
ARCOSA LWS, LLC($80,580) |
|
6348-97-001 |
SHELBY |
LUFKIN |
$241,374 |
US0084 |
RMC - 634897001 |
10/16/2019 |
11/15/2023 |
CLEANING AND SEALING CRACKS |
D & M CONTRACTORS, LLC($197,163) |
|
6393-09-001 |
GARZA |
LUBBOCK |
$337,920 |
US0084 |
MMC - 639309001 |
01/07/2022 |
11/15/2023 |
DE-ICING SALT (MATERIAL ONLY) |
SOUTHWEST ENVIROTX PARTNERS, LLC($282,438) |
|
6328-89-001 |
LUBBOCK |
LUBBOCK |
$171,780 |
US0084 |
RMC - 632889001 |
04/11/2018 |
11/15/2023 |
ROW FULL WIDTH MOW |
GORMAN OUTDOOR, INC.($209,046) |
|
6354-52-001 |
LAMB |
LUBBOCK |
$285,000 |
US0084 |
MMC - 635452001 |
01/30/2020 |
11/15/2023 |
MATERIAL ONLY EMULSION |
ERGON ASPHALT & EMULSIONS, INC.($263,850) |
|
6355-99-001 |
LAMB |
LUBBOCK |
$50,000 |
US0084 |
MMC - 635599001 |
04/23/2020 |
11/15/2023 |
PURCHASE OF MATERIALS LRA_(MATERIALS ONLY) |
VULCAN CONSTRUCTION MATERIALS, LLC($56,345) |
|
6356-03-001 |
LAMB |
LUBBOCK |
$125,000 |
US0084 |
MMC - 635603001 |
06/12/2020 |
11/15/2023 |
ASPH PATCH MATERIAL (MATERIAL ONLY) |
L A FULLER & SONS CONSTRUCTION, LTD.($133,780) |
|
6377-37-001 |
LAMB |
LUBBOCK |
$285,000 |
US0084 |
MMC - 637737001 |
04/06/2021 |
11/15/2023 |
EMULSION |
ERGON ASPHALT & EMULSIONS, INC.($233,100) |
|
6391-90-001 |
LAMB |
LUBBOCK |
$288,325 |
US0084 |
MMC - 639190001 |
11/15/2021 |
11/15/2023 |
AGGREGATE |
TOUCHSTONE RESOURCES, LLC($326,300) |
|
6398-63-001 |
LAMB |
LUBBOCK |
$133,200 |
US0084 |
MMC - 639863001 |
03/31/2022 |
11/15/2023 |
EMULSION |
ERGON ASPHALT & EMULSIONS, INC.($154,400) |
|
6399-28-001 |
LAMB |
LUBBOCK |
$128,250 |
US0084 |
MMC - 639928001 |
04/13/2022 |
11/15/2023 |
LIMESTONE ROCK AND ASPH |
VULCAN CONSTRUCTION MATERIALS, LLC($154,437) |
|
6402-33-001 |
LAMB |
LUBBOCK |
$150,000 |
US0084 |
MMC - 640233001 |
05/11/2022 |
11/15/2023 |
ASPHIC PATCHING MATERIAL |
L A FULLER & SONS CONSTRUCTION, LTD.($161,480) |
|
6404-82-001 |
LUBBOCK |
LUBBOCK |
$210,000 |
US0084 |
MMC - 640482001 |
08/23/2022 |
11/15/2023 |
WINTER WEATHER MATERIAL |
NSG LOGISTICS, LLC($181,600) |
|
6355-14-001 |
GARZA |
LUBBOCK |
$3,993,860 |
US0084 |
MMC - 635514001 |
04/08/2020 |
11/15/2023 |
HERBICIDE & INSECTICIDE POST RDC (MATERIALS ONLY) |
NUTRIEN AG SOLUTIONS, INC.($3,786,880) |
|
6475-63-001 |
GARZA |
LUBBOCK |
$204,000 |
US0084 |
MMC - 647563001 |
12/04/2024 |
11/10/2024 |
HYDRAULIC CEMENT |
|
|
6352-84-001 |
GARZA |
LUBBOCK |
$530,939 |
US0084 |
BPM - 635284001 |
05/07/2020 |
11/15/2023 |
BRIDGE PREVENT MAINT |
BLACKSTONE CONCRETE VENTURES, LLC($517,185) |
|
6475-66-001 |
GARZA |
LUBBOCK |
$170,000 |
US0084 |
MMC - 647566001 |
12/04/2024 |
11/10/2024 |
ASPHIC PATCHING MATERIAL |
|
|
6313-16-001 |
BAILEY |
LUBBOCK |
$533,940 |
US0084 |
RMC - 631316001 |
02/03/2017 |
11/15/2023 |
FULL WIDTH ROW MOW |
CROSS PLUS CONSTRUCTION, LLC($599,168) |
|
6324-59-001 |
GARZA |
LUBBOCK |
$633,244 |
US0084 |
BPM - 632459001 |
06/06/2018 |
11/15/2023 |
BRIDGE MAINT |
EARTH BUILDERS, L.P.($833,015) |
|
6359-11-001 |
GARZA |
LUBBOCK |
$167,427 |
US0084 |
TMC - 635911001 |
05/06/2021 |
11/15/2023 |
DELINEATORS POST RDC (MATERIALS ONLY) |
CENTERLINE SUPPLY, INC.($165,212) |
|
6342-07-001 |
LAMB |
LUBBOCK |
$387,000 |
US0084 |
RMC - 634207001 |
02/06/2019 |
11/15/2023 |
CALL OUT TRAF CONTROL |
BARRICADES UNLIMITED($539,150) |
|
6335-20-001 |
GARZA |
LUBBOCK |
$1,328,083 |
US0084 |
BPM - 633520001 |
04/02/2019 |
11/15/2023 |
BRIDGE PREVENT MAINT |
EARTH BUILDERS, L.P.($1,523,850) |
|
6364-07-001 |
GARZA |
LUBBOCK |
$910,080 |
US0084 |
MMC - 636407001 |
06/04/2020 |
11/15/2023 |
MATERIALS ONLY (ASPPM PATCHING MATERIAL - BAGGED) |
BULLCHASE, INC.($777,600) |
|
6384-55-001 |
LAMB |
LUBBOCK |
$414,996 |
US0084 |
RMC - 638455001 |
09/01/2021 |
11/15/2023 |
CRACK SEAL |
GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY($337,888) |
|
6384-82-001 |
LAMB |
LUBBOCK |
$179,675 |
US0084 |
RMC - 638482001 |
09/02/2021 |
11/15/2023 |
METAL BEAM GUARD FENCE REPAIR |
BARRICADES UNLIMITED($160,125) |
|
6393-21-001 |
GARZA |
LUBBOCK |
$678,060 |
US0084 |
RMC - 639321001 |
02/03/2022 |
11/15/2023 |
MOW HWY RIGHT OF WAY |
TEXAS BLACKTOPS LLC($807,756) |
|
6400-32-001 |
GARZA |
LUBBOCK |
$165,117 |
US0084 |
RMC - 640032001 |
09/07/2022 |
11/15/2023 |
CRACK SEAL |
GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY($98,124) |
|
6404-88-001 |
LAMB |
LUBBOCK |
$591,250 |
US0084 |
MMC - 640488001 |
10/06/2022 |
11/15/2023 |
AGGREGATE |
TOUCHSTONE RESOURCES, LLC($882,600) |
|
6418-83-001 |
GARZA |
LUBBOCK |
$140,000 |
US0084 |
MMC - 641883001 |
10/07/2022 |
11/15/2023 |
HYDRAULIC CEMENT CONC |
KLP COMMERCIAL, L.L.C.($128,800) |
|
6419-42-001 |
GARZA |
LUBBOCK |
$603,500 |
US0084 |
MMC - 641942001 |
10/07/2022 |
11/15/2023 |
ASPHIC PATCHING MATERIAL |
WALLER COUNTY ASPHALT INC.($443,750) |
|
6432-28-001 |
LAMB |
LUBBOCK |
$657,800 |
US0084 |
RMC - 643228001 |
02/01/2023 |
11/15/2023 |
TRAF CONTROL SERVICES |
FC TRAFFIC CONTROL, INC.($450,436) |
|
6435-10-001 |
LAMB |
LUBBOCK |
$238,000 |
US0084 |
MMC - 643510001 |
03/07/2023 |
11/15/2023 |
EMULSION |
ERGON ASPHALT & EMULSIONS, INC.($193,050) |
|
6435-24-001 |
LAMB |
LUBBOCK |
$750,000 |
US0084 |
MMC - 643524001 |
04/04/2023 |
09/24/2024 |
LIMESTONE ROCK ASPH |
MARTIN MARIETTA MATERIALS, INC.($866,900) |
|
6435-16-001 |
LAMB |
LUBBOCK |
$787,500 |
US0084 |
MMC - 643516001 |
03/08/2023 |
11/15/2023 |
CUTBACK |
WRIGHT ASPHALT PRODUCTS COMPANY LLC($729,000) |
|
6435-32-001 |
LAMB |
LUBBOCK |
$412,500 |
US0084 |
MMC - 643532001 |
05/04/2023 |
11/15/2023 |
ASPHIC PATCHING MATERIAL |
L A FULLER & SONS CONSTRUCTION, LTD.($401,975) |
|
6448-09-001 |
LAMB |
LUBBOCK |
$422,375 |
US0084 |
RMC - 644809001 |
09/06/2023 |
11/15/2023 |
METAL BEAM GUARD FENCE REPAIR |
ROSS SA ENTERPRISE LLC($334,615) |
|
6444-68-001 |
GARZA |
LUBBOCK |
$132,350 |
US0084 |
TMC - 644468001 |
09/07/2023 |
11/15/2023 |
DELINEATORS |
CENTERLINE SUPPLY, INC.($131,025) |
|
6333-53-001 |
LAMB |
LUBBOCK |
$278,250 |
US0084 |
RMC - 633353001 |
07/17/2018 |
11/15/2023 |
GUARDRAIL REPAIR |
BARRICADES UNLIMITED($276,585) |