0218-04-126 |
CASS |
ATLANTA |
$2,773,278 |
US 59 |
F 2023(626) |
03/07/2023 |
08/21/2024 |
DIAMOND GRINDING 4-LANE HWY |
WINDING ROAD CONSTRUCTION, INC.($2,198,711) |
|
0089-07-154 |
WHARTON |
YOAKUM |
$375,500,377 |
US 59 |
F 2024(436) |
12/06/2023 |
11/15/2023 |
CONVERT NON-FREEWAY |
WILLIAMS BROTHERS CONSTRUCTION CO., INC.($376,415,385) |
|
0089-08-098 |
WHARTON |
YOAKUM |
$195,525,806 |
US 59 |
NH 2020(496) |
01/10/2020 |
09/26/2024 |
UPGRADE TO RURAL FREEWAY |
WILLIAMS BROTHERS CONSTRUCTION CO., INC.($191,395,295) |
|
0177-02-057 |
SAN JACINTO |
LUFKIN |
$176,543,400 |
US 59 |
F 2023(773) |
06/27/2023 |
11/15/2023 |
HWY IMPRV |
WEBBER, LLC($189,820,654) |
|
0089-06-092 |
WHARTON |
YOAKUM |
$7,398,163 |
US 59 |
STP 2023(977)HES |
06/28/2023 |
11/15/2023 |
INSTL RAISED MEDIAN |
WEBBER, LLC($7,119,900) |
|
0176-05-199 |
POLK |
LUFKIN |
$4,883,633 |
US 59 |
C 176-5-199 |
01/05/2023 |
11/15/2023 |
RESURF ROADWAY |
VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC($5,599,219) |
|
0176-04-087 |
POLK |
LUFKIN |
$6,447,982 |
US 59 |
F 2021(561) |
06/03/2021 |
11/15/2023 |
HWY IMPRV |
VULCAN CONSTRUCTION($6,239,710) |
|
0062-07-103 |
HARRISON |
ATLANTA |
$1,345,549 |
US 59 |
STP 2B24(045)VRU |
04/04/2024 |
02/22/2024 |
INSTL ILLUM |
VACA UNDERGROUND UTILITIES INC($1,254,209) |
|
0089-07-156 |
WHARTON |
YOAKUM |
$295,465 |
US 59 |
C 89-7-156 |
01/09/2019 |
11/15/2023 |
SLOPE REPAIR |
TREVWAY, INC.($286,694) |
|
0088-05-110 |
VICTORIA |
YOAKUM |
$1,885,447 |
US 59 |
F 2024(584) |
01/05/2024 |
11/24/2023 |
INSTL ILLUM |
TRAF-TEX, INC.($1,666,764) |
|
0086-14-073 |
WEBB |
LAREDO |
$513,306 |
US 59 |
STP 2019(608)HES |
04/02/2019 |
11/15/2023 |
IMPROVE TRAF SIG |
TRAF-TEX, INC.($579,929) |
|
0063-03-069 |
PANOLA |
ATLANTA |
$374,605 |
US 59 |
BR 2022(003) |
09/02/2021 |
11/15/2023 |
BRIDGE MAINT |
THK CONSTRUCTION LLC($310,940) |
|
0218-04-121 |
CASS |
ATLANTA |
$2,189,321 |
US 59 |
STP 2020(042)HES |
08/06/2020 |
11/15/2023 |
HIGH FRICTION SURF TREATMENT |
THE TRUESDELL CORPORATION($2,417,417) |
|
0063-01-091 |
HARRISON |
ATLANTA |
$313,227 |
US 59 |
STP 2017(235)HESG |
11/03/2016 |
11/15/2023 |
INSTL TRAF SIGNAL |
TEXAS TRAFFIC CONTROL SYSTEMS, INC.($256,403) |
|
0175-07-065 |
NACOGDOCHES |
LUFKIN |
$6,767,821 |
US 59 |
F 2B23(190) |
09/06/2023 |
11/15/2023 |
RESURF ROADWAY |
TEXAS MATERIALS GROUP, INC.($6,975,521) |
|
0089-06-093 |
WHARTON |
YOAKUM |
$1,837,209 |
US 59 |
C 89-6-93 |
06/01/2023 |
11/27/2023 |
HAZARD ELIM & SAFETY |
TEXAS MATERIALS GROUP, INC.($2,182,905) |
|
0062-07-096 |
HARRISON |
ATLANTA |
$566,503 |
US 59 |
STP 2021(332) |
06/04/2021 |
11/15/2023 |
INSTL SAFETY LIGHTING |
STRIPING TECHNOLOGY, L.P.($539,434) |
|
0063-03-060 |
PANOLA |
ATLANTA |
$494,205 |
US 59 |
STP 2017(505)HES |
01/05/2017 |
11/15/2023 |
IMPROVE TRAF SIGNAL & SAFE LIGHT |
STRIPING TECHNOLOGY, L.P.($524,436) |
|
0062-07-094 |
HARRISON |
ATLANTA |
$516,818 |
US 59 |
STP 2021(325) |
04/07/2021 |
11/15/2023 |
IMPROVE TRAF SIG |
STRIPING TECHNOLOGY, L.P.($468,446) |
|
0218-01-095 |
BOWIE |
ATLANTA |
$184,240 |
US 59 |
STP 2018(352)HES |
12/05/2017 |
11/15/2023 |
SIG & SAFETY LIGHTING |
SOUTH TEXAS ILLUMINATION, LLC($175,785) |
|
0063-10-013 |
PANOLA |
ATLANTA |
$262,171 |
US 59 |
STP 2018(351)HES |
12/05/2017 |
11/15/2023 |
SAFETY LIGHTING AT INTERS |
SOUTH TEXAS ILLUMINATION, LLC($260,188) |
|
0088-01-069 |
BEE |
CORPUS CHRISTI |
$19,724,247 |
US 59 |
C 88-1-69 |
09/04/2020 |
11/15/2023 |
PAVMT REPAIR AND STRUCTURAL OVERLAY |
SMITH & COMPANY($15,920,071) |
|
0177-03-103 |
LIBERTY |
BEAUMONT |
$2,742,971 |
US 59 |
NH 2020(591) |
02/07/2020 |
11/15/2023 |
OV-OVERLAY |
SMITH & COMPANY($2,133,678) |
|
0177-01-103 |
POLK |
LUFKIN |
$636,072 |
US 59 |
NH 2018(613) |
03/06/2018 |
11/15/2023 |
OVERLAY WITH PFC_(NORTH BOUND LANES ONLY) |
SMITH & COMPANY($562,885) |
|
0176-02-127 |
ANGELINA |
LUFKIN |
$255,810 |
US 59 |
BR 2022(514) |
03/03/2022 |
11/15/2023 |
BRIDGE MAINT |
SJ&J CONSTRUCTION, LLC($281,620) |
|
2553-01-117 |
ANGELINA |
LUFKIN |
$1,755,615 |
US 59 |
STP 2017(650)HES |
02/03/2017 |
11/15/2023 |
IMPROVE GUARDRAIL TO DESIGN STANDARDS, ETC. |
SJ&J CONSTRUCTION, LLC($1,891,195) |
|
0088-05-085 |
VICTORIA |
YOAKUM |
$24,497,349 |
US 59 |
C 88-5-85 |
05/01/2018 |
11/15/2023 |
CONSTRUCT FRONTAGE ROADS |
SER CONSTRUCTION PARTNERS, LLC($28,593,623) |
|
0089-07-146 |
WHARTON |
YOAKUM |
$32,500,717 |
US 59 |
NH 2019(437) |
01/08/2019 |
11/15/2023 |
CONSTRUCT FRONTAGE ROADS |
SER CONSTRUCTION PARTNERS, LLC($34,757,445) |
|
0089-07-161 |
WHARTON |
YOAKUM |
$3,524,441 |
US 59 |
STP 1902(295)HES |
08/07/2019 |
11/15/2023 |
INSTL MEDIAN BARRIER |
SCR CIVIL CONSTRUCTION, LLC($3,284,618) |
|
0177-01-112 |
POLK |
LUFKIN |
$1,781,724 |
US 59 |
BR 1902(283) |
08/07/2019 |
11/15/2023 |
BRIDGE MAINT |
SCR CIVIL CONSTRUCTION, LLC($1,536,274) |
|
0088-05-094 |
VICTORIA |
YOAKUM |
$2,619,990 |
US 59 |
STP 1702(483)HES |
07/11/2017 |
11/15/2023 |
INSTL MEDIAN BARRIER |
SCR CIVIL CONSTRUCTION, LLC($1,983,067) |
|
0176-05-201 |
POLK |
LUFKIN |
$6,970,373 |
US 59 |
STP 2B24(377)HES |
08/02/2024 |
06/21/2024 |
HAZARD ELIM & SAFETY |
SCOUT 5 CONSTRUCTION LLC($5,472,431) |
|
0176-03-097 |
ANGELINA |
LUFKIN |
$141,599,693 |
US 59 |
NH 2013(218) |
12/04/2019 |
11/15/2023 |
HWY IMPRV |
SACYR CONSTRUCTION USA LLC($140,865,929) |
|
0542-01-101 |
WEBB |
LAREDO |
$5,869,821 |
US 59 |
F 2024(055) |
09/06/2023 |
11/15/2023 |
SEAL COAT |
RONALD R. WAGNER & CO., LP($5,349,602) |
|
0218-01-096 |
BOWIE |
ATLANTA |
$4,788,910 |
US 59 |
NH 2019(201) |
11/07/2018 |
11/15/2023 |
PLANING, ACP & PAV MRKS |
RK HALL, LLC($4,256,574) |
|
0218-03-087 |
CASS |
ATLANTA |
$9,212,636 |
US 59 |
C 218-3-87 |
02/01/2023 |
11/15/2023 |
REHAB EXIST FOUR LANE ROADWAY |
RK HALL, LLC($9,089,429) |
|
0218-03-094 |
CASS |
ATLANTA |
$9,753,014 |
US 59 |
C 218-3-94 |
01/05/2024 |
11/24/2023 |
REHAB EXIST ROADWAY |
RK HALL, LLC($9,155,620) |
|
0218-03-086 |
CASS |
ATLANTA |
$9,881,473 |
US 59 |
C 218-3-86 |
02/02/2024 |
12/22/2023 |
SURF/ROADWAY RESTOR |
RK HALL, LLC($9,573,841) |
|
0176-05-197 |
POLK |
LUFKIN |
$2,626,397 |
US 59 |
C 176-5-197 |
11/05/2020 |
11/15/2023 |
OVERLAY, OCST, & PFC (SB LANES ONLY) |
MOORE BROTHERS CONSTRUCTION COMPANY($2,332,417) |
|
0176-05-196 |
POLK |
LUFKIN |
$4,517,250 |
US 59 |
NH 2020(495) |
01/09/2020 |
09/26/2024 |
RESURF ROADWAY |
MOORE BROTHERS CONSTRUCTION COMPANY($3,764,702) |
|
0176-02-120 |
ANGELINA |
LUFKIN |
$3,117,155 |
US 59 |
NH 2017(826) |
03/08/2017 |
11/15/2023 |
HMA LEVEL UP, OCST AND PFC SURF |
MOORE BROTHERS CONSTRUCTION COMPANY($2,865,624) |
|
0177-02-095 |
SAN JACINTO |
LUFKIN |
$1,597,055 |
US 59 |
F 2022(296) |
01/06/2022 |
11/15/2023 |
HWY IMPRV |
MOORE BROTHERS CONSTRUCTION COMPANY($1,479,910) |
|
0176-03-135 |
ANGELINA |
LUFKIN |
$8,387,938 |
US 59 |
NH 2018(772) |
04/04/2018 |
11/15/2023 |
PLANE, HMA LEVEL-UP, OCST, PFC |
MOORE BROTHERS CONSTRUCTION COMPANY($8,332,375) |
|
0176-01-112 |
NACOGDOCHES |
LUFKIN |
$1,353,958 |
US 59 |
NH 2020(882) |
06/05/2020 |
11/15/2023 |
WIDENING EXIST PAVMT FOR ACCELERATION LANE |
MOORE BROTHERS CONSTRUCTION COMPANY($1,067,728) |
|
0176-05-181 |
POLK |
LUFKIN |
$3,683,021 |
US 59 |
C 176-5-181 |
01/08/2019 |
11/15/2023 |
PLANE, HMA & PERMEABLE FRICTION COURSE |
MOORE BROTHERS CONSTRUCTION COMPANY($3,604,503) |
|
0177-01-102 |
POLK |
LUFKIN |
$2,523,680 |
US 59 |
NH 2017(641) |
02/02/2017 |
11/15/2023 |
HMA LEVEL-UP, OCST AND PFC |
MOORE BROTHERS CONSTRUCTION COMPANY($2,215,251) |
|
0063-04-064 |
PANOLA |
ATLANTA |
$6,935,552 |
US 59 |
NH 2020(117) |
10/02/2019 |
11/15/2023 |
SEAL COAT AND PAVMT MRK |
MISSOURI PETROLEUM PRODUCTS COMPANY LLC($7,272,584) |
|
0089-04-082 |
JACKSON |
YOAKUM |
$4,588,425 |
US 59 |
STP 2B24(076)HES |
05/03/2024 |
03/22/2024 |
HAZARD ELIM & SAFETY |
MASSANA CONSTRUCTION INC.($3,431,626) |
|
0063-10-017 |
PANOLA |
ATLANTA |
$5,051,229 |
US 59 |
NH 2018(787) |
04/04/2018 |
11/15/2023 |
PAV REPAIR,ACP,MBGF,BR RAIL, PV MRK |
MADDEN CONTRACTING COMPANY, LLC.($4,645,910) |
|
0062-05-062 |
MARION |
ATLANTA |
$4,561,816 |
US 59 |
NH 2021(317) |
01/07/2021 |
11/15/2023 |
RESURF EXIST 4 LANE DIVIDED HWY |
MADDEN CONTRACTING COMPANY, LLC.($2,827,414) |
|
0062-07-088 |
HARRISON |
ATLANTA |
$14,389,895 |
US 59 |
NH 2020(066) |
10/02/2019 |
11/15/2023 |
PLANE ACP, CEMENT TREATMENT, ACP SURF, & PAV MARK |
MADDEN CONTRACTING COMPANY, LLC.($13,662,270) |
|
0176-01-081 |
NACOGDOCHES |
LUFKIN |
$77,867,878 |
US 59 |
NH 1902(081) |
07/09/2019 |
09/27/2024 |
CONSTRUCT 4 LANE DIRECT CONNECTION |
LONGVIEW BRIDGE AND ROAD, LTD.($86,198,369) |
|
0063-03-065 |
PANOLA |
ATLANTA |
$8,869,831 |
US 59 |
NH 2020(979) |
07/09/2020 |
11/15/2023 |
REHAB EXIST 4 LANE HWY |
LONGVIEW BRIDGE AND ROAD, LTD.($8,864,786) |
|
0176-02-118 |
ANGELINA |
LUFKIN |
$48,176,388 |
US 59 |
F 2021(440) |
06/02/2022 |
09/03/2024 |
HWY IMPRV |
LONGVIEW BRIDGE AND ROAD, LTD.($63,145,676) |
|
2553-01-115 |
ANGELINA |
LUFKIN |
$15,921,009 |
US 59 |
NH 2B20(055) |
10/01/2020 |
11/15/2023 |
CONVERT TO 4 LANE FRWY W/2 LANE NB&SB FRONTAGE RD |
LONGVIEW BRIDGE AND ROAD, LTD.($19,326,241) |
|
0063-10-015 |
PANOLA |
ATLANTA |
$34,951,363 |
US 59 |
C 63-10-15 |
06/01/2023 |
11/27/2023 |
CONSTRUCT GRADE SEPARATION |
LONGVIEW BRIDGE AND ROAD, LTD.($36,905,848) |
|
0176-04-056 |
POLK |
LUFKIN |
$150,506,214 |
US 59 |
NH 2013(222) |
05/05/2022 |
08/31/2024 |
HWY IMPRV |
JAMES CONSTRUCTION GROUP, LLC($172,799,108) |
|
0089-07-159 |
WHARTON |
YOAKUM |
$7,389,990 |
US 59 |
F 2022(237) |
11/03/2021 |
11/15/2023 |
SURF/ROADWAY RESTOR |
JAMES CONSTRUCTION GROUP, LLC($8,528,161) |
|
0086-14-075 |
WEBB |
LAREDO |
$311,492,996 |
US 59 |
F 2022(745) |
08/02/2023 |
11/15/2023 |
RECON EXIST ROADWAY |
JAMES CONSTRUCTION GROUP, LLC($344,030,535) |
|
0089-06-090 |
WHARTON |
YOAKUM |
$7,505,321 |
US 59 |
C 89-6-90 |
08/07/2018 |
11/15/2023 |
ACP OVERLAY |
JAMES CONSTRUCTION GROUP, L.L.C.($7,009,734) |
|
0089-06-088 |
WHARTON |
YOAKUM |
$8,011,301 |
US 59 |
NH 1702(485) |
07/12/2017 |
11/15/2023 |
ACP OVERLAY |
JAMES CONSTRUCTION GROUP, L.L.C.($8,161,720) |
|
0177-03-096 |
LIBERTY |
BEAUMONT |
$108,030,552 |
US 59 |
NH 2012(594) |
09/07/2018 |
11/15/2023 |
WIDEN TO 6 MAIN LANES WITH FRONTAGE ROADS |
JAMES CONSTRUCTION GROUP, L.L.C.($102,150,732) |
|
0062-06-058 |
MARION |
ATLANTA |
$1,768,224 |
US 59 |
STP 1902(305)HES |
08/07/2019 |
11/15/2023 |
INSTL MEDIAN BARRIER |
H. V. CAVER, INC.($1,452,714) |
|
0062-04-050 |
CASS |
ATLANTA |
$7,472,559 |
US 59 |
NH 2021(099) |
11/04/2020 |
11/15/2023 |
INSTL MEDIAN BARRIER |
H. V. CAVER, INC.($4,434,953) |
|
0063-04-068 |
PANOLA |
ATLANTA |
$2,360,528 |
US 59 |
STP 2024(670)HES |
02/01/2024 |
12/21/2023 |
HAZARD ELIM & SAFETY |
H. V. CAVER, INC.($1,105,559) |
|
0088-01-068 |
BEE |
CORPUS CHRISTI |
$5,109,247 |
US 59 |
C 88-1-68 |
04/02/2019 |
11/15/2023 |
SPOT BASE REPAIR AND NOVACHIP ROADWAY |
HUNTER INDUSTRIES, LTD.($4,366,328) |
|
0088-03-048 |
GOLIAD |
CORPUS CHRISTI |
$11,511,610 |
US 59 |
F 2023(931) |
06/02/2023 |
11/28/2023 |
RESURF ROADWAY |
HUNTER INDUSTRIES, LTD.($10,014,542) |
|
0089-03-091 |
JACKSON |
YOAKUM |
$13,609,496 |
US 59 |
NH 2020(114) |
10/02/2019 |
11/15/2023 |
PLANING AND ACP OVERLAY |
HUNTER INDUSTRIES, LTD.($12,833,114) |
|
0088-02-062 |
GOLIAD |
CORPUS CHRISTI |
$24,425,868 |
US 59 |
BR 2025(159) |
10/01/2024 |
08/20/2024 |
BRIDGE REPL |
HUNTER INDUSTRIES, LTD.($31,574,353) |
|
0088-04-070 |
VICTORIA |
YOAKUM |
$4,270,409 |
US 59 |
NH 2018(158) |
04/04/2018 |
11/15/2023 |
ACP OVERLAY |
HUNTER INDUSTRIES, LTD.($4,506,273) |
|
0088-05-104 |
VICTORIA |
YOAKUM |
$6,402,470 |
US 59 |
NH 2020(988) |
07/09/2020 |
11/15/2023 |
INSTL MEDIAN BARRIER AND WIDEN ROADWAY |
HUNTER INDUSTRIES, LTD.($6,878,588) |
|
0088-05-091 |
VICTORIA |
YOAKUM |
$8,977,357 |
US 59 |
NH 2018(506) |
02/02/2018 |
11/15/2023 |
ACP OVERLAY |
HUNTER INDUSTRIES, LTD.($9,267,867) |
|
0088-05-098 |
VICTORIA |
YOAKUM |
$11,687,239 |
US 59 |
C 88-5-98 |
08/05/2021 |
11/15/2023 |
CONSTRUCT ONE WAY FRONTAGE ROADS |
HUNTER INDUSTRIES, LTD.($13,531,313) |
|
0088-05-092 |
VICTORIA |
YOAKUM |
$10,988,439 |
US 59 |
C 88-5-92 |
10/05/2016 |
11/15/2023 |
CONSTRUCT 4-LANE OVERPASS |
HUNTER INDUSTRIES, LTD.($8,914,435) |
|
0088-05-096 |
VICTORIA |
YOAKUM |
$51,222,552 |
US 59 |
F 2B23(079) |
08/02/2023 |
11/15/2023 |
WIDEN ROAD - ADD LANES |
HUNTER INDUSTRIES, LTD.($55,933,078) |
|
0062-04-051 |
CASS |
ATLANTA |
$537,740 |
US 59 |
F 2022(515) |
04/07/2022 |
09/24/2024 |
UPGRADE TRAF SIG |
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC.($504,893) |
|
0063-05-040 |
PANOLA |
ATLANTA |
$2,092,138 |
US 59 |
STP 2022(448)HES |
04/06/2022 |
09/24/2024 |
INSTL MEDIAN BARRIER |
GRATIOT CONSTRUCTION, LTD.($2,134,626) |
|
0177-03-104 |
LIBERTY |
BEAUMONT |
$1,633,621 |
US 59 |
NH 2019(621) |
03/06/2019 |
11/15/2023 |
PFC MILL AND INLAY |
FORDE CONSTRUCTION COMPANY, INC.($1,514,862) |
|
0218-04-119 |
CASS |
ATLANTA |
$8,971,075 |
US 59 |
C 218-4-119 |
06/29/2022 |
11/15/2023 |
RESURF EXIST 4-LANE ROADWAY |
EAST TEXAS BRIDGE, INC.($11,842,462) |
|
0063-04-060 |
PANOLA |
ATLANTA |
$4,885,597 |
US 59 |
NH 1902(194) |
07/10/2019 |
09/27/2024 |
CPCD & PAV MRKS |
EAST TEXAS BRIDGE, INC.($4,379,892) |
|
0063-04-061 |
PANOLA |
ATLANTA |
$130,055 |
US 59 |
BR 2020(285) |
11/06/2019 |
11/15/2023 |
METAL BEAM GUARD FENCE AND MOWSTRIP |
EAST TEXAS BRIDGE, INC.($134,765) |
|
0176-04-081 |
POLK |
LUFKIN |
$818,653 |
US 59 |
BR 2017(481) |
01/05/2017 |
11/15/2023 |
UPGRADE BRIDGE AND APPROACH RAILING |
CDM HOLDINGS, LLC($796,806) |
|
0176-03-131 |
ANGELINA |
LUFKIN |
$1,671,568 |
US 59 |
STP 1802(326)HES |
07/11/2018 |
11/15/2023 |
IMPROVE GUARDRAIL TO DES STANDARDS |
B & E CONSTRUCTION INC($1,620,249) |
|
0086-14-094 |
WEBB |
LAREDO |
$634,701 |
US 59 |
C 86-14-94 |
06/05/2020 |
11/15/2023 |
INSTL OF CONC MEDIAN BARRIER. |
ANGEL BROTHERS HOLDINGS CORP.($688,548) |
|
0447-01-063 |
LIVE OAK |
CORPUS CHRISTI |
$10,630,040 |
US 59 |
NH 2017(437) |
01/04/2017 |
11/15/2023 |
OVERLAY ROADWAY_(NB & SB) |
ANGEL BROTHERS HOLDINGS CORP.($8,991,859) |
|
0089-01-099 |
VICTORIA |
YOAKUM |
$2,709,350 |
US 59 |
C 89-1-99 |
05/02/2024 |
03/21/2024 |
UPGRADE DYNAMIC MESSAGE SIGN BOARDS |
ALLSTATE SIGNAL & CONSTRUCTION, LLC($1,868,961) |
|
0089-03-092 |
JACKSON |
YOAKUM |
$1,927,735 |
US 59 |
STP 1902(165)HES |
07/09/2019 |
09/27/2024 |
MODIFY BRIDGE RAIL AND APPROACH GUARD RAIL |
3LW CIVIL LLC($1,939,360) |
|
0089-07-155 |
WHARTON |
YOAKUM |
$2,165,237 |
US 59 |
STP 2020(849)HES |
05/07/2020 |
11/15/2023 |
IMPROVE GUARDRAIL TO DESIGN STANDARD,ETC. |
3LW CIVIL LLC($1,842,177) |