0913-27-091 |
VICTORIA |
YOAKUM |
$66,055 |
CS |
STP 2023(718)HESG |
05/05/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
THIRD COAST SERVICES LLC($50,136) |
|
0913-09-101 |
WHARTON |
YOAKUM |
$148,178 |
CS |
STP 2019(264)TAPS |
12/05/2018 |
11/15/2023 |
CONSTRUCT SIDEWALKS |
TREVWAY, INC.($144,420) |
|
0913-09-081 |
WHARTON |
YOAKUM |
$354,472 |
CS |
STP 1602(475)TAPS |
01/05/2017 |
11/15/2023 |
CONSTRUCT SIDEWALKS |
TREVWAY, INC.($311,986) |
|
0913-27-090 |
VICTORIA |
YOAKUM |
$480,077 |
CS |
STP 2024(914)VRU |
06/06/2024 |
02/22/2024 |
HAZARD ELIM & SAFETY |
STX CIVIL($503,945) |
|
0913-26-065 |
COLORADO |
YOAKUM |
$311,972 |
CS |
STP 2021(658)TAPS |
10/08/2021 |
11/15/2023 |
CONSTRUCT PEDESTRIAN INFRASTRUCT |
TEXAS MATERIALS GROUP, INC.($411,526) |
|
0913-27-089 |
VICTORIA |
YOAKUM |
$51,910 |
CS |
STP 2022(865)HESG |
08/03/2022 |
11/15/2023 |
HAZARD ELIM & SAFETY |
ALLSTATE SIGNAL & CONSTRUCTION, LLC($62,074) |
|
0913-29-054 |
LAVACA |
YOAKUM |
$197,777 |
CS |
STP 2019(310)TAPS |
03/06/2019 |
11/15/2023 |
CONSTRUCT SIDEWALKS |
TREVWAY, INC.($192,922) |
|
0903-03-083 |
WICHITA |
WICHITA FALLS |
$1,085,462 |
CS |
BR 2006(550) |
06/07/2017 |
11/15/2023 |
REPLACE BRIDGE AND APPROACHES |
EARTH BUILDERS, L.P.($1,293,885) |
|
0909-22-190 |
MCLENNAN |
WACO |
$422,550 |
CS |
STP 2024(118)HESG |
10/05/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
DIGG COMMERCIAL, LLC($648,860) |
|
0909-36-165 |
BELL |
WACO |
$705,810 |
CS |
BR 1802(814) |
08/03/2023 |
11/15/2023 |
REHAB BRIDGE AND APPROACHES |
SCR CIVIL CONSTRUCTION, LLC($881,150) |
|
0909-38-078 |
FALLS |
WACO |
$249,884 |
CS |
BR 2017(203) |
08/08/2018 |
11/15/2023 |
REPL BR & APPRS |
KNIFE RIVER CORPORATION - SOUTH($279,404) |
|
0909-22-188 |
MCLENNAN |
WACO |
$433,584 |
CS |
STP 2022(561)HES |
06/01/2022 |
09/03/2024 |
TRAF SIGNAL IMPRVS |
VACA UNDERGROUND UTILITIES INC($448,310) |
|
0909-36-182 |
BELL |
WACO |
$335,014 |
CS |
STP 2023(049)HESG |
10/07/2022 |
11/15/2023 |
INSTL TRAF SIGNAL, SAFETY LIGHTING |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.($461,859) |
|
0909-36-189 |
BELL |
WACO |
$74,607 |
CS |
STP 2023(464)HESG |
02/01/2023 |
11/15/2023 |
INSTL/REPLACE SIGNS |
CROSS PLUS CONSTRUCTION, LLC($81,987) |
|
0909-22-183 |
MCLENNAN |
WACO |
$74,240 |
CS |
STP 1902(128)HES |
08/07/2019 |
11/15/2023 |
HAZARD ELIM & SAFETY |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.($109,680) |
|
0909-36-190 |
BELL |
WACO |
$238,227 |
CS |
STP 2024(119)HES |
10/06/2023 |
11/15/2023 |
CONSTRUCT PEDESTRIAN INFRASTRUCT |
MHB CONSTRUCTION, INC.($236,667) |
|
0909-36-181 |
BELL |
WACO |
$463,329 |
CS |
STP 2023(048)HES |
10/06/2022 |
11/15/2023 |
INSTL PEDESTRIAN CROSSWALK, INSTL SIDEWALKS |
CROSS PLUS CONSTRUCTION, LLC($451,322) |
|
0909-22-197 |
MCLENNAN |
WACO |
$680,501 |
CS |
STP 2024(653)HES |
01/04/2024 |
11/23/2023 |
IMPROVE TRAF SIG, INSTL PEDESTRIAN SIGNAL |
ELECNOR BELCO ELECTRIC, INC.($674,737) |
|
0909-22-173 |
MCLENNAN |
WACO |
$375,491 |
CS |
STP 2017(464)HES |
03/07/2017 |
11/15/2023 |
INCR SUPRELV |
BIG CREEK CONSTRUCTION, LTD.($372,721) |
|
0910-16-183 |
SMITH |
TYLER |
$113,961 |
CS |
STP 2B23(179)HESG |
08/02/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
MARCOM'S MOWING SERVICE, LLC($108,506) |
|
0910-35-036 |
WOOD |
TYLER |
$322,802 |
CS |
STP 2019(291)TAPS |
08/06/2020 |
11/15/2023 |
SIDEWALKS AND PEDESTRIAN BRIDGE |
PIERCE R & B LLC($339,131) |
|
0910-16-039 |
SMITH |
TYLER |
$497,859 |
CS |
BR 94(104) |
03/05/2019 |
11/15/2023 |
REPLACE BRIDGE & APPROACHES |
EAST TEXAS BRIDGE, INC.($469,506) |
|
0910-16-165 |
SMITH |
TYLER |
$163,757 |
CS |
STP 2022(812)HES |
08/04/2022 |
11/15/2023 |
INTERS IMPRV |
STRIPING TECHNOLOGY, L.P.($233,589) |
|
0910-07-082 |
GREGG |
TYLER |
$90,621 |
CS |
STP 2B23(062)HESG |
08/02/2023 |
11/15/2023 |
ROADWAY REHAB/RECON WITH NO ADDE |
3LW CIVIL LLC($90,510) |
|
0910-07-086 |
GREGG |
TYLER |
$404,510 |
CS |
STP 2024(809)VRU |
03/06/2024 |
01/24/2024 |
HAZARD ELIM & SAFETY |
REYNOLDS & KAY, LTD.($439,360) |
|
0910-07-083 |
GREGG |
TYLER |
$104,900 |
CS |
STP 2022(534)HESG |
05/04/2022 |
08/31/2024 |
HAZARD ELIM & SAFETY |
MARCOM'S MOWING SERVICE, LLC($113,740) |
|
0910-16-135 |
SMITH |
TYLER |
$5,317,504 |
CS |
STP 2017(443)TAPS |
11/03/2017 |
11/15/2023 |
CONSTRUCT HIKE & BIKE TRAIL |
REYNOLDS & KAY, LTD.($4,606,677) |
|
0910-07-072 |
GREGG |
TYLER |
$7,726,862 |
CS |
BR 2018(505) |
03/03/2022 |
11/15/2023 |
BRIDGE REPL |
RAGLE CONSTRUCTION, INC.($9,313,028) |
|
0910-07-078 |
GREGG |
TYLER |
$597,153 |
CS |
BR 2020(894) |
02/04/2022 |
11/15/2023 |
BRIDGE REPL |
SOUTH TEXAS ILLUMINATION, LLC($638,113) |
|
0910-16-163 |
SMITH |
TYLER |
$703,911 |
CS |
STP 2023(726)HES |
05/04/2023 |
11/15/2023 |
BICYCLE AND PEDESTRIAN IMPRVS |
TIGHT LINE CONSTRUCTION, LLC($739,937) |
|
0910-16-147 |
SMITH |
TYLER |
$1,258,233 |
CS |
BR 2020(895) |
01/07/2022 |
11/15/2023 |
BRIDGE REPL |
THK CONSTRUCTION LLC($1,258,294) |
|
0915-14-048 |
WILSON |
SAN ANTONIO |
$1,328,983 |
CS |
STP 2022(749)TAPS |
08/02/2023 |
11/15/2023 |
CONSTRUCT PEDESTRIAN INFRASTRUCT |
J3 COMPANY, LLC($1,044,921) |
|
0915-12-625 |
BEXAR |
SAN ANTONIO |
$1,606,979 |
CS |
STP 2021(676)HES |
08/04/2021 |
11/15/2023 |
HAZARD ELIM & SAFETY |
E-Z BEL CONSTRUCTION, LLC($1,494,380) |
|
0915-14-050 |
WILSON |
SAN ANTONIO |
$743,922 |
CS |
STP 2023(123)TAPS |
05/02/2024 |
03/21/2024 |
CONSTRUCT PEDESTRIAN INFRASTRUCT |
DIAMOND R CONTRACTING, LLC($624,919) |
|
0915-12-622 |
BEXAR |
SAN ANTONIO |
$1,778,970 |
CS |
STP 1902(200)HES |
07/10/2019 |
09/27/2024 |
HAZARD ELIM & SAFETY |
E-Z BEL CONSTRUCTION, LLC($1,694,498) |
|
0915-12-531 |
BEXAR |
SAN ANTONIO |
$732,327 |
CS |
BR 1402(213) |
01/10/2020 |
09/26/2024 |
BRIDGE REPL |
DAN WILLIAMS COMPANY($988,635) |
|
0915-17-072 |
COMAL |
SAN ANTONIO |
$1,730,027 |
CS |
STP 2022(692)HES |
06/30/2022 |
11/15/2023 |
HAZARD ELIM & SAFETY |
E-Z BEL CONSTRUCTION, LLC($1,934,817) |
|
0915-12-696 |
BEXAR |
SAN ANTONIO |
$1,897,028 |
CS |
STP 2024(389)HESG |
11/01/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
E-Z BEL CONSTRUCTION, LLC($1,519,980) |
|
0915-11-028 |
KENDALL |
SAN ANTONIO |
$569,951 |
CS |
BR 1102(443) |
10/04/2017 |
11/15/2023 |
REPLACE BRIDGE AND APPROACHES |
CURRAN CONTRACTING COMPANY($514,523) |
|
0915-12-695 |
BEXAR |
SAN ANTONIO |
$2,993,138 |
CS |
STP 2B24(169)VRU |
06/05/2024 |
04/24/2024 |
HAZARD ELIM & SAFETY |
ELECNOR BELCO ELECTRIC, INC.($2,683,102) |
|
0915-12-633 |
BEXAR |
SAN ANTONIO |
$933,602 |
CS |
STP 2021(363)HESG |
02/04/2021 |
11/15/2023 |
HAZARD ELIM & SAFETY |
E-Z BEL CONSTRUCTION, LLC($872,525) |
|
0915-17-073 |
COMAL |
SAN ANTONIO |
$622,496 |
CS |
STP 2022(404)HESG |
03/04/2022 |
11/15/2023 |
HAZARD ELIM & SAFETY |
E-Z BEL CONSTRUCTION, LLC($629,837) |
|
0915-12-698 |
BEXAR |
SAN ANTONIO |
$1,200,517 |
CS |
STP 2023(535)HESG |
03/07/2023 |
08/21/2024 |
HAZARD ELIM & SAFETY |
E-Z BEL CONSTRUCTION, LLC($1,086,718) |
|
0915-12-532 |
BEXAR |
SAN ANTONIO |
$1,905,786 |
CS |
BR 1402(214) |
02/04/2022 |
11/15/2023 |
BRIDGE MAINT |
RELMCO, INC.($1,567,048) |
|
0915-00-252 |
BEXAR |
SAN ANTONIO |
$1,463,854 |
CS |
STP 2023(490)TAPS |
10/06/2023 |
11/15/2023 |
CONSTRUCT PEDESTRIAN INFRASTRUCT |
DELGADO'S CONTRACTORS, LLC($1,244,334) |
|
0915-12-566 |
BEXAR |
SAN ANTONIO |
$2,005,524 |
CS |
STP 2019(899)HES |
05/08/2019 |
11/15/2023 |
SIG & ILLUM, ETC. |
E-Z BEL CONSTRUCTION, LLC($1,774,683) |
|
0915-17-067 |
COMAL |
SAN ANTONIO |
$1,790,990 |
CS |
BR 2019(908) |
05/07/2019 |
11/15/2023 |
REPLACE BRIDGE AND APPROACHES |
SB CONTRACTORS LLC($1,589,567) |
|
0915-12-624 |
BEXAR |
SAN ANTONIO |
$2,030,607 |
CS |
STP 2022(690)HES |
06/29/2022 |
11/15/2023 |
HAZARD ELIM & SAFETY |
D&G ENERGY CORPORATION($2,074,272) |
|
0907-15-006 |
CONCHO |
SAN ANGELO |
$612,546 |
CS |
STP 2017(287)TAPS |
04/03/2019 |
11/15/2023 |
PEDESTRIAN IMPRVS-SIDEWALKS AND LIGHTING |
ENCINO LANDSCAPE, INC.($676,560) |
|
0907-26-006 |
SCHLEICHER |
SAN ANGELO |
$1,081,905 |
CS |
STP 2023(590)TAPS |
07/10/2024 |
05/29/2024 |
CONSTRUCT PEDESTRIAN INFRASTRUCT |
TALBERT COMPANIES LLC($767,531) |
|
0907-26-004 |
SCHLEICHER |
SAN ANGELO |
$516,929 |
CS |
STP 2017(286)TAPS |
05/01/2018 |
11/15/2023 |
PEDESTRIAN IMPRVS |
A GREATER AUSTIN DEVELOPMENT COMPANY, LTD.($368,396) |
|
2574-01-049 |
TOM GREEN |
SAN ANGELO |
$373,364 |
CS |
F 2021(716) |
08/05/2021 |
11/15/2023 |
TRAF SIGNAL IMPRVS |
TI-ZACK CONCRETE, INC.($538,601) |
|
0907-00-226 |
TOM GREEN |
SAN ANGELO |
$1,090,741 |
CS |
BR 2021(703) |
11/02/2022 |
11/15/2023 |
REHAB BRIDGE |
RELMCO, INC.($1,186,200) |
|
0907-15-005 |
CONCHO |
SAN ANGELO |
$895,955 |
CS |
STP 2017(287)TAPS |
06/06/2018 |
11/15/2023 |
PEDESTRIAN IMPRVS |
ENCINO LANDSCAPE, INC.($934,494) |
|
0907-24-053 |
TOM GREEN |
SAN ANGELO |
$110,348 |
CS |
STP 2023(406)VRU |
01/05/2024 |
11/24/2023 |
TRAF SIGNAL IMPRVS |
3LW CIVIL LLC($184,275) |
|
0921-06-306 |
CAMERON |
PHARR |
$1,492,418 |
CS |
BR 2023(387) |
01/05/2023 |
11/15/2023 |
BRIDGE REPL |
LUCANIA CONSTRUCTION LLC($1,753,094) |
|
0921-02-508 |
HIDALGO |
PHARR |
$178,884 |
CS |
STP 2B23(057)HESG |
08/03/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
THE LEVY COMPANY, INC.($192,173) |
|
0921-02-305 |
HIDALGO |
PHARR |
$1,368,414 |
CS |
BR 2015(640) |
07/10/2018 |
11/15/2023 |
REPLACE BRIDGE & RECON APPROACHES |
TEXAS CORDIA CONSTRUCTION, LLC($1,276,034) |
|
0921-02-500 |
HIDALGO |
PHARR |
$212,908 |
CS |
STP 2B23(008)HESG |
06/28/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
THE LEVY COMPANY, INC.($223,433) |
|
0921-02-520 |
HIDALGO |
PHARR |
$238,964 |
CS |
STP 2B24(274)HESG |
08/01/2024 |
06/20/2024 |
HAZARD ELIM & SAFETY |
THE LEVY COMPANY, INC.($241,811) |
|
0921-06-363 |
CAMERON |
PHARR |
$20,593 |
CS |
C 921-6-363 |
09/06/2023 |
11/15/2023 |
RESURF ROADWAY |
LUCANIA CONSTRUCTION LLC($64,546) |
|
0921-02-484 |
HIDALGO |
PHARR |
$260,636 |
CS |
STP 2B23(007)HESG |
06/28/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.($307,598) |
|
0921-06-302 |
CAMERON |
PHARR |
$1,998,623 |
CS |
BR 2021(460) |
02/02/2023 |
11/15/2023 |
BRIDGE REPL |
LUCANIA CONSTRUCTION LLC($2,309,683) |
|
0921-02-507 |
HIDALGO |
PHARR |
$443,113 |
CS |
STP 2024(931)VRU |
04/05/2024 |
02/23/2024 |
HAZARD ELIM & SAFETY |
TRAF-TEX, INC.($780,387) |
|
0039-02-063 |
HIDALGO |
PHARR |
$103,484,636 |
CS |
NH 1902(056) |
10/03/2019 |
11/15/2023 |
NEW LOCATION FREEWAY |
PULICE CONSTRUCTION, INC.($95,994,023) |
|
0921-06-286 |
CAMERON |
PHARR |
$532,514 |
CS |
STP 1602(198)TP |
11/03/2016 |
11/15/2023 |
CONSTRUCT SIDEWALKS AND ADA RAMPS |
ARANDA BROTHERS CONSTRUCTION CO., INC.($412,715) |
|
0921-06-311 |
CAMERON |
PHARR |
$811,482 |
CS |
STP 2020(601)TAPS |
05/04/2022 |
08/31/2024 |
CONSTRUCT PEDESTRIAN INFRASTRUCT |
TI-ZACK CONCRETE, INC.($939,379) |
|
0921-06-252 |
CAMERON |
PHARR |
$8,745,889 |
CS |
CBI 2022(173) |
12/01/2021 |
11/15/2023 |
WIDEN ROAD - ADD LANES AND SHOULDERS |
FOREMOST PAVING, INC.($9,511,089) |
|
0921-06-356 |
CAMERON |
PHARR |
$435,962 |
CS |
STP 2B23(056)HESG |
08/03/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.($368,889) |
|
0921-02-140 |
HIDALGO |
PHARR |
$6,256,194 |
CS |
STP 2008(328)MM |
01/04/2017 |
11/15/2023 |
RECON AND WIDENING |
IOC COMPANY LLC($5,206,108) |
|
0901-29-094 |
LAMAR |
PARIS |
$453,962 |
CS |
BR 2B20(161) |
07/01/2021 |
11/15/2023 |
REHAB BRIDGE |
HIGHWAY 19 CONSTRUCTION LLC($499,929) |
|
0901-27-046 |
RED RIVER |
PARIS |
$966,029 |
CS |
BR 1902(390) |
06/29/2022 |
11/15/2023 |
BRIDGE REPL |
HIGHWAY 19 CONSTRUCTION LLC($1,091,166) |
|
0901-22-122 |
HUNT |
PARIS |
$1,036,647 |
CS |
BR 2023(660) |
06/28/2023 |
11/15/2023 |
BRIDGE REPL |
HIGHWAY 19 CONSTRUCTION LLC($1,080,968) |
|
0901-19-205 |
GRAYSON |
PARIS |
$2,344,964 |
CS |
BR 2020(517) |
04/07/2022 |
09/24/2024 |
BRIDGE REPL |
IBCTX, LLC($3,051,416) |
|
0906-32-054 |
MIDLAND |
ODESSA |
$1,298,056 |
CS |
STP 2017(228)HES |
07/10/2018 |
11/15/2023 |
IMPROVE TRAF SIG,ADD RT LANE |
REECE ALBERT, INC.($1,801,684) |
|
0906-32-060 |
MIDLAND |
ODESSA |
$494,356 |
CS |
STP 2B23(013)HESG |
08/03/2023 |
11/15/2023 |
INTERS IMPRV |
TI-ZACK CONCRETE, INC.($496,353) |
|
0906-32-064 |
MIDLAND |
ODESSA |
$1,686,373 |
CS |
STP 2024(995)HES |
05/02/2024 |
03/21/2024 |
HAZARD ELIM & SAFETY |
TI-ZACK CONCRETE, LLC($1,982,263) |
|
0906-32-050 |
MIDLAND |
ODESSA |
$3,857,967 |
CS |
BR 2B23(292) |
01/04/2024 |
11/23/2023 |
BRIDGE REPL |
DELGADO'S CONTRACTORS, LLC($3,896,639) |
|
0906-32-059 |
MIDLAND |
ODESSA |
$206,088 |
CS |
STP 2022(637)HESG |
08/03/2022 |
11/15/2023 |
HAZARD ELIM & SAFETY |
FNH CONSTRUCTION, LLC($418,688) |
|
0906-32-052 |
MIDLAND |
ODESSA |
$2,090,079 |
CS |
BR 2025(147) |
10/02/2024 |
08/21/2024 |
BRIDGE REPL |
DAN WILLIAMS COMPANY($1,912,117) |
|
0906-32-057 |
MIDLAND |
ODESSA |
$767,308 |
CS |
STP 2019(481)TAPS |
06/05/2019 |
11/15/2023 |
BICYCLE AND PEDESTRIAN IMPRVS |
ENCINO LANDSCAPE, INC.($834,327) |
|
0905-06-110 |
LUBBOCK |
LUBBOCK |
$92,364 |
CS |
BR 1702(601) |
08/09/2017 |
11/15/2023 |
BEAM REPAIR |
DRS CONSTRUCTION, INC.($93,214) |
|
0905-12-043 |
HALE |
LUBBOCK |
$893,268 |
CS |
BR 1802(838) |
02/04/2022 |
11/15/2023 |
BRIDGE REPL |
BLACKSTONE CONCRETE VENTURES, LLC($847,028) |
|
0905-06-086 |
LUBBOCK |
LUBBOCK |
$4,901,937 |
CS |
STP 2014(802)MM |
08/08/2017 |
11/15/2023 |
GRADE, BASE, C&G, ACP |
ALLEN BUTLER CONSTRUCTION, INC.($4,085,773) |
|
0905-06-095 |
LUBBOCK |
LUBBOCK |
$17,487,978 |
CS |
STP 2019(518)MM |
02/02/2024 |
11/24/2023 |
WIDEN ROAD - ADD LANES |
LONE STAR DIRT & PAVING, LTD.($19,074,047) |
|
0905-06-118 |
LUBBOCK |
LUBBOCK |
$10,587,826 |
CS |
STP 2021(423)MM |
06/30/2022 |
11/15/2023 |
CONSTRUCT NEW ROADWAY LANES |
ALLEN BUTLER CONSTRUCTION, INC.($12,797,068) |
|
0905-06-126 |
LUBBOCK |
LUBBOCK |
$250,922 |
CS |
BR 2024(658) |
01/04/2024 |
11/23/2023 |
REHAB BRIDGE |
DIGG COMMERCIAL, LLC($267,401) |
|
0922-33-210 |
WEBB |
LAREDO |
$1,224,873 |
CS |
STP 2025(163)HESG |
10/02/2024 |
08/21/2024 |
TRAF SIGNAL IMPRVS |
TRIPLE H FIELD SERVICES, LLC($1,161,106) |
|
0922-33-163 |
WEBB |
LAREDO |
$355,400 |
CS |
STP 2019(300)HES |
12/05/2018 |
11/15/2023 |
IMPROVE TRAF SIG |
TRAF-TEX, INC.($361,930) |
|
0922-20-019 |
LA SALLE |
LAREDO |
$260,923 |
CS |
STP 1602(372)TAPS |
01/05/2017 |
11/15/2023 |
SAFE PATH SIDEWALK PROJECT |
JESS CONTRACTING, LLC($242,635) |
|
0912-72-352 |
HARRIS |
HOUSTON |
$509,882 |
CS |
BR 2019(251) |
08/05/2021 |
11/15/2023 |
REPLACE BRIDGE AND APPROACHES |
ARANDA BROTHERS CONSTRUCTION CO., INC.($599,801) |
|
0912-72-406 |
HARRIS |
HOUSTON |
$4,337,204 |
CS |
BR 2020(124) |
02/01/2023 |
11/15/2023 |
BRIDGE REPL |
ARANDA BROTHERS CONSTRUCTION CO., INC.($4,303,858) |
|
0912-73-212 |
GALVESTON |
HOUSTON |
$429,837 |
CS |
BR 1802(833) |
07/02/2021 |
11/15/2023 |
REPLACE BRIDGE AND APPROACHES |
TREVWAY, INC.($474,034) |
|
0912-72-641 |
HARRIS |
HOUSTON |
$1,509,547 |
CS |
STP 2B23(157)HESG |
08/03/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
MAIN LANE INDUSTRIES LTD.($1,979,986) |
|
0912-34-143 |
FORT BEND |
HOUSTON |
$5,172,123 |
CS |
C 912-34-143 |
02/03/2017 |
11/15/2023 |
CONSTRUCT 4-LN DIVIDED ROADWAY |
SER CONSTRUCTION PARTNERS, LLC($3,825,527) |
|
0912-72-360 |
HARRIS |
HOUSTON |
$28,023,255 |
CS |
STP 1702(818)MM |
11/04/2020 |
11/15/2023 |
RECON ROADWAY |
SER CONSTRUCTION PARTNERS, LLC($23,186,629) |
|
0912-72-405 |
HARRIS |
HOUSTON |
$800,384 |
CS |
BR 2021(347) |
09/06/2023 |
11/15/2023 |
BRIDGE REPL |
JOHN REED AND COMPANY, LLC($745,291) |
|
0912-72-296 |
HARRIS |
HOUSTON |
$3,886,203 |
CS |
STP 2017(440) |
11/04/2016 |
11/15/2023 |
INTERS IMPRVS |
MAIN LANE INDUSTRIES LTD.($4,496,496) |
|
0912-72-541 |
HARRIS |
HOUSTON |
$13,882,976 |
CS |
STP 2020(724)MM |
10/01/2024 |
08/20/2024 |
CONSTRUCT 4-LANE DIV RDWY |
SER CONSTRUCTION PARTNERS, LLC($10,385,129) |
|
0912-72-348 |
HARRIS |
HOUSTON |
$2,902,453 |
CS |
BR 2018(113) |
03/05/2020 |
11/15/2023 |
REPLACE BRIDGES AND APPROACHES |
ARANDA BROTHERS CONSTRUCTION CO., INC.($2,898,014) |