0044-06-077 |
MONTAGUE |
WICHITA FALLS |
$4,060,608 |
US 82 |
STP 2B24(222)HES |
07/09/2024 |
05/28/2024 |
HAZARD ELIM & SAFETY |
SCOUT 5 CONSTRUCTION LLC($3,283,667) |
|
1293-01-024 |
YOUNG |
WICHITA FALLS |
$5,747,703 |
FM 1287 |
STP 2B24(219)HRR |
07/10/2024 |
05/29/2024 |
HAZARD ELIM & SAFETY |
ZACK BURKETT CO.($6,394,018) |
|
0013-05-065 |
MONTAGUE |
WICHITA FALLS |
$2,580,022 |
US 81 |
STP 2B23(131)HES |
08/03/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
HJC FARMS, INC.($2,243,729) |
|
1609-01-029 |
COOKE |
WICHITA FALLS |
$4,347,623 |
FM 1630 |
STP 2B23(120)HES |
06/28/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
JAGOE-PUBLIC COMPANY($4,611,141) |
|
0043-05-113 |
WILBARGER |
WICHITA FALLS |
$1,840,649 |
US 287 |
STP 2B23(063)HES |
06/27/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
MASSANA CONSTRUCTION INC.($1,828,753) |
|
0802-02-075 |
WICHITA |
WICHITA FALLS |
$1,303,273 |
FM 369 |
STP 2B20(326) |
12/02/2020 |
11/15/2023 |
PAVMT REPAIR AND OVERLAY |
INTEGRITY SERVICES, LLC($976,487) |
|
0282-03-030 |
CLAY |
WICHITA FALLS |
$2,272,114 |
SH 79 |
STP 2B20(325) |
12/03/2020 |
11/15/2023 |
PAVMT REPAIR AND OVERLAY |
JAGOE-PUBLIC COMPANY($1,939,029) |
|
0013-02-023 |
MONTAGUE |
WICHITA FALLS |
$8,000,278 |
US 81 |
STP 2B20(301) |
11/05/2020 |
11/15/2023 |
SEAL COAT |
TEXAS PANHANDLE CONSTRUCTION, INC.($7,507,422) |
|
0137-07-025 |
ARCHER |
WICHITA FALLS |
$655,793 |
SH 25 |
STP 2B20(086)HES |
08/05/2020 |
11/15/2023 |
UPGRADE GUARDRAIL |
HJC FARMS, INC.($590,518) |
|
1837-01-013 |
ARCHER |
WICHITA FALLS |
$5,174,157 |
FM 1954 |
STP 2B20(078) |
11/05/2020 |
11/15/2023 |
REALIGN INTERS |
EUROVIA ATLANTIC COAST LLC($4,925,489) |
|
0514-04-014 |
WICHITA |
WICHITA FALLS |
$1,887,194 |
FM 1177 |
STP 2B20(077)HES |
08/06/2020 |
11/15/2023 |
PROVIDE ADDITIONAL PAVED SURF WIDTH |
A. L. HELMCAMP, INC.($2,189,865) |
|
0312-01-082 |
COOKE |
WICHITA FALLS |
$1,259,784 |
FM 51 |
STP 2B20(076)HES |
08/06/2020 |
11/15/2023 |
UPGRADE GUARDRAIL |
JAGOE-PUBLIC COMPANY($1,193,935) |
|
0134-01-025 |
YOUNG |
WICHITA FALLS |
$2,378,351 |
SH 251 |
STP 2B20(075)HES |
08/05/2020 |
11/15/2023 |
SAFETY TREAT FIXED OBJECTS |
PIERCE R & B LLC($2,299,229) |
|
0124-04-038 |
WILBARGER |
WICHITA FALLS |
$15,373,661 |
US 183 |
STP 2B20(074)HES |
10/02/2020 |
11/15/2023 |
UPGRADE TO SUPER-2 |
A. L. HELMCAMP, INC.($15,116,542) |
|
0044-08-072 |
COOKE |
WICHITA FALLS |
$295,963 |
US 82 |
STP 2B20(072)HES |
08/05/2020 |
11/15/2023 |
INSTL SAFETY LIGHTING |
MICA CORPORATION($281,868) |
|
0903-00-116 |
WICHITA |
WICHITA FALLS |
$899,939 |
VA |
STP 2B20(038)HES |
07/08/2020 |
11/15/2023 |
INSTL RUMBLE STRIPS |
STRIPE-A-ZONE, INC.($637,259) |
|
0043-08-088 |
WICHITA |
WICHITA FALLS |
$4,812,414 |
US 287 |
STP 2024(778)TP |
03/05/2024 |
01/23/2024 |
HWY IMPRV |
A. L. HELMCAMP, INC.($5,428,568) |
|
0137-10-026 |
CLAY |
WICHITA FALLS |
$4,196,246 |
FM 174 |
STP 2023(471)HES |
03/07/2023 |
08/21/2024 |
HAZARD ELIM & SAFETY |
EUROVIA ATLANTIC COAST LLC($4,557,309) |
|
0391-04-030 |
CLAY |
WICHITA FALLS |
$3,476,645 |
SH 148 |
STP 2022(627)HES |
06/02/2022 |
09/03/2024 |
HAZARD ELIM & SAFETY |
ZACK BURKETT CO.($3,432,426) |
|
0134-02-059 |
YOUNG |
WICHITA FALLS |
$4,359,387 |
US 380 |
STP 2021(868)HES |
08/05/2021 |
11/15/2023 |
HAZARD ELIM & SAFETY |
ZACK BURKETT CO.($4,045,567) |
|
0822-01-021 |
COOKE |
WICHITA FALLS |
$7,914,758 |
FM 371 |
STP 2021(711)HES |
07/01/2021 |
11/15/2023 |
WIDEN ROAD - ADD SHOULDERS |
EUROVIA ATLANTIC COAST LLC($7,175,268) |
|
0013-05-062 |
MONTAGUE |
WICHITA FALLS |
$2,127,704 |
US 81 |
STP 2021(252) |
01/08/2021 |
11/15/2023 |
PAVMT REPAIR AND OVERLAY |
JAGOE-PUBLIC COMPANY($1,628,158) |
|
0681-08-024 |
CLAY |
WICHITA FALLS |
$270,145 |
FM 174 |
STP 2020(982)HES |
07/08/2020 |
11/15/2023 |
PROVIDE ADDITIONAL PAVED SURF WIDTH |
PEACHTREE CONSTRUCTION, LTD.($367,887) |
|
0013-05-063 |
MONTAGUE |
WICHITA FALLS |
$521,855 |
US 81 |
STP 2020(981)HES |
07/09/2020 |
11/15/2023 |
INSTL MEDIAN BARRIER |
MASSANA, INC.($482,811) |
|
1855-01-028 |
COOKE |
WICHITA FALLS |
$152,712 |
FM 922 |
STP 2020(833)HES |
04/08/2020 |
11/15/2023 |
SAFETY TREAT FIXED OBJECTS |
3LW CIVIL LLC($159,018) |
|
1352-01-021 |
MONTAGUE |
WICHITA FALLS |
$2,901,997 |
FM 677 |
STP 2020(632) |
03/05/2020 |
11/15/2023 |
PROVIDE ADDITIONAL PAVED SURF WIDTH |
JAGOE-PUBLIC COMPANY($3,163,722) |
|
0194-02-097 |
COOKE |
WICHITA FALLS |
$306,752 |
IH 35 |
STP 2020(454)HES |
01/10/2020 |
09/26/2024 |
SAFETY LIGHTING |
MICA CORPORATION($261,736) |
|
0147-01-022 |
WILBARGER |
WICHITA FALLS |
$3,238,824 |
US 70 |
STP 2020(453) |
01/09/2020 |
09/26/2024 |
PAVMT REPAIR AND OVERLAY |
DUININCK, INC.($3,558,575) |
|
0249-01-047 |
WICHITA |
WICHITA FALLS |
$2,900,317 |
US 281 |
STP 2020(228) |
11/05/2019 |
11/15/2023 |
WIDEN PAVMT AND OVERLAY |
A. L. HELMCAMP, INC.($3,928,716) |
|
0782-03-020 |
COOKE |
WICHITA FALLS |
$2,511,258 |
FM 1201 |
STP 2019(958) |
05/08/2019 |
11/15/2023 |
PAVMT REPAIR AND OVERLAY |
EUROVIA ATLANTIC COAST LLC($2,392,784) |
|
0391-03-031 |
CLAY |
WICHITA FALLS |
$914,851 |
SH 148 |
STP 2019(957) |
05/07/2019 |
11/15/2023 |
REHAB EXIST SHOULDERS AND OVERLAY |
ZACK BURKETT CO.($1,041,711) |
|
0137-10-022 |
CLAY |
WICHITA FALLS |
$2,104,517 |
FM 174 |
STP 2019(504)HES |
02/05/2019 |
11/15/2023 |
PROVIDE ADDITIONAL PAVED SURF WIDTH |
BLYTHE CONSTRUCTION, INC.($2,328,204) |
|
0134-03-032 |
YOUNG |
WICHITA FALLS |
$2,714,623 |
US 380 |
STP 2019(439) |
01/09/2019 |
11/15/2023 |
LEVEL UP AND OVERLAY |
JAGOE-PUBLIC COMPANY($2,678,507) |
|
0043-08-078 |
WICHITA |
WICHITA FALLS |
$487,147 |
US 287 |
STP 2019(438)HES |
01/09/2019 |
11/15/2023 |
HIGH FRICTION SURF TREATMENT |
THE TRUESDELL CORPORATION($433,433) |
|
0043-20-021 |
WILBARGER |
WICHITA FALLS |
$514,311 |
BU 287F |
STP 2019(412)HES |
03/05/2019 |
11/15/2023 |
INSTL SIDEWALKS |
FNH CONSTRUCTION, LLC($739,515) |
|
0043-08-076 |
WICHITA |
WICHITA FALLS |
$976,809 |
US 287 |
STP 2019(305)HES |
01/09/2019 |
11/15/2023 |
SAFETY LIGHTING |
VACA UNDERGROUND UTILITIES INC($1,090,137) |
|
0013-01-010 |
MONTAGUE |
WICHITA FALLS |
$1,942,208 |
US 81 |
STP 2018(948)HES |
06/05/2018 |
11/15/2023 |
MILLED EDGELINE RUMBLE STRIPS |
SURFACE PREPARATION TECHNOLOGIES, LLC($1,399,791) |
|
0823-01-029 |
COOKE |
WICHITA FALLS |
$3,297,240 |
FM 373 |
STP 2018(824) |
05/02/2018 |
11/15/2023 |
EXTEND CULVERTS AND WIDEN PAVMT |
JAGOE-PUBLIC COMPANY($2,899,372) |
|
0903-00-088 |
WICHITA |
WICHITA FALLS |
$522,097 |
VA |
STP 2018(583) |
03/06/2018 |
11/15/2023 |
SIGN UPGRADE |
HJC FARMS, INC.($497,864) |
|
2405-01-012 |
CLAY |
WICHITA FALLS |
$2,648,384 |
FM 2393 |
STP 2018(558) |
02/02/2018 |
11/15/2023 |
REHAB OF EXIST ROAD |
A. L. HELMCAMP, INC.($2,307,479) |
|
0239-02-037 |
MONTAGUE |
WICHITA FALLS |
$1,183,139 |
SH 59 |
STP 2018(557) |
02/01/2018 |
11/15/2023 |
PAVMT REPAIR AND OVERLAY |
THE LANE CONSTRUCTION CORPORATION($1,182,794) |
|
0125-02-033 |
THROCKMORTON |
WICHITA FALLS |
$1,655,323 |
US 183 |
STP 2018(350) |
12/06/2017 |
11/15/2023 |
OVERLAY |
ZACK BURKETT CO.($1,743,253) |
|
0125-03-046 |
THROCKMORTON |
WICHITA FALLS |
$2,432,497 |
US 283 |
STP 2018(185) |
10/04/2017 |
11/15/2023 |
PAVMT REHAB |
A. L. HELMCAMP, INC.($1,720,296) |
|
1076-02-040 |
YOUNG |
WICHITA FALLS |
$2,490,359 |
FM 209 |
STP 2017(881) |
03/07/2017 |
11/15/2023 |
EXTEND CULVERTS |
A. L. HELMCAMP, INC.($2,333,358) |
|
1711-01-029 |
YOUNG |
WICHITA FALLS |
$3,913,381 |
FM 1769 |
STP 2017(404) |
12/06/2017 |
11/15/2023 |
REHAB, WIDEN & OVERLAY |
JAGOE-PUBLIC COMPANY($3,310,004) |
|
0312-01-078 |
COOKE |
WICHITA FALLS |
$783,989 |
FM 51 |
STP 2017(403) |
04/05/2017 |
11/15/2023 |
ADD SHOULDERS |
JAGOE-PUBLIC COMPANY($706,190) |
|
3192-02-009 |
COOKE |
WICHITA FALLS |
$913,936 |
FM 1199 |
STP 2017(402) |
03/07/2017 |
11/15/2023 |
FULL DEPTH REPAIR AND OVERLAY |
THE LANE CONSTRUCTION CORPORATION($793,931) |
|
1356-01-027 |
COOKE |
WICHITA FALLS |
$1,119,298 |
FM 1201 |
STP 2017(273) |
11/03/2016 |
11/15/2023 |
REPAIR DRAINAGE STRUCTS |
HODGES AND SON CONSTRUCTION COMPANY, INC.($1,250,025) |
|
0043-17-032 |
WICHITA |
WICHITA FALLS |
$836,945 |
BU 287J |
STP 1902(337)HES |
08/06/2019 |
11/15/2023 |
MILLED CENTERLINE RUMBLE STRIPS |
TOTAL HIGHWAY MAINTENANCE, LLC($761,013) |
|
0823-01-036 |
COOKE |
WICHITA FALLS |
$5,721,881 |
FM 2382 |
STP 1902(147) |
07/10/2019 |
09/27/2024 |
WIDEN PAVMT AND OVERLAY |
EUROVIA ATLANTIC COAST LLC($6,142,770) |
|
0137-10-025 |
CLAY |
WICHITA FALLS |
$700,318 |
FM 174 |
STP 1902(144)HES |
07/09/2019 |
09/27/2024 |
MILLED CENTERLINE RUMBLE STRIPS |
STRIPE-A-ZONE, INC.($656,778) |
|
0043-05-110 |
WILBARGER |
WICHITA FALLS |
$8,954,955 |
US 70 |
STP 1902(143)HES |
08/06/2019 |
11/15/2023 |
INSTL MEDIAN CABLE BARRIER |
SCR CIVIL CONSTRUCTION, LLC($8,701,329) |
|
0845-03-064 |
COOKE |
WICHITA FALLS |
$4,197,267 |
FM 922 |
STP 1902(068)HES |
06/04/2019 |
11/15/2023 |
SAFETY TRT FXD OBJ, ADDL SURF WIDTH, RUMBLE STRIPS |
JAGOE-PUBLIC COMPANY($4,439,662) |
|
0124-03-062 |
WILBARGER |
WICHITA FALLS |
$77,546 |
US 183 |
STP 1902(047) |
06/05/2019 |
11/15/2023 |
LANDSCAPING |
SJ&J CONSTRUCTION, LLC($98,020) |
|
1615-02-016 |
CLAY |
WICHITA FALLS |
$1,637,724 |
FM 1740 |
STP 1902(043)HES |
08/06/2019 |
11/15/2023 |
SAFETY TRT FXD OBJ, ADDL SURF WIDTH, RUMBLE STRIPS |
A. L. HELMCAMP, INC.($2,211,991) |
|
1615-02-016 |
CLAY |
WICHITA FALLS |
$1,837,035 |
FM 1740 |
STP 1902(043)HES |
06/05/2019 |
11/15/2023 |
SAFETY TRT FXD OBJ, ADDL SURF WIDTH, RUMBLE STRIPS |
A. L. HELMCAMP, INC.($2,420,442) |
|
1767-03-018 |
MONTAGUE |
WICHITA FALLS |
$2,940,969 |
FM 1816 |
STP 1902(041)HES |
06/04/2019 |
11/15/2023 |
SAFETY TRT FXD OBJ, ADDL SURF WIDTH, RUMBLE STRIPS |
JAGOE-PUBLIC COMPANY($3,337,757) |
|
2706-01-008 |
MONTAGUE |
WICHITA FALLS |
$3,903,626 |
FM 2634 |
STP 1902(037)HES |
06/05/2019 |
11/15/2023 |
SAFETY TRT FXD OBJ, ADDL SURF WIDTH, RUMBLE STRIPS |
EUROVIA ATLANTIC COAST LLC($4,677,007) |
|
0156-05-061 |
ARCHER |
WICHITA FALLS |
$9,315,215 |
US 82 |
STP 1902(036)HES |
08/07/2019 |
11/15/2023 |
INSTL MEDIAN CABLE BARRIER |
SCR CIVIL CONSTRUCTION, LLC($7,252,069) |
|
0391-04-027 |
CLAY |
WICHITA FALLS |
$4,968,612 |
SH 148 |
STP 1802(484) |
02/06/2020 |
11/15/2023 |
PROVIDE ADDITIONAL PAVED SURF WIDTH |
JAGOE-PUBLIC COMPANY($4,202,297) |
|
0685-01-032 |
WICHITA |
WICHITA FALLS |
$2,114,525 |
SS 325 |
STP 1802(483) |
08/07/2019 |
11/15/2023 |
RECONFIGURE RAMP |
A. L. HELMCAMP, INC.($3,107,601) |
|
0194-01-014 |
COOKE |
WICHITA FALLS |
$1,786,213 |
IH 35 |
STP 1802(316)HESG |
07/11/2018 |
11/15/2023 |
INCREASE SUPERELEVATION, EDGELINE RUMBLE STRIPS |
JAGOE-PUBLIC COMPANY($2,349,139) |
|
0043-07-111 |
WILBARGER |
WICHITA FALLS |
$528,706 |
US 287 |
STP 1802(315)HES |
07/10/2018 |
11/15/2023 |
IMPROVE GUARDRAIL TO DESIGN STANDARDS |
IIPL USA LLC($524,560) |
|
0681-04-041 |
WICHITA |
WICHITA FALLS |
$4,269,955 |
FM 367 |
STP 1802(253)HES |
08/08/2018 |
11/15/2023 |
SAFETY TREAT FIXED OBBJECTS, PROVIDE ADDL WIDTH |
A. L. HELMCAMP, INC.($5,646,362) |
|
0156-07-109 |
WICHITA |
WICHITA FALLS |
$1,052,496 |
IH 44 |
STP 1702(401)HES |
06/06/2017 |
11/15/2023 |
INTALL MEDIAN BARRIER |
HJC FARMS, INC.($1,167,404) |
|
0133-07-026 |
ARCHER |
WICHITA FALLS |
$483,977 |
SH 114 |
STP 1702(138)HES |
04/04/2017 |
11/15/2023 |
CENTERLINE TEXTURING |
L&L COMPANY($273,291) |
|
1357-01-026 |
COOKE |
WICHITA FALLS |
$2,682,062 |
FM 2896 |
SSW 1357-1-26 |
02/06/2019 |
11/15/2023 |
PROVIDE ADDITIONAL PAVED SURF WIDTH |
JAGOE-PUBLIC COMPANY($2,595,534) |
|
6466-89-001 |
BAYLOR |
WICHITA FALLS |
$903,861 |
US0082 |
RMC - 646689001 |
11/20/2024 |
10/21/2024 |
CRACK SEAL |
CRACKSEAL OF TEXAS, LLC($1,232,490) |
|
6466-88-001 |
WICHITA |
WICHITA FALLS |
$1,478,243 |
US0287 |
RMC - 646688001 |
07/09/2024 |
06/03/2024 |
METAL BEAM GUARD FENCE REPAIR |
MARCOM'S MOWING SERVICE, LLC($1,869,504) |
|
6466-80-001 |
WICHITA |
WICHITA FALLS |
$1,507,571 |
US0287 |
RMC - 646680001 |
07/10/2024 |
05/29/2024 |
PAVMT MRK |
TRP INFRASTRUCTURE SERVICES, LLC($1,468,896) |
|
6466-79-001 |
WICHITA |
WICHITA FALLS |
$494,000 |
IH0044 |
RMC - 646679001 |
07/09/2024 |
05/28/2024 |
TRAF CONTROL SERVICES |
FC TRAFFIC CONTROL, INC.($392,800) |
|
6466-43-001 |
WILBARGER |
WICHITA FALLS |
$1,052,583 |
US0070 |
RMC - 646643001 |
05/03/2024 |
04/05/2024 |
REPAIR/REPLACE CONC BARRIER |
MB WESTERN INDUSTRIAL CONTRACTING CO.($1,281,472) |
|
6465-23-001 |
COOKE |
WICHITA FALLS |
$63,207 |
US0082 |
RMC - 646523001 |
08/13/2024 |
07/12/2024 |
TREE TRIM AND BRUSH RMVL |
AZA CONSTRUCTION INC($46,042) |
|
6463-35-001 |
WICHITA |
WICHITA FALLS |
$942,344 |
US0287 |
RMC - 646335001 |
03/05/2024 |
01/30/2024 |
SWEEPING AND DEBRIS RMVL |
PROFESSIONAL TRAFFIC CONTROL LLC($1,000,620) |
|
6462-49-001 |
WICHITA |
WICHITA FALLS |
$337,404 |
US0287 |
RMC - 646249001 |
03/06/2024 |
01/31/2024 |
MOW HWY RIGHT OF WAY |
BIG STATE MAINTENANCE, INC.($287,844) |
|
6462-48-001 |
WILBARGER |
WICHITA FALLS |
$268,253 |
US0287 |
RMC - 646248001 |
03/19/2024 |
02/19/2024 |
MOW HWY RIGHT OF WAY |
RISE UP CONSTRUCTION LLC($268,122) |
|
6462-47-001 |
MONTAGUE |
WICHITA FALLS |
$350,920 |
US0082 |
RMC - 646247001 |
04/04/2024 |
02/22/2024 |
MOW HWY RIGHT OF WAY |
ANTHONY SERVICES($330,433) |
|
6462-46-001 |
COOKE |
WICHITA FALLS |
$320,438 |
IH0035 |
RMC - 646246001 |
03/05/2024 |
01/31/2024 |
MOW HWY RIGHT OF WAY |
ANTHONY SERVICES($286,568) |
|
6462-45-001 |
CLAY |
WICHITA FALLS |
$328,679 |
US0287 |
RMC - 646245001 |
04/04/2024 |
02/22/2024 |
MOW HWY RIGHT OF WAY |
BIG STATE MAINTENANCE, INC.($292,671) |
|
6462-44-001 |
ARCHER |
WICHITA FALLS |
$226,788 |
SH0079 |
RMC - 646244001 |
03/19/2024 |
02/14/2024 |
MOW HWY RIGHT OF WAY |
RISE UP CONSTRUCTION LLC($218,697) |
|
6462-27-001 |
WICHITA |
WICHITA FALLS |
$2,212,454 |
IH0044 |
RMC - 646227001 |
03/06/2024 |
01/30/2024 |
PAVMT MRK |
STRIPE-A-ZONE, LLC($1,459,912) |
|
6451-39-001 |
WICHITA |
WICHITA FALLS |
$648,056 |
US0287 |
RMC - 645139001 |
09/07/2023 |
11/15/2023 |
CRACK SEAL |
D & M CONTRACTORS, LLC($930,730) |
|
6445-74-001 |
WICHITA |
WICHITA FALLS |
$1,472,330 |
US0082 |
RMC - 644574001 |
08/03/2023 |
11/15/2023 |
FULL DEPTH CONC REPAIR |
O. TREVINO CONSTRUCTION, LLC($1,942,000) |
|
6428-44-001 |
WICHITA |
WICHITA FALLS |
$1,468,493 |
US0287 |
RMC - 642844001 |
06/28/2023 |
11/15/2023 |
METAL BEAM GUARD FENCE REPAIR |
ROSS SA ENTERPRISE LLC($1,681,104) |
|
6428-42-001 |
WICHITA |
WICHITA FALLS |
$1,130,456 |
IH0044 |
RMC - 642842001 |
06/06/2024 |
04/25/2024 |
LARGE SIGN REPL |
HJC FARMS, INC.($963,538) |
|
6428-40-001 |
WICHITA |
WICHITA FALLS |
$1,092,920 |
US0287 |
RMC - 642840001 |
08/02/2023 |
11/15/2023 |
PAVMT MRK |
REYNOLDS & KAY, LTD.($1,342,431) |
|
6428-38-001 |
WICHITA |
WICHITA FALLS |
$452,500 |
IH0044 |
RMC - 642838001 |
06/27/2023 |
11/15/2023 |
TRAF CONTROL SERVICES |
NIXON ENGINEERING($482,000) |
|
6428-36-001 |
WICHITA |
WICHITA FALLS |
$409,950 |
US0082 |
RMC - 642836001 |
02/01/2023 |
11/15/2023 |
DEBRIS RMVL |
GARRET SHIELDS INFRASTRUCTURE($531,600) |
|
6425-80-001 |
COOKE |
WICHITA FALLS |
$2,714,260 |
FM3164 |
RMC - 642580001 |
12/02/2022 |
11/15/2023 |
SEAL COAT |
NORTHEASTERN PAVERS, LLC($2,382,691) |
|
6421-35-001 |
MONTAGUE |
WICHITA FALLS |
$1,086,234 |
US0287 |
RMC - 642135001 |
02/02/2024 |
12/22/2023 |
METAL BEAM GUARD FENCE REPAIR |
3LW CIVIL LLC($841,927) |
|
6421-33-001 |
WICHITA |
WICHITA FALLS |
$331,444 |
US0287 |
RMC - 642133001 |
02/02/2023 |
11/15/2023 |
MOW HWY RIGHT OF WAY |
MTS BRUSH HOGGING DOZER AND LAWN LLC($298,575) |
|
6421-31-001 |
THROCKMORTON |
WICHITA FALLS |
$120,910 |
US0183 |
RMC - 642131001 |
02/16/2023 |
11/15/2023 |
MOW HWY RIGHT OF WAY |
TRIPLE T MAINTENANCE INC.($101,474) |
|
6421-29-001 |
YOUNG |
WICHITA FALLS |
$241,824 |
US0380 |
RMC - 642129001 |
02/16/2023 |
11/15/2023 |
MOW HWY RIGHT OF WAY |
TRIPLE T MAINTENANCE INC.($204,152) |
|
6421-27-001 |
BAYLOR |
WICHITA FALLS |
$224,979 |
US0082 |
RMC - 642127001 |
02/16/2023 |
11/15/2023 |
MOW HWY RIGHT OF WAY |
TRIPLE T MAINTENANCE INC.($204,748) |
|
6414-23-001 |
WICHITA |
WICHITA FALLS |
$912,285 |
US0287 |
RMC - 641423001 |
09/07/2022 |
11/15/2023 |
CRACK SEAL |
SCOUT 5 CONSTRUCTION LLC($500,627) |
|
6414-21-001 |
WICHITA |
WICHITA FALLS |
$402,203 |
FM0367 |
RMC - 641421001 |
09/07/2022 |
11/15/2023 |
TREE TRIM AND BRUSH RMVL |
FOWLER CONSTRUCTION($313,559) |
|
6399-32-001 |
WICHITA |
WICHITA FALLS |
$400,000 |
US0287 |
RMC - 639932001 |
06/02/2022 |
09/03/2024 |
TRAF CONTROL SERVICES |
TOTAL HIGHWAY MAINTENANCE, LLC($680,000) |
|
6399-31-001 |
WICHITA |
WICHITA FALLS |
$263,909 |
US0082 |
RMC - 639931001 |
04/19/2022 |
11/15/2023 |
RAISED PAVMT MARKERS |
BRYDL CONTRACTING, LLC($203,507) |
|
6399-17-001 |
THROCKMORTON |
WICHITA FALLS |
$574,610 |
FM2651 |
RMC - 639917001 |
06/30/2022 |
11/15/2023 |
ASPH PAVMT REPAIR |
BLACKSMITH VENTURES LLC($714,092) |
|
6395-79-001 |
YOUNG |
WICHITA FALLS |
$221,168 |
SH0016 |
RMC - 639579001 |
02/10/2022 |
11/15/2023 |
MOW HWY RIGHT OF WAY |
NOMAD MEDIAN SERVICES LLC($198,062) |