0909-00-066 |
MCLENNAN |
WACO |
$924,047 |
VA |
STP 2B24(519)HES |
09/05/2024 |
07/25/2024 |
INTERS IMPRV |
THIRD COAST SERVICES LLC($830,318) |
|
2506-01-045 |
MCLENNAN |
WACO |
$476,255 |
FM 1695 |
STP 2B24(285)HES |
07/10/2024 |
05/29/2024 |
HAZARD ELIM & SAFETY |
GARRET SHIELDS INFRASTRUCTURE($463,681) |
|
0055-15-081 |
MCLENNAN |
WACO |
$266,713 |
US 84 |
STP 2B24(135)VRU |
06/06/2024 |
04/25/2024 |
INSTL RAISED MEDIAN |
ENCINO LANDSCAPE, INC.($299,986) |
|
0015-01-256 |
MCLENNAN |
WACO |
$227,405 |
IH 35 |
STP 2B23(077)HES |
08/02/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.($341,697) |
|
0014-07-105 |
HILL |
WACO |
$4,444,499 |
IH 35 |
STP 2B20(189)HES |
08/05/2020 |
11/15/2023 |
UPGRADING MBGF TO MASH COMPLIANT STANDARDS. |
ENCINO LANDSCAPE, INC.($5,295,309) |
|
0162-01-098 |
MCLENNAN |
WACO |
$3,874,162 |
SH 31 |
STP 2B20(188)HES |
08/05/2020 |
11/15/2023 |
INSTL CABLE MEDIAN BARRIER AND UPGRADE MBGF |
MASSANA, INC.($3,044,240) |
|
0258-04-036 |
BOSQUE |
WACO |
$241,401 |
SH 6 |
STP 2B20(187)HES |
08/05/2020 |
11/15/2023 |
SAFETY TREAT FIXED OBJECTS |
BEAR CREEK CONTRACTING, LLC($294,194) |
|
0049-01-099 |
MCLENNAN |
WACO |
$9,043,757 |
SH 6 |
STP 2B20(186)HES |
08/05/2020 |
11/15/2023 |
HAZZARD ELIM AND SAFETY |
MASSANA, INC.($6,830,728) |
|
0231-02-064 |
CORYELL |
WACO |
$955,126 |
BU 190E |
STP 2B20(063)HES |
07/09/2020 |
11/15/2023 |
IMPROVE TRAF SIG, INTERCON SIG |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.($905,128) |
|
0231-02-069 |
CORYELL |
WACO |
$228,378 |
BU 190E |
STP 2025(219)VRU |
11/07/2024 |
09/26/2024 |
INSTL RAISED MEDIAN |
TIGHT LINE CONSTRUCTION, LLC($315,605) |
|
0836-02-077 |
BELL |
WACO |
$6,205,434 |
SH 195 |
STP 2024(988)HES |
05/03/2024 |
03/22/2024 |
HAZARD ELIM & SAFETY |
JAMES CONSTRUCTION GROUP, LLC($5,775,775) |
|
0015-07-087 |
BELL |
WACO |
$12,215,676 |
IH 35 |
STP 2024(924)TP |
08/02/2024 |
06/21/2024 |
INFRASTRUCT IMPRVS |
TEXAS MATERIALS GROUP, INC.($12,103,561) |
|
0774-03-015 |
HAMILTON |
WACO |
$129,013 |
FM 1602 |
STP 2024(857)HES |
04/04/2024 |
02/22/2024 |
INTERS IMPRV |
RISE UP CONSTRUCTION LLC($127,891) |
|
0014-10-068 |
MCLENNAN |
WACO |
$620,018 |
BU 77-L |
STP 2024(723)HES |
02/01/2024 |
12/21/2023 |
INSTL TRAF SIGNAL |
E-Z BEL CONSTRUCTION, LLC($787,787) |
|
0909-22-197 |
MCLENNAN |
WACO |
$680,501 |
CS |
STP 2024(653)HES |
01/04/2024 |
11/23/2023 |
IMPROVE TRAF SIG, INSTL PEDESTRIAN SIGNAL |
ELECNOR BELCO ELECTRIC, INC.($674,737) |
|
0909-36-190 |
BELL |
WACO |
$238,227 |
CS |
STP 2024(119)HES |
10/06/2023 |
11/15/2023 |
CONSTRUCT PEDESTRIAN INFRASTRUCT |
MHB CONSTRUCTION, INC.($236,667) |
|
0909-22-190 |
MCLENNAN |
WACO |
$422,550 |
CS |
STP 2024(118)HESG |
10/05/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
DIGG COMMERCIAL, LLC($648,860) |
|
0162-01-102 |
MCLENNAN |
WACO |
$1,198,372 |
SH 31 |
STP 2024(114)HES |
10/06/2023 |
11/15/2023 |
HWY IMPRV |
KNIFE RIVER CORPORATION - SOUTH($993,389) |
|
0909-00-052 |
MCLENNAN |
WACO |
$443,140 |
VA |
STP 2024(049)HES |
09/06/2023 |
11/15/2023 |
INTERS IMPRV |
THIRD COAST SERVICES LLC($436,915) |
|
0231-07-009 |
BELL |
WACO |
$648,035 |
SS 172 |
STP 2023(975)HES |
06/27/2023 |
11/15/2023 |
INSTL ILLUM |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.($625,499) |
|
0209-01-071 |
MCLENNAN |
WACO |
$881,677 |
US 77 |
STP 2023(897)HES |
06/01/2023 |
11/27/2023 |
HAZARD ELIM & SAFETY |
E-Z BEL CONSTRUCTION, LLC($796,945) |
|
2305-01-014 |
BOSQUE |
WACO |
$13,919,679 |
FM 2114 |
STP 2023(895)VRU |
06/02/2023 |
11/28/2023 |
WIDEN PAVMT TO ADD SHOULDERS AND STRUCT WORK |
BIG CREEK CONSTRUCTION, LTD.($13,110,490) |
|
0185-05-003 |
BELL |
WACO |
$4,361,714 |
US 190 |
STP 2023(717)HES |
05/04/2023 |
11/15/2023 |
INSTL MEDIAN BARRIER |
JAMES CONSTRUCTION GROUP, LLC($4,600,000) |
|
0833-04-042 |
MCLENNAN |
WACO |
$5,672,748 |
FM 434 |
STP 2023(713)HES |
06/01/2023 |
11/27/2023 |
WIDEN ROAD - ADD LANES |
BIG CREEK CONSTRUCTION, LTD.($6,538,700) |
|
0258-08-038 |
MCLENNAN |
WACO |
$649,412 |
SH 6 |
STP 2023(617)HES |
04/05/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
KNIFE RIVER CORPORATION - SOUTH($723,086) |
|
0909-36-189 |
BELL |
WACO |
$74,607 |
CS |
STP 2023(464)HESG |
02/01/2023 |
11/15/2023 |
INSTL/REPLACE SIGNS |
CROSS PLUS CONSTRUCTION, LLC($81,987) |
|
0183-04-058 |
CORYELL |
WACO |
$173,840 |
SH 36 |
STP 2023(382)HES |
01/05/2023 |
11/15/2023 |
INTERS IMPRV |
ODUM SERVICES, LLC($162,290) |
|
0909-22-195 |
MCLENNAN |
WACO |
$280,880 |
VA |
STP 2023(338)HESG |
01/05/2023 |
11/15/2023 |
INSTL REFL BACKPLATES |
THIRD COAST SERVICES LLC($258,695) |
|
2311-01-044 |
MCLENNAN |
WACO |
$960,868 |
FM 3051 |
STP 2023(050)HES |
01/06/2023 |
11/15/2023 |
HWY IMPRV |
MB WESTERN INDUSTRIAL CONTRACTING COMPANY($1,210,047) |
|
0909-36-182 |
BELL |
WACO |
$335,014 |
CS |
STP 2023(049)HESG |
10/07/2022 |
11/15/2023 |
INSTL TRAF SIGNAL, SAFETY LIGHTING |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.($461,859) |
|
0909-36-181 |
BELL |
WACO |
$463,329 |
CS |
STP 2023(048)HES |
10/06/2022 |
11/15/2023 |
INSTL PEDESTRIAN CROSSWALK, INSTL SIDEWALKS |
CROSS PLUS CONSTRUCTION, LLC($451,322) |
|
0836-02-078 |
BELL |
WACO |
$536,740 |
SH 195 |
STP 2022(892)HES |
08/04/2022 |
11/15/2023 |
HAZARD ELIM & SAFETY |
TEXAS MATERIALS GROUP, INC.($709,468) |
|
0320-01-078 |
BELL |
WACO |
$384,701 |
SS 290 |
STP 2022(891)HES |
08/03/2022 |
11/15/2023 |
INSTL PEDESTRIAN CROSSWALK, INSTL SIDEWALKS |
CROSS PLUS CONSTRUCTION, LLC($384,376) |
|
0231-16-035 |
BELL |
WACO |
$1,891,533 |
FM 436 |
STP 2022(890)HES |
08/03/2022 |
11/15/2023 |
HAZARD ELIM & SAFETY |
PIERCE R & B LLC($2,084,782) |
|
0093-05-053 |
LIMESTONE |
WACO |
$135,795 |
SH 14 |
STP 2022(887)HES |
08/04/2022 |
11/15/2023 |
INSTL SCHOOL ZONE FLASHING BEACON |
ROAD SOLUTIONS L.L.C.($202,509) |
|
0019-03-028 |
HILL |
WACO |
$6,082,873 |
SH 171 |
STP 2022(886)HES |
08/03/2022 |
11/15/2023 |
HAZARD ELIM & SAFETY |
BEAR CREEK CONTRACTING, LLC($5,859,953) |
|
0015-01-252 |
MCLENNAN |
WACO |
$1,557,845 |
IH 35 |
STP 2022(885)HES |
03/07/2023 |
08/21/2024 |
RESURF ROADWAY |
DIAMOND SURFACE, INC.($1,969,296) |
|
0015-01-252 |
MCLENNAN |
WACO |
$791,881 |
IH 35 |
STP 2022(885)HES |
08/04/2022 |
11/15/2023 |
RESURF ROADWAY |
PINNACLE GRINDING AND GROOVING LLC($1,097,170) |
|
0909-00-051 |
MCLENNAN |
WACO |
$480,706 |
VA |
STP 2022(792)HES |
08/03/2022 |
11/15/2023 |
INTERS IMPRV |
VACA UNDERGROUND UTILITIES INC($454,340) |
|
0382-01-047 |
FALLS |
WACO |
$1,840,743 |
SH 7 |
STP 2022(695)HES |
06/30/2022 |
11/15/2023 |
HAZARD ELIM & SAFETY |
TALBRAN ENTERPRISES LLC($2,042,766) |
|
0909-22-188 |
MCLENNAN |
WACO |
$433,584 |
CS |
STP 2022(561)HES |
06/01/2022 |
09/03/2024 |
TRAF SIGNAL IMPRVS |
VACA UNDERGROUND UTILITIES INC($448,310) |
|
0184-04-053 |
BELL |
WACO |
$487,589 |
SH 36 |
STP 2022(479)HES |
05/05/2022 |
08/31/2024 |
HAZARD ELIM & SAFETY |
ROADWAY SPECIALTIES, INC.($586,558) |
|
0055-07-064 |
MCLENNAN |
WACO |
$1,548,265 |
US 84 |
STP 2022(478)HES |
05/04/2022 |
08/31/2024 |
HAZARD ELIM & SAFETY |
ROADWAY SPECIALTIES, INC.($1,815,348) |
|
3521-01-022 |
MCLENNAN |
WACO |
$304,408 |
FM 2837 |
STP 2022(411)HES |
03/04/2022 |
11/15/2023 |
TRAF SIGNAL IMPRVS |
FLORIDA TRAFFIC CONTROL DEVICES, INC.($290,913) |
|
0184-01-065 |
CORYELL |
WACO |
$57,875 |
SH 36 |
STP 2022(410)HES |
03/03/2022 |
11/15/2023 |
INSTL FLASHING BEACON |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.($55,776) |
|
0121-02-061 |
HILL |
WACO |
$2,285,949 |
SH 22 |
STP 2022(336)HES |
02/03/2022 |
11/15/2023 |
RESURF ROADWAY, MILLED EDGELINE RUMBLE STRIP |
TEXAS MATERIALS GROUP, INC.($2,448,816) |
|
0258-08-037 |
MCLENNAN |
WACO |
$881,233 |
SH 6 |
STP 2022(264)HES |
01/07/2022 |
11/15/2023 |
SAFETY LIGHTING |
SOUTH TEXAS ILLUMINATION, LLC($770,035) |
|
0724-01-056 |
CORYELL |
WACO |
$12,373,652 |
FM 116 |
STP 2022(156)HES |
12/01/2021 |
11/15/2023 |
CONSTRUCT OVERPASS/UNDERPASS |
BIG CREEK CONSTRUCTION, LTD.($10,787,640) |
|
1077-01-026 |
FALLS |
WACO |
$2,292,395 |
FM 434 |
STP 2021(788)HES |
08/04/2021 |
11/15/2023 |
HAZARD ELIM & SAFETY |
KNIFE RIVER CORPORATION - SOUTH($2,480,710) |
|
0833-03-051 |
MCLENNAN |
WACO |
$174,957 |
FM 1637 |
STP 2021(785)HES |
08/05/2021 |
11/15/2023 |
INSTL TRAF SIGNAL AND CURB RAMPS |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.($206,817) |
|
0567-04-022 |
MCLENNAN |
WACO |
$3,605,169 |
FM 185 |
STP 2021(162)HES |
07/02/2021 |
11/15/2023 |
SAFETY TREAT FIXED OBJECTS, PROVIDE ADDITIONAL PAV |
BIG CREEK CONSTRUCTION, LTD.($3,425,177) |
|
3623-01-006 |
CORYELL |
WACO |
$7,491,662 |
SH 9 |
STP 2021(015) |
09/03/2020 |
11/15/2023 |
FY 2021 SEAL COAT |
F. N. PLOCH CONSTRUCTION COMPANY, INC.($7,057,597) |
|
0833-06-019 |
FALLS |
WACO |
$3,402,505 |
FM 2027 |
STP 2020(942)HES |
07/08/2020 |
11/15/2023 |
SAFETY TREAT FIXED OBJECTS, WIDEN PAVED SHOULDER T |
KNIFE RIVER CORPORATION - SOUTH($3,054,891) |
|
0231-03-147 |
BELL |
WACO |
$3,095,819 |
IH 14 |
STP 2020(941)MM |
07/09/2020 |
11/15/2023 |
CONSTRUCT WEST TO EAST TURNAROUND @ FM 2410 |
J.D. ABRAMS, L.P.($3,098,000) |
|
2506-01-042 |
MCLENNAN |
WACO |
$707,722 |
FM 1695 |
STP 2020(743) |
04/09/2020 |
11/15/2023 |
CONSTRUCTION OF PEDESTRIAN, SIDEWALKS & CURB RAMPS |
TI-ZACK CONCRETE, INC.($862,612) |
|
0183-04-053 |
CORYELL |
WACO |
$3,097,761 |
SH 36 |
STP 2020(565) |
02/06/2020 |
11/15/2023 |
ASPHIC CONC OVERLAY |
BIG CREEK CONSTRUCTION, LTD.($2,987,724) |
|
0120-05-026 |
HAMILTON |
WACO |
$4,906,992 |
FM 218 |
STP 2020(564) |
02/07/2020 |
11/15/2023 |
REHAB & WIDEN ROADWAY |
BIG CREEK CONSTRUCTION, LTD.($5,387,759) |
|
0014-07-104 |
HILL |
WACO |
$1,547,876 |
IH 35 |
STP 2020(526)HES |
12/03/2019 |
11/15/2023 |
INSTL OF RUMBLE STRIPS |
SURFACE PREPARATION TECHNOLOGIES, LLC($1,195,738) |
|
0093-04-046 |
LIMESTONE |
WACO |
$3,629,126 |
SH 14 |
STP 2020(468) |
01/10/2020 |
09/26/2024 |
OT IN-PLACE RECYCLE AND OVERLAY |
BIG CREEK CONSTRUCTION, LTD.($3,408,711) |
|
1664-01-019 |
LIMESTONE |
WACO |
$7,658,636 |
FM 1633 |
STP 2020(398) |
12/04/2019 |
11/15/2023 |
REHAB PAVMT STRUCT |
TEXAS MATERIALS GROUP, INC.($7,107,478) |
|
0398-01-042 |
BOSQUE |
WACO |
$1,369,154 |
FM 56 |
STP 2020(191)HES |
11/05/2019 |
11/15/2023 |
INCREASE SUPERELEVATION |
KNIFE RIVER CORPORATION - SOUTH($1,514,248) |
|
0258-10-047 |
MCLENNAN |
WACO |
$943,707 |
SL 396 |
STP 2020(190) |
11/05/2019 |
11/15/2023 |
IMPROVE TRAF SIG |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.($829,994) |
|
0867-02-019 |
CORYELL |
WACO |
$9,377,107 |
FM 932 |
STP 2020(005) |
09/05/2019 |
11/15/2023 |
PREVENT MAINT |
F. N. PLOCH CONSTRUCTION COMPANY, INC.($8,847,137) |
|
0055-04-031 |
CORYELL |
WACO |
$166,380 |
US 84 |
STP 2019(999)HES |
08/06/2019 |
11/15/2023 |
INSTL INTERS FLASHING BEACON |
CHAMPION INFRASTRUCTURE, LLC($139,750) |
|
0833-03-045 |
MCLENNAN |
WACO |
$9,385,341 |
FM 1637 |
STP 2019(842)HES |
05/08/2019 |
11/15/2023 |
SFTY TR FX OBJS |
KNIFE RIVER CORPORATION - SOUTH($9,304,002) |
|
0567-01-020 |
CORYELL |
WACO |
$2,268,526 |
FM 107 |
STP 2019(840) |
05/08/2019 |
11/15/2023 |
WDN GR, STRS & SURF |
BIG CREEK CONSTRUCTION, LTD.($2,142,444) |
|
0183-03-050 |
HAMILTON |
WACO |
$11,978,826 |
SH 36 |
STP 2019(839) |
05/08/2019 |
11/15/2023 |
ADD PASS LNS |
BIG CREEK CONSTRUCTION, LTD.($12,587,706) |
|
0015-05-050 |
BELL |
WACO |
$424,477 |
SH 317 |
STP 2019(837)HES |
05/07/2019 |
11/15/2023 |
IMPROVE TRAF SIG |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.($521,881) |
|
0836-02-073 |
BELL |
WACO |
$7,343,910 |
SH 195 |
STP 2019(835)MM |
05/08/2019 |
11/15/2023 |
TRNARND UNDRPS |
TEXAS MATERIALS GROUP, INC.($8,482,506) |
|
0320-01-072 |
BELL |
WACO |
$5,231,397 |
SH 95 |
STP 2019(598) |
04/03/2019 |
11/15/2023 |
MILL/OVLY |
TEXAS MATERIALS GROUP, INC.($3,571,167) |
|
0382-02-036 |
FALLS |
WACO |
$7,215,206 |
SH 7 |
STP 2019(441) |
02/06/2019 |
11/15/2023 |
MILL/OVLY |
BIG CREEK CONSTRUCTION, LTD.($6,187,425) |
|
0836-02-075 |
BELL |
WACO |
$317,716 |
SH 195 |
STP 2019(406)HES |
01/09/2019 |
11/15/2023 |
INSTLL SGNLS AND SGNS |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.($288,045) |
|
0724-01-053 |
CORYELL |
WACO |
$1,731,017 |
FM 116 |
STP 2019(403) |
01/08/2019 |
11/15/2023 |
BS RPR/SEAL OVLY |
TEXAS MATERIALS GROUP, INC.($1,435,578) |
|
0162-01-094 |
MCLENNAN |
WACO |
$93,974 |
US 84 |
STP 2019(311)HES |
12/06/2018 |
11/15/2023 |
IMPRV SGNL |
JAMES CONSTRUCTION GROUP, L.L.C.($85,121) |
|
0056-02-033 |
LIMESTONE |
WACO |
$9,120,814 |
US 84 |
STP 2019(224) |
11/06/2018 |
11/15/2023 |
WDN SHLDRS & ADD PASS LNS |
BIG CREEK CONSTRUCTION, LTD.($9,187,964) |
|
0120-05-025 |
HAMILTON |
WACO |
$500,929 |
FM 218 |
STP 2019(223)HES |
11/07/2018 |
11/15/2023 |
INCREASE SUPERELEVATION |
BIG CREEK CONSTRUCTION, LTD.($571,907) |
|
0836-02-025 |
BELL |
WACO |
$334,204 |
SH 195 |
STP 2019(143)HES |
11/07/2018 |
11/15/2023 |
SAFETY LIGHTING |
VACA UNDERGROUND UTILITIES INC($281,766) |
|
1187-01-029 |
CORYELL |
WACO |
$8,305,131 |
FM 929 |
STP 2019(018) |
09/06/2018 |
11/15/2023 |
SEAL COAT |
BRANNAN PAVING CO., LTD.($9,397,775) |
|
0833-03-036 |
MCLENNAN |
WACO |
$13,384,546 |
FM 1637 |
STP 2018(766) |
04/03/2018 |
11/15/2023 |
WDN GR, STRS & SURF |
BIG CREEK CONSTRUCTION, LTD.($11,487,770) |
|
0831-02-020 |
LIMESTONE |
WACO |
$729,363 |
FM 342 |
STP 2018(591)HES |
03/06/2018 |
11/15/2023 |
SFTY TR FX OBJS |
BEAR CREEK CONTRACTING, LLC($698,267) |
|
0209-07-045 |
MCLENNAN |
WACO |
$1,052,703 |
FM 933 |
STP 2018(589)HES |
03/07/2018 |
11/15/2023 |
SFTY TR FX OBJ |
TTG UTILITIES, LP($1,033,600) |
|
3330-01-010 |
MCLENNAN |
WACO |
$1,141,780 |
FM 3223 |
STP 2018(559) |
02/02/2018 |
11/15/2023 |
SEAL/OVLY |
KNIFE RIVER CORPORATION - SOUTH($845,728) |
|
0909-00-049 |
MCLENNAN |
WACO |
$2,089,094 |
VA |
STP 2018(546) |
02/02/2018 |
11/15/2023 |
CNSTR CURB RMPS |
TI-ZACK CONCRETE, INC.($1,647,633) |
|
0833-03-049 |
MCLENNAN |
WACO |
$345,970 |
FM 1637 |
STP 2018(545) |
02/01/2018 |
11/15/2023 |
TOM OVLY |
KNIFE RIVER CORPORATION - SOUTH($278,607) |
|
0774-03-014 |
HAMILTON |
WACO |
$3,674,163 |
FM 1602 |
STP 2018(544) |
02/02/2018 |
11/15/2023 |
WDN, GR, SURF, ADD SHLDRS |
OLDCASTLE MATERIALS TEXAS, INC.($3,288,709) |
|
2304-02-042 |
BELL |
WACO |
$884,323 |
FM 2410 |
STP 2018(348) |
12/05/2017 |
11/15/2023 |
SEAL/LVL UP/OVLY |
LONE STAR PAVING COMPANY($795,656) |
|
0231-04-056 |
BELL |
WACO |
$1,064,589 |
US 190 |
STP 2018(251)HES |
11/03/2017 |
11/15/2023 |
SAFETY TREAT FIXED OBJECTS |
BEAR CREEK CONTRACTING, LLC($1,063,872) |
|
0055-05-050 |
CORYELL |
WACO |
$8,114,418 |
US 84 |
STP 2018(006) |
09/07/2017 |
11/15/2023 |
SEAL COAT |
F. N. PLOCH CONSTRUCTION COMPANY, INC.($7,919,406) |
|
1192-01-024 |
MCLENNAN |
WACO |
$6,869,586 |
FM 939 |
STP 2017(936) |
01/09/2019 |
11/15/2023 |
WDN, GR, BS, SURF, ADD SHLDRS |
KNIFE RIVER CORPORATION - SOUTH($6,431,694) |
|
0320-02-036 |
BELL |
WACO |
$7,449,956 |
SH 95 |
STP 2017(900) |
10/03/2017 |
11/15/2023 |
WDN, GR, SURF, ADD PASS LNS |
BIG CREEK CONSTRUCTION, LTD.($6,123,478) |
|
0834-04-024 |
MCLENNAN |
WACO |
$1,332,902 |
FM 308 |
STP 2017(896)HES |
02/02/2018 |
11/15/2023 |
SFTY TR FX OBJS |
CDM HOLDINGS, LLC($1,258,844) |
|
3292-01-014 |
BELL |
WACO |
$85,403 |
FM 93 |
STP 2017(879) |
03/07/2017 |
11/15/2023 |
FLASING BEACANS AND SFTY LIGHTING |
THE LEVY COMPANY, L.P.($55,201) |
|
0231-16-032 |
BELL |
WACO |
$156,896 |
FM 436 |
STP 2017(877)HESG |
03/08/2017 |
11/15/2023 |
CNTRLN TXTRNG |
STRIPE-A-ZONE, INC.($174,161) |
|
3459-01-024 |
LIMESTONE |
WACO |
$692,380 |
FM 3371 |
STP 2017(602)HES |
02/03/2017 |
11/15/2023 |
SFTY TR FX OBJS |
WEST TEXAS REBAR PLACERS INC.($651,105) |
|
2304-03-012 |
BELL |
WACO |
$613,049 |
FM 2484 |
STP 2017(600)HES |
02/03/2017 |
11/15/2023 |
MILLED CL RUMBLE STRIP |
CHAMPION INFRASTRUCTURE, LLC($824,245) |
|
1831-01-019 |
HILL |
WACO |
$2,335,604 |
FM 934 |
STP 2017(599) |
02/03/2017 |
11/15/2023 |
WDN, GR, BS, SURF, ADD SHLDRS |
BIG CREEK CONSTRUCTION, LTD.($2,487,232) |
|
0015-05-047 |
BELL |
WACO |
$214,822 |
FM 817 |
STP 2017(597)HES |
02/02/2017 |
11/15/2023 |
HIGH FRIC SURF TRTMNT |
TOTAL HIGHWAY MAINTENANCE, LLC($115,598) |
|
2506-01-036 |
MCLENNAN |
WACO |
$785,287 |
FM 1695 |
STP 2017(465) |
01/05/2017 |
11/15/2023 |
MILL/SEAL/INLAY |
OLDCASTLE MATERIALS TEXAS, INC.($717,979) |
|
0909-22-173 |
MCLENNAN |
WACO |
$375,491 |
CS |
STP 2017(464)HES |
03/07/2017 |
11/15/2023 |
INCR SUPRELV |
BIG CREEK CONSTRUCTION, LTD.($372,721) |
|
0015-21-012 |
MCLENNAN |
WACO |
$831,210 |
FM 3476 |
STP 2017(463) |
01/05/2017 |
11/15/2023 |
MILL/SEAL/INLAY |
KNIFE RIVER CORPORATION - SOUTH($673,249) |