0015-01-243 |
MCLENNAN |
WACO |
$457,835,185 |
IH 35 |
NH 2019(312) |
12/05/2018 |
11/15/2023 |
WDN, GR, STRS, & SURF |
WEBBER, LLC($447,615,000) |
|
0015-01-246 |
MCLENNAN |
WACO |
$300,195,278 |
IH 35 |
F 2025(144) |
10/02/2024 |
08/21/2024 |
CONSTRUCT NEW ROAD |
JAMES CONSTRUCTION GROUP, LLC($268,949,853) |
|
0048-09-029 |
HILL |
WACO |
$121,792,371 |
IH 35E |
NH 2019(834) |
05/07/2019 |
11/15/2023 |
WDN, GR, STRS, SURF |
SACYR CONSTRUCTION USA LLC($133,117,086) |
|
0185-01-030 |
BELL |
WACO |
$79,955,513 |
US 190 |
NH 2019(599) |
11/06/2019 |
11/15/2023 |
WIDEN FROM TWO TO FOUR LANE DIVIDED HWY |
J.D. ABRAMS, L.P.($77,807,569) |
|
0162-02-031 |
HILL |
WACO |
$76,294,194 |
SH 31 |
STP 2009(661) |
07/11/2017 |
11/15/2023 |
GR, STRS & SURF |
SUNDT CONSTRUCTION, INC.($63,963,885) |
|
0320-06-008 |
BELL |
WACO |
$65,858,239 |
SL 363 |
F 2024(849) |
02/02/2024 |
12/22/2023 |
CONSTRUCT NEW ROAD |
JAMES CONSTRUCTION GROUP, LLC($53,775,775) |
|
0258-09-142 |
MCLENNAN |
WACO |
$61,351,329 |
SH 6 |
F 2021(943) |
08/05/2021 |
11/15/2023 |
CONSTRUCT RAMPS |
WEBBER, LLC($62,594,543) |
|
0231-03-145 |
BELL |
WACO |
$42,581,073 |
US 190 |
NH 2019(651) |
06/04/2019 |
11/15/2023 |
WDN, BS, STR, SURF |
J.D. ABRAMS, L.P.($44,733,666) |
|
0231-04-060 |
BELL |
WACO |
$40,212,907 |
IH 14 |
C 231-4-60 |
06/04/2020 |
11/15/2023 |
WIDEN FROM FOUR TO SIX LANES AND RESURF |
JAMES CONSTRUCTION GROUP, L.L.C.($39,466,124) |
|
6435-02-001 |
BELL |
WACO |
$38,599,454 |
IH0035 |
RMC - 643502001 |
06/01/2023 |
11/28/2023 |
TOTAL MAINT |
CROSS PLUS CONSTRUCTION, LLC($39,982,738) |
|
6450-13-001 |
BELL |
WACO |
$38,574,454 |
IH0035 |
RMC - 645013001 |
08/03/2023 |
11/15/2023 |
TOTAL MAINT |
ROY JORGENSEN ASSOCIATES, INC.($37,852,917) |
|
0162-01-100 |
MCLENNAN |
WACO |
$33,843,950 |
SH 31 |
F 2024(984) |
05/02/2024 |
03/21/2024 |
CONSTRUCT OVERPASS, ETC. |
BIG CREEK CONSTRUCTION, LTD.($29,287,263) |
|
2502-01-021 |
BELL |
WACO |
$29,978,534 |
SL 121 |
F 2021(093) |
08/05/2021 |
11/15/2023 |
WIDEN ROAD - ADD LANES |
JAMES CONSTRUCTION GROUP, LLC($29,180,209) |
|
0258-04-035 |
BOSQUE |
WACO |
$29,200,790 |
SH 6 |
F 2023(497) |
03/08/2023 |
08/21/2024 |
ADD PASSING LANES AND OVERLAY |
BIG CREEK CONSTRUCTION, LTD.($26,587,290) |
|
0049-01-095 |
MCLENNAN |
WACO |
$29,068,891 |
SH 6 |
F 2024(764) |
02/02/2024 |
12/22/2023 |
SURF/ROADWAY RESTOR |
BIG CREEK CONSTRUCTION, LTD.($22,852,588) |
|
6351-58-001 |
MCLENNAN |
WACO |
$28,080,845 |
IH0035 |
RMC - 635158001 |
05/08/2020 |
11/15/2023 |
ROUTINE MAINT OF IH - 35 CORRIDOR |
CROSS PLUS CONSTRUCTION, LLC($26,575,153) |
|
0055-08-099 |
MCLENNAN |
WACO |
$27,609,767 |
US 84 |
NH 2018(346) |
02/01/2018 |
11/15/2023 |
GR, STRS & SURF |
BIG CREEK CONSTRUCTION, LTD.($20,587,595) |
|
0258-06-040 |
BOSQUE |
WACO |
$20,506,355 |
SH 6 |
NH 2020(189) |
11/06/2019 |
11/15/2023 |
ADD PASS LNS, MILL/INLY |
BIG CREEK CONSTRUCTION, LTD.($19,873,561) |
|
0162-01-099 |
MCLENNAN |
WACO |
$19,749,994 |
US 84 |
C 162-1-99 |
09/06/2024 |
07/26/2024 |
RESURF ROADWAY |
TEXAS MATERIALS GROUP, INC.($10,569,490) |
|
0398-04-059 |
BELL |
WACO |
$16,930,873 |
SH 317 |
C 398-4-59 |
05/03/2016 |
11/15/2023 |
RECON & WIDEN TO 4 LANES W/RAISED MEDIAN |
BIG CREEK CONSTRUCTION, LTD.($16,887,377) |
|
0183-02-028 |
HAMILTON |
WACO |
$16,703,962 |
SH 36 |
F 2024(012) |
09/07/2023 |
11/15/2023 |
REHAB RDWY TO ADD PASS LNS |
BIG CREEK CONSTRUCTION, LTD.($18,187,374) |
|
0519-02-019 |
HILL |
WACO |
$16,611,185 |
SH 174 |
BR 2022(480) |
05/05/2022 |
08/31/2024 |
REPLACE BRIDGES AND APPROACHES |
A. L. HELMCAMP, INC.($23,690,787) |
|
0656-01-040 |
HILL |
WACO |
$15,467,709 |
FM 67 |
C 656-1-40 |
04/04/2023 |
09/24/2024 |
REHAB EXIST ROADWAY |
KNIFE RIVER CORPORATION - SOUTH($17,279,323) |
|
2060-01-037 |
MCLENNAN |
WACO |
$15,388,383 |
FM 2113 |
F 2021(489) |
01/07/2022 |
11/15/2023 |
WIDEN PAVMT AND ADD CURB & GUTTER |
BIG CREEK CONSTRUCTION, LTD.($15,387,558) |
|
2305-01-014 |
BOSQUE |
WACO |
$13,919,679 |
FM 2114 |
STP 2023(895)VRU |
06/02/2023 |
11/28/2023 |
WIDEN PAVMT TO ADD SHOULDERS AND STRUCT WORK |
BIG CREEK CONSTRUCTION, LTD.($13,110,490) |
|
0184-01-070 |
CORYELL |
WACO |
$13,792,008 |
SH 36 |
F 2024(331) |
11/01/2023 |
11/15/2023 |
SURF/ROADWAY RESTOR |
BIG CREEK CONSTRUCTION, LTD.($8,907,042) |
|
0867-01-017 |
HAMILTON |
WACO |
$13,725,256 |
FM 932 |
C 867-1-17 |
01/06/2022 |
11/15/2023 |
REHAB AND WIDEN ROADWAY |
BIG CREEK CONSTRUCTION, LTD.($13,587,883) |
|
0833-03-036 |
MCLENNAN |
WACO |
$13,384,546 |
FM 1637 |
STP 2018(766) |
04/03/2018 |
11/15/2023 |
WDN GR, STRS & SURF |
BIG CREEK CONSTRUCTION, LTD.($11,487,770) |
|
1054-02-023 |
BOSQUE |
WACO |
$13,280,170 |
FM 219 |
F 2023(363) |
12/01/2022 |
09/24/2024 |
REHAB EXIST ROADWAY |
BIG CREEK CONSTRUCTION, LTD.($10,387,524) |
|
0752-06-024 |
LIMESTONE |
WACO |
$13,009,783 |
FM 147 |
F 2B24(407) |
11/06/2024 |
09/25/2024 |
REHAB EXIST ROADWAY |
BIG CREEK CONSTRUCTION, LTD.($9,559,737) |
|
3030-01-010 |
HILL |
WACO |
$12,787,432 |
FM 2959 |
C 3030-1-10 |
01/04/2024 |
11/23/2023 |
WIDEN ROAD - ADD SHOULDERS |
BIG CREEK CONSTRUCTION, LTD.($12,787,366) |
|
0752-06-024 |
LIMESTONE |
WACO |
$12,635,845 |
FM 147 |
F 2B24(407) |
08/02/2024 |
06/21/2024 |
REHAB OF EXIST ROAD |
|
|
0184-01-063 |
CORYELL |
WACO |
$12,492,719 |
SH 36 |
C 184-1-63 |
07/11/2018 |
11/15/2023 |
WDN RDWY & ADD PASS LNS |
BIG CREEK CONSTRUCTION, LTD.($11,187,471) |
|
0724-01-056 |
CORYELL |
WACO |
$12,373,652 |
FM 116 |
STP 2022(156)HES |
12/01/2021 |
11/15/2023 |
CONSTRUCT OVERPASS/UNDERPASS |
BIG CREEK CONSTRUCTION, LTD.($10,787,640) |
|
0015-07-087 |
BELL |
WACO |
$12,215,676 |
IH 35 |
STP 2024(924)TP |
08/02/2024 |
06/21/2024 |
INFRASTRUCT IMPRVS |
TEXAS MATERIALS GROUP, INC.($12,103,561) |
|
0418-02-035 |
HILL |
WACO |
$12,006,392 |
SH 171 |
C 418-2-35 |
01/05/2024 |
11/24/2023 |
SURF/ROADWAY RESTOR |
TEXAS MATERIALS GROUP, INC.($8,755,570) |
|
0183-03-050 |
HAMILTON |
WACO |
$11,978,826 |
SH 36 |
STP 2019(839) |
05/08/2019 |
11/15/2023 |
ADD PASS LNS |
BIG CREEK CONSTRUCTION, LTD.($12,587,706) |
|
0833-02-020 |
BOSQUE |
WACO |
$11,923,878 |
FM 217 |
F 2022(560) |
06/01/2022 |
09/03/2024 |
REHAB EXIST ROADWAY |
KNIFE RIVER CORPORATION - SOUTH($12,983,870) |
|
0162-01-097 |
MCLENNAN |
WACO |
$11,439,533 |
SH 31 |
C 162-1-97 |
08/04/2021 |
11/15/2023 |
CONSTRUCT NEW OVERPASS AND APPROACHES |
WEBBER, LLC($11,321,680) |
|
0120-03-031 |
BOSQUE |
WACO |
$11,178,328 |
SH 22 |
F 2021(784) |
08/05/2021 |
11/15/2023 |
REHAB EXIST ROADWAY |
TEXAS MATERIALS GROUP, INC.($9,797,443) |
|
0320-02-039 |
BELL |
WACO |
$10,936,141 |
SH 95 |
BR 2023(463) |
02/02/2023 |
11/15/2023 |
BRIDGE REPL |
JAMES CONSTRUCTION GROUP, LLC($11,989,344) |
|
0055-15-072 |
MCLENNAN |
WACO |
$10,621,678 |
US 84 |
F 2021(567) |
05/06/2021 |
11/15/2023 |
INTERS AND PEDESTRIAN IMPRVS |
CROSS PLUS CONSTRUCTION, LLC($9,930,694) |
|
0231-02-066 |
CORYELL |
WACO |
$10,266,461 |
IH 14 |
C 231-2-66 |
02/01/2023 |
11/15/2023 |
MILL AND INLAY |
TEXAS MATERIALS GROUP, INC.($9,294,253) |
|
2304-02-044 |
BELL |
WACO |
$10,121,008 |
FM 2410 |
C 2304-2-44 |
03/08/2023 |
08/21/2024 |
REHAB EXIST ROADWAY |
TEXAS MATERIALS GROUP, INC.($9,585,341) |
|
0162-13-002 |
HILL |
WACO |
$9,439,338 |
SH 31 |
F 2025(088) |
09/05/2024 |
07/25/2024 |
SURF/ROADWAY RESTOR |
BIG CREEK CONSTRUCTION, LTD.($7,287,640) |
|
0833-03-045 |
MCLENNAN |
WACO |
$9,385,341 |
FM 1637 |
STP 2019(842)HES |
05/08/2019 |
11/15/2023 |
SFTY TR FX OBJS |
KNIFE RIVER CORPORATION - SOUTH($9,304,002) |
|
0867-02-019 |
CORYELL |
WACO |
$9,377,107 |
FM 932 |
STP 2020(005) |
09/05/2019 |
11/15/2023 |
PREVENT MAINT |
F. N. PLOCH CONSTRUCTION COMPANY, INC.($8,847,137) |
|
2061-02-030 |
MCLENNAN |
WACO |
$9,350,224 |
FM 2114 |
STP 1802(320) |
10/02/2018 |
11/15/2023 |
REHAB & WDN RDWY |
BIG CREEK CONSTRUCTION, LTD.($9,997,468) |
|
0056-02-033 |
LIMESTONE |
WACO |
$9,120,814 |
US 84 |
STP 2019(224) |
11/06/2018 |
11/15/2023 |
WDN SHLDRS & ADD PASS LNS |
BIG CREEK CONSTRUCTION, LTD.($9,187,964) |
|
0049-01-099 |
MCLENNAN |
WACO |
$9,043,757 |
SH 6 |
STP 2B20(186)HES |
08/05/2020 |
11/15/2023 |
HAZZARD ELIM AND SAFETY |
MASSANA, INC.($6,830,728) |
|
0833-01-009 |
CORYELL |
WACO |
$8,721,664 |
FM 217 |
F 2024(015) |
09/06/2023 |
11/15/2023 |
SEAL COAT |
BRANNAN PAVING CO., LTD.($7,582,812) |
|
0055-03-028 |
CORYELL |
WACO |
$8,719,872 |
US 84 |
F 2024(009) |
09/06/2023 |
11/15/2023 |
SEAL COAT |
COX PAVING OF TEXAS, INC.($7,829,870) |
|
1187-01-029 |
CORYELL |
WACO |
$8,305,131 |
FM 929 |
STP 2019(018) |
09/06/2018 |
11/15/2023 |
SEAL COAT |
BRANNAN PAVING CO., LTD.($9,397,775) |
|
0055-04-032 |
CORYELL |
WACO |
$8,253,949 |
US 84 |
F 2B24(522) |
09/05/2024 |
07/25/2024 |
SEAL COAT |
COX PAVING OF TEXAS, INC.($7,926,981) |
|
0055-15-079 |
MCLENNAN |
WACO |
$8,243,562 |
US 84 |
F 2B24(523) |
09/05/2024 |
07/25/2024 |
REHAB EXIST ROADWAY |
SILVER CREEK CONSTRUCTION, INC.($8,584,310) |
|
0055-05-050 |
CORYELL |
WACO |
$8,114,418 |
US 84 |
STP 2018(006) |
09/07/2017 |
11/15/2023 |
SEAL COAT |
F. N. PLOCH CONSTRUCTION COMPANY, INC.($7,919,406) |
|
3534-02-007 |
BELL |
WACO |
$8,101,016 |
SH 201 |
F 2024(115) |
10/05/2023 |
11/15/2023 |
SURF/ROADWAY RESTOR |
TEXAS MATERIALS GROUP, INC.($5,861,342) |
|
0231-03-143 |
BELL |
WACO |
$7,986,415 |
US 190 |
NH 2018(347) |
12/06/2017 |
11/15/2023 |
WDN, BS, STR, SURF |
BIG CREEK CONSTRUCTION, LTD.($7,287,694) |
|
6458-10-001 |
BELL |
WACO |
$7,878,179 |
SH0317 |
RMC - 645810001 |
10/02/2024 |
08/26/2024 |
PAVMT MRK |
TRAFFIC HIGHWAY MAINTENANCE, LLC($4,363,169) |
|
0120-05-027 |
HAMILTON |
WACO |
$7,839,709 |
FM 218 |
F 2022(951) |
09/07/2022 |
11/15/2023 |
SEAL COAT |
COX PAVING OF TEXAS, INC.($8,071,175) |
|
0015-14-126 |
BELL |
WACO |
$7,703,332 |
IH 35 |
C 15-14-126 |
01/08/2019 |
11/15/2023 |
MILL/PFC OVERLAY |
TEXAS MATERIALS GROUP, INC.($6,939,665) |
|
1664-01-019 |
LIMESTONE |
WACO |
$7,658,636 |
FM 1633 |
STP 2020(398) |
12/04/2019 |
11/15/2023 |
REHAB PAVMT STRUCT |
TEXAS MATERIALS GROUP, INC.($7,107,478) |
|
0724-02-020 |
BOSQUE |
WACO |
$7,591,387 |
FM 219 |
BR 2B24(133) |
06/06/2024 |
04/25/2024 |
REPLACE BRIDGE AND APPROACHES |
KNIFE RIVER CORPORATION - SOUTH($6,464,517) |
|
3623-01-006 |
CORYELL |
WACO |
$7,491,662 |
SH 9 |
STP 2021(015) |
09/03/2020 |
11/15/2023 |
FY 2021 SEAL COAT |
F. N. PLOCH CONSTRUCTION COMPANY, INC.($7,057,597) |
|
0320-02-036 |
BELL |
WACO |
$7,449,956 |
SH 95 |
STP 2017(900) |
10/03/2017 |
11/15/2023 |
WDN, GR, SURF, ADD PASS LNS |
BIG CREEK CONSTRUCTION, LTD.($6,123,478) |
|
0836-02-073 |
BELL |
WACO |
$7,343,910 |
SH 195 |
STP 2019(835)MM |
05/08/2019 |
11/15/2023 |
TRNARND UNDRPS |
TEXAS MATERIALS GROUP, INC.($8,482,506) |
|
0209-06-041 |
HILL |
WACO |
$7,252,063 |
FM 310 |
F 2025(086) |
09/06/2024 |
07/26/2024 |
SEAL COAT |
CLARK CONSTRUCTION OF TEXAS, INC.($7,292,707) |
|
0382-02-036 |
FALLS |
WACO |
$7,215,206 |
SH 7 |
STP 2019(441) |
02/06/2019 |
11/15/2023 |
MILL/OVLY |
BIG CREEK CONSTRUCTION, LTD.($6,187,425) |
|
2038-01-031 |
BELL |
WACO |
$6,908,139 |
FM 2115 |
C 2038-1-31 |
02/04/2022 |
11/15/2023 |
REHAB AND WIDEN SHOULDERS |
TEXAS MATERIALS GROUP, INC.($7,148,926) |
|
1192-01-024 |
MCLENNAN |
WACO |
$6,869,586 |
FM 939 |
STP 2017(936) |
01/09/2019 |
11/15/2023 |
WDN, GR, BS, SURF, ADD SHLDRS |
KNIFE RIVER CORPORATION - SOUTH($6,431,694) |
|
0015-01-253 |
MCLENNAN |
WACO |
$6,580,061 |
IH 35 |
F 2023(618) |
04/04/2023 |
09/24/2024 |
SURF/ROADWAY RESTOR |
BIG CREEK CONSTRUCTION, LTD.($6,126,287) |
|
0014-24-065 |
HILL |
WACO |
$6,546,206 |
IH 35 |
F 2023(619) |
04/04/2023 |
09/24/2024 |
SURF/ROADWAY RESTOR |
BIG CREEK CONSTRUCTION, LTD.($6,648,202) |
|
1308-01-025 |
BELL |
WACO |
$6,260,469 |
FM 1123 |
BR 2024(990) |
05/02/2024 |
03/21/2024 |
REPLACE BRIDGE AND APPROACHES |
C. E. BARKER, LTD.($5,183,802) |
|
0836-02-077 |
BELL |
WACO |
$6,205,434 |
SH 195 |
STP 2024(988)HES |
05/03/2024 |
03/22/2024 |
HAZARD ELIM & SAFETY |
JAMES CONSTRUCTION GROUP, LLC($5,775,775) |
|
1054-01-009 |
BOSQUE |
WACO |
$6,192,286 |
FM 219 |
C 1054-1-9 |
09/01/2021 |
11/15/2023 |
SEAL COAT |
BRANNAN PAVING CO., LTD.($5,391,495) |
|
0019-03-028 |
HILL |
WACO |
$6,082,873 |
SH 171 |
STP 2022(886)HES |
08/03/2022 |
11/15/2023 |
HAZARD ELIM & SAFETY |
BEAR CREEK CONTRACTING, LLC($5,859,953) |
|
0231-02-062 |
CORYELL |
WACO |
$5,877,661 |
BU 190E |
NH 2020(690) |
09/04/2020 |
11/15/2023 |
WIDEN PAVMT, CONSTRUCT RAISED MEDIAN |
TTG UTILITIES, LP($4,762,517) |
|
0055-08-119 |
MCLENNAN |
WACO |
$5,792,174 |
US 84 |
C 55-8-119 |
04/04/2018 |
11/15/2023 |
MILL/PFC OVLY |
KNIFE RIVER CORPORATION - SOUTH($4,721,563) |
|
0833-04-042 |
MCLENNAN |
WACO |
$5,672,748 |
FM 434 |
STP 2023(713)HES |
06/01/2023 |
11/27/2023 |
WIDEN ROAD - ADD LANES |
BIG CREEK CONSTRUCTION, LTD.($6,538,700) |
|
0231-03-152 |
BELL |
WACO |
$5,548,675 |
IH 14 |
NH 2021(228) |
01/07/2021 |
11/15/2023 |
ADVANCED TRAF MGT SYSTEM CONNECTION |
MICA CORPORATION($4,573,813) |
|
0014-17-078 |
HILL |
WACO |
$5,455,088 |
FM 1242 |
F 2022(065) |
09/01/2021 |
11/15/2023 |
SEAL COAT |
COX PAVING OF TEXAS, INC.($4,783,740) |
|
0049-01-092 |
MCLENNAN |
WACO |
$5,446,397 |
SH 6 |
NH 2017(876) |
03/08/2017 |
11/15/2023 |
MILL/PFC OVLY |
BIG CREEK CONSTRUCTION, LTD.($3,877,223) |
|
1190-02-018 |
HILL |
WACO |
$5,397,006 |
FM 933 |
F 2021(910) |
07/02/2021 |
11/15/2023 |
SURF/ROADWAY RESTOR |
BIG CREEK CONSTRUCTION, LTD.($4,587,557) |
|
6472-49-001 |
BOSQUE |
WACO |
$5,338,478 |
SH0006 |
RMC - 647249001 |
11/06/2024 |
09/27/2024 |
TRAF CONTROL SERVICES |
AWP SAFETY($3,168,625) |
|
0386-02-026 |
BOSQUE |
WACO |
$5,257,068 |
SH 144 |
F 2024(112) |
10/06/2023 |
11/15/2023 |
SURF/ROADWAY RESTOR |
BIG CREEK CONSTRUCTION, LTD.($4,557,803) |
|
0320-01-072 |
BELL |
WACO |
$5,231,397 |
SH 95 |
STP 2019(598) |
04/03/2019 |
11/15/2023 |
MILL/OVLY |
TEXAS MATERIALS GROUP, INC.($3,571,167) |
|
1926-01-018 |
CORYELL |
WACO |
$5,198,881 |
FM 1829 |
F 2022(952) |
09/07/2022 |
11/15/2023 |
SEAL COAT |
BRANNAN PAVING CO., LTD.($5,068,817) |
|
0513-01-017 |
CORYELL |
WACO |
$5,176,664 |
SH 236 |
BR 2021(617) |
06/03/2021 |
11/15/2023 |
REPLACE BRIDGE & APPROACHES |
BIG CREEK CONSTRUCTION, LTD.($5,087,623) |
|
0519-03-035 |
BOSQUE |
WACO |
$5,127,756 |
SH 174 |
C 519-3-35 |
10/01/2024 |
08/20/2024 |
SURF/ROADWAY RESTOR |
TEXAS MATERIALS GROUP, INC.($4,687,668) |
|
0231-03-154 |
BELL |
WACO |
$4,936,773 |
IH 14 |
C 231-3-154 |
05/04/2023 |
11/15/2023 |
HWY IMPRV |
SCR CIVIL CONSTRUCTION, LLC($4,494,840) |
|
0120-05-026 |
HAMILTON |
WACO |
$4,906,992 |
FM 218 |
STP 2020(564) |
02/07/2020 |
11/15/2023 |
REHAB & WIDEN ROADWAY |
BIG CREEK CONSTRUCTION, LTD.($5,387,759) |
|
0014-07-105 |
HILL |
WACO |
$4,444,499 |
IH 35 |
STP 2B20(189)HES |
08/05/2020 |
11/15/2023 |
UPGRADING MBGF TO MASH COMPLIANT STANDARDS. |
ENCINO LANDSCAPE, INC.($5,295,309) |
|
0724-01-050 |
CORYELL |
WACO |
$4,391,657 |
FM 116 |
STP 2017(011) |
03/07/2017 |
11/15/2023 |
ADD LEFT TURN LANE |
BIG CREEK CONSTRUCTION, LTD.($4,345,841) |
|
0831-01-019 |
MCLENNAN |
WACO |
$4,388,482 |
FM 939 |
F 2022(696) |
09/07/2022 |
11/15/2023 |
REHAB AND WIDEN ROADWAY |
KNIFE RIVER CORPORATION - SOUTH($4,553,672) |
|
0185-05-003 |
BELL |
WACO |
$4,361,714 |
US 190 |
STP 2023(717)HES |
05/04/2023 |
11/15/2023 |
INSTL MEDIAN BARRIER |
JAMES CONSTRUCTION GROUP, LLC($4,600,000) |
|
0231-03-146 |
BELL |
WACO |
$4,323,326 |
US 190 |
NH 1802(211) |
06/05/2018 |
11/15/2023 |
RDWY RECONFIG |
CAPITAL EXCAVATION COMPANY($4,549,398) |
|
1219-02-017 |
CORYELL |
WACO |
$4,205,681 |
FM 182 |
BR 2023(976) |
06/28/2023 |
11/15/2023 |
REPLACE BRIDGE AND APPROACHES |
KNIFE RIVER CORPORATION - SOUTH($3,507,188) |
|
2136-01-015 |
BELL |
WACO |
$4,194,503 |
FM 2268 |
BR 2019(313) |
02/06/2019 |
11/15/2023 |
REPL BR & APPRS |
CAPITAL EXCAVATION COMPANY($5,238,854) |
|
0752-04-024 |
FALLS |
WACO |
$3,976,979 |
FM 935 |
STP 1702(621) |
08/09/2017 |
11/15/2023 |
WDN, GR, BS, SURF, ADD SHLDRS |
BIG CREEK CONSTRUCTION, LTD.($3,524,689) |
|
0162-01-098 |
MCLENNAN |
WACO |
$3,874,162 |
SH 31 |
STP 2B20(188)HES |
08/05/2020 |
11/15/2023 |
INSTL CABLE MEDIAN BARRIER AND UPGRADE MBGF |
MASSANA, INC.($3,044,240) |