6303-05-001 |
BELL |
WACO |
$229,108 |
US0190 |
RMC - 630305001 |
11/15/2016 |
11/15/2023 |
RAISED PAVMT MARKERS - DISTRICTWIDE |
BRYDL CONTRACTING, INC.($191,536) |
|
6306-28-001 |
MCLENNAN |
WACO |
$234,477 |
SH0006 |
RMC - 630628001 |
11/15/2016 |
11/15/2023 |
STORM SEWER & INLET CLEANING |
H. T. S. CONSTRUCTION ENTERPRISES, INC.($239,902) |
|
6306-31-001 |
MCLENNAN |
WACO |
$117,480 |
SH0006 |
RMC - 630631001 |
07/18/2017 |
11/15/2023 |
TREE TRIM AND RMVL |
RAFTER JK CONSTRUCTION, LLC($105,038) |
|
6306-32-001 |
CORYELL |
WACO |
$264,880 |
US0084 |
RMC - 630632001 |
07/18/2017 |
11/15/2023 |
TREE TRIMMIMG AND TREE RMVL |
KASPARIAN UNDERGROUND, LLC($190,139) |
|
6306-33-001 |
HILL |
WACO |
$224,483 |
US0077 |
RMC - 630633001 |
07/18/2017 |
11/15/2023 |
TREE TRIM AND TREE RMVL |
KASPARIAN UNDERGROUND, LLC($173,013) |
|
6319-13-001 |
BELL |
WACO |
$160,825 |
FM0438 |
RMC - 631913001 |
08/15/2017 |
11/15/2023 |
CRACK SEAL - COLD APPLICATION |
GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY($139,695) |
|
6324-16-001 |
BELL |
WACO |
$33,482 |
SH0317 |
RMC - 632416001 |
02/13/2018 |
11/15/2023 |
MEASURING RETROREFLECTIVITY DISTRICTWIDE |
STRIPE-A-ZONE, INC.($35,446) |
|
6325-53-001 |
FALLS |
WACO |
$109,152 |
US0077 |
RMC - 632553001 |
05/15/2018 |
11/15/2023 |
WIDEN PAVMT |
KNIFE RIVER CORPORATION - SOUTH($164,979) |
|
6331-58-001 |
BELL |
WACO |
$78,375 |
FM0487 |
RMC - 633158001 |
09/27/2018 |
11/15/2023 |
TREE TRIM AND TREE RMVL |
VIKOTA SERVICES LLC($54,500) |
|
6331-59-001 |
MCLENNAN |
WACO |
$117,838 |
SH0317 |
RMC - 633159001 |
09/27/2018 |
11/15/2023 |
TREE TRIM AND RMVL |
VIKOTA SERVICES LLC($70,500) |
|
6339-77-001 |
BELL |
WACO |
$243,001 |
US0190 |
RMC - 633977001 |
12/12/2018 |
11/15/2023 |
URBAN MOW |
TNK SERVICES, LLC($202,245) |
|
6339-78-001 |
BELL |
WACO |
$161,184 |
US0190 |
RMC - 633978001 |
12/12/2018 |
11/15/2023 |
RURAL MOW |
TNK SERVICES, LLC($142,849) |
|
6339-79-001 |
MCLENNAN |
WACO |
$153,058 |
US0084 |
RMC - 633979001 |
12/12/2018 |
11/15/2023 |
MOW AND LITTER PICKUP & DISPOSAL |
T&L CLEANING SERVICES LLC($134,654) |
|
6339-81-001 |
BOSQUE |
WACO |
$229,505 |
SH0006 |
RMC - 633981001 |
12/12/2018 |
11/15/2023 |
MOW AND LITTER PICK UP & RMVL |
BAR NONE AG SUPPLY COMPANY, INC.($208,300) |
|
6339-83-001 |
HAMILTON |
WACO |
$174,514 |
SH0006 |
RMC - 633983001 |
12/12/2018 |
11/15/2023 |
COUNTY WIDE MOW AND LITTER RMVL |
JASCO($160,591) |
|
6339-84-001 |
HILL |
WACO |
$283,428 |
SH0022 |
RMC - 633984001 |
12/12/2018 |
11/15/2023 |
COUNTY WIDE MOW & LITTER RMVL |
CEN-TEX IRRIGATION SYSTEMS, INC.($329,765) |
|
6339-85-001 |
FALLS |
WACO |
$252,015 |
SH0006 |
RMC - 633985001 |
12/12/2018 |
11/15/2023 |
MOW AND LITTER PICKUP AND DISPOSAL |
P-VILLE, INCORPORATED($288,494) |
|
6339-86-001 |
LIMESTONE |
WACO |
$253,509 |
SH0007 |
RMC - 633986001 |
12/12/2018 |
11/15/2023 |
MOW AND LITTER PICKUP & DISPOSAL |
LAWRENCE W. SIMS($205,252) |
|
6332-42-001 |
MCLENNAN |
WACO |
$117,969 |
SH0006 |
BPM - 633242001 |
12/12/2018 |
11/15/2023 |
BRIDGE PREVENT MAINT |
C.E.S. CONTRACTOR($112,065) |
|
6347-28-001 |
CORYELL |
WACO |
$213,340 |
FM0217 |
RMC - 634728001 |
11/19/2019 |
11/15/2023 |
TREE TRIM AND TREE RMVL |
BOEN LANDSCAPING & IRRIGATION, LLC($271,295) |
|
6352-37-001 |
BELL |
WACO |
$29,782 |
SH0317 |
RMC - 635237001 |
01/21/2020 |
11/15/2023 |
NON SITE SPEC MEAS OF RETROREFLECTIVITY |
D. I. J. CONSTRUCTION, INC.($27,462) |
|
6349-43-001 |
BELL |
WACO |
$150,982 |
IH0035 |
RMC - 634943001 |
11/06/2019 |
11/15/2023 |
LIFT STATION REPL |
AAD CONTRACTING INC.($699,999) |
|
6350-96-001 |
BELL |
WACO |
$851,073 |
US0190 |
RMC - 635096001 |
11/06/2019 |
11/15/2023 |
MBGF,CABLE BARRIER & BRDG RAIL REPR/INST |
T&L CLEANING SERVICES LLC($849,325) |
|
6381-60-001 |
BELL |
WACO |
$114,345 |
FM0817 |
RMC - 638160001 |
07/29/2021 |
11/15/2023 |
TREE TRIM AND BRUSH RMVL |
FOWLER CONSTRUCTION($99,989) |
|
6381-63-001 |
MCLENNAN |
WACO |
$107,704 |
SH0006 |
RMC - 638163001 |
07/29/2021 |
11/15/2023 |
TREE TRIM AND BRUSH RMVL |
BA NEWTON'S ENTERPRISES LLC($94,715) |
|
6381-64-001 |
CORYELL |
WACO |
$186,340 |
US0084 |
RMC - 638164001 |
07/29/2021 |
11/15/2023 |
TREE TRIM AND BRUSH RMVL |
BA NEWTON'S ENTERPRISES LLC($163,079) |
|
6352-97-001 |
LIMESTONE |
WACO |
$296,786 |
SH0007 |
RMC - 635297001 |
12/03/2019 |
11/15/2023 |
MOW AND LITTER RMVL |
P-VILLE, INCORPORATED($292,186) |
|
6390-82-001 |
MCLENNAN |
WACO |
$293,000 |
US0084 |
MMC - 639082001 |
10/11/2021 |
11/15/2023 |
HOT MIX |
KNIFE RIVER CORPORATION - SOUTH($285,647) |
|
6390-83-001 |
HAMILTON |
WACO |
$291,300 |
US0281 |
MMC - 639083001 |
10/11/2021 |
11/15/2023 |
HOT MIX |
TEXAS MATERIALS GROUP, INC.($296,825) |
|
6385-00-001 |
MCLENNAN |
WACO |
$277,451 |
US0084 |
MMC - 638500001 |
10/11/2021 |
11/15/2023 |
DE-ICING SALT |
SOUTHWEST ENVIROTX PARTNERS, LLC($253,215) |
|
6352-98-001 |
MCLENNAN |
WACO |
$487,975 |
US0084 |
RMC - 635298001 |
12/03/2019 |
11/15/2023 |
URBAN & RURAL MOW, LITTER REM |
CROSS PLUS CONSTRUCTION, LLC($446,521) |
|
6389-10-001 |
HAMILTON |
WACO |
$235,561 |
US0281 |
RMC - 638910001 |
12/14/2021 |
11/15/2023 |
MOW HWY RIGHT OF WAY |
GREG SCRUGGS($184,438) |
|
6393-19-001 |
MCLENNAN |
WACO |
$166,519 |
US0084 |
RMC - 639319001 |
12/14/2021 |
11/15/2023 |
SWEEPING AND DEBRIS RMVL |
SWEEPING CORPORATION OF AMERICA, INC.($297,584) |
|
6396-94-001 |
HAMILTON |
WACO |
$293,400 |
US0281 |
MMC - 639694001 |
03/15/2022 |
11/15/2023 |
HOT MIX |
TEXAS MATERIALS GROUP, INC.($392,733) |
|
6396-93-001 |
MCLENNAN |
WACO |
$283,000 |
US0084 |
MMC - 639693001 |
03/15/2022 |
11/15/2023 |
HOT MIX |
BIG CREEK CONSTRUCTION, LTD.($318,250) |
|
6398-54-001 |
BELL |
WACO |
$296,300 |
US0190 |
MMC - 639854001 |
03/15/2022 |
11/15/2023 |
HOT MIX |
LONE STAR PAVING COMPANY($328,375) |
|
6394-40-001 |
LIMESTONE |
WACO |
$196,214 |
FM0634 |
RMC - 639440001 |
04/12/2022 |
11/15/2023 |
SEAL COAT |
TEXAS MATERIALS GROUP, INC.($425,408) |
|
6346-23-001 |
BELL |
WACO |
$758,697 |
FM2086 |
BPM - 634623001 |
12/04/2019 |
11/15/2023 |
BRIDGE PREVENT MAINT |
BECK-REIT & SONS, LTD.($943,122) |
|
6352-99-001 |
BELL |
WACO |
$476,907 |
US0190 |
RMC - 635299001 |
12/04/2019 |
11/15/2023 |
URBAN AND RURAL MOW |
CROSS PLUS CONSTRUCTION, LLC($552,738) |
|
6352-92-001 |
CORYELL |
WACO |
$320,800 |
SH0036 |
RMC - 635292001 |
12/04/2019 |
11/15/2023 |
MOW AND LITTER RMVL |
JASCO($379,470) |
|
6401-02-001 |
BELL |
WACO |
$80,707 |
FM0436 |
RMC - 640102001 |
06/28/2022 |
11/15/2023 |
TREE TRIM AND BRUSH RMVL |
GV LANDSCAPE AND CONSTRUCTION LLC($89,675) |
|
6418-19-001 |
BOSQUE |
WACO |
$291,500 |
SH0006 |
MMC - 641819001 |
08/30/2022 |
11/15/2023 |
HOT MIX |
KNIFE RIVER CORPORATION - SOUTH($299,980) |
|
6418-23-001 |
HILL |
WACO |
$286,440 |
SH0081 |
MMC - 641823001 |
08/30/2022 |
11/15/2023 |
HOT MIX |
KNIFE RIVER CORPORATION - SOUTH($296,960) |
|
6418-25-001 |
LIMESTONE |
WACO |
$289,960 |
US0084 |
MMC - 641825001 |
08/30/2022 |
11/15/2023 |
HOT MIX |
KNIFE RIVER CORPORATION - SOUTH($291,365) |
|
6418-27-001 |
FALLS |
WACO |
$279,070 |
SH0006 |
MMC - 641827001 |
08/30/2022 |
11/15/2023 |
HOT MIX |
KNIFE RIVER CORPORATION - SOUTH($283,160) |
|
6418-31-001 |
MCLENNAN |
WACO |
$277,550 |
US0084 |
MMC - 641831001 |
08/30/2022 |
11/15/2023 |
EMULSION |
WRIGHT ASPHALT PRODUCTS COMPANY LLC($243,150) |
|
6352-94-001 |
HILL |
WACO |
$330,915 |
SH0022 |
RMC - 635294001 |
12/04/2019 |
11/15/2023 |
MOW AND LITTER RMVL |
CEN-TEX IRRIGATION SYSTEMS, INC.($390,764) |
|
6352-95-001 |
FALLS |
WACO |
$294,453 |
SH0006 |
RMC - 635295001 |
12/04/2019 |
11/15/2023 |
MOW AND LITTER |
P-VILLE, INCORPORATED($321,655) |
|
6420-91-001 |
HAMILTON |
WACO |
$290,666 |
FM0219 |
RMC - 642091001 |
12/06/2022 |
11/15/2023 |
MOW HWY RIGHT OF WAY |
MARLANE CONSTRUCTION, LLC($221,141) |
|
0398-04-059 |
BELL |
WACO |
$16,930,873 |
SH 317 |
C 398-4-59 |
05/03/2016 |
11/15/2023 |
RECON & WIDEN TO 4 LANES W/RAISED MEDIAN |
BIG CREEK CONSTRUCTION, LTD.($16,887,377) |
|
0183-04-051 |
CORYELL |
WACO |
$293,816 |
SH 36 |
STP 2017(268) |
11/03/2016 |
11/15/2023 |
INSTL SFTY LGHTNG/UPGR EXT FLSH BC |
DURABLE SPECIALTIES, INC.($281,200) |
|
0056-03-061 |
LIMESTONE |
WACO |
$1,252,848 |
US 84 |
STP 2017(397) |
12/01/2016 |
11/15/2023 |
MILL/SEAL/INLAY |
BIG CREEK CONSTRUCTION, LTD.($1,218,683) |
|
3534-01-011 |
BELL |
WACO |
$3,468,716 |
FM 3470 |
STP 2017(398) |
12/01/2016 |
11/15/2023 |
MILL/SEAL/INLY |
OLDCASTLE MATERIALS TEXAS, INC.($3,489,226) |
|
0909-39-128 |
CORYELL |
WACO |
$691,150 |
VA |
STP 2016(368) |
01/04/2017 |
11/15/2023 |
CONSTRUCT CURB RAMPS |
PROJECT ALLIED RESOURCES, LLC($663,079) |
|
0909-22-167 |
MCLENNAN |
WACO |
$812,169 |
CR |
BR 2015(489) |
01/04/2017 |
11/15/2023 |
REPLACE BRIDGE AND APPROACHES |
ELLIS-MCGINNIS CONSTRUCTION CO.($697,710) |
|
0909-22-174 |
MCLENNAN |
WACO |
$481,594 |
CR |
BR 2016(885) |
01/05/2017 |
11/15/2023 |
REPL BR & APPRS |
ELLIS-MCGINNIS CONSTRUCTION CO.($453,594) |
|
0015-21-012 |
MCLENNAN |
WACO |
$831,210 |
FM 3476 |
STP 2017(463) |
01/05/2017 |
11/15/2023 |
MILL/SEAL/INLAY |
KNIFE RIVER CORPORATION - SOUTH($673,249) |
|
2506-01-036 |
MCLENNAN |
WACO |
$785,287 |
FM 1695 |
STP 2017(465) |
01/05/2017 |
11/15/2023 |
MILL/SEAL/INLAY |
OLDCASTLE MATERIALS TEXAS, INC.($717,979) |
|
1831-01-019 |
HILL |
WACO |
$2,335,604 |
FM 934 |
STP 2017(599) |
02/03/2017 |
11/15/2023 |
WDN, GR, BS, SURF, ADD SHLDRS |
BIG CREEK CONSTRUCTION, LTD.($2,487,232) |
|
0724-01-050 |
CORYELL |
WACO |
$4,391,657 |
FM 116 |
STP 2017(011) |
03/07/2017 |
11/15/2023 |
ADD LEFT TURN LANE |
BIG CREEK CONSTRUCTION, LTD.($4,345,841) |
|
0909-22-173 |
MCLENNAN |
WACO |
$375,491 |
CS |
STP 2017(464)HES |
03/07/2017 |
11/15/2023 |
INCR SUPRELV |
BIG CREEK CONSTRUCTION, LTD.($372,721) |
|
0049-01-092 |
MCLENNAN |
WACO |
$5,446,397 |
SH 6 |
NH 2017(876) |
03/08/2017 |
11/15/2023 |
MILL/PFC OVLY |
BIG CREEK CONSTRUCTION, LTD.($3,877,223) |
|
6352-29-001 |
BOSQUE |
WACO |
$1,627,925 |
SH0022 |
RMC - 635229001 |
01/09/2020 |
11/15/2023 |
FLAGGING AND WORK ZONE TRAF CONTROL |
AREA WIDE PROTECTIVE, INC.($1,757,572) |
|
0909-28-022 |
BOSQUE |
WACO |
$1,353,297 |
CR |
BR 2000(962) |
04/05/2017 |
11/15/2023 |
REPLACE BRIDGE AND APPROACHES |
HODGES AND SON CONSTRUCTION COMPANY, INC.($1,451,177) |
|
1835-02-054 |
BELL |
WACO |
$1,039,695 |
FM 1741 |
STP 1702(304) |
06/07/2017 |
11/15/2023 |
MILL/INLAY |
BIG CREEK CONSTRUCTION, LTD.($897,190) |
|
0162-02-031 |
HILL |
WACO |
$76,294,194 |
SH 31 |
STP 2009(661) |
07/11/2017 |
11/15/2023 |
GR, STRS & SURF |
SUNDT CONSTRUCTION, INC.($63,963,885) |
|
0808-01-058 |
FALLS |
WACO |
$2,663,883 |
FM 413 |
BR 2017(897) |
07/11/2017 |
11/15/2023 |
CONC OVLY DECK REHAB |
FNH CONSTRUCTION, LLC($3,535,362) |
|
0752-04-024 |
FALLS |
WACO |
$3,976,979 |
FM 935 |
STP 1702(621) |
08/09/2017 |
11/15/2023 |
WDN, GR, BS, SURF, ADD SHLDRS |
BIG CREEK CONSTRUCTION, LTD.($3,524,689) |
|
2866-01-009 |
LIMESTONE |
WACO |
$1,746,167 |
FM 2838 |
SSW 2866-1-9 |
08/09/2017 |
11/15/2023 |
PROV ADDTL PV SURF WDTH |
BIG CREEK CONSTRUCTION, LTD.($1,299,987) |
|
0055-05-050 |
CORYELL |
WACO |
$8,114,418 |
US 84 |
STP 2018(006) |
09/07/2017 |
11/15/2023 |
SEAL COAT |
F. N. PLOCH CONSTRUCTION COMPANY, INC.($7,919,406) |
|
0320-02-036 |
BELL |
WACO |
$7,449,956 |
SH 95 |
STP 2017(900) |
10/03/2017 |
11/15/2023 |
WDN, GR, SURF, ADD PASS LNS |
BIG CREEK CONSTRUCTION, LTD.($6,123,478) |
|
0015-05-049 |
BELL |
WACO |
$1,409,036 |
FM 817 |
BR 2017(899) |
11/03/2017 |
11/15/2023 |
TRUSS CLEANING AND PAINTING |
JAMES CONSTRUCTION GROUP, L.L.C.($1,599,938) |
|
0055-06-033 |
CORYELL |
WACO |
$369,124 |
US 84 |
BR 2018(345) |
12/05/2017 |
11/15/2023 |
BRIDGE MAINT |
ELLIS-MCGINNIS CONSTRUCTION CO.($277,779) |
|
2304-02-042 |
BELL |
WACO |
$884,323 |
FM 2410 |
STP 2018(348) |
12/05/2017 |
11/15/2023 |
SEAL/LVL UP/OVLY |
LONE STAR PAVING COMPANY($795,656) |
|
6354-18-001 |
BELL |
WACO |
$550,598 |
US0190 |
RMC - 635418001 |
02/06/2020 |
11/15/2023 |
CLEANING AND SWEEPING |
EXPERT MAINTENANCE & CONSTRUCTION SERVICES LLC($411,184) |
|
0231-03-143 |
BELL |
WACO |
$7,986,415 |
US 190 |
NH 2018(347) |
12/06/2017 |
11/15/2023 |
WDN, BS, STR, SURF |
BIG CREEK CONSTRUCTION, LTD.($7,287,694) |
|
0055-08-099 |
MCLENNAN |
WACO |
$27,609,767 |
US 84 |
NH 2018(346) |
02/01/2018 |
11/15/2023 |
GR, STRS & SURF |
BIG CREEK CONSTRUCTION, LTD.($20,587,595) |
|
1594-02-012 |
CORYELL |
WACO |
$1,116,439 |
FM 1783 |
BR 2018(547) |
02/01/2018 |
11/15/2023 |
REPLACE BRIDGE AND APPROACHES |
KNIFE RIVER CORPORATION - SOUTH($1,048,921) |
|
0833-03-049 |
MCLENNAN |
WACO |
$345,970 |
FM 1637 |
STP 2018(545) |
02/01/2018 |
11/15/2023 |
TOM OVLY |
KNIFE RIVER CORPORATION - SOUTH($278,607) |
|
0834-04-024 |
MCLENNAN |
WACO |
$1,332,902 |
FM 308 |
STP 2017(896)HES |
02/02/2018 |
11/15/2023 |
SFTY TR FX OBJS |
CDM HOLDINGS, LLC($1,258,844) |
|
3330-01-010 |
MCLENNAN |
WACO |
$1,141,780 |
FM 3223 |
STP 2018(559) |
02/02/2018 |
11/15/2023 |
SEAL/OVLY |
KNIFE RIVER CORPORATION - SOUTH($845,728) |
|
0909-00-049 |
MCLENNAN |
WACO |
$2,089,094 |
VA |
STP 2018(546) |
02/02/2018 |
11/15/2023 |
CNSTR CURB RMPS |
TI-ZACK CONCRETE, INC.($1,647,633) |
|
0831-02-020 |
LIMESTONE |
WACO |
$729,363 |
FM 342 |
STP 2018(591)HES |
03/06/2018 |
11/15/2023 |
SFTY TR FX OBJS |
BEAR CREEK CONTRACTING, LLC($698,267) |
|
0209-07-045 |
MCLENNAN |
WACO |
$1,052,703 |
FM 933 |
STP 2018(589)HES |
03/07/2018 |
11/15/2023 |
SFTY TR FX OBJ |
TTG UTILITIES, LP($1,033,600) |
|
0833-03-036 |
MCLENNAN |
WACO |
$13,384,546 |
FM 1637 |
STP 2018(766) |
04/03/2018 |
11/15/2023 |
WDN GR, STRS & SURF |
BIG CREEK CONSTRUCTION, LTD.($11,487,770) |
|
0909-22-175 |
MCLENNAN |
WACO |
$617,209 |
CR |
BR 1602(214) |
04/04/2018 |
11/15/2023 |
REPL BR & APPRS |
PROJECT ALLIED RESOURCES, LLC($586,253) |
|
0232-05-016 |
BELL |
WACO |
$839,513 |
FM 2305 |
C 232-5-16 |
05/02/2018 |
11/15/2023 |
SEAL/OVLY |
OLDCASTLE MATERIALS TEXAS, INC.($888,222) |
|
0231-03-146 |
BELL |
WACO |
$4,323,326 |
US 190 |
NH 1802(211) |
06/05/2018 |
11/15/2023 |
RDWY RECONFIG |
CAPITAL EXCAVATION COMPANY($4,549,398) |
|
0184-04-050 |
BELL |
WACO |
$2,831,808 |
SH 36 |
C 184-4-50 |
07/10/2018 |
11/15/2023 |
MISC SPOT PAVMT REPAIRS |
LONE STAR PAVING COMPANY($2,282,822) |
|
1656-03-012 |
FALLS |
WACO |
$881,744 |
FM 413 |
STP 1702(303)HES |
07/10/2018 |
11/15/2023 |
SAFETY TREAT FIXED OBJECTS |
TALBRAN ENTERPRISES LLC($777,557) |
|
0014-08-084 |
MCLENNAN |
WACO |
$854,053 |
IH 35 |
C 14-8-84 |
07/10/2018 |
11/15/2023 |
MISC SPOT PAVMT REPAIRS |
OLDCASTLE MATERIALS TEXAS, INC.($810,416) |
|
0184-01-063 |
CORYELL |
WACO |
$12,492,719 |
SH 36 |
C 184-1-63 |
07/11/2018 |
11/15/2023 |
WDN RDWY & ADD PASS LNS |
BIG CREEK CONSTRUCTION, LTD.($11,187,471) |
|
0320-05-015 |
BELL |
WACO |
$3,072,993 |
SL 363 |
C 320-5-15 |
07/11/2018 |
11/15/2023 |
MILL/SEAL/OVLY |
BIG CREEK CONSTRUCTION, LTD.($2,938,131) |
|
2362-01-036 |
MCLENNAN |
WACO |
$1,847,786 |
SL 340 |
C 2362-1-36 |
07/11/2018 |
11/15/2023 |
SEAL & OVERLAY |
KNIFE RIVER CORPORATION - SOUTH($2,101,672) |
|
0014-05-039 |
HILL |
WACO |
$1,956,234 |
SH 81 |
C 14-5-39 |
07/11/2018 |
11/15/2023 |
MISC SPOT PAVMT REPAIRS |
OLDCASTLE MATERIALS TEXAS, INC.($1,999,585) |
|
0120-01-019 |
HAMILTON |
WACO |
$1,725,935 |
SH 22 |
C 120-1-19 |
07/11/2018 |
11/15/2023 |
MISC SPOT PAVMT REPAIR |
OLDCASTLE MATERIALS TEXAS, INC.($1,642,122) |
|
0909-39-127 |
CORYELL |
WACO |
$978,729 |
CR |
BR 1502(366) |
07/11/2018 |
11/15/2023 |
REPL BR & APPRS |
CAPITAL EXCAVATION COMPANY($1,020,198) |
|
0909-29-040 |
HAMILTON |
WACO |
$548,441 |
CR |
BR 1702(407) |
08/07/2018 |
11/15/2023 |
REPL BR & APPRS |
ELLIS-MCGINNIS CONSTRUCTION CO.($495,665) |
|
0909-38-071 |
FALLS |
WACO |
$512,191 |
CR |
BR 1702(197) |
08/07/2018 |
11/15/2023 |
REPL BR & APPRS |
ELLIS-MCGINNIS CONSTRUCTION CO.($439,500) |
|
0909-38-078 |
FALLS |
WACO |
$249,884 |
CS |
BR 2017(203) |
08/08/2018 |
11/15/2023 |
REPL BR & APPRS |
KNIFE RIVER CORPORATION - SOUTH($279,404) |