0910-07-089 |
GREGG |
TYLER |
$210,290 |
VARIOUS |
F 2022(957) |
09/08/2022 |
11/15/2023 |
LANDSCAPE DEVELOPMENT |
TIGHT LINE CONSTRUCTION, LLC($198,617) |
|
0910-16-185 |
SMITH |
TYLER |
$1,555,500 |
VA |
F 2B24(309), ETC |
11/07/2024 |
10/15/2024 |
TRAF CONTROL DEVICES |
|
|
0910-00-132 |
SMITH |
TYLER |
$610,402 |
VA |
F 2022(579) |
04/07/2022 |
09/24/2024 |
INSTL/UPGRADE ROADWAY LIGHTING |
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC.($402,136) |
|
0910-00-142 |
SMITH |
TYLER |
$4,486,200 |
VA |
BR 2B24(231) |
07/10/2024 |
05/29/2024 |
BRIDGE MAINT |
CROSS PLUS CONSTRUCTION, LLC($4,387,550) |
|
0910-16-187 |
SMITH |
TYLER |
$820,888 |
VA |
F 2B24(310) |
08/02/2024 |
06/21/2024 |
PEDESTRIAN, SIDEWALKS & CURB RAMPS |
|
|
0910-36-137 |
CHEROKEE |
TYLER |
$180,909 |
VA |
STP 2025(022)HESG |
09/06/2024 |
07/26/2024 |
INSTL/REPLACE SIGNS |
RISE UP CONSTRUCTION LLC($159,987) |
|
0910-16-168 |
SMITH |
TYLER |
$796,631 |
VA |
C 910-16-168 |
12/01/2022 |
09/24/2024 |
STATE PARK IMPRVS |
EAST TEXAS BRIDGE, INC.($921,723) |
|
0910-00-136 |
SMITH |
TYLER |
$921,525 |
VA |
STP 2023(518)HES |
03/07/2023 |
08/21/2024 |
HAZARD ELIM & SAFETY |
VACA UNDERGROUND UTILITIES INC($932,150) |
|
0910-08-081 |
ANDERSON |
TYLER |
$748,230 |
VA |
STP 2022(533)HES |
05/04/2022 |
08/31/2024 |
HAZARD ELIM & SAFETY |
MARCOM'S MOWING SERVICE, LLC($757,095) |
|
0910-00-121 |
SMITH |
TYLER |
$2,103,159 |
VA |
F 2022(551) |
06/01/2022 |
09/03/2024 |
PREVENT MAINT |
TRP CONSTRUCTION GROUP, LLC($1,937,247) |
|
0910-00-131 |
SMITH |
TYLER |
$2,240,791 |
VA |
C 910-00-131 |
08/04/2022 |
11/15/2023 |
BICYCLE AND PEDESTRIAN IMPRVS |
CROSS PLUS CONSTRUCTION, LLC($2,538,364) |
|
0910-16-178 |
SMITH |
TYLER |
$1,658,455 |
VA |
STP 2024(808)VRU |
03/05/2024 |
01/23/2024 |
HAZARD ELIM & SAFETY |
SYNERGY SIGNS & SERVICES LLC($1,451,085) |
|
0910-00-123 |
SMITH |
TYLER |
$1,721,002 |
VA |
F 2024(958) |
04/04/2024 |
02/22/2024 |
HAZARD ELIM & SAFETY |
STRIPE-A-ZONE, LLC($1,144,488) |
|
0910-34-037 |
HENDERSON |
TYLER |
$157,492 |
VA |
F 2022(757) |
06/30/2022 |
11/15/2023 |
LANDSCAPE DEVELOPMENT |
TIGHT LINE CONSTRUCTION, LLC($173,162) |
|
0910-16-185 |
SMITH |
TYLER |
$1,555,500 |
VA |
F 2B24(309) |
11/06/2024 |
09/25/2024 |
TRAF SIGNAL IMPRVS |
3LW CIVIL LLC($1,685,438) |
|
0910-16-187 |
SMITH |
TYLER |
$820,888 |
VA |
F 2B24(310) |
11/06/2024 |
09/25/2024 |
CONSTRUCT PEDESTRIAN INFRASTRUCT |
TIGHT LINE CONSTRUCTION, LLC($865,454) |
|
0910-07-079 |
GREGG |
TYLER |
$309,095 |
VA |
NH 2020(494) |
01/10/2020 |
09/26/2024 |
RECONRCT PIPE ENTRANCE, ADD LNDSCPING & LIGHTIN |
ENCINO LANDSCAPE, INC.($298,629) |
|
0910-00-106 |
SMITH |
TYLER |
$2,343,971 |
VA |
C 910-00-106 |
01/10/2020 |
09/26/2024 |
THERMOPLASTIC & PROFILE PAVMT MRK |
STRIPE-A-ZONE, INC.($2,074,842) |
|
0910-00-142 |
SMITH |
TYLER |
$4,536,200 |
VA |
C 910-00-142 |
11/07/2024 |
09/26/2024 |
BRIDGE MAINT |
OLYMPUS PAINTING CONTRACTORS, INC.($3,108,496) |
|
0910-16-180 |
SMITH |
TYLER |
$326,139 |
VA |
STP 2025(155)HES |
11/07/2024 |
09/26/2024 |
INSTL ILLUM |
TEXAS TRAFFIC CONTROL SYSTEMS, INC.($299,533) |
|
0910-00-135 |
SMITH |
TYLER |
$653,255 |
VA |
F 2022(965) |
08/03/2022 |
11/15/2023 |
BICYCLE AND PEDESTRIAN IMPRVS |
REYNOLDS & KAY, LTD.($783,828) |
|
0910-00-122 |
SMITH |
TYLER |
$1,908,487 |
VA |
F 2023(724) |
05/05/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
INTERSTATE BARRICADES & MARKINGS, INC.($1,698,785) |
|
0910-36-134 |
CHEROKEE |
TYLER |
$644,986 |
VA |
STP 2B23(066)HES |
08/03/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
GARRET SHIELDS INFRASTRUCTURE($532,753) |
|
0910-16-182 |
SMITH |
TYLER |
$271,182 |
VA |
STP 2024(336)HES |
11/02/2023 |
11/15/2023 |
INSTL ILLUM |
SNOWHILL CONTRACTING LLC($232,606) |
|
0910-00-137 |
SMITH |
TYLER |
$1,774,650 |
VA |
STP 2024(629)VRU |
01/05/2024 |
11/24/2023 |
HAZARD ELIM & SAFETY |
TEXAS TRAFFIC CONTROL SYSTEMS, INC.($1,755,175) |
|
0910-16-181 |
SMITH |
TYLER |
$112,930 |
VA |
STP 2B23(178)HES |
08/02/2023 |
11/15/2023 |
INSTL ILLUM |
TEXAS TRAFFIC CONTROL SYSTEMS, INC.($143,045) |
|
0910-12-141 |
VAN ZANDT |
TYLER |
$472,400 |
VA |
STP 2024(855)HES |
04/04/2024 |
02/22/2024 |
HAZARD ELIM & SAFETY |
MARCOM'S MOWING SERVICE, LLC($450,860) |
|
0910-07-085 |
GREGG |
TYLER |
$359,075 |
VA |
STP 2024(983)HESG |
05/02/2024 |
03/21/2024 |
HAZARD ELIM & SAFETY |
SYNERGY SIGNS & SERVICES LLC($240,950) |
|
0910-07-100 |
GREGG |
TYLER |
$1,555,500 |
VA |
F 2B24(308), ETC |
08/01/2024 |
06/20/2024 |
INTERS & OPERATIONAL IMPRV |
|
|
0910-16-162 |
SMITH |
TYLER |
$3,104,945 |
VA |
STP 2023(201)TAPS |
08/03/2023 |
11/15/2023 |
CONSTRUCT PEDESTRIAN INFRASTRUCT |
THK CONSTRUCTION LLC($2,988,319) |
|
0910-12-140 |
VAN ZANDT |
TYLER |
$785,460 |
VA |
STP 2B23(065)HES |
08/02/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
MARCOM'S MOWING SERVICE, LLC($671,280) |
|
0910-16-130 |
SMITH |
TYLER |
$2,162,859 |
VA |
STP 1602(439) |
03/08/2017 |
11/15/2023 |
GR,SGNL,ACP BS&SURF,C&G,STM SWR,PED RMP,PV MK |
L. S. EQUIPMENT CO., INC.($2,355,456) |
|
0910-16-152 |
SMITH |
TYLER |
$893,749 |
VA |
STP 2B20(142)HES |
08/06/2020 |
11/15/2023 |
REPLACE GUARDRAIL |
3LW CIVIL LLC($833,358) |
|
0910-00-133 |
SMITH |
TYLER |
$419,806 |
VA |
F 2022(963) |
08/03/2022 |
11/15/2023 |
BICYCLE AND PEDESTRIAN IMPRVS |
ENCINO LANDSCAPE, INC.($548,791) |
|
0910-00-107 |
SMITH |
TYLER |
$1,947,371 |
VA |
STP 2019(324) |
01/09/2019 |
11/15/2023 |
THERMOPLASTIC PAVMT MRK |
CENTERLINE TECHNOLOGIES, LLC($1,530,350) |
|
0910-00-120 |
SMITH |
TYLER |
$796,864 |
VA |
F 2021(600) |
06/04/2021 |
11/15/2023 |
HAZARD ELIM & SAFETY |
PROFESSIONAL TRAFFIC CONTROL LLC($471,302) |
|
0910-16-166 |
SMITH |
TYLER |
$1,017,280 |
VA |
STP 2023(729)HES |
05/05/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
CROSS PLUS CONSTRUCTION, LLC($925,714) |
|
0910-42-042 |
RUSK |
TYLER |
$167,625 |
VA |
STP 2021(171) |
12/02/2020 |
11/15/2023 |
LANDSCAPING |
TIGHT LINE CONSTRUCTION, LLC($172,336) |
|
0910-00-114 |
SMITH |
TYLER |
$2,585,271 |
VA |
STP 2021(215) |
01/07/2021 |
11/15/2023 |
PREVENT MAINT |
STRIPE-A-ZONE, INC.($2,322,961) |
|
0910-34-033 |
HENDERSON |
TYLER |
$108,760 |
VA |
F 2021(924) |
08/05/2021 |
11/15/2023 |
LANDSCAPE DEVELOPMENT |
TIGHT LINE CONSTRUCTION, LLC($72,072) |
|
0910-00-115 |
SMITH |
TYLER |
$2,453,269 |
VA |
F 2022(095) |
09/01/2021 |
11/15/2023 |
PREVENT MAINT |
TOTAL HIGHWAY MAINTENANCE, LLC($2,493,890) |
|
0910-16-169 |
SMITH |
TYLER |
$157,515 |
VA |
F 2022(028) |
09/02/2021 |
11/15/2023 |
LANDSCAPE DEVELOPMENT |
TIGHT LINE CONSTRUCTION, LLC($157,495) |
|
0910-16-146 |
SMITH |
TYLER |
$39,800 |
VA |
F 2022(021) |
10/08/2021 |
11/15/2023 |
REPL OF MISSING SMALL ROADSIDE SIGNS |
HX FARMS, INC.($34,806) |
|
0910-34-035 |
HENDERSON |
TYLER |
$57,748 |
VA |
C 910-34-35 |
03/03/2022 |
11/15/2023 |
STATE PARK IMPRVS |
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.($110,625) |
|
0910-00-134 |
SMITH |
TYLER |
$435,667 |
VA |
F 2022(964) |
08/03/2022 |
11/15/2023 |
BICYCLE AND PEDESTRIAN IMPRVS |
TI-ZACK CONCRETE, INC.($470,055) |
|
0910-07-084 |
GREGG |
TYLER |
$198,220 |
VA |
STP 2023(371)HES |
01/05/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
H. V. CAVER, INC.($224,592) |
|
0910-08-080 |
ANDERSON |
TYLER |
$1,057,250 |
VA |
C 910-8-80 |
02/01/2023 |
11/15/2023 |
STATE PARK IMPRVS |
BAKER & COMPANY CONSTRUCTION, LLC($958,749) |
|
0910-00-126 |
SMITH |
TYLER |
$892,205 |
VA |
C 910-00-126 |
06/05/2019 |
11/15/2023 |
THERMOPLASTIC & PROFILE PAVMT MRK |
TOTAL HIGHWAY MAINTENANCE, LLC($738,214) |
|
0910-34-031 |
HENDERSON |
TYLER |
$413,200 |
VA |
NH 2020(179) |
11/06/2019 |
11/15/2023 |
INSTL/REPLACE SIGNS |
JASCO($324,000) |
|
0910-00-113 |
SMITH |
TYLER |
$734,375 |
VA |
STP 2020(891) |
06/04/2020 |
11/15/2023 |
THERMOPLASTIC & PROFILE PAVMT MRK |
STRIPE-A-ZONE, INC.($668,551) |
|
0910-00-127 |
SMITH |
TYLER |
$4,112,570 |
VA |
STP 2B20(022) |
07/08/2020 |
11/15/2023 |
SIDEWALKS & ADA PED RAMPS |
HIGHWAY 19 CONSTRUCTION LLC($3,512,939) |
|
0910-16-151 |
SMITH |
TYLER |
$149,744 |
VA |
C 910-16-151 |
07/09/2020 |
11/15/2023 |
DRAINAGE IMPRVS, STRS, EMBANKMENT & SEEDING |
BAKER & COMPANY CONSTRUCTION, LLC($177,736) |
|
0910-34-032 |
HENDERSON |
TYLER |
$1,447,717 |
VA |
STP 2B20(192)HES |
08/05/2020 |
11/15/2023 |
REPLACE GUARDRAIL |
3LW CIVIL LLC($1,420,616) |
|
0910-07-081 |
GREGG |
TYLER |
$437,735 |
VA |
STP 2B20(194)HES |
08/06/2020 |
11/15/2023 |
REPLACE GUARDRAIL |
ODUM SERVICES, LLC($415,606) |
|
0910-35-038 |
WOOD |
TYLER |
$782,275 |
VA |
STP 2B20(193)HES |
08/06/2020 |
11/15/2023 |
REPLACE GUARDRAIL |
CATOCON, INC.($777,779) |
|
0910-35-037 |
WOOD |
TYLER |
$387,900 |
VA |
C 910-35-37 |
10/01/2020 |
11/15/2023 |
REPL OF MISSING SMALL ROADSIDE SIGNS |
CROSS PLUS CONSTRUCTION, LLC($303,114) |
|
0910-07-077 |
GREGG |
TYLER |
$299,250 |
VA |
C 910-7-77 |
10/02/2020 |
11/15/2023 |
REPL OF MISSING SMALL ROADSIDE SIGNS |
JASCO($220,600) |
|
0910-42-041 |
RUSK |
TYLER |
$130,681 |
VA |
STP 2017(245) |
11/03/2016 |
11/15/2023 |
LANDSCAPE PLANTING |
TIGHT LINE CONSTRUCTION, LLC($145,279) |
|
0910-16-130 |
SMITH |
TYLER |
$1,897,070 |
VA |
STP 1602(439) |
11/04/2016 |
11/15/2023 |
GR,SGNL,ACP BS&SURF,C&G,STM SWR,PED RMP,PV MK |
EAST TEXAS BRIDGE, INC.($2,469,057) |
|
0910-00-105 |
SMITH |
TYLER |
$1,440,422 |
VA |
STP 2016(366) |
12/01/2016 |
11/15/2023 |
CONSTRUCT ADA COMPLIANT CURB RAMPS |
TI-ZACK CONCRETE, INC.($1,419,691) |
|
0910-00-100 |
SMITH |
TYLER |
$311,113 |
VA |
STP 2017(230) |
01/04/2017 |
11/15/2023 |
THERMOPLASTIC STRIPING |
STRIPE-A-ZONE, INC.($209,930) |
|
0910-16-138 |
SMITH |
TYLER |
$141,497 |
VA |
STP 2017(928) |
04/05/2017 |
11/15/2023 |
CONSTRUCT SIDEWALKS & ADA CURB RAMPS |
M & M STRIPING & POWER WASHING, LLC($97,066) |
|
0910-07-069 |
GREGG |
TYLER |
$1,381,190 |
VA |
STP 1702(387) |
06/07/2017 |
11/15/2023 |
INSTL FLASHING YELLOW LT TURN ARROWS ON TRF SGNL |
AMERICAN LIGHTING AND SIGNALIZATION, INC.($1,279,639) |
|
0910-00-108 |
SMITH |
TYLER |
$276,650 |
VA |
STP 1702(466) |
08/08/2017 |
11/15/2023 |
PLANT TREES & SHRUBS, IRRIGATION |
CENTRAL NORTH CONSTRUCTION, LLC($224,600) |
|
0910-16-143 |
SMITH |
TYLER |
$133,671 |
VA |
STP 2018(481) |
12/05/2017 |
11/15/2023 |
CONSTRUCT SIDEWALKS AND CURB RAMPS |
ENCINO LANDSCAPE, INC.($126,560) |
|
0910-00-111 |
SMITH |
TYLER |
$1,037,301 |
VA |
C 910-00-111 |
07/10/2018 |
11/15/2023 |
THERMOPLASTIC PAVMT MRK |
TOTAL HIGHWAY MAINTENANCE, LLC($958,013) |
|
0910-16-145 |
SMITH |
TYLER |
$169,546 |
VA |
STP 1802(757) |
08/07/2018 |
11/15/2023 |
PLANTING TREES AND SHRUBS |
TIGHT LINE CONSTRUCTION, LLC($131,480) |
|
0123-04-021 |
RUSK |
TYLER |
$1,267,012 |
US 84 |
STP 2020(483)HES |
01/09/2020 |
09/26/2024 |
INSTL PROFILE EDGELINE & CENTERLINE MRK |
STRIPE-A-ZONE, INC.($1,024,467) |
|
0123-03-022 |
CHEROKEE |
TYLER |
$9,385,832 |
US 84 |
STP 2021(216) |
01/08/2021 |
11/15/2023 |
GR,STRS,PLANING,BS RPR,SBGR WDN,ACP SURF,MBGF,PVMK |
MADDEN CONTRACTING COMPANY, LLC.($7,859,265) |
|
0123-05-015 |
RUSK |
TYLER |
$11,730,694 |
US 84 |
F 2023(369) |
01/06/2023 |
11/15/2023 |
ROADWAY REHAB/RECON WITH NO ADDE |
DREWERY CONSTRUCTION COMPANY, INCORPORATED($12,866,630) |
|
0123-03-021 |
CHEROKEE |
TYLER |
$2,946,223 |
US 84 |
C 123-3-21 |
05/01/2018 |
11/15/2023 |
MILL & INLAY, SURF, PVT MRKG |
MADDEN CONTRACTING COMPANY, LLC.($2,742,754) |
|
0123-04-023 |
RUSK |
TYLER |
$3,073,701 |
US 84 |
F 2023(370) |
01/05/2023 |
11/15/2023 |
WIDEN ROAD - ADD LANES |
MADDEN CONTRACTING COMPANY, LLC.($2,429,719) |
|
0095-08-021 |
SMITH |
TYLER |
$23,747,209 |
US 80 |
F 2024(697) |
12/06/2023 |
11/15/2023 |
SEAL COAT |
RONALD R. WAGNER & CO., LP($21,313,599) |
|
0096-04-071 |
GREGG |
TYLER |
$3,566,383 |
US 80 |
C 96-4-71 |
03/08/2023 |
08/21/2024 |
RESURF ROADWAY |
MADDEN CONTRACTING COMPANY, LLC.($3,878,620) |
|
0095-07-060 |
VAN ZANDT |
TYLER |
$11,566,707 |
US 80 |
STP 2019(334) |
12/06/2018 |
11/15/2023 |
SEAL COAT AND PAVMT MRK |
CLARK CONSTRUCTION OF TEXAS, INC.($14,140,387) |
|
0095-06-071 |
VAN ZANDT |
TYLER |
$557,547 |
US 80 |
STP 2019(853)HESG |
05/07/2019 |
11/15/2023 |
CENTERLINE & EDGELINE PROFILE PAVMENT MRK |
TOTAL HIGHWAY MAINTENANCE, LLC($499,197) |
|
0095-06-073 |
VAN ZANDT |
TYLER |
$2,971,188 |
US 80 |
STP 2020(560)HES |
02/06/2020 |
11/15/2023 |
IMPROVING DRAINAGE, CULVERTS, UPGRADE GUARD RAIL |
BAKER & COMPANY CONSTRUCTION, LLC($2,544,981) |
|
0096-02-049 |
WOOD |
TYLER |
$201,570 |
US 80 |
STP 2018(196)HES |
10/04/2017 |
11/15/2023 |
INSTL SAFETY LIGHTING |
TEXAS TRAFFIC CONTROL SYSTEMS, INC.($160,005) |
|
0096-04-066 |
GREGG |
TYLER |
$3,122,457 |
US 80 |
NH 2017(893) |
04/04/2017 |
11/15/2023 |
GR,BS,ACP SURF,STRM SWR,C&G,SFTY IMPRV,SIGNS,PM |
LONGVIEW BRIDGE AND ROAD, LTD.($3,538,933) |
|
0095-07-059 |
VAN ZANDT |
TYLER |
$9,975,779 |
US 80 |
STP 2018(257) |
12/06/2017 |
11/15/2023 |
SEAL COAT AND PAVMT MRK |
MISSOURI PETROLEUM PRODUCTS COMPANY LLC($10,067,448) |
|
0095-06-074 |
VAN ZANDT |
TYLER |
$13,215,240 |
US 80 |
STP 2021(169) |
12/03/2020 |
11/15/2023 |
SEAL COAT |
BRANNAN PAVING CO., LTD.($11,795,598) |
|
0096-06-074 |
GREGG |
TYLER |
$1,140,939 |
US 80 |
C 96-6-74 |
03/04/2021 |
11/15/2023 |
INSTL RAISED MEDIAN |
LONGVIEW BRIDGE AND ROAD, LTD.($1,094,462) |
|
0096-06-075 |
GREGG |
TYLER |
$11,898,353 |
US 80 |
F 2023(461) |
02/02/2023 |
11/15/2023 |
RESURF ROADWAY |
EAST TEXAS BRIDGE, INC.($12,569,411) |
|
0206-01-050 |
ANDERSON |
TYLER |
$13,463,239 |
US 79 |
NH 1902(161) |
07/09/2019 |
09/27/2024 |
BASE & SURF, WIDEN STRS, REPLC BR RAIL, PV MK |
MADDEN CONTRACTING COMPANY, LLC.($14,425,842) |
|
0246-01-037 |
RUSK |
TYLER |
$757,497 |
US 79 |
F 2B24(254) |
06/05/2024 |
04/24/2024 |
EMBANKMENT STABILIZATION |
GARRET SHIELDS INFRASTRUCTURE($718,631) |
|
0206-06-032 |
RUSK |
TYLER |
$6,651,780 |
US 79 |
F 2024(763) |
02/01/2024 |
12/21/2023 |
PVMNT REPAIR, PLANING, OCST, PFC SURF, MBGF, PV MK |
REYNOLDS & KAY, LTD.($4,925,093) |
|
0206-07-059 |
RUSK |
TYLER |
$4,458,301 |
US 79 |
C 206-7-59 |
01/04/2024 |
11/23/2023 |
PVMNT REPAIR, PLANING, OCST, PFC SURF, MBGF, PV MK |
MADDEN CONTRACTING COMPANY, LLC.($3,202,957) |
|
0206-03-061 |
CHEROKEE |
TYLER |
$8,246,557 |
US 79 |
NH 1802(198) |
06/06/2018 |
11/15/2023 |
FLX BS,LVL-UP,OCST,HMAC,STRS,PV MRK |
DREWERY CONSTRUCTION COMPANY, INCORPORATED($8,257,306) |
|
0246-01-034 |
RUSK |
TYLER |
$5,687,717 |
US 79 |
STP 2019(435) |
01/08/2019 |
11/15/2023 |
PLAN,CAM,HARST,SUPERPV,OCST,PFC SURF,SIGNS,PM |
MADDEN CONTRACTING COMPANY, LLC.($5,843,498) |
|
0206-07-062 |
RUSK |
TYLER |
$2,163,415 |
US 79 |
C 206-7-62 |
03/06/2019 |
11/15/2023 |
PLNG,BS RPR,PFC,MBGF,SUPERPV,OCST |
FOUTSCO PAVING COMPANY, LLC($1,940,981) |
|
0206-04-042 |
CHEROKEE |
TYLER |
$8,282,983 |
US 79 |
NH 2019(733) |
04/02/2019 |
11/15/2023 |
PLN,CM TRT,BS&SURF,BR RL,MBGF,PV MK |
MADDEN CONTRACTING COMPANY, LLC.($8,163,209) |
|
0205-07-078 |
ANDERSON |
TYLER |
$367,685 |
US 79 |
STP 2020(878)HES |
06/05/2020 |
11/15/2023 |
IMPROVE AND INTERCON SIG |
STRIPING TECHNOLOGY, L.P.($406,417) |
|
0206-01-049 |
ANDERSON |
TYLER |
$1,358,585 |
US 79 |
BR 1702(753) |
08/08/2017 |
11/15/2023 |
CLEAN/PAINT STEEL GRDRS,REPL BR RAIL,CONC DK OVLY |
DREWERY CONSTRUCTION COMPANY, INCORPORATED($1,646,254) |
|
0246-01-036 |
RUSK |
TYLER |
$6,188,566 |
US 79 |
STP 1902(169) |
08/06/2019 |
11/15/2023 |
PLN,SPRPV BS,OCST,PFC SURF,BRG RAIL,MBGF,PV MK |
MADDEN CONTRACTING COMPANY, LLC.($6,403,501) |
|
0205-07-080 |
ANDERSON |
TYLER |
$495,350 |
US 79 |
F 2024(025) |
09/07/2023 |
11/15/2023 |
RESURF ROADWAY |
FNH CONSTRUCTION, LLC($664,721) |
|
0203-05-039 |
WOOD |
TYLER |
$46,810,289 |
US 69 |
C 203-5-39 |
03/05/2024 |
01/23/2024 |
INTERCHANGE IMPRV (NEW OR UP) |
LAMAR COMPANIES LLC($37,954,683) |
|
0203-05-047 |
WOOD |
TYLER |
$9,303,468 |
US 69 |
C 203-5-47 |
01/05/2024 |
11/24/2023 |
REHAB EXIST ROADWAY |
TRUE ROADS CONSTRUCTION, LLC($6,350,678) |
|
0199-02-061 |
CHEROKEE |
TYLER |
$3,823,320 |
US 69 |
STP 2B23(069)HES |
08/02/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
HIGHWAY 19 CONSTRUCTION LLC($3,673,344) |
|
0191-01-063 |
SMITH |
TYLER |
$16,519,021 |
US 69 |
NH 2013(216) |
08/08/2018 |
11/15/2023 |
GR,STRS,ACP BS&SURF,MBGF,SIG,PV MK |
LONGVIEW BRIDGE AND ROAD, LTD.($16,738,120) |
|
0191-01-085 |
SMITH |
TYLER |
$3,729,276 |
US 69 |
NH 1702(418) |
03/06/2018 |
11/15/2023 |
PLNG,BS RPR,OCST,PFC,SPRPV,MBGF,SHLDR TXT,PV MK |
DREWERY CONSTRUCTION COMPANY, INCORPORATED($3,628,777) |