0198-04-029 |
CHEROKEE |
TYLER |
$196,471,581 |
US 175 |
C 198-4-29 |
10/05/2023 |
11/15/2023 |
WIDEN ROAD - ADD LANES |
A. L. HELMCAMP, INC.($167,154,897) |
|
0191-02-066 |
CHEROKEE |
TYLER |
$66,240,110 |
US 69 |
F 2023(722) |
08/03/2023 |
11/15/2023 |
INTERCHANGE IMPRV (NEW OR UP) |
EAST TEXAS BRIDGE, INC.($66,711,336) |
|
0191-03-083 |
SMITH |
TYLER |
$51,794,226 |
FM 2493 |
C 191-3-83 |
04/04/2023 |
08/22/2024 |
WIDEN ROAD - ADD LANES |
LONGVIEW BRIDGE AND ROAD, LTD.($69,493,846) |
|
0198-03-026 |
ANDERSON |
TYLER |
$48,036,549 |
US 175 |
C 198-3-26 |
06/30/2022 |
11/15/2023 |
WIDEN ROAD - ADD LANES |
BIG CREEK CONSTRUCTION, LTD.($55,487,305) |
|
0203-05-039 |
WOOD |
TYLER |
$46,810,289 |
US 69 |
C 203-5-39 |
03/05/2024 |
01/23/2024 |
INTERCHANGE IMPRV (NEW OR UP) |
LAMAR COMPANIES LLC($37,954,683) |
|
0697-02-039 |
HENDERSON |
TYLER |
$40,593,999 |
SH 334 |
STP 2019(242) |
11/06/2018 |
11/15/2023 |
RECON BRGS, GR, BS, SURF, PVT MRK |
AUSTIN BRIDGE & ROAD SERVICES, LP($43,069,729) |
|
0522-04-032 |
SMITH |
TYLER |
$35,671,840 |
FM 16 |
F 2022(811) |
08/03/2022 |
11/15/2023 |
WIDEN ROAD - ADD LANES |
HIGHWAY 19 CONSTRUCTION LLC($44,362,527) |
|
0495-02-064 |
VAN ZANDT |
TYLER |
$31,709,757 |
IH 20 |
BR 2B23(276) |
08/03/2023 |
11/15/2023 |
BRIDGE REPL |
INDUS ROAD & BRIDGE, INC.($39,144,960) |
|
0646-05-027 |
HENDERSON |
TYLER |
$26,604,181 |
SH 198 |
BR 2021(213) |
01/07/2021 |
11/15/2023 |
RPLC BR&APP,C&G,RET WALLS,ACP B&S |
COPASA INC($30,355,868) |
|
0207-02-031 |
RUSK |
TYLER |
$26,418,703 |
SH 43 |
F 2025(020) |
09/05/2024 |
07/25/2024 |
REHAB EXIST ROADWAY |
MADDEN CONTRACTING COMPANY, LLC.($21,244,670) |
|
0191-03-089 |
SMITH |
TYLER |
$24,876,254 |
FM 2493, ETC |
F 2025(255), ETC |
12/04/2024 |
11/10/2024 |
SEAL COAT |
|
|
0095-08-021 |
SMITH |
TYLER |
$23,747,209 |
US 80 |
F 2024(697) |
12/06/2023 |
11/15/2023 |
SEAL COAT |
RONALD R. WAGNER & CO., LP($21,313,599) |
|
0083-06-040 |
WOOD |
TYLER |
$23,028,978 |
SH 11 |
F 2023(235) |
12/02/2022 |
09/24/2024 |
SEAL COAT |
CLARK CONSTRUCTION OF TEXAS, INC.($24,618,622) |
|
1322-02-017 |
VAN ZANDT |
TYLER |
$22,915,167 |
FM 1255 |
F 2024(023) |
09/07/2023 |
11/15/2023 |
REHAB EXIST ROADWAY |
REYNOLDS & KAY, LTD.($17,084,796) |
|
0450-01-013 |
CHEROKEE |
TYLER |
$21,820,239 |
SH 204 |
F 2024(335) |
11/01/2023 |
11/15/2023 |
HWY IMPRV |
MADDEN CONTRACTING COMPANY, LLC.($16,863,171) |
|
0108-03-041 |
HENDERSON |
TYLER |
$20,755,210 |
SH 19 |
C 108-3-41 |
09/06/2024 |
07/26/2024 |
HWY IMPRV |
BIG CREEK CONSTRUCTION, LTD.($13,887,918) |
|
0520-06-043 |
SMITH |
TYLER |
$19,743,675 |
SH 155 |
C 520-6-43 |
03/05/2021 |
11/15/2023 |
SURF/ROADWAY RESTOR |
MADDEN CONTRACTING COMPANY, LLC.($16,954,295) |
|
0462-01-025 |
RUSK |
TYLER |
$18,858,014 |
SH 315 |
F 2023(828) |
06/01/2023 |
11/27/2023 |
RESURF ROADWAY |
MADDEN CONTRACTING COMPANY, LLC.($13,565,152) |
|
0520-08-071 |
ANDERSON |
TYLER |
$16,863,436 |
SH 155 |
C 520-8-71 |
04/07/2022 |
09/24/2024 |
PREVENT MAINT |
MADDEN CONTRACTING COMPANY, LLC.($14,607,487) |
|
0191-01-063 |
SMITH |
TYLER |
$16,519,021 |
US 69 |
NH 2013(216) |
08/08/2018 |
11/15/2023 |
GR,STRS,ACP BS&SURF,MBGF,SIG,PV MK |
LONGVIEW BRIDGE AND ROAD, LTD.($16,738,120) |
|
2073-01-009 |
GREGG |
TYLER |
$15,218,265 |
FM 2206 |
STP 2013(212) |
04/08/2020 |
11/15/2023 |
GR, STR, ACP BASE & SURF, PV MK |
EAST TEXAS BRIDGE, INC.($15,164,541) |
|
0058-01-019 |
ANDERSON |
TYLER |
$15,115,691 |
SH 294 |
STP 2020(404) |
12/04/2019 |
11/15/2023 |
SEAL COAT |
CDM HOLDINGS, LLC($14,050,797) |
|
0198-07-014 |
CHEROKEE |
TYLER |
$14,670,601 |
SH 204 |
STP 1902(166) |
07/10/2019 |
09/27/2024 |
GRADING, BS, ASPH PV, DRNAGE, SIGNING, PV MK |
MADDEN CONTRACTING COMPANY, LLC.($13,705,298) |
|
0191-03-081 |
SMITH |
TYLER |
$14,297,208 |
FM 2493 |
STP 2013(215) |
07/10/2018 |
11/15/2023 |
GR,FLX BS,ACP,CULV EXT&RPLCMT,SIGNS,PV MK |
HIGHWAY 19 CONSTRUCTION LLC($14,458,790) |
|
0495-04-065 |
SMITH |
TYLER |
$14,229,479 |
IH 20 |
NH 2018(425) |
06/05/2018 |
11/15/2023 |
EXCVT,EMBNK,DRN STRS,RTN WL,BRDG WDN,ACP,PV MK |
LONGVIEW BRIDGE AND ROAD, LTD.($14,842,183) |
|
2073-01-010 |
GREGG |
TYLER |
$14,156,750 |
FM 2206 |
STP 2020(788) |
08/05/2020 |
11/15/2023 |
WIDEN 2 LN ROAD TO 4 LANE DIVIDED ROADWAY W/FLUSH |
EAST TEXAS BRIDGE, INC.($13,220,500) |
|
0424-10-009 |
RUSK |
TYLER |
$14,016,829 |
FM 3231 |
CC 424-10-9 |
06/02/2023 |
11/28/2023 |
REHAB EXIST ROADWAY |
L. S. EQUIPMENT CO., INC.($15,996,366) |
|
0206-01-050 |
ANDERSON |
TYLER |
$13,463,239 |
US 79 |
NH 1902(161) |
07/09/2019 |
09/27/2024 |
BASE & SURF, WIDEN STRS, REPLC BR RAIL, PV MK |
MADDEN CONTRACTING COMPANY, LLC.($14,425,842) |
|
0108-02-033 |
VAN ZANDT |
TYLER |
$13,424,556 |
SH 19 |
F 2021(821) |
08/05/2021 |
11/15/2023 |
HWY IMPRV |
BIG CREEK CONSTRUCTION, LTD.($12,108,566) |
|
0198-01-031 |
HENDERSON |
TYLER |
$13,306,824 |
US 175 |
NH 2020(009) |
09/06/2019 |
11/15/2023 |
SHLDR WIDEN, GRADING, PVT, DRNG, SIGNS, PV MK |
REYNOLDS & KAY, LTD.($12,138,163) |
|
0095-06-074 |
VAN ZANDT |
TYLER |
$13,215,240 |
US 80 |
STP 2021(169) |
12/03/2020 |
11/15/2023 |
SEAL COAT |
BRANNAN PAVING CO., LTD.($11,795,598) |
|
0108-06-055 |
ANDERSON |
TYLER |
$12,612,281 |
SH 19 |
F 2022(140) |
12/02/2021 |
11/15/2023 |
SEAL COAT |
BRANNAN PAVING CO., LTD.($13,128,959) |
|
0165-02-065 |
SMITH |
TYLER |
$12,539,380 |
US 271 |
F 2021(509) |
05/05/2021 |
11/15/2023 |
ROADWAY REHAB/RECON WITH NO ADDE |
MADDEN CONTRACTING COMPANY, LLC.($12,377,401) |
|
0495-04-081 |
SMITH |
TYLER |
$12,538,227 |
IH 20 |
F 2024(722) |
02/02/2024 |
12/22/2023 |
RESURF ROADWAY |
DREWERY CONSTRUCTION COMPANY, INCORPORATED($13,106,221) |
|
1671-02-012 |
VAN ZANDT |
TYLER |
$12,355,638 |
FM 1651 |
C 1671-2-12 |
05/03/2024 |
03/22/2024 |
REHAB EXIST ROADWAY |
BAKER & COMPANY CONSTRUCTION, LLC($10,542,339) |
|
0096-06-075 |
GREGG |
TYLER |
$11,898,353 |
US 80 |
F 2023(461) |
02/02/2023 |
11/15/2023 |
RESURF ROADWAY |
EAST TEXAS BRIDGE, INC.($12,569,411) |
|
0123-05-015 |
RUSK |
TYLER |
$11,730,694 |
US 84 |
F 2023(369) |
01/06/2023 |
11/15/2023 |
ROADWAY REHAB/RECON WITH NO ADDE |
DREWERY CONSTRUCTION COMPANY, INCORPORATED($12,866,630) |
|
0095-07-060 |
VAN ZANDT |
TYLER |
$11,566,707 |
US 80 |
STP 2019(334) |
12/06/2018 |
11/15/2023 |
SEAL COAT AND PAVMT MRK |
CLARK CONSTRUCTION OF TEXAS, INC.($14,140,387) |
|
0559-02-037 |
HENDERSON |
TYLER |
$11,302,404 |
FM 315 |
STP 2B23(064)HES |
08/03/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
BIG CREEK CONSTRUCTION, LTD.($9,287,827) |
|
0122-04-038 |
ANDERSON |
TYLER |
$11,279,435 |
US 287 |
STP 2017(355) |
01/04/2017 |
11/15/2023 |
ONE COURSE SURF TRT & PVT MRK |
MISSOURI PETROLEUM PRODUCTS COMPANY LLC($11,487,064) |
|
0245-02-031 |
VAN ZANDT |
TYLER |
$11,101,486 |
SH 64 |
C 245-2-31 |
04/03/2018 |
11/15/2023 |
FLX BS,LVL-UP,OCST,HMAC,STRS,PV MRK |
BIG CREEK CONSTRUCTION, LTD.($9,587,788) |
|
0095-07-059 |
VAN ZANDT |
TYLER |
$9,975,779 |
US 80 |
STP 2018(257) |
12/06/2017 |
11/15/2023 |
SEAL COAT AND PAVMT MRK |
MISSOURI PETROLEUM PRODUCTS COMPANY LLC($10,067,448) |
|
2653-01-016 |
RUSK |
TYLER |
$9,677,750 |
FM 2658 |
BR 2B23(067) |
08/02/2023 |
11/15/2023 |
BRIDGE REPL |
HIGHWAY 19 CONSTRUCTION LLC($9,612,238) |
|
0123-03-022 |
CHEROKEE |
TYLER |
$9,385,832 |
US 84 |
STP 2021(216) |
01/08/2021 |
11/15/2023 |
GR,STRS,PLANING,BS RPR,SBGR WDN,ACP SURF,MBGF,PVMK |
MADDEN CONTRACTING COMPANY, LLC.($7,859,265) |
|
0203-05-047 |
WOOD |
TYLER |
$9,303,468 |
US 69 |
C 203-5-47 |
01/05/2024 |
11/24/2023 |
REHAB EXIST ROADWAY |
TRUE ROADS CONSTRUCTION, LLC($6,350,678) |
|
0393-01-101 |
GREGG |
TYLER |
$9,059,129 |
SH 149 |
F 2023(453) |
02/01/2023 |
11/15/2023 |
RESURF ROADWAY |
MADDEN CONTRACTING COMPANY, LLC.($9,370,472) |
|
0108-12-018 |
VAN ZANDT |
TYLER |
$8,429,563 |
SH 19 |
F 2022(423) |
04/06/2022 |
08/22/2024 |
HWY IMPRV |
A. L. HELMCAMP, INC.($8,769,309) |
|
0592-02-015 |
RUSK |
TYLER |
$8,332,689 |
FM 840 |
STP 1802(562)HES |
08/08/2018 |
11/15/2023 |
PL,BS,SURF TRT,ACP,STRS,MBGF,SIGNS,PV MK |
PINTO CONSTRUCTION CO., INC.($7,676,967) |
|
0545-01-014 |
GREGG |
TYLER |
$8,294,730 |
SH 135 |
F 2022(024) |
05/05/2022 |
08/31/2024 |
SURF/ROADWAY RESTOR |
EAST TEXAS BRIDGE, INC.($8,374,226) |
|
0206-04-042 |
CHEROKEE |
TYLER |
$8,282,983 |
US 79 |
NH 2019(733) |
04/02/2019 |
11/15/2023 |
PLN,CM TRT,BS&SURF,BR RL,MBGF,PV MK |
MADDEN CONTRACTING COMPANY, LLC.($8,163,209) |
|
0206-03-061 |
CHEROKEE |
TYLER |
$8,246,557 |
US 79 |
NH 1802(198) |
06/06/2018 |
11/15/2023 |
FLX BS,LVL-UP,OCST,HMAC,STRS,PV MRK |
DREWERY CONSTRUCTION COMPANY, INCORPORATED($8,257,306) |
|
0378-03-017 |
SMITH |
TYLER |
$7,884,833 |
SH 135 |
STP 1902(170) |
08/07/2019 |
11/15/2023 |
BS RPR,TRT SUBGRD,ACP,OCST,PFC SURF,STRS,PV MK |
DREWERY CONSTRUCTION COMPANY, INCORPORATED($8,695,777) |
|
1385-02-024 |
GREGG |
TYLER |
$7,852,366 |
SH 300 |
NH 2018(517) |
02/01/2018 |
11/15/2023 |
BS RPR,OCST,PFC,HMAC,STRS,PV MK |
MADDEN CONTRACTING COMPANY, LLC.($6,613,692) |
|
0910-07-072 |
GREGG |
TYLER |
$7,726,862 |
CS |
BR 2018(505) |
03/03/2022 |
11/15/2023 |
BRIDGE REPL |
RAGLE CONSTRUCTION, INC.($9,313,028) |
|
0138-05-057 |
RUSK |
TYLER |
$7,461,518 |
US 259 |
NH 2020(002) |
09/05/2019 |
11/15/2023 |
PLANING, BS RPR, ACP BS, OCST, PFC SUR, MBGF,PV MK |
MADDEN CONTRACTING COMPANY, LLC.($7,308,695) |
|
6399-99-001 |
HENDERSON |
TYLER |
$7,213,056 |
SH0031 |
MMC - 639999001 |
05/05/2022 |
11/15/2023 |
HERBICIDE/INSECTICIDE |
HELENA AGRI-ENTERPRISES, LLC($6,881,080) |
|
0393-02-027 |
RUSK |
TYLER |
$7,170,336 |
SH 149 |
C 393-2-27 |
07/10/2018 |
11/15/2023 |
PLNG,BS RPR,OCST,SUPERPV SURF,BR RL,MBGF,PV MK |
MADDEN CONTRACTING COMPANY, LLC.($6,294,092) |
|
0495-03-065 |
VAN ZANDT |
TYLER |
$7,015,842 |
IH 20 |
STP 2021(170)HES |
02/04/2021 |
11/15/2023 |
REPLACE GUARDRAIL |
SEFBO PIPELINE BRIDGE, INCORPORATED($4,990,253) |
|
0495-03-065 |
VAN ZANDT |
TYLER |
$7,015,842 |
IH 20 |
STP 2021(170)HES |
12/03/2020 |
11/15/2023 |
REPLACE GUARDRAIL |
SEFBO PIPELINE BRIDGE, INCORPORATED($3,660,941) |
|
0495-03-063 |
VAN ZANDT |
TYLER |
$6,817,962 |
IH 20 |
NH 2020(301) |
02/07/2020 |
11/15/2023 |
PLANING, PAVMT REPAIR, OCST, OV, MBGF, PV MK |
AUSTIN BRIDGE & ROAD SERVICES, LP($6,622,009) |
|
0206-06-032 |
RUSK |
TYLER |
$6,651,780 |
US 79 |
F 2024(763) |
02/01/2024 |
12/21/2023 |
PVMNT REPAIR, PLANING, OCST, PFC SURF, MBGF, PV MK |
REYNOLDS & KAY, LTD.($4,925,093) |
|
0522-02-037 |
VAN ZANDT |
TYLER |
$6,558,717 |
SH 243 |
STP 1702(386) |
06/07/2017 |
11/15/2023 |
GR, STRS, WDNG, OCST, ACP, PVT MRKG |
LONGVIEW BRIDGE AND ROAD, LTD.($6,654,770) |
|
0646-07-009 |
HENDERSON |
TYLER |
$6,490,816 |
FM 316 |
F 2023(136) |
12/02/2022 |
09/24/2024 |
REHAB EXIST ROADWAY |
BAKER & COMPANY CONSTRUCTION, LLC($7,938,414) |
|
6431-16-001 |
GREGG |
TYLER |
$6,380,843 |
IH0020 |
RMC - 643116001 |
05/04/2023 |
11/15/2023 |
TOTAL MAINT |
FIREMAN EXCAVATING, INC.($4,768,998) |
|
0118-04-032 |
CHEROKEE |
TYLER |
$6,306,254 |
SH 21 |
F 2021(822) |
08/05/2021 |
11/15/2023 |
SURF/ROADWAY RESTOR |
A. L. HELMCAMP, INC.($5,923,689) |
|
0109-01-062 |
ANDERSON |
TYLER |
$6,226,272 |
US 287 |
STP 2019(092) |
10/03/2018 |
11/15/2023 |
BS RPR,TRT SBGD,ACP,OCST,PFC,STRS,SIGNS,PM |
A. L. HELMCAMP, INC.($6,180,317) |
|
0910-16-156 |
SMITH |
TYLER |
$6,215,471 |
CR |
BR 2022(748) |
06/27/2023 |
11/15/2023 |
BRIDGE REPL |
BAKER & COMPANY CONSTRUCTION, LLC($4,280,740) |
|
0246-01-036 |
RUSK |
TYLER |
$6,188,566 |
US 79 |
STP 1902(169) |
08/06/2019 |
11/15/2023 |
PLN,SPRPV BS,OCST,PFC SURF,BRG RAIL,MBGF,PV MK |
MADDEN CONTRACTING COMPANY, LLC.($6,403,501) |
|
0495-02-069 |
VAN ZANDT |
TYLER |
$6,031,827 |
IH 20 |
C 495-2-69 |
03/07/2023 |
08/21/2024 |
REHAB EXIST ROADWAY |
H. V. CAVER, INC.($5,701,600) |
|
3240-01-019 |
WOOD |
TYLER |
$5,870,280 |
SL 564 |
STP 2019(323) |
01/09/2019 |
11/15/2023 |
PLANING,PVMT RPR,ACP,OCST,PFS,MBGF,PV MK |
REYNOLDS & KAY, LTD.($5,773,807) |
|
0138-04-046 |
RUSK |
TYLER |
$5,848,095 |
US 259 |
C 138-4-46 |
05/02/2018 |
11/15/2023 |
PLNG, ACP OVERLAY, SEAL COAT, PFC, PV MK |
MADDEN CONTRACTING COMPANY, LLC.($5,220,900) |
|
0165-01-107 |
SMITH |
TYLER |
$5,785,892 |
SH 110 |
F 2024(022) |
09/06/2023 |
11/15/2023 |
PREVENT MAINT |
FNH CONSTRUCTION, LLC($6,495,390) |
|
0191-01-094 |
SMITH |
TYLER |
$5,780,392 |
US 69 |
C 191-1-94 |
02/02/2023 |
11/15/2023 |
REHAB EXIST ROADWAY |
DREWERY CONSTRUCTION COMPANY, INCORPORATED($7,798,138) |
|
0495-02-063 |
VAN ZANDT |
TYLER |
$5,728,608 |
IH 20 |
STP 1702(381)HES |
06/06/2017 |
11/15/2023 |
UPGRADE MBGF AND MOW STRIP |
FNH CONSTRUCTION, LLC($5,703,542) |
|
0207-01-021 |
RUSK |
TYLER |
$5,713,298 |
SH 43 |
STP 2017(357) |
03/07/2017 |
11/15/2023 |
SURF TRT, ACP SURF, MBGF, PVMT MRKG |
MADDEN CONTRACTING COMPANY, LLC.($4,670,550) |
|
6355-15-001 |
HENDERSON |
TYLER |
$5,690,494 |
SH0031 |
MMC - 635515001 |
04/08/2020 |
11/15/2023 |
HERBICIDE AND INSECTICIDE ATHENS RDC (MAT ONLY) |
NUTRIEN AG SOLUTIONS, INC.($5,403,487) |
|
0246-01-034 |
RUSK |
TYLER |
$5,687,717 |
US 79 |
STP 2019(435) |
01/08/2019 |
11/15/2023 |
PLAN,CAM,HARST,SUPERPV,OCST,PFC SURF,SIGNS,PM |
MADDEN CONTRACTING COMPANY, LLC.($5,843,498) |
|
1124-03-012 |
CHEROKEE |
TYLER |
$5,620,911 |
FM 241 |
STP 2020(617)HESG |
03/05/2020 |
11/15/2023 |
SUBGRADE WDN, ACP BS, OCST, ACP SURF, STRS, MBGF, |
A. L. HELMCAMP, INC.($5,515,688) |
|
0634-01-014 |
CHEROKEE |
TYLER |
$5,329,290 |
FM 22 |
STP 2021(318)HES |
02/05/2021 |
11/15/2023 |
HAZARD ELIM & SAFETY |
STATELINE CONSTRUCTION, LLC($5,533,706) |
|
0910-16-135 |
SMITH |
TYLER |
$5,317,504 |
CS |
STP 2017(443)TAPS |
11/03/2017 |
11/15/2023 |
CONSTRUCT HIKE & BIKE TRAIL |
REYNOLDS & KAY, LTD.($4,606,677) |
|
6456-93-001 |
WOOD |
TYLER |
$5,233,466 |
US0080 |
RMC - 645693001 |
02/01/2024 |
12/21/2023 |
PAVMT MRK |
STRIPING TECHNOLOGY, L.P.($4,729,775) |
|
6456-91-001 |
HENDERSON |
TYLER |
$5,233,466 |
SH0019 |
RMC - 645691001 |
02/02/2024 |
12/22/2023 |
PAVMT MRK |
TRP CONSTRUCTION GROUP, LLC($4,796,394) |
|
6456-41-001 |
GREGG |
TYLER |
$5,233,466 |
US0259 |
RMC - 645641001 |
11/02/2023 |
11/15/2023 |
PAVMT MRK |
REYNOLDS & KAY, LTD.($5,035,051) |
|
6456-39-001 |
SMITH |
TYLER |
$5,233,466 |
US0069 |
RMC - 645639001 |
11/01/2023 |
11/15/2023 |
PAVMT MRK |
REYNOLDS & KAY, LTD.($4,944,538) |
|
0392-03-052 |
GREGG |
TYLER |
$5,183,154 |
US 259 |
STP 2023(939)HES |
06/27/2023 |
11/15/2023 |
INSTL RAISED MEDIAN |
REYNOLDS & KAY, LTD.($3,787,211) |
|
6462-94-001 |
HENDERSON |
TYLER |
$5,142,078 |
SH0031 |
MMC - 646294001 |
06/06/2024 |
04/26/2024 |
HERBICIDE/INSECTICIDE |
NUTRIEN AG SOLUTIONS, INC.($4,115,798) |
|
0646-02-029 |
VAN ZANDT |
TYLER |
$5,095,340 |
FM 47 |
STP 2020(329)HES |
12/03/2019 |
11/15/2023 |
GUARD RAIL, DRAINAGE STRUCTS, BRIDGE RAIL |
HIGHWAY 19 CONSTRUCTION LLC($4,537,224) |
|
6367-43-001 |
SMITH |
TYLER |
$5,044,222 |
IH0020 |
RMC - 636743001 |
03/04/2021 |
11/15/2023 |
IH-20 TOTAL MAINT |
FIREMAN EXCAVATING, INC.($4,603,064) |
|
6315-99-001 |
VAN ZANDT |
TYLER |
$5,035,341 |
IH0020 |
RMC - 631599001 |
06/06/2017 |
11/15/2023 |
TOTAL MAINT |
FIREMAN EXCAVATING, INC.($4,102,824) |
|
0495-04-076 |
SMITH |
TYLER |
$5,034,660 |
IH 20 |
C 495-4-76 |
02/03/2022 |
11/15/2023 |
RESURF ROADWAY |
TEXAS MATERIALS GROUP, INC.($6,035,178) |
|
0392-03-050 |
GREGG |
TYLER |
$5,016,991 |
US 259 |
F 2022(956) |
09/07/2022 |
11/15/2023 |
RESURF ROADWAY |
MADDEN CONTRACTING COMPANY, LLC.($5,038,500) |
|
6444-58-001 |
VAN ZANDT |
TYLER |
$5,012,428 |
FM0016 |
RMC - 644458001 |
08/03/2023 |
11/15/2023 |
MILL AND INLAY |
EAST TEXAS BRIDGE, INC.($7,319,995) |
|
6342-80-001 |
SMITH |
TYLER |
$4,924,948 |
IH0020 |
RMC - 634280001 |
06/05/2019 |
11/15/2023 |
IH-20 TOTAL MAINT |
FIREMAN EXCAVATING, INC.($4,687,552) |
|
1672-01-004 |
VAN ZANDT |
TYLER |
$4,883,864 |
FM 1652 |
SSW 1672-1-4 |
07/11/2017 |
11/15/2023 |
GR, FLX BS, TCST, STRS, PVT MRKG |
HIGHWAY 19 CONSTRUCTION LLC($4,481,849) |
|
2072-01-016 |
GREGG |
TYLER |
$4,806,415 |
FM 2204 |
STP 2020(708)HES |
04/08/2020 |
11/15/2023 |
IMPROVE DRAINAGE, CULVERTS AND UPGRADE GUARD RAIL |
STATELINE CONSTRUCTION, LLC($3,889,931) |
|
6412-19-001 |
ANDERSON |
TYLER |
$4,708,983 |
US0287 |
RMC - 641219001 |
09/07/2022 |
11/15/2023 |
MILL AND INLAY |
BIG CREEK CONSTRUCTION, LTD.($4,990,503) |
|
0492-03-036 |
WOOD |
TYLER |
$4,674,054 |
FM 14 |
STP 2020(615) |
03/05/2020 |
11/15/2023 |
REPAIR & RESURF ROADWAY |
EAST TEXAS BRIDGE, INC.($4,511,806) |
|
0138-16-005 |
GREGG |
TYLER |
$4,629,219 |
US 259 |
C 138-16-5 |
09/07/2022 |
11/15/2023 |
RESURF ROADWAY |
MADDEN CONTRACTING COMPANY, LLC.($4,533,083) |
|
6453-97-001 |
SMITH |
TYLER |
$4,623,568 |
SL0323 |
RMC - 645397001 |
01/04/2024 |
11/29/2023 |
MILL AND INLAY |
BIG CREEK CONSTRUCTION, LTD.($4,469,287) |
|
0190-03-087 |
WOOD |
TYLER |
$4,596,702 |
SH 37 |
F 2021(820) |
08/04/2021 |
11/15/2023 |
ROADWAY REHAB/RECON WITH NO ADDE |
EAST TEXAS BRIDGE, INC.($4,577,457) |