|
0327-05-041 |
KENEDY |
PHARR |
$181,963,014 |
US 77 |
F 2024(529) |
12/05/2023 |
11/15/2023 |
INTERSTATE DESIGNATION |
POSILLICO CIVIL, INC.($190,998,296) |
|
0327-04-039 |
KENEDY |
PHARR |
$106,176,094 |
US 77 |
F 2B24(314) |
08/02/2024 |
06/21/2024 |
INTERSTATE DESIGNATION |
FOREMOST PAVING, INC.($93,082,027) |
|
0039-02-063 |
HIDALGO |
PHARR |
$103,484,636 |
CS |
NH 1902(056) |
10/03/2019 |
11/15/2023 |
NEW LOCATION FREEWAY |
PULICE CONSTRUCTION, INC.($95,994,023) |
|
0327-04-037 |
KENEDY |
PHARR |
$40,574,001 |
US 77 |
F 2B24(398) |
08/01/2024 |
06/20/2024 |
INTERSTATE DESIGNATION |
FOREMOST PAVING, INC.($33,508,386) |
|
0038-06-047 |
STARR |
PHARR |
$38,517,640 |
US 83 |
F 2B24(195) |
06/05/2024 |
04/24/2024 |
WIDEN ROAD - ADD LANES |
IOC COMPANY LLC($32,096,791) |
|
0038-05-040 |
ZAPATA |
PHARR |
$35,075,173 |
US 83 |
F 2023(629) |
05/05/2023 |
11/15/2023 |
WIDEN ROAD - ADD LANES |
IOC COMPANY LLC($33,170,887) |
|
0482-01-036 |
JIM HOGG |
PHARR |
$34,499,735 |
SH 285 |
F 2B24(072) |
05/03/2024 |
03/22/2024 |
RECON EXIST ROADWAY |
FOREMOST PAVING, INC.($34,775,853) |
|
0039-10-080 |
CAMERON |
PHARR |
$33,616,736 |
SH 4 |
F 2B24(071) |
05/03/2024 |
03/22/2024 |
REHAB EXIST ROADWAY |
FOREMOST PAVING, INC.($27,558,982) |
|
1103-04-039 |
STARR |
PHARR |
$30,872,296 |
FM 755 |
C 1103-4-39 |
07/10/2024 |
05/29/2024 |
RECON EXIST ROADWAY |
FOREMOST PAVING, INC.($24,639,662) |
|
0038-06-045 |
STARR |
PHARR |
$29,012,476 |
US 83 |
F 2022(185) |
12/02/2021 |
11/15/2023 |
WIDEN ROAD - ADD LANES AND SHOULDERS |
IOC COMPANY LLC($24,806,299) |
|
1228-04-015 |
HIDALGO |
PHARR |
$22,884,379 |
FM 1015 |
C 1228-4-15 |
09/05/2024 |
07/25/2024 |
REHAB EXIST ROADWAY |
IOC COMPANY LLC($20,273,403) |
|
0433-02-052 |
WILLACY |
PHARR |
$22,069,391 |
SH 186 |
C 433-2-52 |
08/07/2018 |
11/15/2023 |
REHAB ROADWAY (SUPER 2) |
ASAGO, LLC($20,899,928) |
|
0864-01-068 |
HIDALGO |
PHARR |
$21,492,841 |
FM 494 |
F 2B24(397) |
08/02/2024 |
06/21/2024 |
WIDEN NON-FREEWAY |
|
|
1504-01-037 |
CAMERON |
PHARR |
$21,477,583 |
SH 4 |
F 2B23(010) |
06/27/2023 |
11/15/2023 |
REHAB EXIST ROADWAY |
POSILLICO CIVIL, INC.($20,955,781) |
|
0864-01-068 |
HIDALGO |
PHARR |
$21,445,755 |
FM 494 |
F 2B24(397) |
10/02/2024 |
09/02/2024 |
WIDEN ROAD - ADD LANES |
TEXAS CORDIA CONSTRUCTION, LLC($19,548,135) |
|
0327-10-057 |
WILLACY |
PHARR |
$21,166,609 |
US 77 |
NH 1702(492) |
08/08/2017 |
11/15/2023 |
CONSTRUCT MAINLANES & OVERPASS |
FOREMOST PAVING, INC.($22,671,108) |
|
0342-01-074 |
HIDALGO |
PHARR |
$20,285,142 |
SH 107 |
STP 2019(085) |
03/06/2019 |
11/15/2023 |
CONST 6 LN DIV RURAL |
FOREMOST PAVING, INC.($21,103,891) |
|
0255-09-094 |
HIDALGO |
PHARR |
$19,245,790 |
UP 281 |
NH 2019(045) |
09/07/2018 |
11/15/2023 |
REHAB ROADWAY |
IOC COMPANY, LLC($23,982,430) |
|
1064-01-032 |
HIDALGO |
PHARR |
$18,534,567 |
FM 676 |
C 1064-1-32 |
02/01/2023 |
11/15/2023 |
WIDEN ROAD - ADD LANES |
TEXAS CORDIA CONSTRUCTION, LLC($15,880,158) |
|
1801-02-017 |
CAMERON |
PHARR |
$18,147,673 |
FM 1847 |
STP 1902(311) |
08/07/2019 |
11/15/2023 |
REHAB & WIDENING EXIST ROADWAY |
FOREMOST PAVING, INC.($19,989,898) |
|
0255-04-094 |
BROOKS |
PHARR |
$16,244,519 |
US 281 |
C 255-4-94 |
11/06/2018 |
11/15/2023 |
REHAB ROADWAY |
FOREMOST PAVING, INC.($17,284,414) |
|
0872-04-030 |
CAMERON |
PHARR |
$15,854,781 |
FM 506 |
C 872-4-30 |
09/08/2022 |
11/15/2023 |
REHAB EXIST ROADWAY |
FOREMOST PAVING, INC.($15,785,772) |
|
1236-01-015 |
WILLACY |
PHARR |
$14,854,432 |
FM 1018 |
F 2021(843) |
08/04/2021 |
11/15/2023 |
RECON EXIST ROADWAY |
FOREMOST PAVING, INC.($12,441,759) |
|
0327-10-062 |
WILLACY |
PHARR |
$14,830,225 |
US 77 |
NH 1802(561) |
08/08/2018 |
11/15/2023 |
CONSTRUCT MAINLANES & OVERPASSES |
FOREMOST PAVING, INC.($15,409,268) |
|
1428-01-027 |
HIDALGO |
PHARR |
$14,648,007 |
FM 1425 |
F 2B23(005) |
06/27/2023 |
11/15/2023 |
REHAB EXIST ROADWAY |
ASAGO, LLC($13,257,196) |
|
1057-03-045 |
CAMERON |
PHARR |
$14,086,164 |
FM 510 |
STP 2B23(055) |
08/03/2023 |
11/15/2023 |
REHAB EXIST ROADWAY |
FOREMOST PAVING, INC.($15,675,731) |
|
1228-03-051 |
HIDALGO |
PHARR |
$13,846,020 |
FM 1015 |
C 1228-3-51 |
09/07/2023 |
11/15/2023 |
REHAB EXIST ROADWAY |
TEXAS CORDIA CONSTRUCTION, LLC($11,217,266) |
|
1057-03-051 |
CAMERON |
PHARR |
$13,126,017 |
FM 510 |
C 1057-3-51 |
09/05/2024 |
07/25/2024 |
REHAB EXIST ROADWAY |
IOC COMPANY LLC($12,411,802) |
|
0433-01-030 |
HIDALGO |
PHARR |
$12,915,934 |
SH 186 |
STP 1702(838) |
10/03/2017 |
11/15/2023 |
REHAB ROADWAY (SUPER 2) |
ASAGO, LLC($12,133,439) |
|
2094-01-038 |
HIDALGO |
PHARR |
$12,823,713 |
FM 2220 |
STP 1602(275)MM |
06/05/2018 |
11/15/2023 |
WIDEN TO 6 LANE |
IOC COMPANY, LLC($12,292,866) |
|
1064-01-043 |
HIDALGO |
PHARR |
$11,824,162 |
FM 676 |
STP 2024(158)MM |
03/06/2024 |
01/24/2024 |
WIDEN ROAD - ADD LANES |
TEXAS CORDIA CONSTRUCTION, LLC($11,811,612) |
|
1804-01-082 |
HIDALGO |
PHARR |
$11,303,035 |
SS 115 |
F 2023(909) |
06/01/2023 |
11/27/2023 |
PREVENT MAINT |
FOREMOST PAVING, INC.($8,569,909) |
|
0342-02-054 |
HIDALGO |
PHARR |
$11,030,085 |
SH 107 |
NH 1902(320) |
08/06/2019 |
11/15/2023 |
REHAB OF EXIST ROADWAY |
FOREMOST PAVING, INC.($10,978,593) |
|
0669-01-049 |
HIDALGO |
PHARR |
$10,796,893 |
FM 681 |
STP 2017(317) |
12/01/2016 |
11/15/2023 |
REHAB OF EXIST ROADWAY |
ASAGO, LLC($8,889,678) |
|
1586-01-069 |
HIDALGO |
PHARR |
$10,779,189 |
FM 907 |
STP 1702(649) |
08/08/2017 |
11/15/2023 |
WIDEN TO 4 LANE DIVIDED CURB AND GUTTER |
TEXAS CORDIA CONSTRUCTION, LLC($10,446,130) |
|
1430-01-031 |
WILLACY |
PHARR |
$10,477,791 |
FM 490 |
STP 2B23(003)VRU |
06/28/2023 |
11/15/2023 |
WIDEN ROAD - ADD SHOULDERS |
FOREMOST PAVING, INC.($5,944,074) |
|
0039-08-100 |
CAMERON |
PHARR |
$9,905,939 |
IH 69E |
NH 2018(333) |
12/05/2017 |
11/15/2023 |
CONSTRUCT NB FRONTAGE ROAD OVERPASSES |
FOREMOST PAVING, INC.($10,510,082) |
|
0255-08-108 |
HIDALGO |
PHARR |
$9,897,572 |
IH 69C |
C 255-8-108 |
04/06/2022 |
08/22/2024 |
PREVENT MAINT |
IOC COMPANY LLC($9,148,470) |
|
0220-03-031 |
CAMERON |
PHARR |
$9,667,564 |
US 281 |
C 220-4-44 |
06/05/2018 |
11/15/2023 |
REHAB & WIDENING EXIST ROADWAY |
FOREMOST PAVING, INC.($9,818,479) |
|
0102-07-045 |
BROOKS |
PHARR |
$9,481,408 |
SH 285 |
STP 1902(052) |
06/04/2019 |
11/15/2023 |
OVERLAY |
FOREMOST PAVING, INC.($11,330,611) |
|
0039-19-061 |
CAMERON |
PHARR |
$9,358,695 |
IH 2 |
NH 2019(112) |
10/02/2018 |
11/15/2023 |
OVERLAY |
TEXAS SAI, INC.($8,734,018) |
|
0039-17-198 |
HIDALGO |
PHARR |
$9,059,721 |
IH 2 |
NH 2020(562) |
02/06/2020 |
11/15/2023 |
OVERLAY |
ANDERSON COLUMBIA CO., INC.($9,929,405) |
|
0921-06-252 |
CAMERON |
PHARR |
$8,745,889 |
CS |
CBI 2022(173) |
12/01/2021 |
11/15/2023 |
WIDEN ROAD - ADD LANES AND SHOULDERS |
FOREMOST PAVING, INC.($9,511,089) |
|
2529-02-010 |
CAMERON |
PHARR |
$8,651,632 |
FM 2556 |
STP 2B24(212)HES |
07/09/2024 |
05/28/2024 |
HAZARD ELIM & SAFETY |
FOREMOST PAVING, INC.($7,945,429) |
|
1228-03-050 |
HIDALGO |
PHARR |
$8,607,824 |
FM 1015 |
C 1228-3-50 |
09/06/2023 |
11/15/2023 |
REHAB EXIST ROADWAY |
REIM CONSTRUCTION, INC.($8,435,309) |
|
1803-02-035 |
HIDALGO |
PHARR |
$8,538,203 |
FM 1925 |
F 2024(623) |
01/05/2024 |
11/24/2023 |
WIDEN ROAD - ADD LANES |
ASAGO, LLC($8,283,398) |
|
1137-02-042 |
CAMERON |
PHARR |
$8,427,358 |
SL 499 |
C 1137-2-42 |
01/04/2024 |
11/23/2023 |
PREVENT MAINT |
FOREMOST PAVING, INC.($7,765,565) |
|
0039-02-066 |
HIDALGO |
PHARR |
$8,319,988 |
US 83 |
C 39-2-66 |
06/06/2018 |
11/15/2023 |
OVERLAY |
IOC COMPANY, LLC($7,654,069) |
|
0865-01-112 |
HIDALGO |
PHARR |
$8,293,541 |
SH 495 |
NH 2020(111) |
11/06/2019 |
11/15/2023 |
OVERLAY |
FOREMOST PAVING, INC.($9,895,598) |
|
0862-02-020 |
HIDALGO |
PHARR |
$8,292,929 |
FM 1427 |
C 862-2-20 |
09/05/2024 |
07/25/2024 |
PREVENT MAINT |
CK NEWBERRY, LLC($8,895,309) |
|
0039-02-070 |
HIDALGO |
PHARR |
$8,135,944 |
US 83 |
NH 2019(954) |
04/03/2019 |
11/15/2023 |
REHAB ROADWAY |
FOREMOST PAVING, INC.($8,019,897) |
|
0255-04-099 |
BROOKS |
PHARR |
$8,073,768 |
US 281 |
NH 2B20(153) |
07/08/2020 |
11/15/2023 |
INSTL CABLE BARRIER |
MASSANA, INC.($6,056,600) |
|
0255-08-111 |
HIDALGO |
PHARR |
$8,061,414 |
IH 69C |
F 2023(908) |
06/02/2023 |
11/28/2023 |
PREVENT MAINT |
FOREMOST PAVING, INC.($6,495,031) |
|
0038-07-078 |
STARR |
PHARR |
$7,616,090 |
US 83 |
F 2024(695) |
01/04/2024 |
11/23/2023 |
OVERLAY |
IOC COMPANY LLC($7,818,780) |
|
0219-02-013 |
HIDALGO |
PHARR |
$7,179,122 |
FM 1016 |
STP 2017(094) |
11/04/2016 |
11/15/2023 |
REHAB ROADWAY |
TEXAS CORDIA CONSTRUCTION, LLC($7,102,463) |
|
1227-01-027 |
JIM HOGG |
PHARR |
$7,086,466 |
FM 1017 |
STP 2021(073) |
09/03/2020 |
11/15/2023 |
SEAL COAT |
BRANNAN PAVING CO., LTD.($5,725,979) |
|
0331-04-069 |
CAMERON |
PHARR |
$6,998,934 |
PR 100 |
BR 2020(709) |
04/09/2020 |
11/15/2023 |
BRIDGE MAINT |
SOUTHERN ROAD & BRIDGE, LLC($9,814,198) |
|
0039-12-259 |
CAMERON |
PHARR |
$6,987,316 |
BU 77-X |
C 39-12-259 |
01/06/2023 |
11/15/2023 |
PREVENT MAINT |
FOREMOST PAVING, INC.($6,349,770) |
|
3098-01-016 |
HIDALGO |
PHARR |
$6,974,998 |
FM 3072 |
C 3098-1-16 |
10/07/2021 |
11/15/2023 |
REHAB EXIST ROADWAY |
TEXAS CORDIA CONSTRUCTION, LLC($6,196,268) |
|
0039-20-008 |
CAMERON |
PHARR |
$6,920,192 |
SS 54 |
NH 2019(773) |
04/02/2019 |
11/15/2023 |
WIDEN ROADWAY |
TEXAS CORDIA CONSTRUCTION, LLC($7,086,524) |
|
0039-02-068 |
HIDALGO |
PHARR |
$6,404,510 |
US 83 |
STP 2019(275)HES |
12/06/2018 |
11/15/2023 |
IMPROVE TRAF SIG |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.($6,096,123) |
|
0039-07-256 |
CAMERON |
PHARR |
$6,314,122 |
IH 69E |
NH 2B20(151) |
08/05/2020 |
11/15/2023 |
CONSTRUCT PEDESTRIAN INFRASTRUCT |
EARTHWORKS ENTERPRISE($5,394,454) |
|
0528-01-121 |
HIDALGO |
PHARR |
$6,258,578 |
SH 107 |
C 528-1-121 |
11/02/2022 |
11/15/2023 |
PREVENT MAINT |
IOC COMPANY LLC($5,739,476) |
|
0921-02-140 |
HIDALGO |
PHARR |
$6,256,194 |
CS |
STP 2008(328)MM |
01/04/2017 |
11/15/2023 |
RECON AND WIDENING |
IOC COMPANY LLC($5,206,108) |
|
0921-02-465 |
HIDALGO |
PHARR |
$6,192,871 |
CR |
C 921-2-465 |
08/05/2021 |
11/15/2023 |
ADVANCED TRAF MGT SYSTEM CONNECTION |
TRAF-TEX, INC.($5,092,399) |
|
1140-02-038 |
CAMERON |
PHARR |
$6,181,411 |
FM 802 |
NH 2B20(157) |
08/06/2020 |
11/15/2023 |
CONSTRUCT 6 LANE W/RAISED MEDIAN |
TEXAS CORDIA CONSTRUCTION, LLC($6,262,978) |
|
1137-01-031 |
CAMERON |
PHARR |
$6,162,381 |
FM 801 |
C 1137-1-31 |
09/06/2024 |
07/26/2024 |
PREVENT MAINT |
CK NEWBERRY, LLC($6,481,370) |
|
0039-18-123 |
HIDALGO |
PHARR |
$6,129,862 |
IH 2 |
F 2024(007) |
09/07/2023 |
11/15/2023 |
PREVENT MAINT |
RONALD R. WAGNER & CO., LP($6,490,669) |
|
0220-05-069 |
CAMERON |
PHARR |
$6,101,503 |
SH 48 |
STP 1702(829) |
10/03/2017 |
11/15/2023 |
OVERLAY |
TEXAS SAI, INC.($5,234,722) |
|
1586-01-076 |
HIDALGO |
PHARR |
$6,095,618 |
FM 907 |
STP 2019(893) |
05/08/2019 |
11/15/2023 |
REHAB ROADWAY |
TEXAS CORDIA CONSTRUCTION, LLC($6,912,455) |
|
0684-03-022 |
CAMERON |
PHARR |
$5,976,836 |
FM 1732 |
STP 2B20(170) |
07/09/2020 |
11/15/2023 |
REHAB ROADWAY |
FOREMOST PAVING, INC.($6,603,454) |
|
0220-05-080 |
CAMERON |
PHARR |
$5,830,777 |
SH 48 |
STP 2024(690)HES |
01/05/2024 |
11/24/2023 |
INSTL RAISED MEDIAN |
IOC COMPANY LLC($4,549,749) |
|
0860-02-015 |
WILLACY |
PHARR |
$5,823,682 |
FM 490 |
STP 2B24(196)HES |
06/05/2024 |
04/24/2024 |
CONSTRUCT 4' SHOULDERS |
FOREMOST PAVING, INC.($5,494,397) |
|
1227-04-022 |
HIDALGO |
PHARR |
$5,673,448 |
FM 1017 |
STP 2021(072) |
09/03/2020 |
11/15/2023 |
SEAL COAT |
BRANNAN PAVING CO., LTD.($5,380,487) |
|
6443-66-001 |
HIDALGO |
PHARR |
$5,657,661 |
IH0002 |
RMC - 644366001 |
02/02/2024 |
12/25/2023 |
ASPH PAVMT REPAIR |
IOC COMPANY LLC($5,590,785) |
|
1427-01-040 |
HIDALGO |
PHARR |
$5,649,564 |
FM 1423 |
STP 2021(370) |
02/05/2021 |
11/15/2023 |
PREVENT MAINT |
IOC COMPANY LLC($5,388,775) |
|
0342-03-037 |
CAMERON |
PHARR |
$5,633,369 |
SH 107 |
C 342-3-37 |
08/02/2023 |
11/15/2023 |
REHAB EXIST ROADWAY |
TEXAS CORDIA CONSTRUCTION, LLC($5,551,077) |
|
0698-03-099 |
HIDALGO |
PHARR |
$5,588,619 |
FM 88 |
NH 2021(191) |
11/05/2020 |
11/15/2023 |
OVERLAY |
FOREMOST PAVING, INC.($4,998,521) |
|
0517-06-036 |
JIM HOGG |
PHARR |
$5,588,168 |
SH 16 |
STP 2B20(155)HES |
08/05/2020 |
11/15/2023 |
IMPROVE GUARDRAIL |
VECTOR UTILITIES LLC($4,952,063) |
|
6392-11-001 |
BROOKS |
PHARR |
$5,293,487 |
SH0285 |
RMC - 639211001 |
04/06/2022 |
11/15/2023 |
MILL AND INLAY |
IOC COMPANY LLC($4,664,148) |
|
1429-01-033 |
HIDALGO |
PHARR |
$5,288,076 |
FM 2557 |
CC 1429-1-33 |
04/04/2018 |
11/15/2023 |
REHAB ROADWAY |
IOC COMPANY, LLC($4,427,443) |
|
1801-01-051 |
CAMERON |
PHARR |
$5,282,099 |
FM 1847 |
C 1801-1-51 |
09/01/2021 |
11/15/2023 |
PREVENT MAINT |
BRANNAN PAVING CO., LTD.($4,751,672) |
|
0921-06-359 |
CAMERON |
PHARR |
$5,246,981 |
VA |
BOR 2002(633) |
10/02/2024 |
08/21/2024 |
TRANSPORT NON-ROADWAY |
IOC COMPANY LLC($6,961,346) |
|
0921-06-359 |
CAMERON |
PHARR |
$5,168,794 |
VA |
BOR 2002(633) |
08/01/2024 |
06/20/2024 |
BORDER CROSSING FACILITY |
|
|
6296-79-001 |
HIDALGO |
PHARR |
$5,139,906 |
FM1015 |
RMC - 629679001 |
08/09/2017 |
11/15/2023 |
ACP OVERLAY WORK |
IOC COMPANY LLC($4,485,274) |
|
6321-85-001 |
HIDALGO |
PHARR |
$5,085,064 |
SH0107 |
RMC - 632185001 |
01/08/2019 |
11/15/2023 |
DISTRICTWIDE OVERLAY |
EARTHWORKS ENTERPRISE($5,265,199) |
|
3093-01-002 |
CAMERON |
PHARR |
$4,967,569 |
FM 3069 |
STP 2022(729)HES |
08/04/2022 |
11/15/2023 |
SAFETY |
FOREMOST PAVING, INC.($5,289,301) |
|
0818-01-020 |
BROOKS |
PHARR |
$4,956,874 |
FM 755 |
F 2B24(500) |
09/06/2024 |
07/26/2024 |
PREVENT MAINT |
CLARK CONSTRUCTION OF TEXAS, INC.($5,005,656) |
|
6392-60-001 |
HIDALGO |
PHARR |
$4,885,783 |
IH0002 |
RMC - 639260001 |
02/04/2022 |
11/15/2023 |
ASPH PAVMT REPAIR |
FOREMOST PAVING, INC.($5,603,814) |
|
0517-10-019 |
JIM HOGG |
PHARR |
$4,777,994 |
SH 16 |
STP 2020(075) |
09/06/2019 |
11/15/2023 |
SEAL COAT |
BRANNAN PAVING CO., LTD.($3,674,000) |
|
1586-01-079 |
HIDALGO |
PHARR |
$4,754,899 |
FM 907 |
BR 2022(665) |
06/02/2022 |
09/03/2024 |
REHAB EXIST ROADWAY |
FOREMOST PAVING, INC.($5,127,398) |
|
0331-01-052 |
CAMERON |
PHARR |
$4,633,928 |
SH 100 |
NH 2021(193) |
11/05/2020 |
11/15/2023 |
REHAB |
EARTHWORKS ENTERPRISE($4,728,316) |
|
6443-42-001 |
STARR |
PHARR |
$4,505,389 |
FM2686 |
RMC - 644342001 |
09/07/2023 |
11/15/2023 |
SEAL COAT |
RONALD R. WAGNER & CO., LP($4,902,372) |
|
6321-71-001 |
HIDALGO |
PHARR |
$4,500,328 |
IH0002 |
RMC - 632171001 |
10/04/2017 |
11/15/2023 |
PAVMT REPAIR |
FOREMOST PAVING, INC.($4,016,934) |
|
6417-08-001 |
CAMERON |
PHARR |
$4,498,790 |
FM1847 |
RMC - 641708001 |
03/07/2023 |
11/15/2023 |
MILL AND INLAY |
IOC COMPANY LLC($4,139,780) |
|
2717-02-010 |
CAMERON |
PHARR |
$4,496,063 |
FM 3248 |
NH 2020(176) |
09/06/2019 |
11/15/2023 |
SEALCOATS AND PAVMT MRK |
BRANNAN PAVING CO., LTD.($3,226,291) |
|
3097-02-016 |
HIDALGO |
PHARR |
$4,489,096 |
FM 396 |
NH 2020(077) |
09/06/2019 |
11/15/2023 |
SEAL COAT |
BRANNAN PAVING CO., LTD.($3,726,802) |
|
6443-68-001 |
CAMERON |
PHARR |
$4,407,962 |
BU0083S |
RMC - 644368001 |
04/04/2024 |
03/01/2024 |
MILL AND INLAY |
IOC COMPANY LLC($3,706,632) |
|
0342-04-032 |
CAMERON |
PHARR |
$4,345,457 |
SH 107 |
NH 2017(971) |
04/05/2017 |
11/15/2023 |
WIDEN TO 4 LANE UNDIVIDED C&G |
FOREMOST PAVING, INC.($4,313,270) |
|
0039-07-257 |
CAMERON |
PHARR |
$4,282,929 |
IH 69E |
F 2023(418) |
03/07/2023 |
08/21/2024 |
CONSTRUCT RAMPS |
FOREMOST PAVING, INC.($4,138,511) |