Control County District Estimate Highway Project Date Added Type Low bidder
0086-14-075 WEBB LAREDO $311,492,996 US 59 F 2022(745) 08/02/2023 11/15/2023 RECON EXIST ROADWAY JAMES CONSTRUCTION GROUP, LLC($344,030,535)
3483-02-002 WEBB LAREDO $144,625,047 SH 84 STP 2B24(041)MM 05/02/2024 03/21/2024 CONSTRUCT NEW ROAD WEBBER, LLC($122,229,769)
0018-06-136 WEBB LAREDO $100,875,581 IH 35 C 18-6-136 06/04/2020 11/15/2023 GRADE,BASE,STRUCT,ACP,SIGN,PAV MRKS WEBBER, LLC($114,884,944)
0483-01-056 LA SALLE LAREDO $67,581,993 SH 97 STP 1802(439) 12/03/2019 11/15/2023 BASE,ACP,GRAD,STR,PAV MRK HUNTER INDUSTRIES, LTD.($67,316,512)
0037-10-037 WEBB LAREDO $59,197,012 US 83 NH 2019(047) 08/06/2019 11/15/2023 BASE,ACP,GRAD,STR,PAV MRK ANDERSON COLUMBIA CO., INC.($68,572,893)
0037-09-033 WEBB LAREDO $57,517,760 US 83 NH 2019(048) 10/03/2018 11/15/2023 REHAB OF EXIST HWY ANDERSON COLUMBIA CO., INC.($48,720,817)
0037-08-042 DIMMIT LAREDO $55,196,345 US 83 C 37-8-42 07/09/2024 05/28/2024 REHAB EXIST ROADWAY HUNTER INDUSTRIES, LTD.($46,859,660)
0086-01-073 WEBB LAREDO $49,327,702 SH 359 F 2B23(273) 08/02/2023 11/15/2023 WIDEN ROAD - ADD LANES ANDERSON COLUMBIA CO., INC.($47,686,786)
0086-16-008 WEBB LAREDO $43,532,862 SL 20 F 2025(211) 11/06/2024 09/25/2024 INTERCHANGE IMPRV (NEW OR UP) ANDERSON COLUMBIA CO., INC.($49,586,907)
0018-06-212 WEBB LAREDO $31,488,481 IH 35 C 18-6-212 02/01/2023 11/15/2023 RESURF ROADWAY ANDERSON COLUMBIA CO., INC.($29,750,033)
0018-02-091 LA SALLE LAREDO $30,359,848 IH 35 C 18-2-91 03/06/2024 01/24/2024 RESURF ROADWAY ANDERSON COLUMBIA CO., INC.($31,549,072)
0086-01-091 WEBB LAREDO $28,072,487 SH 359 STP 1802(248)HES 06/06/2018 11/15/2023 PLANING,PAV REPAIR,ACP,PAV MRK,MBGF,PROFILE MRK ANDERSON COLUMBIA CO., INC.($28,248,454)
0086-14-065 WEBB LAREDO $26,744,985 SL 20 CBI 1602(504) 07/11/2017 11/15/2023 FLEX BASE,SURF,BRIDGE AND PAV MRK SER CONSTRUCTION PARTNERS, LLC($25,596,044)
3586-02-006 WEBB LAREDO $26,044,110 SH 255 C 3586-2-6 07/10/2024 05/29/2024 REHAB EXIST ROADWAY ANDERSON COLUMBIA CO., INC.($24,522,672)
0299-03-050 MAVERICK LAREDO $24,478,621 US 277 NH 1702(691) 08/09/2017 11/15/2023 ADDING PASSING LANES & SURF ANDERSON COLUMBIA CO., INC.($20,795,395)
6386-13-001 MAVERICK LAREDO $23,321,829 SL0480 EMC - 638613001 07/08/2021 09/26/2024 INCIDENT MGT ANDERSON COLUMBIA CO., INC.($25,442,161)
3532-02-011 WEBB LAREDO $22,551,599 FM 3338 C 3532-2-11 04/03/2019 11/15/2023 BASE,ACP,GRAD,STR,PAV MRK ANDERSON COLUMBIA CO., INC.($23,429,429)
0300-01-080 MAVERICK LAREDO $21,040,183 US 277 NH 1702(331) 08/09/2017 11/15/2023 WIDENING, GRADE, BASE, STRUCT, PAVMRK REECE ALBERT, INC.($18,990,865)
2660-01-012 DIMMIT LAREDO $18,754,771 FM 2688 C 2660-1-12 09/08/2022 11/15/2023 BASE, ACP, GRAD, STR, PAV MRKS, SIGNS HUNTER INDUSTRIES, LTD.($12,957,925)
0237-07-015 DIMMIT LAREDO $18,004,309 FM 133 STP 2018(946) 08/08/2018 11/15/2023 BASE,ACP,GRAD,STR,PAV MRK ANGEL BROTHERS HOLDINGS CORP.($16,183,209)
1545-02-023 LA SALLE LAREDO $16,533,179 FM 468 STP 2020(917) 05/08/2020 11/15/2023 GRADE, ACP, STR, MBGF, PAV MRKS, SIGNS ANDERSON COLUMBIA CO., INC.($15,239,643)
0022-09-055 VAL VERDE LAREDO $16,243,353 US 90 C 22-9-55 05/04/2023 11/15/2023 RESURF ROADWAY HUNTER INDUSTRIES, LTD. / ANDERSON COLU($17,895,331)
0018-04-065 WEBB LAREDO $14,801,297 IH 35 F 2022(669) 05/05/2022 08/31/2024 RESURF ROADWAY TEXAS MATERIALS GROUP, INC.($16,568,075)
0852-02-013 LA SALLE LAREDO $14,758,446 FM 469 C 852-2-13 08/02/2024 06/21/2024 REHAB EXIST ROADWAY J. CARROLL WEAVER, INC.($12,342,228)
3621-01-014 VAL VERDE LAREDO $14,331,589 SL 79 STP 1802(541) 08/08/2018 11/15/2023 BASE,GRADE,ACP,PAVMRK,ILLUM HUNTER INDUSTRIES, LTD.($11,318,353)
0301-04-020 DIMMIT LAREDO $13,823,743 FM 186 C 301-4-20 08/07/2018 11/15/2023 BASE, ACP, GRAD, STR, PAV MRK J. CARROLL WEAVER, INC.($12,607,041)
0018-05-104 WEBB LAREDO $13,692,541 IH 35 C 18-5-104 02/04/2022 11/15/2023 RESURF ROADWAY ANDERSON COLUMBIA CO., INC.($14,045,934)
0086-14-084 WEBB LAREDO $13,361,330 IH 69W C 86-14-84 08/06/2020 11/15/2023 BASE,GRADE,CONC PAVT,SIGNS,PAV MRKS SER CONSTRUCTION PARTNERS, LLC($13,993,277)
0018-04-063 WEBB LAREDO $13,240,407 IH 35 NH 2021(233) 03/04/2021 11/15/2023 PLANING, OVERLAY, RAIL UPGRADE & PAVMT MRK ANGEL BROTHERS HOLDINGS CORP.($11,076,278)
0017-08-096 LA SALLE LAREDO $12,481,136 IH 35 C 17-8-96 12/03/2020 11/15/2023 GRAD,BASE,ASPH,DRAIN,STRUC,CONC PAVE,SIGN,& STRIPE J. CARROLL WEAVER, INC.($11,436,092)
0018-05-095 WEBB LAREDO $12,388,126 IH 35 NH 2019(375) 01/09/2019 11/15/2023 RESURF OF EXIST HWY ANDERSON COLUMBIA CO., INC.($12,256,476)
0023-04-065 KINNEY LAREDO $12,383,484 US 90 NH 2017(587) 04/05/2017 11/15/2023 ACP OVERLAY, PAV MRKS HUNTER INDUSTRIES, LTD.($10,014,131)
0301-04-021 DIMMIT LAREDO $12,378,224 FM 186 C 301-4-21 06/27/2023 11/15/2023 REHAB EXIST ROADWAY ANDERSON COLUMBIA CO., INC.($13,415,969)
0022-05-025 VAL VERDE LAREDO $12,119,655 US 90 F 2022(601) 06/02/2022 11/15/2023 PLANING, OVERLAYING, RAIL UPGRADE & PAV MRK HUNTER INDUSTRIES, LTD.($16,723,941)
0018-01-091 LA SALLE LAREDO $11,759,085 IH 35 NH 2018(779) 04/03/2018 11/15/2023 BASE, ACP, GRAD, STR, PAV MRK ANDERSON COLUMBIA CO., INC.($11,655,295)
0160-05-049 VAL VERDE LAREDO $11,697,332 US 277 F 2024(060) 09/06/2023 11/15/2023 SEAL COAT RONALD R. WAGNER & CO., LP($9,710,711)
2660-01-011 DIMMIT LAREDO $11,357,045 FM 2688 C 2660-1-11 07/01/2021 11/15/2023 BASE, ACP, GRAD, STR, PAV MRKS, SIGNS ANDERSON COLUMBIA CO., INC.($10,393,729)
0018-02-086 LA SALLE LAREDO $11,273,451 IH 35 C 18-2-86 03/04/2022 11/15/2023 BASE, SEAL COAT, PAV MRKS CK NEWBERRY, LLC($11,045,138)
0018-01-093 LA SALLE LAREDO $11,016,398 IH 35 NH 2019(164) 11/07/2018 11/15/2023 REHAB OF EXIST HWY J. CARROLL WEAVER, INC.($10,878,130)
0237-07-013 DIMMIT LAREDO $10,511,417 FM 133 STP 1702(496) 07/12/2017 11/15/2023 BASE,GRADE,ACP, PAV MARK ANDERSON COLUMBIA CO., INC.($9,690,620)
0023-02-044 KINNEY LAREDO $10,138,249 US 90 C 23-2-44 09/07/2022 11/15/2023 SEAL COAT RONALD R. WAGNER & CO., LP($8,058,701)
1937-02-032 ZAVALA LAREDO $9,587,229 FM 393 BR 2021(297) 01/07/2021 11/15/2023 BRIDGE REPL HUNTER INDUSTRIES, LTD.($8,978,776)
0038-01-086 WEBB LAREDO $9,450,986 US 83 NH 2017(582) 02/03/2017 11/15/2023 THIN OVERLAY MIXTURE, PAV MRKS ANDERSON COLUMBIA CO., INC.($7,537,202)
0022-07-031 VAL VERDE LAREDO $9,284,312 US 90 C 22-7-31 02/04/2021 11/15/2023 SPOT BASE REPAIR, OVERLAY, RAIL UPGRADE & PVM MRKS HUNTER INDUSTRIES, LTD.($7,511,304)
0022-09-053 VAL VERDE LAREDO $9,064,225 US 90 NH 2020(539) 02/06/2020 11/15/2023 ACP, PAV MRKS, PLANING ANDERSON COLUMBIA CO., INC.($8,302,881)
6414-11-001 DUVAL LAREDO $7,724,559 SH0044 RMC - 641411001 10/07/2022 11/15/2023 SEAL COAT RONALD R. WAGNER & CO., LP($6,713,664)
0299-04-068 MAVERICK LAREDO $7,611,638 US 277 NH 2017(794) 03/08/2017 11/15/2023 ACP OVERLAY AND PAV MRKS H. L. ZUMWALT CONSTRUCTION, INC.($6,593,234)
0086-08-028 DUVAL LAREDO $7,435,540 SH 359 F 2025(032) 09/05/2024 07/25/2024 SEAL COAT CK NEWBERRY, LLC($6,321,935)
0017-08-114 LA SALLE LAREDO $7,268,949 IH 35 F 2022(016) 09/01/2021 11/15/2023 SEAL COAT RONALD R. WAGNER & CO., LP($6,453,182)
0300-01-105 MAVERICK LAREDO $7,033,200 US 277 F 2022(104) 11/04/2021 11/15/2023 GRADE,BASE,ACP,SURF,STR,PAV MRK ANDERSON COLUMBIA CO., INC.($5,512,872)
2150-04-076 WEBB LAREDO $6,897,420 FM 1472 C 2150-4-76 11/04/2020 11/15/2023 GRADE, INLETS, CONC. PAV., SIGNS, & PAV. MRKGS. ANDERSON COLUMBIA CO., INC.($6,359,706)
0483-01-052 LA SALLE LAREDO $6,853,144 SH 97 F 2B23(147) 08/03/2023 11/15/2023 REHAB EXIST ROADWAY HUNTER INDUSTRIES, LTD.($7,207,235)
0022-06-052 VAL VERDE LAREDO $6,196,225 US 90 F 2022(418) 03/03/2022 11/15/2023 RESURF ROADWAY HUNTER INDUSTRIES, LTD.($6,003,080)
0086-02-030 WEBB LAREDO $6,107,897 SH 359 F 2021(630) 06/03/2021 11/15/2023 WIDEN ROAD - ADD LANES AND SHOULDERS ANDERSON COLUMBIA CO., INC.($5,168,085)
1799-02-017 DIMMIT LAREDO $5,888,684 FM 1867 C 1799-2-17 06/02/2022 09/03/2024 REHAB EXIST ROADWAY VECTOR UTILITIES LLC($6,904,229)
0542-01-101 WEBB LAREDO $5,869,821 US 59 F 2024(055) 09/06/2023 11/15/2023 SEAL COAT RONALD R. WAGNER & CO., LP($5,349,602)
2373-01-022 LA SALLE LAREDO $5,754,069 FM 624 STP 2020(936)HES 06/04/2021 11/15/2023 WIDEN SHLDR, SEALCOAT, PROF MRK ON EDGE&CTR LINES BRANNAN PAVING CO., LTD.($5,569,436)
0922-33-198 WEBB LAREDO $5,509,536 CR BR 2023(323) 06/05/2024 04/24/2024 BRIDGE REPL J. CARROLL WEAVER, INC.($4,378,550)
3621-01-012 VAL VERDE LAREDO $5,399,314 SL 79 STP 1702(690) 08/08/2017 11/15/2023 BASE,GRADE,ACP,PAVMRK,ILLUM HUNTER INDUSTRIES, LTD.($5,023,548)
0963-01-032 DIMMIT LAREDO $5,394,105 FM 190 SSW 963-1-32 02/02/2017 11/15/2023 BRIDGE REPLS,BASE,SURF IOC COMPANY LLC($4,902,990)
0037-05-054 DIMMIT LAREDO $5,035,455 US 83 NH 2020(067) 09/05/2019 11/15/2023 SURF TREAT,PAV MARKS RONALD R. WAGNER & CO., LP($5,065,083)
0018-01-097 LA SALLE LAREDO $5,025,391 IH 35 C 18-1-97 07/10/2018 11/15/2023 PLANING, ACP, PAV MRK ANDERSON COLUMBIA CO., INC.($5,687,629)
6470-27-001 MAVERICK LAREDO $4,698,835 US0277 RMC - 647027001 09/05/2024 07/25/2024 SEAL COAT
0018-01-094 LA SALLE LAREDO $4,596,124 IH 35 C 18-1-94 01/07/2022 11/15/2023 REHAB EXIST ROADWAY J. CARROLL WEAVER, INC.($4,380,302)
6470-27-001 MAVERICK LAREDO $4,456,701 US0277 RMC - 647027001 10/02/2024 09/05/2024 SEAL COAT RONALD R. WAGNER & CO., LP($3,876,466)
0301-01-087 DIMMIT LAREDO $4,389,002 SH 85 STP 2B24(042)HES 05/03/2024 03/22/2024 WIDEN ROAD - ADD SHOULDERS TEXAS MATERIALS GROUP, INC.($4,036,048)
6345-15-001 ZAVALA LAREDO $4,283,618 US0083 RMC - 634515001 09/05/2019 11/15/2023 SEAL COAT RONALD R. WAGNER & CO., LP($4,077,239)
6383-26-001 MAVERICK LAREDO $4,273,738 US0057 RMC - 638326001 09/01/2021 11/15/2023 SEAL COAT BRANNAN PAVING CO., LTD.($4,186,715)
6365-92-001 DIMMIT LAREDO $4,222,637 SH0085 RMC - 636592001 09/04/2020 11/15/2023 SEAL COAT SURF TREATMENT RONALD R. WAGNER & CO., LP($4,011,721)
0922-11-043 VAL VERDE LAREDO $4,213,915 PW C 922-11-43 07/10/2019 09/27/2024 BASE, SURF TREAT, GRAD, STR, PAV MRK RELMCO, INC.($3,978,828)
0018-05-090 WEBB LAREDO $3,966,686 IH 35 C 18-5-90 02/01/2024 12/21/2023 REHAB EXIST ROADWAY TEXAS MATERIALS GROUP, INC.($3,289,937)
0018-04-056 WEBB LAREDO $3,782,493 IH 35 NH 2019(033) 09/06/2018 11/15/2023 SURF TREAT,PAV MRKS RONALD R. WAGNER & CO., LP($4,275,901)
0922-33-159 WEBB LAREDO $3,720,253 CR BR 2021(892) 08/04/2022 11/15/2023 BRIDGE REPL RELMCO, INC.($6,734,391)
0160-07-033 VAL VERDE LAREDO $3,646,953 US 277 NH 2021(044) 09/03/2020 11/15/2023 SURF TREAT, PAV MARKS RONALD R. WAGNER & CO., LP($3,839,579)
0922-20-020 LA SALLE LAREDO $3,608,106 CR BR 2021(502) 05/05/2022 08/31/2024 BRIDGE REPL HILL COUNTRY BRIDGE, INC.($3,804,556)
0922-33-186 WEBB LAREDO $3,587,017 CR BR 2023(495) 06/01/2023 11/27/2023 BRIDGE REPL RELMCO, INC.($2,879,456)
1229-04-015 MAVERICK LAREDO $3,473,239 FM 375 STP 2B20(132)HES 08/06/2020 11/15/2023 CONC RAISED MEDIAN VECTOR UTILITIES LLC($3,474,240)
0086-10-053 DUVAL LAREDO $3,449,387 SH 359 F 2023(859) 06/28/2023 11/15/2023 REHAB EXIST ROADWAY MAKO CONTRACTING, LLC($4,204,392)
0922-33-159 WEBB LAREDO $3,374,330 CR BR 2021(892) 12/01/2022 09/24/2024 BRIDGE REPL RELMCO, INC.($4,871,881)
0922-00-077 VAL VERDE LAREDO $3,186,040 VA STP 2024(102)HES 08/03/2023 11/15/2023 HAZARD ELIM & SAFETY HIGHWAY BARRICADES AND SERVICES, LLC($2,156,160)
6302-62-001 ZAVALA LAREDO $3,148,936 US0083 RMC - 630262001 09/07/2017 11/15/2023 SEAL COAT WORK RONALD R. WAGNER & CO., LP($2,747,093)
0922-00-075 WEBB LAREDO $3,104,311 VA C 922-00-75 04/04/2024 02/22/2024 REMOVE/REPLACE BRIDGE RAIL LUCANIA CONTRACTORS LLC($3,357,099)
6324-89-001 ZAVALA LAREDO $2,947,542 FM2691 RMC - 632489001 03/07/2018 11/15/2023 BLADE LEVEL UP/OVERLAY AND PAVMT EDGE REPAIR RAY FARIS, INC.($2,366,031)
0922-00-066 WEBB LAREDO $2,790,115 VA STP 2B20(133) 08/05/2020 11/15/2023 UPGRADE BRIDGE RAIL AND MBGF RELMCO, INC.($2,347,169)
0160-04-049 VAL VERDE LAREDO $2,663,284 US 277 NH 2018(088) 09/07/2017 11/15/2023 SEAL COAT & PAV MRKS CLARK CONSTRUCTION OF TEXAS, INC.($2,245,196)
0037-05-062 DIMMIT LAREDO $2,659,261 US 83 C 37-5-62 06/27/2023 11/15/2023 CONSTRUCT PEDESTRIAN INFRASTRUCT RELMCO, INC.($2,887,281)
0022-10-073 VAL VERDE LAREDO $2,647,753 US 90 C 22-10-73 06/03/2021 11/15/2023 CONC SIDEWALKS, PVMT DELGADO'S CONTRACTORS, LLC($2,280,944)
0922-23-010 DUVAL LAREDO $2,644,774 TO BR 2B23(173) 08/01/2024 06/20/2024 BRIDGE REPL CK NEWBERRY, LLC($2,301,233)
6331-76-001 WEBB LAREDO $2,576,956 SH0044 RMC - 633176001 10/03/2018 11/15/2023 SEAL COAT SURF TREAT AND PAVE MRK RONALD R. WAGNER & CO., LP($2,712,498)
2150-02-009 WEBB LAREDO $2,458,000 FM 1472 SSW 215-2-9 02/07/2020 11/15/2023 BASE,GRADE,ACP,PAV MARK ANDERSON COLUMBIA CO., INC.($3,148,791)
0542-01-099 WEBB LAREDO $2,452,964 BU 59-Z STP 2023(873)HES 06/02/2023 11/28/2023 INSTL ILLUM D&G ENERGY CORPORATION($1,789,114)
0018-04-064 WEBB LAREDO $2,450,473 IH 35 F 2021(882) 08/05/2021 11/15/2023 REPL OF BRIDGE RAIL SJ&J CONSTRUCTION, LLC($2,622,757)
0922-00-074 WEBB LAREDO $2,446,515 VA C 922-00-74 04/06/2022 08/22/2024 REMOVE/REPLACE BRIDGE RAIL RELMCO, INC.($2,435,840)
6375-96-001 LA SALLE LAREDO $2,386,636 SH0044 RMC - 637596001 11/03/2021 11/15/2023 SPOT BASE REPAIR ANDERSON COLUMBIA CO., INC.($2,189,115)
2636-01-010 MAVERICK LAREDO $2,384,218 FM 2644 STP 2023(860)VRU 06/01/2023 11/27/2023 WIDEN ROAD - ADD SHOULDERS CK NEWBERRY, LLC($2,696,126)
6452-35-001 MAVERICK LAREDO $2,230,587 US0277 RMC - 645235001 01/04/2024 12/01/2023 MILL AND INLAY CK NEWBERRY, LLC($2,370,971)
0375-03-017 MAVERICK LAREDO $2,174,751 SH 131 STP 2B24(153)HES 06/05/2024 04/24/2024 WIDEN SHLDRS, FL BS, SURF TREAT, SETS, & PAV. MK. J. CARROLL WEAVER, INC.($1,757,674)
0922-00-064 WEBB LAREDO $2,121,686 VA STP 1802(313) 07/11/2018 11/15/2023 BRIDGE RAIL,SET,MBGF,SGT RELMCO, INC.($2,482,190)
0922-00-065 WEBB LAREDO $1,997,496 VA STP 1902(188) 07/10/2019 09/27/2024 REMOVE & REPL OF BRIDGE RAIL ANDERSON COLUMBIA CO., INC.($2,894,261)
0161-03-025 VAL VERDE LAREDO $1,992,676 SS 239 C 161-3-25 03/05/2024 01/23/2024 CONSTRUCT PEDESTRIAN INFRASTRUCT DELGADO'S CONTRACTORS, LLC($1,810,443)