6270-15-001 |
HARRIS |
HOUSTON |
$22,216 |
FM1959 |
SUP - 627015001 |
05/17/2014 |
06/06/2024 |
BUILDING JANITORIAL SERVICE |
TIBH INDUSTRIES, INC.($22,216) |
|
2523-02-076 |
BRAZORIA |
HOUSTON |
$113,526 |
FM 2004 |
STP 2B24(531)HES |
10/01/2024 |
08/20/2024 |
HAZARD ELIM & SAFETY |
THIRD COAST SERVICES LLC($90,038) |
|
0028-02-097 |
HARRIS |
HOUSTON |
$72,238,041 |
US 90 |
STP 2B24(429)MM |
06/05/2024 |
04/24/2024 |
CONSTRUCT BRIDGE |
SER CONSTRUCTION PARTNERS, LLC($66,988,357) |
|
1986-01-072 |
MONTGOMERY |
HOUSTON |
$2,007,352 |
FM 1314 |
STP 2B24(357)HES |
08/02/2024 |
06/21/2024 |
HAZARD ELIM & SAFETY |
SICE, INC.($1,309,536) |
|
1986-01-072 |
MONTGOMERY |
HOUSTON |
$1,712,053 |
FM 1314 |
STP 2B24(357)HES |
12/04/2024 |
11/10/2024 |
SAFETY IMPRV PROJECTS |
|
|
1911-01-022 |
GALVESTON |
HOUSTON |
$2,819,481 |
FM 2004 |
STP 2B24(356)VRU |
08/02/2024 |
06/21/2024 |
HAZARD ELIM & SAFETY |
MC2 CIVIL, LLC($2,818,752) |
|
1844-01-029 |
HARRIS |
HOUSTON |
$2,958,919 |
FM 1959 |
STP 2B24(354)VRU |
08/02/2024 |
06/21/2024 |
HAZARD ELIM & SAFETY |
SER CONSTRUCTION PARTNERS, LLC($2,826,450) |
|
1685-02-054 |
HARRIS |
HOUSTON |
$852,488 |
FM 1960 |
STP 2B24(353)VRU |
08/01/2024 |
06/20/2024 |
HAZARD ELIM & SAFETY |
STATEWIDE TRAFFIC SIGNAL COMPANY($848,434) |
|
0508-01-385 |
HARRIS |
HOUSTON |
$1,139,040 |
IH 10 |
STP 2B24(346)VRU |
08/01/2024 |
06/20/2024 |
HAZARD ELIM & SAFETY |
THIRD COAST SERVICES LLC($753,027) |
|
0502-01-237 |
HARRIS |
HOUSTON |
$902,285 |
SH 225 |
STP 2B24(345)HES |
08/02/2024 |
06/21/2024 |
HAZARD ELIM & SAFETY |
TRAF-TEX, INC.($658,352) |
|
0178-03-159 |
BRAZORIA |
HOUSTON |
$978,738 |
SH 35 |
STP 2B24(344)HES |
08/02/2024 |
06/21/2024 |
HAZARD ELIM & SAFETY |
TRAF-TEX, INC.($835,254) |
|
0177-14-045 |
MONTGOMERY |
HOUSTON |
$745,470 |
SL 494 |
STP 2B24(343)HES |
08/02/2024 |
06/21/2024 |
HAZARD ELIM & SAFETY |
TRAF-TEX, INC.($573,846) |
|
0110-06-155 |
HARRIS |
HOUSTON |
$1,065,255 |
SS 261 |
STP 2B24(342)VRU |
08/02/2024 |
06/21/2024 |
HAZARD ELIM & SAFETY |
STATEWIDE TRAFFIC SIGNAL COMPANY($998,083) |
|
0051-03-120 |
GALVESTON |
HOUSTON |
$371,717 |
SH 3 |
STP 2B24(341)VRU |
08/01/2024 |
06/20/2024 |
HAZARD ELIM & SAFETY |
THIRD COAST SERVICES LLC($315,582) |
|
0027-10-077 |
HARRIS |
HOUSTON |
$75,354,246 |
UA 90 |
STP 2B24(340)VRU, ETC |
08/01/2024 |
06/20/2024 |
SAFETY IMPRV PROJECTS |
|
|
0027-10-077 |
HARRIS |
HOUSTON |
$46,625,734 |
UA 90 |
STP 2B24(340)VRU |
10/02/2024 |
08/21/2024 |
RECON ROADWAY |
MC2 CIVIL, LLC($38,157,860) |
|
0271-14-240 |
HARRIS |
HOUSTON |
$904,110 |
IH 610 |
STP 2B24(241)TP |
09/06/2024 |
07/26/2024 |
BICYCLE AND PEDESTRIAN IMPRVS |
DIGG COMMERCIAL, LLC($848,116) |
|
0686-02-032 |
GALVESTON |
HOUSTON |
$1,693,032 |
FM 1765 |
STP 2B24(175)VRU |
08/01/2024 |
06/20/2024 |
HAZARD ELIM & SAFETY |
ALLSTATE SIGNAL & CONSTRUCTION, LLC($1,024,066) |
|
1413-01-019 |
BRAZORIA |
HOUSTON |
$253,605 |
FM 1459 |
STP 2B24(116)HES |
06/06/2024 |
04/25/2024 |
HAZARD ELIM & SAFETY |
MARCOM'S MOWING SERVICE, LLC($134,455) |
|
0338-11-058 |
MONTGOMERY |
HOUSTON |
$1,710,176 |
SL 336 |
STP 2B24(064)HES |
08/01/2024 |
06/20/2024 |
HAZARD ELIM & SAFETY |
ALLSTATE SIGNAL & CONSTRUCTION, LLC($518,165) |
|
0979-01-027 |
GALVESTON |
HOUSTON |
$3,617,842 |
FM 519 |
STP 2B23(207)TAPS |
06/06/2024 |
04/25/2024 |
CONSTRUCT PEDESTRIAN INFRASTRUCT |
SER CONSTRUCTION PARTNERS, LLC($3,290,125) |
|
0027-07-046 |
FORT BEND |
HOUSTON |
$2,347,572 |
UA 90 |
STP 2B23(203)HES |
09/06/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
THIRD COAST SERVICES LLC($1,998,146) |
|
0912-72-662 |
HARRIS |
HOUSTON |
$2,660,105 |
VA |
STP 2B23(160)HES |
12/05/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
GARRET SHIELDS INFRASTRUCTURE($2,378,449) |
|
0912-72-662 |
HARRIS |
HOUSTON |
$2,107,066 |
VA |
STP 2B23(160)HES |
08/03/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
RAGLE CONSTRUCTION, INC.($4,864,313) |
|
0912-72-642 |
HARRIS |
HOUSTON |
$795,644 |
CS |
STP 2B23(158)HESG |
08/02/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
MAIN LANE INDUSTRIES LTD.($1,234,892) |
|
0912-72-641 |
HARRIS |
HOUSTON |
$1,509,547 |
CS |
STP 2B23(157)HESG |
08/03/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
MAIN LANE INDUSTRIES LTD.($1,979,986) |
|
1986-01-070 |
MONTGOMERY |
HOUSTON |
$4,201,946 |
FM 1314 |
STP 2B23(073)HES |
08/02/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
THIRD COAST SERVICES LLC($2,022,486) |
|
0912-00-621 |
HARRIS |
HOUSTON |
$1,365,814 |
VA |
STP 2B20(059) |
08/05/2020 |
11/15/2023 |
CONSTRUCT TURN LANES ON VARIOUS ROADS |
RAGLE CONSTRUCTION, INC.($1,598,405) |
|
0912-00-619 |
HARRIS |
HOUSTON |
$2,413,069 |
VA |
STP 2B20(058) |
08/06/2020 |
11/15/2023 |
INSTL RUMBLE STRIPS ON VARIOUS ROADWAYS |
SURFACE PREPARATION TECHNOLOGIES, LLC($3,056,781) |
|
1415-03-012 |
FORT BEND |
HOUSTON |
$1,599,659 |
FM 2759 |
STP 2B20(052) |
09/03/2020 |
11/15/2023 |
CONSTRUCT NOISE BARRIER |
TEXAS WALL & LANDSCAPE($1,285,464) |
|
0179-02-087 |
BRAZORIA |
HOUSTON |
$12,602,399 |
SH 35 |
STP 2B20(045) |
08/05/2020 |
11/15/2023 |
SURF/ROADWAY RESTOR |
DURWOOD GREENE CONSTRUCTION CO.($10,077,740) |
|
3256-03-097 |
HARRIS |
HOUSTON |
$767,517 |
SL 8 |
STP 2B20(012)HES |
07/08/2020 |
11/15/2023 |
IMPROV TRF SIG SAFETY LIGHTING AT INTERS |
TRAF-TEX, INC.($709,810) |
|
2941-02-067 |
HARRIS |
HOUSTON |
$611,133 |
FM 2920 |
STP 2025(045)HES |
09/06/2024 |
07/26/2024 |
HAZARD ELIM & SAFETY |
STATEWIDE TRAFFIC SIGNAL COMPANY($514,412) |
|
1685-01-120 |
HARRIS |
HOUSTON |
$11,757,854 |
FM 1960 |
STP 2025(044)TP |
09/05/2024 |
07/25/2024 |
CONSTRUCT PEDESTRIAN INFRASTRUCT |
MBN ENTERPRISES LLC($10,487,210) |
|
0338-11-056 |
MONTGOMERY |
HOUSTON |
$31,110,991 |
SL 336 |
STP 2025(042)MM |
09/06/2024 |
07/26/2024 |
WIDEN ROAD - ADD LANES |
JAMES CONSTRUCTION GROUP, LLC($20,568,606) |
|
0050-05-070 |
WALLER |
HOUSTON |
$622,114 |
BU 290H |
STP 2025(040)HES |
09/05/2024 |
07/25/2024 |
HAZARD ELIM & SAFETY |
TRAF-TEX, INC.($571,855) |
|
0027-08-187 |
FORT BEND |
HOUSTON |
$301,612 |
UA 90 |
STP 2025(037)HES |
09/06/2024 |
07/26/2024 |
HAZARD ELIM & SAFETY |
FLORIDA TRAFFIC CONTROL DEVICES, INC.($241,600) |
|
0027-13-200 |
HARRIS |
HOUSTON |
$615,772,712 |
IH 69 |
STP 2025(009)MM |
09/05/2024 |
08/18/2024 |
WIDEN ROAD - ADD LANES |
WILLIAMS BROTHERS CONSTRUCTION CO., INC.($695,529,456) |
|
0675-08-118 |
MONTGOMERY |
HOUSTON |
$1,475,396 |
IH 45 |
STP 2024(820)HES |
06/05/2024 |
04/24/2024 |
HAZARD ELIM & SAFETY |
DECO CONTRACTORS, INC.($1,445,628) |
|
0114-11-094 |
WALLER |
HOUSTON |
$3,193,956 |
US 290 |
STP 2024(635)HES |
04/04/2024 |
02/22/2024 |
HAZARD ELIM & SAFETY |
MASSANA CONSTRUCTION INC.($1,970,595) |
|
0979-01-029 |
GALVESTON |
HOUSTON |
$643,490 |
FM 519 |
STP 2024(521)VRU |
08/01/2024 |
06/20/2024 |
HAZARD ELIM & SAFETY |
THIRD COAST SERVICES LLC($411,475) |
|
0508-01-387 |
HARRIS |
HOUSTON |
$2,051,824 |
IH 10 |
STP 2024(483)HES |
12/06/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
BATTERSON, LLP($1,902,441) |
|
0912-73-215 |
GALVESTON |
HOUSTON |
$7,034,818 |
VA |
STP 2024(163)TP |
11/01/2023 |
11/15/2023 |
HIKE AND/OR BIKE |
MAIN LANE INDUSTRIES LTD.($7,167,628) |
|
0912-37-237 |
MONTGOMERY |
HOUSTON |
$3,808,756 |
VA |
STP 2024(139)TP |
10/06/2023 |
11/15/2023 |
HIKE AND/OR BIKE |
MBN ENTERPRISES LLC($4,077,635) |
|
0178-01-042 |
HARRIS |
HOUSTON |
$977,849 |
SH 35 |
STP 2023(893)HES |
06/28/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
TRAF-TEX, INC.($985,520) |
|
1685-01-107 |
HARRIS |
HOUSTON |
$1,796,672 |
FM 1960 |
STP 2023(752)TP |
05/04/2023 |
11/15/2023 |
CONSTRUCT SHARED USE PATH |
TEXAS WALL & LANDSCAPE($1,450,429) |
|
0110-06-154 |
HARRIS |
HOUSTON |
$1,244,972 |
SS 261 |
STP 2023(749)HES |
05/04/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
STATEWIDE TRAFFIC SIGNAL COMPANY($1,169,438) |
|
2523-03-014 |
GALVESTON |
HOUSTON |
$15,413,289 |
FM 646 |
STP 2023(630)VRU |
06/27/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
TEXAS MATERIALS GROUP, INC.($16,604,494) |
|
1685-02-056 |
HARRIS |
HOUSTON |
$6,707,910 |
FM 1960 |
STP 2023(594)HES |
05/05/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
BRIZO CONSTRUCTION, LLC($5,127,652) |
|
0050-04-030 |
WALLER |
HOUSTON |
$1,897,349 |
SH 6 |
STP 2023(562)HES |
06/27/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
MASSANA CONSTRUCTION INC.($1,561,387) |
|
0686-02-029 |
GALVESTON |
HOUSTON |
$1,008,995 |
FM 1765 |
STP 2023(549)HES |
04/05/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
RAGLE CONSTRUCTION, INC.($1,425,059) |
|
1004-01-065 |
BRAZORIA |
HOUSTON |
$344,772 |
FM 521 |
STP 2023(522)HES |
03/08/2023 |
08/21/2024 |
HAZARD ELIM & SAFETY |
MAIN LANE INDUSTRIES LTD.($532,257) |
|
0110-04-202 |
MONTGOMERY |
HOUSTON |
$44,825,425 |
IH 45 |
STP 2023(491)MM |
08/02/2024 |
06/21/2024 |
DRAINAGE IMPRVS |
JAMES CONSTRUCTION GROUP, LLC($42,630,751) |
|
0111-08-126 |
BRAZORIA |
HOUSTON |
$1,799,585 |
BS 288B |
STP 2023(348)HES |
01/05/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
VACA UNDERGROUND UTILITIES INC($1,319,308) |
|
0179-05-004 |
BRAZORIA |
HOUSTON |
$664,766 |
SH 35 |
STP 2023(019)HES |
09/08/2022 |
11/15/2023 |
HAZARD ELIM & SAFETY |
TRAF-TEX, INC.($542,422) |
|
0177-11-159 |
HARRIS |
HOUSTON |
$192,840 |
IH 69 |
STP 2023(018)HES |
09/08/2022 |
11/15/2023 |
HAZARD ELIM & SAFETY |
REPUBLIC TRAFFIC SAFETY, INC.($184,301) |
|
3510-04-019 |
FORT BEND |
HOUSTON |
$102,182,803 |
SH 99 |
STP 2022(936)MM |
01/05/2023 |
11/15/2023 |
ADVANCED TRAF MGT SYSTEM |
WEBBER, LLC($90,916,060) |
|
0976-01-045 |
HARRIS |
HOUSTON |
$554,971 |
FM 865 |
STP 2022(931)HES |
08/04/2022 |
11/15/2023 |
HAZARD ELIM & SAFETY |
ALLSTATE SIGNAL & CONSTRUCTION, LLC($518,222) |
|
0051-09-126 |
GALVESTON |
HOUSTON |
$681,072 |
FM 3005 |
STP 2022(920)HES |
08/04/2022 |
11/15/2023 |
HAZARD ELIM & SAFETY |
ALLSTATE SIGNAL & CONSTRUCTION, LLC($848,581) |
|
0051-03-119 |
GALVESTON |
HOUSTON |
$1,281,785 |
SH 3 |
STP 2022(919)HES |
08/03/2022 |
11/15/2023 |
HAZARD ELIM & SAFETY |
MAIN LANE INDUSTRIES LTD.($1,131,154) |
|
1400-04-040 |
MONTGOMERY |
HOUSTON |
$2,662,997 |
FM 1774 |
STP 2022(697)HES |
08/03/2022 |
11/15/2023 |
HAZARD ELIM & SAFETY |
THIRD COAST SERVICES LLC($1,870,036) |
|
0598-02-111 |
BRAZORIA |
HOUSTON |
$45,430,167 |
SH 288 |
STP 2022(575)MM |
08/04/2022 |
11/15/2023 |
CONSTRUCT BRIDGE |
JAMES CONSTRUCTION GROUP, LLC($50,829,746) |
|
0051-02-108 |
HARRIS |
HOUSTON |
$5,618,936 |
SH 3 |
STP 2022(405)HES |
03/04/2022 |
11/15/2023 |
HAZARD ELIM & SAFETY |
ISI CONTRACTING, INC.($5,450,260) |
|
3158-01-044 |
MONTGOMERY |
HOUSTON |
$1,837,972 |
FM 3083 |
STP 2022(349)HES |
02/03/2022 |
11/15/2023 |
HAZARD ELIM & SAFETY |
MAIN LANE INDUSTRIES LTD.($1,594,936) |
|
0523-10-047 |
MONTGOMERY |
HOUSTON |
$11,751,935 |
FM 1488 |
STP 2022(307)HES |
04/07/2022 |
09/24/2024 |
HAZARD ELIM & SAFETY |
ISI CONTRACTING, INC.($10,225,881) |
|
0271-14-239 |
HARRIS |
HOUSTON |
$614,380 |
IH 610 |
STP 2022(289)HES |
01/07/2022 |
11/15/2023 |
HAZARD ELIM & SAFETY |
ALLSTATE SIGNAL & CONSTRUCTION, LLC($539,001) |
|
0720-06-002 |
HARRIS |
HOUSTON |
$388,176 |
SH 249 |
STP 2022(209)HES |
01/06/2022 |
11/15/2023 |
TRAF SIGNAL IMPRVS |
ALLSTATE SIGNAL & CONSTRUCTION, LLC($375,697) |
|
0976-02-095 |
BRAZORIA |
HOUSTON |
$277,241 |
FM 518 |
STP 2021(839)HES |
08/04/2021 |
11/15/2023 |
IMPROVE TRAF SIGNAL |
TRAF-TEX, INC.($246,129) |
|
0976-03-111 |
GALVESTON |
HOUSTON |
$2,935,761 |
FM 518 |
STP 2021(344) |
02/05/2021 |
11/15/2023 |
CONSTRUCT CURB RAMPS AND SIGNAL IMPRVS |
TI-ZACK CONCRETE, INC.($2,777,975) |
|
0050-06-094 |
HARRIS |
HOUSTON |
$117,718 |
BU 290H |
STP 2021(331)HES |
05/06/2021 |
11/15/2023 |
SAFETY LIGHTING |
THIRD COAST SERVICES LLC($78,734) |
|
1685-06-036 |
FORT BEND |
HOUSTON |
$2,219,345 |
SH 6 |
STP 2021(330)HES |
02/05/2021 |
11/15/2023 |
SAFETY LIGHTING |
ALLSTATE SIGNAL & CONSTRUCTION, LLC($1,979,822) |
|
1685-05-126 |
HARRIS |
HOUSTON |
$1,061,588 |
SH 6 |
STP 2021(261)HES |
01/08/2021 |
11/15/2023 |
IMPROVE TRAF SIG |
CITYLYNX, INC.($882,567) |
|
0179-11-004 |
BRAZORIA |
HOUSTON |
$482,848 |
SH 35 |
STP 2021(260)HES |
01/08/2021 |
11/15/2023 |
IMPROVE TRAF SIG |
CITYLYNX, INC.($458,468) |
|
0110-05-130 |
HARRIS |
HOUSTON |
$500,251 |
IH 45 |
STP 2021(259)HES |
01/07/2021 |
11/15/2023 |
IMPROVE TRAF SIG |
STATEWIDE TRAFFIC SIGNAL COMPANY($474,659) |
|
2523-02-068 |
BRAZORIA |
HOUSTON |
$32,419,999 |
FM 2004 |
STP 2021(189) |
12/02/2020 |
11/15/2023 |
CONSTRUCTION OF SUPER 2 HWY |
ANGEL BROTHERS HOLDINGS CORP.($28,859,306) |
|
0178-01-037 |
HARRIS |
HOUSTON |
$321,468 |
SH 35 |
STP 2021(188)HES |
12/03/2020 |
11/15/2023 |
IMPROVE SIG, INSTL ADV WARN SIGNS /SIGNAL |
STATEWIDE TRAFFIC SIGNAL COMPANY($313,438) |
|
0110-06-144 |
HARRIS |
HOUSTON |
$1,252,363 |
IH 45 |
STP 2021(187)HES |
12/03/2020 |
11/15/2023 |
INSTL ADVANCED WARN SIG AND SIGNS |
STATEWIDE TRAFFIC SIGNAL COMPANY($1,115,890) |
|
3256-04-076 |
HARRIS |
HOUSTON |
$469,022 |
SL 8 |
STP 2021(098)HES |
11/05/2020 |
11/15/2023 |
INSTL ADVANCE WARN SIG AND SIGNS |
CITYLYNX, INC.($415,823) |
|
1685-01-109 |
HARRIS |
HOUSTON |
$864,133 |
FM 1960 |
STP 2020(970)HES |
07/08/2020 |
11/15/2023 |
IMPROVE TRAF SIG |
STATEWIDE TRAFFIC SIGNAL COMPANY($702,778) |
|
0912-72-595 |
HARRIS |
HOUSTON |
$3,516,505 |
CS |
STP 2020(890) |
08/06/2020 |
11/15/2023 |
REHAB OF NORTH BERTHING AND LANDING |
RUSSELL MARINE, LLC($2,787,309) |
|
0912-31-310 |
BRAZORIA |
HOUSTON |
$2,320,568 |
VA |
STP 2020(803)TP |
05/08/2020 |
11/15/2023 |
BICYCLE INFRASTRUCT IMPRVS |
ANGEL BROTHERS HOLDINGS CORP.($2,194,263) |
|
0192-02-054 |
BRAZORIA |
HOUSTON |
$470,812 |
SH 6 |
STP 2020(801)HES |
05/07/2020 |
11/15/2023 |
IMPROVE TRAF SIG, INSTL ADVANCED WARN |
STATEWIDE TRAFFIC SIGNAL COMPANY($387,301) |
|
1259-01-043 |
MONTGOMERY |
HOUSTON |
$16,350,800 |
FM 1097 |
STP 2020(790) |
10/01/2020 |
11/15/2023 |
RECON & WIDEN FROM 2 TO 4 LANES |
JAMES CONSTRUCTION GROUP, L.L.C.($14,690,168) |
|
0912-72-541 |
HARRIS |
HOUSTON |
$13,882,976 |
CS |
STP 2020(724)MM |
10/01/2024 |
08/20/2024 |
CONSTRUCT 4-LANE DIV RDWY |
SER CONSTRUCTION PARTNERS, LLC($10,385,129) |
|
1685-05-128 |
HARRIS |
HOUSTON |
$503,166 |
SH 6 |
STP 2020(698)HES |
04/08/2020 |
11/15/2023 |
TRAF SIGNAL IMPRVS |
STATEWIDE TRAFFIC SIGNAL COMPANY($387,861) |
|
1685-05-123 |
HARRIS |
HOUSTON |
$239,084 |
SH 6 |
STP 2020(697)HES |
04/08/2020 |
11/15/2023 |
IMPROVE TRAF SIG, INSTL ADVANCED WARN |
STATEWIDE TRAFFIC SIGNAL COMPANY($207,829) |
|
0543-01-066 |
WALLER |
HOUSTON |
$78,197 |
FM 359 |
STP 2020(696)HES |
04/09/2020 |
11/15/2023 |
INSTL LED FLASHING CHEVRONS (CURVE) |
SYNERGY SIGNS & SERVICES LLC($48,725) |
|
0111-04-035 |
BRAZORIA |
HOUSTON |
$2,115,337 |
FM 521 |
STP 2020(694) |
04/09/2020 |
11/15/2023 |
PAVMT REPAIR, SEAL COAT AND 1.5 IN PFC OVERLAY |
DURWOOD GREENE CONSTRUCTION CO.($1,947,783) |
|
1258-04-062 |
HARRIS |
HOUSTON |
$2,155,444 |
FM 1093 |
STP 2020(666) |
03/04/2020 |
11/15/2023 |
CONSTRUCTION OF AN OVERLAY |
ANGEL BROTHERS HOLDINGS CORP.($2,091,002) |
|
1004-02-017 |
BRAZORIA |
HOUSTON |
$2,633,017 |
FM 524 |
STP 2020(665) |
03/04/2020 |
11/15/2023 |
PAVMT REPAIR, SEAL COAT AND 1.5 IN ACP OVERLAY |
DURWOOD GREENE CONSTRUCTION CO.($2,696,289) |
|
0976-03-104 |
GALVESTON |
HOUSTON |
$2,236,122 |
FM 518 |
STP 2020(664)TP |
05/08/2020 |
11/15/2023 |
CONSTRUCTION OF A 10' WIDE SHARED USED PATH |
ARANDA BROTHERS CONSTRUCTION CO., INC.($2,146,674) |
|
1003-01-096 |
BRAZORIA |
HOUSTON |
$305,797 |
FM 523 |
STP 2020(598)HES |
02/06/2020 |
11/15/2023 |
INSTL LED FLASHING CHEVRONS (CURVE) |
VACA UNDERGROUND UTILITIES INC($150,250) |
|
0912-00-578 |
HARRIS |
HOUSTON |
$2,191,481 |
VA |
STP 2020(597) |
02/06/2020 |
11/15/2023 |
CONSTRUCTION OF TRAF SIGNAL WORK |
VACA UNDERGROUND UTILITIES INC($1,780,190) |
|
0543-01-065 |
WALLER |
HOUSTON |
$1,753,720 |
FM 359 |
STP 2020(595) |
02/07/2020 |
11/15/2023 |
PLANING, SEAL COAT, ACP OVERLAY AND TEXTURING |
ANGEL BROTHERS HOLDINGS CORP.($1,597,357) |
|
0271-09-023 |
WALLER |
HOUSTON |
$2,161,424 |
US 90 |
STP 2020(594) |
02/06/2020 |
11/15/2023 |
ADD 5 FT SHLDR, PLANING, LEVEL-UP AND 1.5 IN PFC |
JAMES CONSTRUCTION GROUP, L.L.C.($1,784,542) |
|
0050-05-067 |
WALLER |
HOUSTON |
$5,691,832 |
BU 290H |
STP 2020(593) |
02/06/2020 |
11/15/2023 |
SURF/ROADWAY RESTOR |
JAMES CONSTRUCTION GROUP, L.L.C.($5,433,537) |
|
3256-04-077 |
HARRIS |
HOUSTON |
$600,426 |
SL 8 |
STP 2020(508)HES |
01/10/2020 |
09/26/2024 |
REHAB OF TRAF SIG |
STATEWIDE TRAFFIC SIGNAL COMPANY($494,672) |
|
3158-01-043 |
MONTGOMERY |
HOUSTON |
$642,331 |
FM 3083 |
STP 2020(507)HES |
01/10/2020 |
09/26/2024 |
TRAF SIGNAL IMPRVS |
VACA UNDERGROUND UTILITIES INC($432,985) |
|
1414-01-020 |
GALVESTON |
HOUSTON |
$264,306 |
FM 528 |
STP 2020(505)HES |
01/09/2020 |
11/15/2023 |
CONSTRUCTION/INSTL OF TRAF SIGNAL |
TRAF-TEX, INC.($203,915) |
|
0912-00-577 |
HARRIS |
HOUSTON |
$1,722,891 |
VA |
STP 2020(504) |
01/09/2020 |
09/26/2024 |
INSTL TRAF SIG |
VACA UNDERGROUND UTILITIES INC($1,438,223) |