0168-09-083 |
RANDALL |
AMARILLO |
$235,609,131 |
IH 27 |
F 2024(864) |
02/01/2024 |
12/21/2023 |
CONSTRUCT NEW ROAD |
WEBBER, LLC($312,507,981) |
|
2635-04-031 |
POTTER |
AMARILLO |
$102,940,702 |
SL 335 |
F 2023(243) |
12/01/2022 |
09/24/2024 |
CONSTRUCT FRONTAGE ROADS |
WEBBER, LLC($133,890,000) |
|
0275-01-199 |
POTTER |
AMARILLO |
$47,476,789 |
IH 40 |
NH 2020(549) |
02/06/2020 |
11/15/2023 |
B-2 PHASE II: RECON IH 40 2ND LEVEL MAINLANE |
ALLEN BUTLER CONSTRUCTION, INC.($50,032,708) |
|
2635-05-001 |
RANDALL |
AMARILLO |
$46,878,849 |
SL 335 |
NH 2019(411) |
01/09/2019 |
11/15/2023 |
B-2 PHASE I: CONSTRUCT FRT RDS FOR FUTURE FREEWAY |
ALLEN BUTLER CONSTRUCTION, INC.($45,797,691) |
|
2635-03-018 |
RANDALL |
AMARILLO |
$46,556,724 |
SL 335 |
NH 1702(473) |
07/12/2017 |
11/15/2023 |
CONSTRUCT INTERCHANGE,MAINLANES AND FRT ROADS |
ALLEN BUTLER CONSTRUCTION, INC.($42,375,492) |
|
0168-07-043 |
DEAF SMITH |
AMARILLO |
$41,529,754 |
US 60 |
C 168-7-43 |
03/05/2024 |
01/23/2024 |
REHAB EXIST ROADWAY |
WEBBER, LLC($73,856,678) |
|
0168-08-075 |
RANDALL |
AMARILLO |
$40,452,690 |
US 60 |
F 2024(033) |
09/07/2023 |
11/15/2023 |
REHAB EXIST ROADWAY |
DUININCK, INC.($34,924,134) |
|
1727-02-024 |
MOORE |
AMARILLO |
$39,780,978 |
FM 281 |
C 1727-2-24 |
02/02/2024 |
12/22/2023 |
REHAB EXIST ROADWAY |
J. LEE MILLIGAN, INC.($41,097,397) |
|
0238-02-038 |
HARTLEY |
AMARILLO |
$36,913,701 |
US 54 |
NH 2019(409) |
01/08/2019 |
11/15/2023 |
CONVERT TO SUPER 2 HWY |
J. LEE MILLIGAN, INC.($35,223,787) |
|
0066-05-065 |
MOORE |
AMARILLO |
$31,825,597 |
US 87 |
NH 2013(606) |
04/08/2021 |
11/15/2023 |
HWY IMPRV |
SEMA CONSTRUCTION, INC.($36,800,374) |
|
0355-03-034 |
OCHILTREE |
AMARILLO |
$30,107,140 |
SH 15 |
C 355-3-34 |
09/05/2024 |
07/25/2024 |
SURF/ROADWAY RESTOR |
KIEWIT INFRASTRUCTURE SOUTH CO.($28,843,111) |
|
0090-05-109 |
POTTER |
AMARILLO |
$29,748,351 |
BI 40-D |
STP 2025(139)HES |
10/02/2024 |
08/21/2024 |
HAZARD ELIM & SAFETY |
GILVIN-TERRILL, LTD.($30,982,054) |
|
2635-03-024 |
RANDALL |
AMARILLO |
$28,174,171 |
SL 335 |
C 2635-3-24 |
12/02/2020 |
11/15/2023 |
CONSTRUCT NEW ROAD |
ALLEN BUTLER CONSTRUCTION, INC.($25,974,527) |
|
0168-09-181 |
RANDALL |
AMARILLO |
$26,010,565 |
IH 27 |
F 2021(518) |
05/06/2021 |
11/15/2023 |
HWY IMPRV |
ALLEN BUTLER CONSTRUCTION, INC.($30,998,613) |
|
0168-07-050 |
DEAF SMITH |
AMARILLO |
$24,184,741 |
US 60 |
C 168-7-50 |
01/06/2023 |
11/15/2023 |
REHAB EXIST ROADWAY |
RK HALL, LLC($23,784,486) |
|
2614-01-024 |
RANDALL |
AMARILLO |
$23,802,423 |
FM 2590 |
STP 2B24(144)HES |
06/05/2024 |
04/24/2024 |
INTERS IMPRVS WITH RIGHT AND/OR LEFT T |
J. LEE MILLIGAN, INC.($28,487,051) |
|
0490-04-045 |
ROBERTS |
AMARILLO |
$23,322,706 |
SH 70 |
STP 2019(727) |
04/02/2019 |
11/15/2023 |
OVERLAY |
J. LEE MILLIGAN, INC.($23,349,234) |
|
0042-03-047 |
ARMSTRONG |
AMARILLO |
$21,345,607 |
US 287 |
F 2025(201) |
11/06/2024 |
09/25/2024 |
PREVENT MAINT |
DUININCK, INC.($19,891,474) |
|
0041-01-050 |
HARTLEY |
AMARILLO |
$21,289,886 |
US 87 |
F 2B23(294) |
11/01/2023 |
11/15/2023 |
SEAL COAT |
MISSOURI PETROLEUM PRODUCTS COMPANY LLC($19,650,398) |
|
0238-03-061 |
DALLAM |
AMARILLO |
$21,200,630 |
US 54 |
C 238-3-61 |
10/01/2024 |
08/27/2024 |
HAZARD ELIM & SAFETY |
J. LEE MILLIGAN, INC.($25,914,961) |
|
0066-05-081 |
MOORE |
AMARILLO |
$20,015,412 |
US 87 |
C 66-5-81 |
11/07/2024 |
09/26/2024 |
SEAL COAT |
MISSOURI PETROLEUM PRODUCTS COMPANY LLC($18,664,181) |
|
0030-06-066 |
HEMPHILL |
AMARILLO |
$19,917,148 |
US 60 |
F 2023(179) |
11/02/2022 |
11/15/2023 |
SEAL COAT |
MISSOURI PETROLEUM PRODUCTS COMPANY LLC($21,819,571) |
|
0170-02-023 |
LIPSCOMB |
AMARILLO |
$19,830,078 |
US 60 |
C 170-2-23 |
04/04/2024 |
02/22/2024 |
PREVENT MAINT |
DUININCK, INC.($19,475,601) |
|
0169-07-053 |
GRAY |
AMARILLO |
$18,919,048 |
US 60 |
C 169-7-53 |
08/04/2021 |
11/15/2023 |
HWY IMPRV |
RK HALL, LLC($16,536,379) |
|
0455-03-038 |
GRAY |
AMARILLO |
$18,393,817 |
SH 152 |
F 2B24(078) |
05/02/2024 |
03/21/2024 |
HWY IMPRV |
RK HALL, LLC($17,457,097) |
|
0169-03-036 |
CARSON |
AMARILLO |
$17,852,193 |
US 60 |
NH 2019(080) |
10/03/2018 |
11/15/2023 |
EBL - FULL DEPTH REPAIR, MILL AND FILL |
RK HALL, LLC($16,196,034) |
|
0275-05-044 |
GRAY |
AMARILLO |
$17,835,108 |
IH 40 |
NH 2019(079) |
10/02/2018 |
11/15/2023 |
OVERLAY |
KIEWIT INFRASTRUCTURE SOUTH CO.($16,401,397) |
|
0455-02-031 |
CARSON |
AMARILLO |
$17,731,103 |
SH 152 |
F 2B23(295) |
11/02/2023 |
11/15/2023 |
HWY IMPRV |
RK HALL, LLC($16,474,504) |
|
0397-01-045 |
GRAY |
AMARILLO |
$16,937,610 |
SH 152 |
STP 2021(130) |
11/04/2020 |
11/15/2023 |
HWY IMPRV |
RK HALL, LLC($15,464,360) |
|
0030-06-064 |
HEMPHILL |
AMARILLO |
$16,878,230 |
US 83 |
STP 2021(129) |
11/04/2020 |
11/15/2023 |
SEALCOAT |
MISSOURI PETROLEUM PRODUCTS COMPANY LLC($14,748,007) |
|
0030-05-069 |
HEMPHILL |
AMARILLO |
$16,798,303 |
US 83 |
BR 2020(634) |
03/05/2020 |
11/15/2023 |
REPLACE EXIST BRIDGES |
WEBBER, LLC($16,941,870) |
|
1245-01-019 |
OLDHAM |
AMARILLO |
$16,783,145 |
RM 1061 |
F 2022(375) |
02/03/2022 |
11/15/2023 |
HWY IMPRV |
KIEWIT INFRASTRUCTURE SOUTH CO.($18,084,714) |
|
0090-02-055 |
OLDHAM |
AMARILLO |
$16,724,606 |
IH 40 |
F 2B24(295) |
06/05/2024 |
04/24/2024 |
HWY IMPRV |
KIEWIT INFRASTRUCTURE SOUTH CO.($15,078,258) |
|
0275-03-066 |
CARSON |
AMARILLO |
$16,161,505 |
IH 40 |
NH 2019(053) |
09/07/2018 |
11/15/2023 |
EBL - MILL, REHAB AND OVERLAY |
GILVIN-TERRILL, LTD.($15,103,094) |
|
1819-01-015 |
LIPSCOMB |
AMARILLO |
$15,835,525 |
FM 1920 |
SSW 1819-1-15 |
04/09/2020 |
11/15/2023 |
ADDITIONAL PAVED SURF WIDTH |
J. LEE MILLIGAN, INC.($16,356,130) |
|
0040-03-064 |
DALLAM |
AMARILLO |
$15,797,809 |
US 87 |
C 40-3-64 |
04/02/2019 |
11/15/2023 |
OVERLAY |
RK HALL, LLC($17,114,342) |
|
0169-05-041 |
CARSON |
AMARILLO |
$15,490,402 |
US 60 |
NH 2013(613) |
02/06/2019 |
11/15/2023 |
REHAB EXISITNG ROADWAY |
RK HALL, LLC($16,325,738) |
|
0030-02-047 |
OCHILTREE |
AMARILLO |
$15,455,585 |
US 83 |
NH 2017(260) |
11/03/2016 |
11/15/2023 |
SEALCOAT |
LIPHAM ASPHALT AND PAVING COMPANY, LLC($12,438,154) |
|
0169-04-036 |
CARSON |
AMARILLO |
$15,322,422 |
US 60 |
NH 2013(611) |
10/04/2017 |
11/15/2023 |
FULL DEPTH RECLAMATION,PLANING,HOTMIX&PAV MRK |
RK HALL, LLC($11,057,967) |
|
0030-07-019 |
HEMPHILL |
AMARILLO |
$15,202,420 |
US 83 |
STP 2018(282) |
11/02/2017 |
11/15/2023 |
SEAL COAT |
COX PAVING OF TEXAS, INC.($14,437,253) |
|
0066-03-041 |
SHERMAN |
AMARILLO |
$14,893,378 |
US 287 |
NH 2019(458) |
02/05/2019 |
11/15/2023 |
OVERLAY |
RK HALL, LLC($14,540,199) |
|
0275-04-061 |
CARSON |
AMARILLO |
$14,893,249 |
IH 40 |
BR 2024(461) |
12/05/2023 |
11/15/2023 |
BRIDGE MAINT |
BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC($13,665,831) |
|
0041-07-111 |
POTTER |
AMARILLO |
$14,775,593 |
US 87 |
F 2022(118) |
11/03/2021 |
11/15/2023 |
SEAL COAT |
MISSOURI PETROLEUM PRODUCTS COMPANY LLC($14,719,116) |
|
0275-01-205 |
POTTER |
AMARILLO |
$14,312,032 |
IH 40 |
BR 2020(793) |
05/08/2020 |
11/15/2023 |
BRIDGE MAINT AND REPAIR |
GIBSON & ASSOCIATES, INC.($15,820,659) |
|
0030-02-052 |
OCHILTREE |
AMARILLO |
$14,148,590 |
US 83 |
STP 2019(603) |
03/05/2019 |
11/15/2023 |
OVERLAY |
J. LEE MILLIGAN, INC.($13,814,377) |
|
0356-01-112 |
HUTCHINSON |
AMARILLO |
$14,044,457 |
SH 136 |
BR 2B24(553) |
09/05/2024 |
07/25/2024 |
BRIDGE MAINT |
GIBSON & ASSOCIATES, INC.($14,937,903) |
|
0238-03-064 |
DALLAM |
AMARILLO |
$13,993,637 |
US 54 |
NH 2020(034) |
08/06/2019 |
11/15/2023 |
THICK OVERLAY AND PAVMT REPAIR |
RK HALL, LLC($14,364,734) |
|
0490-03-028 |
OCHILTREE |
AMARILLO |
$13,097,047 |
SH 70 |
STP 2019(237) |
11/06/2018 |
11/15/2023 |
BASE REPAIR AND OVERLAY |
J. LEE MILLIGAN, INC.($13,090,322) |
|
0169-08-024 |
ROBERTS |
AMARILLO |
$12,975,352 |
US 60 |
NH 2018(974) |
06/06/2018 |
11/15/2023 |
THICK OVERLAY,JOINT REPAIR,MBGF,RUMBLE STRIPS |
J. LEE MILLIGAN, INC.($13,340,742) |
|
0041-07-113 |
POTTER |
AMARILLO |
$12,784,388 |
US 87 |
BR 2023(597) |
04/05/2023 |
11/15/2023 |
BRIDGE REPL |
J. LEE MILLIGAN, INC.($11,665,732) |
|
0041-08-004 |
POTTER |
AMARILLO |
$12,751,828 |
SL 434 |
STP 2020(202) |
11/05/2019 |
11/15/2023 |
SEAL COAT |
MISSOURI PETROLEUM PRODUCTS COMPANY LLC($12,785,668) |
|
0169-05-042 |
CARSON |
AMARILLO |
$12,655,032 |
US 60 |
NH 2013(614) |
02/02/2018 |
11/15/2023 |
REHAB EXIST ROADWAY |
RK HALL, LLC($10,873,603) |
|
0066-05-066 |
MOORE |
AMARILLO |
$12,476,003 |
US 87 |
C 66-5-66 |
04/04/2018 |
11/15/2023 |
THICK OVERLAY,PAV REPAIR,SIGNS,BMGF,HSIP IMPROVE |
HIGHWAY CONTRACTORS, INC.($11,242,986) |
|
0275-11-090 |
GRAY |
AMARILLO |
$12,348,796 |
IH 40 |
BR 2024(136) |
10/05/2023 |
11/15/2023 |
BRIDGE REPL |
J. LEE MILLIGAN, INC.($12,919,745) |
|
0030-05-073 |
HEMPHILL |
AMARILLO |
$12,107,268 |
US 60 |
BR 2022(398) |
03/03/2022 |
11/15/2023 |
BRIDGE MAINT |
GIBSON & ASSOCIATES, INC.($8,566,512) |
|
0275-01-244 |
POTTER |
AMARILLO |
$12,020,605 |
IH 40 |
F 2B24(154) |
06/06/2024 |
04/25/2024 |
INSTL ILLUM |
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, LLC($11,497,987) |
|
0275-01-229 |
POTTER |
AMARILLO |
$11,723,292 |
IH 40 |
BR 2023(596) |
04/04/2023 |
09/24/2024 |
BRIDGE MAINT |
GIBSON & ASSOCIATES, INC.($8,159,181) |
|
1245-02-049 |
POTTER |
AMARILLO |
$11,717,878 |
RM 1061 |
F 2022(374) |
02/04/2022 |
11/15/2023 |
HWY IMPRV |
KIEWIT INFRASTRUCTURE SOUTH CO.($12,755,021) |
|
0040-01-050 |
DALLAM |
AMARILLO |
$11,386,918 |
US 87 |
STP 1802(176)HES |
05/02/2018 |
11/15/2023 |
OVERLAY,PVMT REPAIR,MBGF,RUMBLE STRIPS,STRIPING |
KIEWIT INFRASTRUCTURE SOUTH CO.($10,092,336) |
|
0275-01-221 |
POTTER |
AMARILLO |
$11,234,135 |
IH 40 |
F 2022(166) |
12/01/2021 |
11/15/2023 |
PREVENT MAINT |
J. LEE MILLIGAN, INC.($13,120,890) |
|
2635-02-035 |
RANDALL |
AMARILLO |
$11,067,276 |
SL 335 |
NH 2019(267) |
12/06/2018 |
11/15/2023 |
OVERLAY, MILL FILL, CONC BARRIER, ADD TURN LANES. |
J. LEE MILLIGAN, INC.($10,708,978) |
|
1339-02-028 |
LIPSCOMB |
AMARILLO |
$10,968,221 |
FM 1454 |
BR 2023(457) |
02/01/2023 |
11/15/2023 |
BRIDGE REPL |
COPPELL CONSTRUCTION CO., INC.($10,425,012) |
|
0066-01-021 |
DALLAM |
AMARILLO |
$10,000,117 |
US 287 |
NH 2020(203) |
11/05/2019 |
11/15/2023 |
OVERLAY AND PAVMT REPAIR |
RK HALL, LLC($11,978,030) |
|
0356-01-107 |
HUTCHINSON |
AMARILLO |
$9,968,434 |
SH 136 |
F 2023(456) |
02/02/2023 |
11/15/2023 |
HWY IMPRV |
RK HALL, LLC($9,658,644) |
|
0030-06-060 |
HEMPHILL |
AMARILLO |
$9,959,858 |
US 60 |
F 2023(455) |
02/02/2023 |
11/15/2023 |
BICYCLE AND PEDESTRIAN IMPRVS |
TI-ZACK CONCRETE, INC.($13,405,600) |
|
0275-11-083 |
GRAY |
AMARILLO |
$9,813,112 |
IH 40 |
NH 2020(353) |
12/03/2019 |
11/15/2023 |
CRCP REPAIR, OVERLAY AND BRIDGE RAIL REPL F |
GILVIN-TERRILL, LTD.($10,924,180) |
|
0090-05-107 |
POTTER |
AMARILLO |
$9,565,794 |
IH 40 |
BR 2024(779) |
03/05/2024 |
01/23/2024 |
BRIDGE REPL |
ALTUS CONSTRUCTION LLC($10,246,890) |
|
2635-01-038 |
POTTER |
AMARILLO |
$9,417,018 |
SL 335 |
NH 2020(079) |
10/02/2019 |
11/15/2023 |
OVERLAY |
RK HALL, LLC($10,715,637) |
|
0226-02-038 |
OLDHAM |
AMARILLO |
$9,360,611 |
US 385 |
F 2022(282) |
12/01/2021 |
11/15/2023 |
REHAB EXIST ROADWAY |
J. LEE MILLIGAN, INC.($9,766,080) |
|
0379-01-046 |
HUTCHINSON |
AMARILLO |
$9,350,961 |
SH 136 |
F 2022(299) |
01/07/2022 |
11/15/2023 |
REHAB EXIST ROADWAY |
DUININCK, INC.($9,504,385) |
|
0455-02-027 |
CARSON |
AMARILLO |
$8,924,621 |
SH 152 |
BR 2021(709) |
07/01/2021 |
11/15/2023 |
BRIDGE REPL |
GILVIN-TERRILL, LTD.($8,225,270) |
|
0041-02-016 |
HARTLEY |
AMARILLO |
$8,784,107 |
US 385 |
F 2021(441) |
04/08/2021 |
11/15/2023 |
REHAB EXIST ROADWAY |
J. LEE MILLIGAN, INC.($9,656,579) |
|
0041-07-107 |
POTTER |
AMARILLO |
$8,587,278 |
US 87 |
NH 2019(212) |
11/06/2018 |
11/15/2023 |
SEALCOAT |
BRANNAN PAVING CO., LTD.($12,390,506) |
|
0090-05-108 |
POTTER |
AMARILLO |
$8,578,402 |
IH 40 |
BR 2024(730) |
02/01/2024 |
12/21/2023 |
BRIDGE REPL |
GILVIN-TERRILL, LTD.($9,782,901) |
|
0379-02-032 |
POTTER |
AMARILLO |
$8,577,015 |
SH 136 |
STP 2B20(144)HES |
08/06/2020 |
11/15/2023 |
REHAB EXIST ROADWAY |
KIEWIT INFRASTRUCTURE SOUTH CO.($9,215,103) |
|
0238-04-038 |
DALLAM |
AMARILLO |
$8,541,035 |
US 54 |
F 2022(300) |
01/06/2022 |
11/15/2023 |
HWY IMPRV |
RK HALL, LLC($8,285,085) |
|
0455-01-048 |
HUTCHINSON |
AMARILLO |
$8,506,438 |
SH 152 |
F 2023(821) |
06/02/2023 |
11/28/2023 |
RESURF ROADWAY |
RK HALL, LLC($7,851,872) |
|
0030-05-067 |
HEMPHILL |
AMARILLO |
$8,488,627 |
US 83 |
STP 2019(210) |
11/06/2018 |
11/15/2023 |
SEALCOAT |
MISSOURI PETROLEUM PRODUCTS COMPANY LLC($9,058,028) |
|
1727-01-016 |
HARTLEY |
AMARILLO |
$8,444,421 |
FM 281 |
STP 2020(512) |
01/09/2020 |
09/26/2024 |
ACP OVERLAY AND PAVMT REPAIR |
J. LEE MILLIGAN, INC.($10,006,009) |
|
0042-04-043 |
ARMSTRONG |
AMARILLO |
$8,316,513 |
US 287 |
NH 2020(352) |
12/04/2019 |
11/15/2023 |
2" ACP OVERLAY, PAVMT REPAIR |
KIEWIT INFRASTRUCTURE SOUTH CO.($8,973,976) |
|
0067-01-087 |
RANDALL |
AMARILLO |
$8,011,274 |
US 87 |
F 2024(460) |
12/05/2023 |
11/15/2023 |
CONSTRUCT PEDESTRIAN INFRASTRUCT |
TI-ZACK CONCRETE, INC.($9,542,615) |
|
0275-04-052 |
CARSON |
AMARILLO |
$7,990,543 |
IH 40 |
C 275-4-52 |
01/09/2019 |
11/15/2023 |
ACP OVERLAY,CRCP REPAIR, MBGF, AND STRIPING. |
KIEWIT INFRASTRUCTURE SOUTH CO.($8,012,745) |
|
0090-05-098 |
POTTER |
AMARILLO |
$7,871,584 |
IH 40 |
NH 2019(408) |
01/08/2019 |
11/15/2023 |
SMA OVERLAY, MBGF, STRIPING, RUMBLE STRIPS. |
RK HALL, LLC($7,778,312) |
|
0090-01-032 |
DEAF SMITH |
AMARILLO |
$7,866,943 |
IH 40 |
BR 2018(777) |
04/03/2018 |
11/15/2023 |
2018 BMIP PROGRAM |
GILVIN-TERRILL, LTD.($8,261,962) |
|
1245-02-050 |
POTTER |
AMARILLO |
$7,835,330 |
RM 1061 |
F 2023(053) |
09/08/2022 |
11/15/2023 |
PREVENT MAINT |
RK HALL, LLC($7,909,237) |
|
0275-01-163 |
POTTER |
AMARILLO |
$7,545,527 |
IH 40 |
NH 2017(367) |
02/03/2017 |
11/15/2023 |
OVERLAY |
J. LEE MILLIGAN, INC.($6,982,390) |
|
0557-02-019 |
HUTCHINSON |
AMARILLO |
$7,439,116 |
SH 152 |
F 2023(128) |
10/06/2022 |
11/15/2023 |
SURF/ROADWAY RESTOR |
DUININCK, INC.($7,081,620) |
|
0042-03-042 |
ARMSTRONG |
AMARILLO |
$7,412,912 |
US 287 |
NH 2019(052) |
09/07/2018 |
11/15/2023 |
OVERLAY |
KIEWIT INFRASTRUCTURE SOUTH CO.($6,591,548) |
|
2635-02-038 |
RANDALL |
AMARILLO |
$7,187,371 |
SL 335 |
STP 2B24(243)VRU |
07/09/2024 |
05/28/2024 |
HAZARD ELIM & SAFETY |
L A FULLER & SONS CONSTRUCTION, LTD.($6,927,099) |
|
0169-06-042 |
GRAY |
AMARILLO |
$6,702,096 |
US 60 |
F 2B24(156) |
06/05/2024 |
04/24/2024 |
CONSTRUCT PEDESTRIAN INFRASTRUCT |
TI-ZACK CONCRETE, LLC($5,798,331) |
|
6396-09-001 |
POTTER |
AMARILLO |
$6,618,501 |
IH0040 |
MMC - 639609001 |
04/07/2022 |
11/15/2023 |
ASPH |
ERGON ASPHALT & EMULSIONS, INC.($8,273,562) |
|
6462-58-001 |
POTTER |
AMARILLO |
$6,491,250 |
IH0040 |
RMC - 646258001 |
02/02/2024 |
12/25/2023 |
TOTAL MAINT |
J. LEE MILLIGAN, INC.($6,977,100) |
|
0168-09-165 |
RANDALL |
AMARILLO |
$6,459,740 |
IH 27 |
NH 2021(021) |
10/02/2020 |
11/15/2023 |
ACP OVERLAY, PAVMT REPAIR, UPGRADE MBGF |
J. LEE MILLIGAN, INC.($6,336,099) |
|
1337-02-012 |
LIPSCOMB |
AMARILLO |
$6,381,400 |
SH 23 |
F 2022(057) |
10/07/2021 |
11/15/2023 |
REHAB EXIST ROADWAY |
J. LEE MILLIGAN, INC.($7,414,244) |
|
0041-07-117 |
POTTER |
AMARILLO |
$6,231,995 |
US 87 |
BR 2023(503) |
03/07/2023 |
08/21/2024 |
REHAB BRIDGE |
GILVIN-TERRILL, LTD.($6,968,415) |
|
0042-11-006 |
POTTER |
AMARILLO |
$6,223,592 |
SL 395 |
STP 2023(467)TAPS |
06/05/2024 |
04/24/2024 |
CONSTRUCT PEDESTRIAN INFRASTRUCT |
L A FULLER & SONS CONSTRUCTION, LTD.($5,976,375) |
|
0226-05-072 |
DEAF SMITH |
AMARILLO |
$6,151,364 |
US 385 |
F 2B24(155) |
06/06/2024 |
04/25/2024 |
CONSTRUCT PEDESTRIAN INFRASTRUCT |
TI-ZACK CONCRETE, LLC($5,281,885) |
|
0904-00-197 |
POTTER |
AMARILLO |
$6,057,309 |
VA |
F 2021(874) |
08/05/2021 |
11/15/2023 |
HWY IMPRV |
MASSANA CONSTRUCTION INC.($4,796,527) |
|
0090-09-006 |
OLDHAM |
AMARILLO |
$5,959,636 |
BI 40-- |
BR 2019(915) |
05/08/2019 |
11/15/2023 |
2018 BMIP REPAIR BRIDGE |
GILVIN-TERRILL, LTD.($7,204,392) |
|
0168-05-041 |
DEAF SMITH |
AMARILLO |
$5,883,460 |
US 60 |
F 2022(056) |
10/08/2021 |
11/15/2023 |
PREVENT MAINT |
RK HALL, LLC($5,275,867) |