All Jobs

 
All My Jobs
Clear:
Export:
My Jobs:
Results: 7
Selected:
Total: $419,512,460.79
Filtered by: SH 107 highway
Control County District Estimate Highway Project Date Added Type Low bidder
0342-01-099 HIDALGO PHARR $240,752 SH 107 BR 2020(913) 06/04/2020 11/15/2023 BRIDGE MAINT VALLEY INFRASTRUCTURE, INC.($325,600)
0342-02-059 HIDALGO PHARR $536,642 SH 107 F 2B24(197) 06/06/2024 04/25/2024 HAZARD ELIM & SAFETY MASSANA CONSTRUCTION INC.($554,000)
0342-04-032 CAMERON PHARR $4,345,457 SH 107 NH 2017(971) 04/05/2017 11/15/2023 WIDEN TO 4 LANE UNDIVIDED C&G FOREMOST PAVING, INC.($4,313,270)
0342-03-037 CAMERON PHARR $5,633,369 SH 107 C 342-3-37 08/02/2023 11/15/2023 REHAB EXIST ROADWAY TEXAS CORDIA CONSTRUCTION, LLC($5,551,077)
0528-01-121 HIDALGO PHARR $6,258,578 SH 107 C 528-1-121 11/02/2022 11/15/2023 PREVENT MAINT IOC COMPANY LLC($5,739,476)
0342-02-054 HIDALGO PHARR $11,030,085 SH 107 NH 1902(320) 08/06/2019 11/15/2023 REHAB OF EXIST ROADWAY FOREMOST PAVING, INC.($10,978,593)
0342-01-074 HIDALGO PHARR $20,285,142 SH 107 STP 2019(085) 03/06/2019 11/15/2023 CONST 6 LN DIV RURAL FOREMOST PAVING, INC.($21,103,891)