|
0002-05-045 |
HUDSPETH |
EL PASO |
$677,614 |
IH 10 |
NH 1702(307) |
07/12/2017 |
11/15/2023 |
CHANNEL IMPRVS |
LESNA CONSTRUCTION, INC.($603,661) |
|
0002-05-048 |
HUDSPETH |
EL PASO |
$4,789,182 |
IH 10 |
STP 2021(541)HES |
05/06/2021 |
11/15/2023 |
HAZARD ELIM & SAFETY |
LESNA CONSTRUCTION, INC.($4,097,877) |
|
0002-05-050 |
HUDSPETH |
EL PASO |
$2,203,954 |
IH 10 |
C 2-5-50 |
05/08/2020 |
11/15/2023 |
REPLACE SUBSTANDARD METAL BEAM GUARD FENCE |
SYNERGY PROJECT CONTRACTORS, INC.($1,883,865) |
|
0002-06-054 |
HUDSPETH |
EL PASO |
$4,118,429 |
IH 10 |
NH 2020(577) |
12/03/2019 |
11/15/2023 |
SEAL COAT |
COX PAVING OF TEXAS, INC.($3,670,432) |
|
0002-06-055 |
HUDSPETH |
EL PASO |
$1,474,894 |
IH 10 |
STP 2019(964)HES |
05/08/2019 |
11/15/2023 |
INSTL LED FLASHING CHEVRON |
INTERNATIONAL EAGLE ENTERPRISES, INC.($1,232,441) |
|
0002-06-058 |
HUDSPETH |
EL PASO |
$1,812,113 |
IH 10 |
F 2021(411) |
04/07/2021 |
11/15/2023 |
HAZARD ELIM & SAFETY |
DIAMOND SURFACE, INC.($1,994,619) |
|
0002-06-059 |
HUDSPETH |
EL PASO |
$3,269,099 |
IH 10 |
STP 2021(354)HES |
02/05/2021 |
11/15/2023 |
HAZARD ELIM & SAFETY |
TRI STATE ELECTRIC, LTD.($3,140,241) |
|
0002-06-062 |
HUDSPETH |
EL PASO |
$5,305,332 |
IH 10 |
F 2023(118) |
09/07/2022 |
11/15/2023 |
PREVENT MAINT |
DAN WILLIAMS COMPANY($4,777,419) |
|
0002-07-049 |
HUDSPETH |
EL PASO |
$5,465,090 |
IH 10 |
BR 1802(572) |
11/07/2018 |
11/15/2023 |
REPLACE BRIDGES AND APPROACHES |
DAN WILLIAMS COMPANY($5,693,877) |
|
0002-07-049 |
HUDSPETH |
EL PASO |
$5,721,389 |
IH 10 |
BR 1802(572) |
08/08/2018 |
11/15/2023 |
REPLACE BRIDGES AND APPROACHES |
DAN WILLIAMS COMPANY($7,766,379) |
|
0002-07-054 |
HUDSPETH |
EL PASO |
$2,707,251 |
IH 10 |
C 2-7-54 |
07/08/2020 |
11/15/2023 |
INSTL OF QUEUE DETECTION SYSTEM |
TRI STATE ELECTRIC, LTD.($2,841,820) |
|
0002-07-057 |
HUDSPETH |
EL PASO |
$860,190 |
IH 10 |
C 2-7-57 |
02/01/2024 |
12/21/2023 |
INFRASTRUCT IMPRVS |
TRI STATE ELECTRIC, LTD.($922,153) |
|
0002-10-038 |
HUDSPETH |
EL PASO |
$6,491,678 |
IH 10 |
STP 2021(554)HES |
05/05/2021 |
11/15/2023 |
HAZARD ELIM & SAFETY |
LESNA CONSTRUCTION, INC.($5,286,278) |
|
0002-10-039 |
HUDSPETH |
EL PASO |
$18,263,528 |
IH 10 |
F 2024(040) |
09/07/2023 |
11/15/2023 |
PREVENT MAINT |
DAN WILLIAMS COMPANY($18,357,209) |
|
0003-01-055 |
CULBERSON |
EL PASO |
$23,710,370 |
IH 10 |
STP 2019(990)TAPS |
08/07/2019 |
11/15/2023 |
CONSTRUCT REST AREA |
J.D. ABRAMS, L.P.($29,328,229) |
|
0003-01-057 |
CULBERSON |
EL PASO |
$1,183,336 |
IH 10 |
STP 1702(499)HESG |
07/12/2017 |
11/15/2023 |
INSTL MEDIAN BARRIER |
DAN WILLIAMS COMPANY($957,145) |
|
0003-01-064 |
CULBERSON |
EL PASO |
$27,260,465 |
IH 10 |
F 2024(654) |
01/05/2024 |
11/24/2023 |
PREVENT MAINT |
DAN WILLIAMS COMPANY($29,566,262) |
|
0025-02-160 |
BEXAR |
SAN ANTONIO |
$126,653,961 |
IH 10 |
C 25-2-160 |
05/01/2018 |
11/15/2023 |
EXPAND FROM 4 TO 6 LANE EXPRESSWAY |
WEBBER, LLC($119,776,274) |
|
0025-02-215 |
BEXAR |
SAN ANTONIO |
$158,203,252 |
IH 10 |
C 25-2-215 |
07/09/2020 |
11/15/2023 |
EXPAND 4 TO 6 LN EXPRESSWAY & FROM 4 TO 4 LN FR |
ZACHRY CONSTRUCTION CORPORATION($149,200,124) |
|
0025-02-216 |
BEXAR |
SAN ANTONIO |
$6,315,723 |
IH 10 |
C 25-2-216 |
07/10/2018 |
11/15/2023 |
UPGRADE ILLUM |
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC.($6,167,909) |
|
0025-02-217 |
BEXAR |
SAN ANTONIO |
$2,058,727 |
IH 10 |
BR 2019(035) |
09/06/2018 |
11/15/2023 |
PAINT & REPAIR BRG, SURF, PAV'T MRK |
RELMCO, INC.($1,479,046) |
|
0025-02-219 |
BEXAR |
SAN ANTONIO |
$62,147,181 |
IH 10 |
NH 1902(314) |
08/07/2019 |
11/15/2023 |
WIDEN FREEWAY |
JORDAN FOSTER CONSTRUCTION, LLC($91,651,868) |
|
0025-02-223 |
BEXAR |
SAN ANTONIO |
$1,218,003 |
IH 10 |
STP 1902(318) |
08/07/2019 |
11/15/2023 |
LANDSCAPE & SCENIC ENHAN |
TIGHT LINE CONSTRUCTION, LLC($1,049,982) |
|
0025-02-225 |
BEXAR |
SAN ANTONIO |
$2,246,524 |
IH 10 |
STP 2023(502)HES |
03/07/2023 |
08/21/2024 |
HAZARD ELIM & SAFETY |
D&G ENERGY CORPORATION($1,631,615) |
|
0025-03-097 |
GUADALUPE |
SAN ANTONIO |
$140,726,612 |
IH 10 |
F 2022(097) |
11/03/2021 |
11/15/2023 |
WIDEN ROAD - ADD LANES |
WEBBER, LLC($125,021,001) |
|
0028-09-116 |
ORANGE |
BEAUMONT |
$15,154,924 |
IH 10 |
IM 0108(181) |
07/10/2018 |
11/15/2023 |
INSTL HIGH MAST LIGHTING |
THIRD COAST SERVICES LLC($15,083,452) |
|
0028-09-123 |
ORANGE |
BEAUMONT |
$13,265,488 |
IH 10 |
F 2023(009) |
09/07/2022 |
11/15/2023 |
SEAL COAT |
CLARK CONSTRUCTION OF TEXAS, INC.($15,248,084) |
|
0028-11-179 |
ORANGE |
BEAUMONT |
$12,537,623 |
IH 10 |
C 28-11-179 |
11/04/2016 |
11/15/2023 |
WIDEN EXIST MAINLANES FROM 4 TO 6 LANES |
JAMES CONSTRUCTION GROUP, L.L.C.($12,418,604) |
|
0028-13-135 |
JEFFERSON |
BEAUMONT |
$445,396,397 |
IH 10 |
F 2024(979) |
05/02/2024 |
03/21/2024 |
WIDEN ROAD - ADD LANES |
WILLIAMS BROTHERS CONSTRUCTION CO., INC.($533,247,313) |
|
0028-13-141 |
JEFFERSON |
BEAUMONT |
$754,831 |
IH 10 |
STP 2022(366)HES |
02/03/2022 |
11/15/2023 |
HAZARD ELIM & SAFETY |
VACA UNDERGROUND UTILITIES INC($916,599) |
|
0028-13-143 |
JEFFERSON |
BEAUMONT |
$1,815,410 |
IH 10 |
F 2B23(153) |
08/02/2023 |
11/15/2023 |
RESURF ROADWAY |
THE TRUESDELL CORPORATION($969,969) |
|
0028-14-091 |
ORANGE |
BEAUMONT |
$47,457,145 |
IH 10 |
NH 2020(966) |
06/05/2020 |
11/15/2023 |
WIDEN EXIST MAINLANES FROM 4 TO 6 LANES |
WILLIAMS BROTHERS CONSTRUCTION CO., INC.($52,363,934) |
|
0028-14-116 |
ORANGE |
BEAUMONT |
$6,832,289 |
IH 10 |
BR 2022(535) |
02/01/2023 |
11/15/2023 |
BRIDGE MAINT |
GIBSON & ASSOCIATES, INC.($4,742,241) |
|
0028-14-118 |
ORANGE |
BEAUMONT |
$10,449,115 |
IH 10 |
NH 2021(007) |
09/03/2020 |
11/15/2023 |
SURF / ROADWAY RESTOR |
CLARK CONSTRUCTION OF TEXAS, INC.($11,323,815) |
|
0028-14-120 |
ORANGE |
BEAUMONT |
$2,609,891 |
IH 10 |
C 28-14-120 |
05/04/2022 |
08/31/2024 |
SURF/ROADWAY RESTOR |
O. TREVINO CONSTRUCTION, LLC($2,592,504) |
|
0072-05-089 |
KENDALL |
SAN ANTONIO |
$30,111,804 |
IH 10 |
F 2024(004) |
09/07/2023 |
11/15/2023 |
RESURF ROADWAY |
TEXAS MATERIALS GROUP, INC.($26,085,495) |
|
0072-05-090 |
KENDALL |
SAN ANTONIO |
$5,756,438 |
IH 10 |
F 2022(034) |
10/07/2021 |
11/15/2023 |
RESURF ROADWAY |
CLARK CONSTRUCTION OF TEXAS, INC.($5,699,778) |
|
0072-05-096 |
KENDALL |
SAN ANTONIO |
$2,854,419 |
IH 10 |
STP 2023(673)HES |
06/27/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
DAN WILLIAMS COMPANY($2,404,185) |
|
0072-06-074 |
KENDALL |
SAN ANTONIO |
$18,670,375 |
IH 10 |
NH 2019(776) |
04/03/2019 |
11/15/2023 |
RECONFG RAMPS & WIDEN FR TO CONVERT TO ONE WAY OP |
AUSTIN BRIDGE & ROAD SERVICES, LP($18,335,085) |
|
0072-06-075 |
KENDALL |
SAN ANTONIO |
$66,431,418 |
IH 10 |
C 72-6-75 |
03/06/2018 |
11/15/2023 |
GRAD, BS, STR, SURF, PVMT MRKG |
STERLING DELAWARE HOLDING COMPANY, INC.($64,660,757) |
|
0072-06-084 |
KENDALL |
SAN ANTONIO |
$24,113,700 |
IH 10 |
NH 2019(768) |
10/02/2019 |
11/15/2023 |
OVERLAY & PVMNT MRK ON MAIN LNS |
LONE STAR PAVING COMPANY($21,437,419) |
|
0072-06-084 |
KENDALL |
SAN ANTONIO |
$22,598,454 |
IH 10 |
NH 2019(768) |
04/02/2019 |
11/15/2023 |
OVERLAY & PVMNT MRK ON MAIN LNS |
CLARK CONSTRUCTION OF TEXAS, INC.($20,658,006) |
|
0072-07-070 |
BEXAR |
SAN ANTONIO |
$36,185,518 |
IH 10 |
NH 1802(387) |
07/10/2018 |
11/15/2023 |
GRAD, BASE, STRUCT, PAVMT MRK |
J3 COMPANY, LLC($37,255,989) |
|
0072-08-144 |
BEXAR |
SAN ANTONIO |
$431,491,491 |
IH 10 |
CR 2022(402) |
06/01/2022 |
09/03/2024 |
CONSTRUCT DIRECT CONNECTORS |
WILLIAMS BROTHERS CONSTRUCTION CO., INC.($418,111,026) |
|
0072-12-197 |
BEXAR |
SAN ANTONIO |
$1,429,099 |
IH 10 |
NH 2017(560) |
02/02/2017 |
11/15/2023 |
OVERLAY & PAVMT MRK ON EB FRONTAGE ROAD |
LONE STAR PAVING COMPANY($1,177,188) |
|
0072-12-198 |
BEXAR |
SAN ANTONIO |
$1,453,745 |
IH 10 |
NH 2018(862) |
05/01/2018 |
11/15/2023 |
INTERS AND OPERATIONAL IMPRVS |
DAN WILLIAMS COMPANY($1,598,613) |
|
0140-01-081 |
PECOS |
ODESSA |
$13,705,923 |
IH 10 |
F 2024(017) |
09/07/2023 |
11/15/2023 |
FY 2024 SEAL COAT - CRUMB RUBBER |
COX PAVING OF TEXAS, INC.($14,363,578) |
|
0140-02-050 |
PECOS |
ODESSA |
$2,084,200 |
IH 10 |
STP 2023(306)HES |
09/06/2023 |
11/15/2023 |
INSTL MEDIAN BARRIER |
HJC FARMS, INC.($1,938,518) |
|
0140-02-052 |
PECOS |
ODESSA |
$1,895,748 |
IH 10 |
BR 2022(636) |
06/01/2022 |
09/03/2024 |
BRIDGE MAINT |
RELMCO, INC.($1,622,640) |
|
0140-10-034 |
CROCKETT |
SAN ANGELO |
$4,212,424 |
IH 10 |
STP 2022(702)HES |
06/29/2022 |
11/15/2023 |
HAZARD ELIM & SAFETY |
VECTOR UTILITIES LLC($5,283,752) |
|
0140-11-044 |
CROCKETT |
SAN ANGELO |
$5,474,290 |
IH 10 |
NH 1702(546) |
07/12/2017 |
11/15/2023 |
PLANE, EMULSION TREAT, SURF TREATMENT & OVERLAY |
REECE ALBERT, INC.($4,567,929) |
|
0140-11-045 |
CROCKETT |
SAN ANGELO |
$3,674,637 |
IH 10 |
C 140-11-45 |
08/07/2018 |
11/15/2023 |
RELOCATE EXIT RAMP, BUILD FRONTAGE ROAD AND BRIDGE |
ALLEN KELLER COMPANY($3,784,610) |
|
0140-11-046 |
CROCKETT |
SAN ANGELO |
$3,097,661 |
IH 10 |
NH 2020(748) |
04/08/2020 |
11/15/2023 |
MICROSURF |
INTERMOUNTAIN SLURRY SEAL, INC.($2,925,471) |
|
0140-13-021 |
CROCKETT |
SAN ANGELO |
$9,322,477 |
IH 10 |
F 2021(715) |
07/01/2021 |
11/15/2023 |
HAZARD ELIM & SAFETY |
VECTOR UTILITIES LLC($7,780,967) |
|
0140-13-025 |
CROCKETT |
SAN ANGELO |
$1,421,600 |
IH 10 |
STP 2022(878)HES |
08/04/2022 |
11/15/2023 |
HAZARD ELIM & SAFETY |
SCR CIVIL CONSTRUCTION, LLC($1,714,802) |
|
0141-02-033 |
SUTTON |
SAN ANGELO |
$21,507,910 |
IH 10 |
C 141-2-33 |
11/03/2022 |
11/15/2023 |
ACP OVERLAY |
DELHUR INDUSTRIES, INC.($21,298,154) |
|
0141-03-062 |
SUTTON |
SAN ANGELO |
$10,015,336 |
IH 10 |
C 141-3-62 |
06/01/2022 |
09/03/2024 |
ACP OVERLAY |
DELHUR INDUSTRIES, INC.($11,863,754) |
|
0141-04-039 |
SUTTON |
SAN ANGELO |
$10,052,454 |
IH 10 |
STP 2023(403)HES |
02/02/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
MASSANA CONSTRUCTION INC.($9,433,781) |
|
0141-08-047 |
KIMBLE |
SAN ANGELO |
$7,992,651 |
IH 10 |
NH 2018(061) |
11/02/2017 |
11/15/2023 |
HOT RECYCLE AND ACP OVERLAY |
LONE STAR PAVING COMPANY($6,324,554) |
|
0141-08-050 |
KIMBLE |
SAN ANGELO |
$10,955,919 |
IH 10 |
F 2023(137) |
11/02/2022 |
11/15/2023 |
PREVENT MAINT |
ALLEN KELLER COMPANY($9,718,660) |
|
0141-09-070 |
KIMBLE |
SAN ANGELO |
$8,434,548 |
IH 10 |
C 141-9-70 |
06/06/2018 |
11/15/2023 |
HOT RECYCLE AND ACP OVERLAY |
LONE STAR PAVING COMPANY($8,342,120) |
|
0141-09-071 |
KIMBLE |
SAN ANGELO |
$2,484,820 |
IH 10 |
C 141-9-71 |
08/05/2020 |
11/15/2023 |
MEDIAN CABLE BARRIER |
MASSANA, INC.($2,752,521) |
|
0142-01-076 |
KIMBLE |
SAN ANGELO |
$23,767,597 |
IH 10 |
F 2023(680) |
05/05/2023 |
11/15/2023 |
PREVENT MAINT |
LONE STAR PAVING COMPANY($20,144,525) |
|
0142-02-029 |
KERR |
SAN ANTONIO |
$15,062,463 |
IH 10 |
C 142-2-29 |
03/05/2019 |
11/15/2023 |
BASE REPAIR, SEAL, OVERLAY & PAV MRKNGS ON MAINLNS |
LONE STAR PAVING COMPANY($17,870,936) |
|
0142-15-026 |
KENDALL |
SAN ANTONIO |
$11,445,737 |
IH 10 |
NH 2019(788) |
07/09/2019 |
09/27/2024 |
GRAD, BASE, SURF, STR, PAV'T MRKMT |
HUNTER INDUSTRIES, LTD.($12,602,402) |
|
0271-01-066 |
COLORADO |
YOAKUM |
$443,597,130 |
IH 10 |
C 271-1-66 |
06/28/2023 |
11/15/2023 |
WIDEN ROAD - ADD LANES |
WEBBER, LLC($429,395,800) |
|
0271-01-079 |
COLORADO |
YOAKUM |
$1,686,593 |
IH 10 |
STP 1902(291)HES |
08/06/2019 |
11/15/2023 |
IMPROVE GRDRAIL TO DESIGN STANDARDS,ETC. |
3LW CIVIL LLC($2,199,681) |
|
0271-01-083 |
COLORADO |
YOAKUM |
$469,969,329 |
IH 10 |
F 2B24(075) |
05/03/2024 |
03/22/2024 |
WIDEN ROAD - ADD LANES |
PULICE CONSTRUCTION, INC.($439,895,581) |
|
0271-02-049 |
AUSTIN |
YOAKUM |
$195,127,131 |
IH 10 |
NH 2020(115) |
11/05/2019 |
11/15/2023 |
WIDEN FREEWAY |
WEBBER, LLC($184,551,690) |
|
0271-02-055 |
AUSTIN |
YOAKUM |
$303,003,725 |
IH 10 |
NH 1802(497) |
08/08/2018 |
11/15/2023 |
PVT,GRDING,STRS,BASE,SIGNING,ITS |
WEBBER, LLC($317,508,659) |
|
0271-04-071 |
WALLER |
HOUSTON |
$142,378,747 |
IH 10 |
NH 1702(007) |
06/07/2017 |
11/15/2023 |
CONST 1 MORE ML EACH DIRECTION AND REPLACE BRIDGES |
WILLIAMS BROTHERS CONSTRUCTION CO., INC.($141,496,478) |
|
0271-05-042 |
FORT BEND |
HOUSTON |
$2,440,647 |
IH 10 |
CC 271-5-42 |
12/01/2016 |
11/15/2023 |
RAMP RELOCATION |
ISI CONTRACTING, INC.($2,297,995) |
|
0271-05-043 |
FORT BEND |
HOUSTON |
$927,052 |
IH 10 |
NH 2017(487) |
01/05/2017 |
11/15/2023 |
CONSTRUCT INTERS IMPRVS |
DURWOOD GREENE CONSTRUCTION CO.($1,107,206) |
|
0271-05-044 |
FORT BEND |
HOUSTON |
$340,529 |
IH 10 |
NH 1802(416) |
09/06/2018 |
11/15/2023 |
REMOVING AND REPLACING PAVMT MRK |
PROFESSIONAL TRAFFIC CONTROL LLC($223,832) |
|
0271-06-120 |
HARRIS |
HOUSTON |
$2,119,850 |
IH 10 |
NH 1802(603) |
08/07/2018 |
11/15/2023 |
EROSION REP AND CHANNEL PROTECTION |
SJ&J CONSTRUCTION, LLC($1,785,427) |
|
0271-06-126 |
HARRIS |
HOUSTON |
$840,360 |
IH 10 |
NH 1702(630) |
08/09/2017 |
11/15/2023 |
LANDSCAPING |
YELLOWSTONE LANDSCAPE - CENTRAL, INC.($825,265) |
|
0271-07-318 |
HARRIS |
HOUSTON |
$531,493 |
IH 10 |
NH 2018(960) |
06/06/2018 |
11/15/2023 |
LANDSCAPE ENHNACEMENTS |
BOYER, INC.($496,320) |
|
0271-07-322 |
HARRIS |
HOUSTON |
$657,889 |
IH 10 |
C 271-7-322 |
01/09/2019 |
11/15/2023 |
INSTL STRIPING |
PMI PAVEMENT MARKING, LLC($529,716) |
|
0271-07-324 |
HARRIS |
HOUSTON |
$922,175 |
IH 10 |
F 2023(892) |
08/02/2023 |
11/15/2023 |
SURF/ROADWAY RESTOR |
TEXAS MATERIALS GROUP, INC.($1,723,424) |
|
0271-07-326 |
HARRIS |
HOUSTON |
$344,977,612 |
IH 10 |
C 271-7-326 |
08/01/2024 |
06/20/2024 |
RECON EXIST ROADWAY |
WEBBER, LLC($407,810,028) |
|
0271-07-329 |
HARRIS |
HOUSTON |
$5,371,013 |
IH 10 |
CC 271-7-329 |
11/03/2021 |
11/15/2023 |
CONSTRUCT PEDESTRIAN INFRASTRUCT |
NBG CONSTRUCTORS, INC.($6,254,712) |
|
0271-07-348 |
HARRIS |
HOUSTON |
$4,145,106 |
IH 10 |
F 2024(928) |
05/02/2024 |
03/21/2024 |
INSTL/UPGRADE ROADWAY LIGHTING |
DECO CONTRACTORS, INC.($2,337,646) |
|
0441-07-071 |
PECOS |
ODESSA |
$7,457,227 |
IH 10 |
NH 2019(031) |
09/06/2018 |
11/15/2023 |
RECON PAVMT |
FNF CONSTRUCTION, INC.($6,847,259) |
|
0441-07-074 |
PECOS |
ODESSA |
$14,670,236 |
IH 10 |
C 441-7-74 |
03/05/2024 |
01/23/2024 |
ROADWAY REHAB |
FNF CONSTRUCTION, INC.($12,743,573) |
|
0441-09-045 |
REEVES |
ODESSA |
$299,035 |
IH 10 |
BR 1902(014) |
06/04/2019 |
11/15/2023 |
BRIDGE MAINT |
FNH CONSTRUCTION, LLC($415,240) |
|
0508-01-345 |
HARRIS |
HOUSTON |
$16,601,549 |
IH 10 |
C 508-1-345 |
10/02/2020 |
11/15/2023 |
CONSTRUCT EAST BOUND ENTRANCE RAMP |
SER CONSTRUCTION PARTNERS, LLC($14,598,296) |
|
0508-01-346 |
HARRIS |
HOUSTON |
$17,349,553 |
IH 10 |
NH 1702(180) |
06/06/2017 |
11/15/2023 |
SPALL REP, FULL DEPTH REP, O/L, STRP |
ANGEL BROTHERS HOLDINGS CORP.($14,771,556) |
|
0508-01-353 |
HARRIS |
HOUSTON |
$6,491,829 |
IH 10 |
BR 2020(205) |
11/06/2019 |
11/15/2023 |
BRIDGE REPL |
NBG CONSTRUCTORS, INC.($6,382,061) |
|
0508-01-354 |
HARRIS |
HOUSTON |
$6,769,459 |
IH 10 |
C 508-1-354 |
04/06/2022 |
08/22/2024 |
SURF/ROADWAY RESTOR |
TEXAS MATERIALS GROUP, INC.($5,653,888) |
|
0508-01-355 |
HARRIS |
HOUSTON |
$1,284,608 |
IH 10 |
NH 2020(058) |
10/02/2019 |
11/15/2023 |
SURF/ROADWAY RESTOR |
PROFESSIONAL TRAFFIC CONTROL LLC($1,132,908) |
|
0508-01-356 |
HARRIS |
HOUSTON |
$5,439,246 |
IH 10 |
NH 2018(760) |
04/03/2018 |
11/15/2023 |
INSTL CTMS |
TRAF-TEX, INC.($4,844,982) |
|
0508-01-357 |
HARRIS |
HOUSTON |
$7,146,353 |
IH 10 |
STP 2020(059)TP |
05/07/2020 |
11/15/2023 |
BICYCLE AND PEDESTRIAN IMPRVS |
SER CONSTRUCTION PARTNERS, LLC($5,499,460) |
|
0508-01-359 |
HARRIS |
HOUSTON |
$4,114,790 |
IH 10 |
NH 2020(025) |
09/05/2019 |
11/15/2023 |
CONSTRUCT RAMPS |
JAMES CONSTRUCTION GROUP, L.L.C.($4,637,319) |
|
0508-01-360 |
HARRIS |
HOUSTON |
$592,049 |
IH 10 |
NH 1702(516) |
09/07/2017 |
11/15/2023 |
LANDSCAPE ENHAN |
YELLOWSTONE LANDSCAPE - CENTRAL, INC.($593,718) |
|
0508-01-360 |
HARRIS |
HOUSTON |
$592,049 |
IH 10 |
NH 1702(516) |
07/11/2017 |
11/15/2023 |
LANDSCAPE ENHAN |
BOYER, INC.($618,277) |
|
0508-01-381 |
HARRIS |
HOUSTON |
$703,825 |
IH 10 |
C 508-1-381 |
05/05/2021 |
11/15/2023 |
LANDSCAPE DEVELOPMENT |
TEXAS WALL & LANDSCAPE($655,025) |
|
0508-01-385 |
HARRIS |
HOUSTON |
$1,139,040 |
IH 10 |
STP 2B24(346)VRU |
08/01/2024 |
06/20/2024 |
HAZARD ELIM & SAFETY |
THIRD COAST SERVICES LLC($753,027) |
|
0508-01-387 |
HARRIS |
HOUSTON |
$2,051,824 |
IH 10 |
STP 2024(483)HES |
12/06/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
BATTERSON, LLP($1,902,441) |
|
0508-01-391 |
HARRIS |
HOUSTON |
$18,228,318 |
IH 10 |
C 508-1-391 |
08/02/2024 |
06/21/2024 |
SURF/ROADWAY RESTOR |
TEXAS MATERIALS GROUP, INC.($18,279,582) |
|
0508-01-394 |
HARRIS |
HOUSTON |
$2,207,938 |
IH 10 |
C 508-1-394 |
02/01/2024 |
12/21/2023 |
LANDSCAPE DEVELOPMENT |
YELLOWSTONE LANDSCAPE - CENTRAL, INC.($2,043,682) |