0921-06-286 |
CAMERON |
PHARR |
$532,514 |
CS |
STP 1602(198)TP |
11/03/2016 |
11/15/2023 |
CONSTRUCT SIDEWALKS AND ADA RAMPS |
ARANDA BROTHERS CONSTRUCTION CO., INC.($412,715) |
|
6309-45-001 |
CAMERON |
PHARR |
$606,945 |
FM1847 |
RMC - 630945001 |
11/04/2016 |
11/15/2023 |
FM MOW |
R&M INCORPORATED($576,601) |
|
6309-44-001 |
HIDALGO |
PHARR |
$473,678 |
FM0490 |
RMC - 630944001 |
11/04/2016 |
11/15/2023 |
FM MOW |
R&M INCORPORATED($522,620) |
|
0219-02-013 |
HIDALGO |
PHARR |
$7,179,122 |
FM 1016 |
STP 2017(094) |
11/04/2016 |
11/15/2023 |
REHAB ROADWAY |
TEXAS CORDIA CONSTRUCTION, LLC($7,102,463) |
|
0669-01-049 |
HIDALGO |
PHARR |
$10,796,893 |
FM 681 |
STP 2017(317) |
12/01/2016 |
11/15/2023 |
REHAB OF EXIST ROADWAY |
ASAGO, LLC($8,889,678) |
|
0331-04-067 |
CAMERON |
PHARR |
$3,181,309 |
PR 100 |
STP 2017(193)TAPS |
01/04/2017 |
11/15/2023 |
CONST. SIDEWALKS, RAMPS AND CURBS |
REIM CONSTRUCTION, INC.($3,452,509) |
|
0921-02-140 |
HIDALGO |
PHARR |
$6,256,194 |
CS |
STP 2008(328)MM |
01/04/2017 |
11/15/2023 |
RECON AND WIDENING |
IOC COMPANY LLC($5,206,108) |
|
6295-91-001 |
HIDALGO |
PHARR |
$437,128 |
SH0336 |
BPM - 629591001 |
01/05/2017 |
11/15/2023 |
BPM |
VALLEY INFRASTRUCTURE, INC.($344,250) |
|
0039-07-248 |
CAMERON |
PHARR |
$259,101 |
IH 69E |
NH 2017(479) |
01/05/2017 |
11/15/2023 |
LANDSCAPE/LIGHTING IMPRVS |
SOUTHERN LANDSCAPES($293,349) |
|
0433-04-029 |
WILLACY |
PHARR |
$364,165 |
SH 186 |
STP 2017(696)HES |
02/02/2017 |
11/15/2023 |
PROF EDGELINE MRKS,RAISED CENTERLINE RUMBLE STRIPS |
PAVEMENT MARKINGS INC.($266,494) |
|
0038-07-068 |
STARR |
PHARR |
$1,283,794 |
US 83 |
STP 2017(651)HES |
02/03/2017 |
11/15/2023 |
INSTL INT. FLASHING BEACON |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.($1,030,637) |
|
6287-23-001 |
CAMERON |
PHARR |
$626,469 |
FM0106 |
RMC - 628723001 |
03/07/2017 |
11/15/2023 |
DRAINAGE IMPRVS |
TEXAS CORDIA CONSTRUCTION, LLC($482,939) |
|
0921-02-318 |
HIDALGO |
PHARR |
$1,266,973 |
VA |
STP 2017(830) |
03/08/2017 |
11/15/2023 |
CONSTRUCT CURB RAMPS AND SIDEWALKS |
SOUTH TEXAS ILLUMINATION, LLC($1,608,279) |
|
6295-90-001 |
CAMERON |
PHARR |
$475,031 |
FM1419 |
BPM - 629590001 |
03/08/2017 |
11/15/2023 |
BRIDGE PREVENT MAINT |
ARANDA BROTHERS CONSTRUCTION CO., INC.($455,673) |
|
6316-29-001 |
CAMERON |
PHARR |
$746,800 |
US0083 |
RMC - 631629001 |
04/05/2017 |
11/15/2023 |
DEBRIS RMVL AND DISPOSAL |
T.F.R. ENTERPRISES, INC.($599,300) |
|
0342-04-032 |
CAMERON |
PHARR |
$4,345,457 |
SH 107 |
NH 2017(971) |
04/05/2017 |
11/15/2023 |
WIDEN TO 4 LANE UNDIVIDED C&G |
FOREMOST PAVING, INC.($4,313,270) |
|
6296-68-001 |
HIDALGO |
PHARR |
$148,200 |
IH0002 |
RMC - 629668001 |
07/11/2017 |
11/15/2023 |
PALM TREE TRIM AND RMVL |
CROSS PLUS CONSTRUCTION, LLC($392,736) |
|
1586-01-069 |
HIDALGO |
PHARR |
$10,779,189 |
FM 907 |
STP 1702(649) |
08/08/2017 |
11/15/2023 |
WIDEN TO 4 LANE DIVIDED CURB AND GUTTER |
TEXAS CORDIA CONSTRUCTION, LLC($10,446,130) |
|
0327-10-057 |
WILLACY |
PHARR |
$21,166,609 |
US 77 |
NH 1702(492) |
08/08/2017 |
11/15/2023 |
CONSTRUCT MAINLANES & OVERPASS |
FOREMOST PAVING, INC.($22,671,108) |
|
0921-02-212 |
HIDALGO |
PHARR |
$780,556 |
CR |
BR 2011(281) |
08/08/2017 |
11/15/2023 |
REPLACE OFF-SYSTEM BRIDGE |
IOC COMPANY LLC($1,033,763) |
|
6296-79-001 |
HIDALGO |
PHARR |
$5,139,906 |
FM1015 |
RMC - 629679001 |
08/09/2017 |
11/15/2023 |
ACP OVERLAY WORK |
IOC COMPANY LLC($4,485,274) |
|
6316-43-001 |
HIDALGO |
PHARR |
$2,108,744 |
FM1426 |
RMC - 631643001 |
09/07/2017 |
11/15/2023 |
SEAL COAT |
CLARK CONSTRUCTION OF TEXAS, INC.($2,005,741) |
|
0433-01-030 |
HIDALGO |
PHARR |
$12,915,934 |
SH 186 |
STP 1702(838) |
10/03/2017 |
11/15/2023 |
REHAB ROADWAY (SUPER 2) |
ASAGO, LLC($12,133,439) |
|
0220-07-058 |
CAMERON |
PHARR |
$314,735 |
SH 48 |
STP 1702(831)HESG |
10/03/2017 |
11/15/2023 |
TEXTURIZE SHOULDERS |
TRP CONSTRUCTION GROUP, LLC($280,101) |
|
0220-05-069 |
CAMERON |
PHARR |
$6,101,503 |
SH 48 |
STP 1702(829) |
10/03/2017 |
11/15/2023 |
OVERLAY |
TEXAS SAI, INC.($5,234,722) |
|
6322-07-001 |
HIDALGO |
PHARR |
$696,801 |
IH0002 |
RMC - 632207001 |
10/04/2017 |
11/15/2023 |
HOT POUR_CRACK SEAL |
GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY($591,021) |
|
6321-71-001 |
HIDALGO |
PHARR |
$4,500,328 |
IH0002 |
RMC - 632171001 |
10/04/2017 |
11/15/2023 |
PAVMT REPAIR |
FOREMOST PAVING, INC.($4,016,934) |
|
0255-07-141 |
HIDALGO |
PHARR |
$1,712,611 |
IH 69C |
NH 1702(836) |
10/04/2017 |
11/15/2023 |
SEAL COAT (NB & SB FRONTAGE ROADS) |
CLARK CONSTRUCTION OF TEXAS, INC.($1,572,941) |
|
6321-80-001 |
HIDALGO |
PHARR |
$1,111,472 |
IH0002 |
RMC - 632180001 |
11/03/2017 |
11/15/2023 |
PAVMT MRK |
MIJELUM($906,374) |
|
0255-05-040 |
BROOKS |
PHARR |
$2,619,427 |
US 281 |
NH 2018(316) |
11/03/2017 |
11/15/2023 |
OVERLAY OF NORTH AND SOUTH_BOUND LANES |
FOREMOST PAVING, INC.($2,511,870) |
|
0698-02-052 |
HIDALGO |
PHARR |
$676,225 |
FM 88 |
STP 2018(336)HES |
12/05/2017 |
11/15/2023 |
PROF EDGELINE MRKS,RAISED CENTERLINE RUMBLE STRIPS |
PAVEMENT MARKINGS INC.($428,221) |
|
0039-08-100 |
CAMERON |
PHARR |
$9,905,939 |
IH 69E |
NH 2018(333) |
12/05/2017 |
11/15/2023 |
CONSTRUCT NB FRONTAGE ROAD OVERPASSES |
FOREMOST PAVING, INC.($10,510,082) |
|
6323-90-001 |
HIDALGO |
PHARR |
$847,317 |
US0083 |
RMC - 632390001 |
01/04/2018 |
11/15/2023 |
INSTL OF HWY TRAF SIG |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.($778,138) |
|
6325-70-001 |
STARR |
PHARR |
$562,590 |
US0083 |
RMC - 632570001 |
02/02/2018 |
11/15/2023 |
CLEANING AND SWEEPING OF HWYS |
CTX SPECIAL SERVICES CO LLC($450,285) |
|
0039-12-058 |
CAMERON |
PHARR |
$1,217,817 |
BU 77-X |
STP 2018(523)HES |
02/02/2018 |
11/15/2023 |
INSTL INTERSECT. FLASHING BEACONS, SAFETY LIGHTS |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.($1,094,325) |
|
6318-29-001 |
HIDALGO |
PHARR |
$906,326 |
FM1015 |
BPM - 631829001 |
03/06/2018 |
11/15/2023 |
BPM |
VALLEY INFRASTRUCTURE, INC.($827,634) |
|
0039-17-196 |
HIDALGO |
PHARR |
$1,200,278 |
IH 2 |
BR 2018(635) |
03/06/2018 |
11/15/2023 |
INSTL DEFLECTION WALLS,PAINT AND_SEAL JOINTS |
IOC COMPANY LLC($1,104,702) |
|
0684-01-069 |
CAMERON |
PHARR |
$3,589,601 |
FM 511 |
NH 2018(643) |
03/06/2018 |
11/15/2023 |
REHAB PAVMT |
TEXAS SAI, INC.($3,399,954) |
|
0220-05-070 |
CAMERON |
PHARR |
$1,212,067 |
SH 48 |
STP 2018(636)MM |
03/06/2018 |
11/15/2023 |
INSTL TRAF SIGNAL AND SIDEWALKS |
THE LEVY COMPANY, INC.($1,198,847) |
|
6323-92-001 |
HIDALGO |
PHARR |
$874,654 |
IH0002 |
RMC - 632392001 |
04/03/2018 |
11/15/2023 |
INSTL/RMVL OF LARGE/SMALL SIGN |
THE LEVY COMPANY, INC.($867,630) |
|
1429-01-033 |
HIDALGO |
PHARR |
$5,288,076 |
FM 2557 |
CC 1429-1-33 |
04/04/2018 |
11/15/2023 |
REHAB ROADWAY |
IOC COMPANY, LLC($4,427,443) |
|
6328-33-001 |
HIDALGO |
PHARR |
$781,259 |
IH0002 |
RMC - 632833001 |
05/01/2018 |
11/15/2023 |
INSTL OF CCTV |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.($772,051) |
|
6331-98-001 |
CAMERON |
PHARR |
$922,800 |
US0083 |
RMC - 633198001 |
06/05/2018 |
11/15/2023 |
DEBRIS RMVL AND DISPOSAL |
CROSS PLUS CONSTRUCTION, LLC($1,168,120) |
|
0220-03-031 |
CAMERON |
PHARR |
$9,667,564 |
US 281 |
C 220-4-44 |
06/05/2018 |
11/15/2023 |
REHAB & WIDENING EXIST ROADWAY |
FOREMOST PAVING, INC.($9,818,479) |
|
2094-01-038 |
HIDALGO |
PHARR |
$12,823,713 |
FM 2220 |
STP 1602(275)MM |
06/05/2018 |
11/15/2023 |
WIDEN TO 6 LANE |
IOC COMPANY, LLC($12,292,866) |
|
0039-02-066 |
HIDALGO |
PHARR |
$8,319,988 |
US 83 |
C 39-2-66 |
06/06/2018 |
11/15/2023 |
OVERLAY |
IOC COMPANY, LLC($7,654,069) |
|
0921-02-305 |
HIDALGO |
PHARR |
$1,368,414 |
CS |
BR 2015(640) |
07/10/2018 |
11/15/2023 |
REPLACE BRIDGE & RECON APPROACHES |
TEXAS CORDIA CONSTRUCTION, LLC($1,276,034) |
|
0039-16-066 |
CAMERON |
PHARR |
$3,981,852 |
IH 69E |
C 39-16-66 |
07/11/2018 |
11/15/2023 |
OVERLAY (FRONTAGE ROADS) |
FOREMOST PAVING, INC.($3,781,272) |
|
6331-35-001 |
ZAPATA |
PHARR |
$275,065 |
SH0016 |
RMC - 633135001 |
08/06/2018 |
11/15/2023 |
PARKING LOT IMPRVS,CONC REPAIRS,ETC |
VALLEY INFRASTRUCTURE, INC.($329,370) |
|
0921-06-303 |
CAMERON |
PHARR |
$314,245 |
VA |
STP 1802(565)TP |
08/07/2018 |
11/15/2023 |
CONST SIDEWALKS, CROSSWALKS,& PATHS |
ARANDA BROTHERS CONSTRUCTION CO., INC.($361,733) |
|
6332-58-001 |
CAMERON |
PHARR |
$646,760 |
FM1847 |
RMC - 633258001 |
08/07/2018 |
11/15/2023 |
FM MOW |
R&M INCORPORATED($849,303) |
|
0433-02-052 |
WILLACY |
PHARR |
$22,069,391 |
SH 186 |
C 433-2-52 |
08/07/2018 |
11/15/2023 |
REHAB ROADWAY (SUPER 2) |
ASAGO, LLC($20,899,928) |
|
6332-59-001 |
HIDALGO |
PHARR |
$568,764 |
FM0490 |
RMC - 633259001 |
08/08/2018 |
11/15/2023 |
FM MOW |
R&M INCORPORATED($726,084) |
|
0327-10-062 |
WILLACY |
PHARR |
$14,830,225 |
US 77 |
NH 1802(561) |
08/08/2018 |
11/15/2023 |
CONSTRUCT MAINLANES & OVERPASSES |
FOREMOST PAVING, INC.($15,409,268) |
|
1939-01-059 |
HIDALGO |
PHARR |
$1,113,892 |
FM 2061 |
STP 1802(567)HES |
08/08/2018 |
11/15/2023 |
INSTL TRAF SIG |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.($1,064,871) |
|
6332-93-001 |
HIDALGO |
PHARR |
$292,883 |
IH0002 |
RMC - 633293001 |
08/09/2018 |
11/15/2023 |
ON CALL PAVMT MRK AND PAVMT M |
PAVEMENT MARKINGS INC.($285,928) |
|
0255-09-094 |
HIDALGO |
PHARR |
$19,245,790 |
UP 281 |
NH 2019(045) |
09/07/2018 |
11/15/2023 |
REHAB ROADWAY |
IOC COMPANY, LLC($23,982,430) |
|
1425-03-061 |
CAMERON |
PHARR |
$1,795,929 |
FM 106 |
C 1425-3-61 |
09/07/2018 |
11/15/2023 |
SEAL COAT |
BRANNAN PAVING CO., LTD.($1,737,656) |
|
0482-02-033 |
BROOKS |
PHARR |
$2,769,153 |
SH 285 |
STP 2019(041) |
09/07/2018 |
11/15/2023 |
SEAL COAT |
BRANNAN PAVING CO., LTD.($2,763,466) |
|
0039-19-061 |
CAMERON |
PHARR |
$9,358,695 |
IH 2 |
NH 2019(112) |
10/02/2018 |
11/15/2023 |
OVERLAY |
TEXAS SAI, INC.($8,734,018) |
|
6337-18-001 |
HIDALGO |
PHARR |
$384,373 |
IH0002 |
RMC - 633718001 |
10/02/2018 |
11/15/2023 |
EXPRESSWAY MOW AND LITTER RMVL |
R&M INCORPORATED($517,345) |
|
6332-01-001 |
BROOKS |
PHARR |
$3,167,946 |
FM0755 |
RMC - 633201001 |
10/02/2018 |
11/15/2023 |
SEAL COAT |
RONALD R. WAGNER & CO., LP($3,713,524) |
|
6332-00-001 |
HIDALGO |
PHARR |
$994,018 |
IH0002 |
RMC - 633200001 |
10/03/2018 |
11/15/2023 |
CRACK SEAL |
D & M CONTRACTORS, LLC($1,105,900) |
|
0255-04-094 |
BROOKS |
PHARR |
$16,244,519 |
US 281 |
C 255-4-94 |
11/06/2018 |
11/15/2023 |
REHAB ROADWAY |
FOREMOST PAVING, INC.($17,284,414) |
|
6335-53-001 |
HIDALGO |
PHARR |
$1,281,341 |
IH0002 |
RMC - 633553001 |
11/07/2018 |
11/15/2023 |
PAVMT MRK |
PAVEMENT MARKINGS INC.($1,127,180) |
|
0039-02-068 |
HIDALGO |
PHARR |
$6,404,510 |
US 83 |
STP 2019(275)HES |
12/06/2018 |
11/15/2023 |
IMPROVE TRAF SIG |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.($6,096,123) |
|
0327-08-097 |
CAMERON |
PHARR |
$1,859,300 |
BU 77-X |
STP 2019(399)HES |
01/08/2019 |
11/15/2023 |
PROFILE EDGELINE MRK & RUMBLE STRIPS |
PAVEMENT MARKINGS INC.($1,440,767) |
|
6321-85-001 |
HIDALGO |
PHARR |
$5,085,064 |
SH0107 |
RMC - 632185001 |
01/08/2019 |
11/15/2023 |
DISTRICTWIDE OVERLAY |
EARTHWORKS ENTERPRISE($5,265,199) |
|
0039-17-201 |
HIDALGO |
PHARR |
$2,366,368 |
IH 2 |
NH 2019(694) |
02/05/2019 |
11/15/2023 |
PAVMT REHAB OF FRONTAGE ROADS |
FOREMOST PAVING, INC.($2,966,778) |
|
6318-30-001 |
HIDALGO |
PHARR |
$1,054,565 |
FM0088 |
BPM - 631830001 |
02/05/2019 |
11/15/2023 |
BRIDGE PREVENT MAINT |
VALLEY INFRASTRUCTURE, INC.($1,227,644) |
|
0698-03-095 |
HIDALGO |
PHARR |
$1,815,432 |
FM 88 |
STP 2019(649)HES |
03/05/2019 |
11/15/2023 |
SAFETY LIGHTING |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.($1,620,585) |
|
0342-01-074 |
HIDALGO |
PHARR |
$20,285,142 |
SH 107 |
STP 2019(085) |
03/06/2019 |
11/15/2023 |
CONST 6 LN DIV RURAL |
FOREMOST PAVING, INC.($21,103,891) |
|
0039-20-008 |
CAMERON |
PHARR |
$6,920,192 |
SS 54 |
NH 2019(773) |
04/02/2019 |
11/15/2023 |
WIDEN ROADWAY |
TEXAS CORDIA CONSTRUCTION, LLC($7,086,524) |
|
6344-12-001 |
CAMERON |
PHARR |
$928,224 |
IH0069E |
RMC - 634412001 |
04/02/2019 |
11/15/2023 |
CLEANING AND SWEEPING, DEBRIS RMVL |
PANNELL INDUSTRIES, INC.($868,157) |
|
6344-13-001 |
HIDALGO |
PHARR |
$1,041,462 |
IH0002 |
RMC - 634413001 |
04/02/2019 |
11/15/2023 |
CLEANING AND SWEEPING, DEBRIS RMVL |
PANNELL INDUSTRIES, INC.($991,681) |
|
0220-05-075 |
CAMERON |
PHARR |
$2,878,918 |
SH 48 |
NH 2019(774) |
04/03/2019 |
11/15/2023 |
PROPOSED RAISED MEDIAN |
TEXAS CORDIA CONSTRUCTION, LLC($3,422,327) |
|
0039-02-070 |
HIDALGO |
PHARR |
$8,135,944 |
US 83 |
NH 2019(954) |
04/03/2019 |
11/15/2023 |
REHAB ROADWAY |
FOREMOST PAVING, INC.($8,019,897) |
|
0220-07-064 |
CAMERON |
PHARR |
$1,395,276 |
SH 48 |
STP 2019(897) |
04/03/2019 |
11/15/2023 |
REPLACE RAIL AT BRIDGE AND REPAIR APPROACHES |
SCR CIVIL CONSTRUCTION, LLC($2,475,986) |
|
0039-01-094 |
STARR |
PHARR |
$759,390 |
US 83 |
STP 2019(953)HES |
05/07/2019 |
11/15/2023 |
CONSTRUCT MEDIAN CROSSOVER |
REIM CONSTRUCTION, INC.($1,161,965) |
|
1586-01-076 |
HIDALGO |
PHARR |
$6,095,618 |
FM 907 |
STP 2019(893) |
05/08/2019 |
11/15/2023 |
REHAB ROADWAY |
TEXAS CORDIA CONSTRUCTION, LLC($6,912,455) |
|
0220-04-055 |
CAMERON |
PHARR |
$3,019,767 |
US 281 |
STP 1902(053) |
06/04/2019 |
11/15/2023 |
OVERLAY |
FOREMOST PAVING, INC.($3,773,984) |
|
0102-07-045 |
BROOKS |
PHARR |
$9,481,408 |
SH 285 |
STP 1902(052) |
06/04/2019 |
11/15/2023 |
OVERLAY |
FOREMOST PAVING, INC.($11,330,611) |
|
1804-01-079 |
HIDALGO |
PHARR |
$1,655,690 |
SS 115 |
BR 1902(310) |
08/06/2019 |
11/15/2023 |
BRIDGE MAINT |
CLORE EQUIPMENT LLC($1,760,708) |
|
0342-02-054 |
HIDALGO |
PHARR |
$11,030,085 |
SH 107 |
NH 1902(320) |
08/06/2019 |
11/15/2023 |
REHAB OF EXIST ROADWAY |
FOREMOST PAVING, INC.($10,978,593) |
|
0039-02-072 |
HIDALGO |
PHARR |
$1,740,246 |
US 83 |
STP 1902(312)HES |
08/07/2019 |
11/15/2023 |
SFT - HAZARD ELIM & SAFETY |
CLORE EQUIPMENT LLC($2,177,829) |
|
1801-02-017 |
CAMERON |
PHARR |
$18,147,673 |
FM 1847 |
STP 1902(311) |
08/07/2019 |
11/15/2023 |
REHAB & WIDENING EXIST ROADWAY |
FOREMOST PAVING, INC.($19,989,898) |
|
3097-02-016 |
HIDALGO |
PHARR |
$4,489,096 |
FM 396 |
NH 2020(077) |
09/06/2019 |
11/15/2023 |
SEAL COAT |
BRANNAN PAVING CO., LTD.($3,726,802) |
|
0517-10-019 |
JIM HOGG |
PHARR |
$4,777,994 |
SH 16 |
STP 2020(075) |
09/06/2019 |
11/15/2023 |
SEAL COAT |
BRANNAN PAVING CO., LTD.($3,674,000) |
|
2717-02-010 |
CAMERON |
PHARR |
$4,496,063 |
FM 3248 |
NH 2020(176) |
09/06/2019 |
11/15/2023 |
SEALCOATS AND PAVMT MRK |
BRANNAN PAVING CO., LTD.($3,226,291) |
|
6343-35-001 |
CAMERON |
PHARR |
$3,238,213 |
FM0800 |
RMC - 634335001 |
09/06/2019 |
11/15/2023 |
DISTRICT WIDE SEAL COAT |
BRANNAN PAVING CO., LTD.($3,124,059) |
|
6348-16-001 |
HIDALGO |
PHARR |
$847,975 |
IH0002 |
RMC - 634816001 |
09/06/2019 |
11/15/2023 |
HOT POUR CRACK SEAL |
CHAMPION INFRASTRUCTURE, LLC($949,553) |
|
0039-02-063 |
HIDALGO |
PHARR |
$103,484,636 |
CS |
NH 1902(056) |
10/03/2019 |
11/15/2023 |
NEW LOCATION FREEWAY |
PULICE CONSTRUCTION, INC.($95,994,023) |
|
0865-01-112 |
HIDALGO |
PHARR |
$8,293,541 |
SH 495 |
NH 2020(111) |
11/06/2019 |
11/15/2023 |
OVERLAY |
FOREMOST PAVING, INC.($9,895,598) |
|
6348-17-001 |
HIDALGO |
PHARR |
$1,586,622 |
SH0336 |
RMC - 634817001 |
11/06/2019 |
11/15/2023 |
CLEANING & SWEEPING OF HWYS (FM ROADS) |
PANNELL INDUSTRIES, INC.($1,718,893) |
|
6350-83-001 |
BROOKS |
PHARR |
$2,823,387 |
BU0281T |
RMC - 635083001 |
12/03/2019 |
11/15/2023 |
OVERLAY, MILLING AND PAVMT MRK |
CLORE EQUIPMENT LLC($3,795,359) |
|
6349-32-001 |
HIDALGO |
PHARR |
$779,219 |
IH0069C |
RMC - 634932001 |
12/03/2019 |
11/15/2023 |
INSTL OF HWY TRAF SIG |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.($805,114) |
|
6349-33-001 |
HIDALGO |
PHARR |
$757,596 |
IH0002 |
RMC - 634933001 |
12/04/2019 |
11/15/2023 |
MAINT & REPAIR OF SAFETY LIGHTING |
VACA UNDERGROUND UTILITIES INC($710,313) |
|
6352-74-001 |
CAMERON |
PHARR |
$771,133 |
IH0069E |
BPM - 635274001 |
12/04/2019 |
11/15/2023 |
BRIDGE PREVENT MAINT |
VALLEY INFRASTRUCTURE, INC.($869,612) |
|
0039-12-252 |
CAMERON |
PHARR |
$3,472,230 |
BU 77-X |
STP 2020(041)HES |
01/09/2020 |
09/26/2024 |
TRAF SIGNAL IMPRVS |
TRAF-TEX, INC.($3,330,767) |
|
0039-17-198 |
HIDALGO |
PHARR |
$9,059,721 |
IH 2 |
NH 2020(562) |
02/06/2020 |
11/15/2023 |
OVERLAY |
ANDERSON COLUMBIA CO., INC.($9,929,405) |