6306-41-001 |
BRAZOS |
BRYAN |
$864,850 |
BS0006R |
RMC - 630641001 |
11/03/2016 |
11/15/2023 |
HMA MILL AND INLAY |
BIG CREEK CONSTRUCTION, LTD.($671,410) |
|
6315-29-001 |
BRAZOS |
BRYAN |
$895,855 |
BS0006R |
RMC - 631529001 |
07/12/2017 |
11/15/2023 |
HMA MILL AND INLAY |
BIG CREEK CONSTRUCTION, LTD.($687,930) |
|
6341-26-001 |
BRAZOS |
BRYAN |
$547,402 |
BS0006R |
RMC - 634126001 |
06/05/2019 |
11/15/2023 |
HMA MILL AND INLAY |
KNIFE RIVER CORPORATION - SOUTH($546,196) |
|
6332-10-001 |
BRAZOS |
BRYAN |
$3,958,216 |
BS0006R |
RMC - 633210001 |
06/05/2018 |
11/15/2023 |
MILL AND INLAY |
KNIFE RIVER CORPORATION - SOUTH($2,477,766) |
|
6373-94-001 |
BRAZOS |
BRYAN |
$732,160 |
BS0006R |
RMC - 637394001 |
07/01/2021 |
11/15/2023 |
HMA MILL & INLAY |
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.($708,467) |
|
6328-21-001 |
BRAZOS |
BRYAN |
$747,945 |
BS0006R |
RMC - 632821001 |
06/06/2018 |
11/15/2023 |
HMA MILL AND INLAY |
KNIFE RIVER CORPORATION - SOUTH($629,253) |
|
6470-89-001 |
BRAZOS |
BRYAN |
$127,280 |
BS0006R |
RMC - 647089001 |
11/12/2024 |
10/03/2024 |
CURB & GUTTER MAINT |
B & MS CONSTRUCTION, INC.($114,952) |
|
6375-83-001 |
GRIMES |
BRYAN |
$1,633,101 |
BS0006S |
RMC - 637583001 |
06/29/2022 |
11/15/2023 |
ASPH PAVMT REPAIR |
KNIFE RIVER CORPORATION - SOUTH($1,743,869) |
|
0186-05-044 |
WASHINGTON |
BRYAN |
$1,489,111 |
BS 36-J |
F 2B23(031) |
08/02/2023 |
11/15/2023 |
CONSTRUCT PEDESTRIAN INFRASTRUCT |
TI-ZACK CONCRETE, INC.($1,547,420) |
|
0186-05-045 |
WASHINGTON |
BRYAN |
$526,961 |
BS 36-J |
STP 2024(941)VRU |
08/01/2024 |
06/20/2024 |
TRAF SIGNAL IMPRVS |
LARRY YOUNG PAVING, INC.($522,513) |
|
0050-01-079 |
BRAZOS |
BRYAN |
$1,810,027 |
BS 6-R |
STP 2017(914)HES |
04/04/2017 |
11/15/2023 |
IMPROVE TRAF SIG |
KNIFE RIVER CORPORATION - SOUTH($1,474,038) |
|
0050-01-080 |
BRAZOS |
BRYAN |
$935,617 |
BS 6-R |
STP 1802(407)HES |
07/11/2018 |
11/15/2023 |
INSTL RAISED MEDIAN |
KNIFE RIVER CORPORATION - SOUTH($1,137,292) |
|
0050-01-086 |
BRAZOS |
BRYAN |
$8,761,103 |
BS 6-R |
NH 2019(681) |
03/06/2019 |
11/15/2023 |
CONC PAVMT REPAIR |
MAIN LANE INDUSTRIES LTD.($5,989,655) |
|
0050-01-087 |
BRAZOS |
BRYAN |
$1,390,096 |
BS 6-R |
STP 2021(024)HES |
10/01/2020 |
11/15/2023 |
SFT- SAFETY IMPRV PROJECT |
BAYER CONSTRUCTION ELECTRICAL CONTRACTORS, INC.($1,136,624) |
|
0049-09-088 |
BRAZOS |
BRYAN |
$910,095 |
BS 6-R |
F 2022(058) |
10/07/2021 |
11/15/2023 |
SEAL COAT |
COX PAVING OF TEXAS, INC.($847,125) |
|
0049-09-087 |
BRAZOS |
BRYAN |
$3,673,380 |
BS 6-R |
C 49-9-87 |
12/02/2021 |
11/15/2023 |
INSTL RAISED MEDIAN |
LARRY YOUNG PAVING, INC.($4,137,993) |
|
0049-09-076 |
BRAZOS |
BRYAN |
$4,750,800 |
BS 6-R |
F 2022(857) |
08/03/2022 |
11/15/2023 |
INSTL RAISED MEDIAN |
BRAZOS PAVING, INC.($5,236,845) |
|
0049-09-094 |
BRAZOS |
BRYAN |
$2,564,974 |
BS 6-R |
F 2023(216) |
09/07/2022 |
11/15/2023 |
HAZARD ELIM & SAFETY |
D. I. J. CONSTRUCTION, INC.($2,897,018) |
|
0050-11-023 |
GRIMES |
BRYAN |
$24,905,607 |
BS 6-S |
F 2025(135) |
10/01/2024 |
08/20/2024 |
SEAL COAT |
D. I. J. CONSTRUCTION, INC.($28,059,692) |
|
0114-09-077 |
WASHINGTON |
BRYAN |
$2,691,639 |
BU 290F |
STP 2B20(105) |
08/05/2020 |
11/15/2023 |
MILL AND INLAY |
KNIFE RIVER CORPORATION - SOUTH($2,697,458) |
|
0057-02-037 |
FREESTONE |
BRYAN |
$12,270,775 |
BU 84-R |
STP 2018(232) |
10/03/2017 |
11/15/2023 |
SEAL COAT |
NEWMAN & KENG PAVING COMPANY, INC.($12,525,077) |
|
0917-27-044 |
WALKER |
BRYAN |
$504,815 |
CR |
BR 2016(317) |
06/06/2017 |
11/15/2023 |
REPLACE EXIST BRIDGE FACILITY |
TREVWAY, INC.($504,030) |
|
0917-12-080 |
MILAM |
BRYAN |
$540,787 |
CR |
BR 2012(334) |
06/06/2017 |
11/15/2023 |
REPLACE EXIST BRIDGE FACILITY |
ELLIS-MCGINNIS CONSTRUCTION CO.($447,590) |
|
0917-29-120 |
BRAZOS |
BRYAN |
$877,922 |
CR |
BR 2016(358) |
04/04/2018 |
11/15/2023 |
REPL OF AN EXIST BRIDGE |
PROJECT ALLIED RESOURCES, LLC($772,705) |
|
0917-20-039 |
FREESTONE |
BRYAN |
$475,352 |
CR |
BR 2019(179) |
04/08/2020 |
11/15/2023 |
BRIDGE REPL |
KNIFE RIVER CORPORATION - SOUTH($479,341) |
|
0917-30-055 |
BURLESON |
BRYAN |
$1,521,771 |
CR |
BR 1702(414) |
04/09/2020 |
11/15/2023 |
BRIDGE REPL |
FUQUA CONSTRUCTION CO., INC.($1,458,198) |
|
0917-30-057 |
BURLESON |
BRYAN |
$1,013,298 |
CR |
BR 1702(439) |
04/07/2022 |
11/15/2023 |
BRIDGE REPL |
TREVWAY, INC.($1,449,786) |
|
0917-19-053 |
WASHINGTON |
BRYAN |
$826,686 |
CR |
BR 2023(081) |
01/05/2023 |
11/15/2023 |
BRIDGE REPL |
FUQUA CONSTRUCTION CO., INC.($815,696) |
|
0917-30-059 |
BURLESON |
BRYAN |
$1,594,655 |
CR |
BR 2021(237) |
01/06/2023 |
11/15/2023 |
BRIDGE REPL |
TEXAS MATERIALS GROUP, INC.($1,827,279) |
|
0917-27-046 |
WALKER |
BRYAN |
$1,770,438 |
CR |
BR 2023(082) |
05/04/2023 |
11/15/2023 |
BRIDGE REPL |
R CONSTRUCTION CIVIL, LLC($1,498,227) |
|
0917-17-076 |
GRIMES |
BRYAN |
$2,488,279 |
CR |
BR 2023(064) |
08/02/2023 |
11/15/2023 |
BRIDGE REPL |
FORDE CONSTRUCTION COMPANY, INC.($2,278,373) |
|
0917-20-046 |
FREESTONE |
BRYAN |
$592,675 |
CR |
BR 2023(135) |
08/02/2023 |
11/15/2023 |
BRIDGE REPL |
THK CONSTRUCTION LLC($609,028) |
|
0917-12-084 |
MILAM |
BRYAN |
$484,638 |
CR |
BR 2021(762) |
04/07/2022 |
09/24/2024 |
BRIDGE REPL |
PIERCE R & B LLC($515,115) |
|
0917-17-074 |
GRIMES |
BRYAN |
$573,431 |
CR |
BR 1802(201) |
04/06/2022 |
09/24/2024 |
BRIDGE REPL |
FUQUA CONSTRUCTION CO., INC.($597,985) |
|
0917-20-045 |
FREESTONE |
BRYAN |
$530,451 |
CR |
BR 2021(939) |
06/02/2023 |
11/28/2023 |
BRIDGE REPL |
R CONSTRUCTION CIVIL, LLC($581,241) |
|
0917-27-047 |
WALKER |
BRYAN |
$645,072 |
CR |
BR 2022(283) |
08/02/2023 |
11/15/2023 |
BRIDGE REPL |
TREVWAY, INC.($832,940) |
|
0917-12-086 |
MILAM |
BRYAN |
$958,319 |
CR |
BR 2021(240) |
06/01/2023 |
11/27/2023 |
BRIDGE REPL |
KNIFE RIVER CORPORATION - SOUTH($774,755) |
|
0917-31-034 |
MADISON |
BRYAN |
$657,162 |
CR |
BR 2021(239) |
06/02/2023 |
11/28/2023 |
BRIDGE REPL |
R CONSTRUCTION CIVIL, LLC($669,118) |
|
0917-12-088 |
MILAM |
BRYAN |
$1,296,774 |
CR |
BR 2B23(229) |
05/03/2024 |
03/22/2024 |
BRIDGE REPL |
C. E. BARKER, LTD.($974,112) |
|
0917-30-053 |
BURLESON |
BRYAN |
$1,417,696 |
CR |
BR 2017(905) |
06/05/2024 |
04/24/2024 |
BRIDGE REPL |
A GREATER AUSTIN DEVELOPMENT COMPANY, LLC($1,209,203) |
|
0917-30-054 |
BURLESON |
BRYAN |
$835,430 |
CR |
BR 1702(413) |
03/07/2023 |
08/21/2024 |
BRIDGE REPL |
KNIFE RIVER CORPORATION - SOUTH($946,425) |
|
0917-17-065 |
GRIMES |
BRYAN |
$890,126 |
CR |
BR 2012(273) |
06/07/2017 |
11/15/2023 |
REPLACE EXIST BRIDGE |
TREVWAY, INC.($905,681) |
|
0917-19-050 |
WASHINGTON |
BRYAN |
$359,349 |
CS |
BR 2017(904) |
06/06/2018 |
11/15/2023 |
REPLACE EXIST BRIDGE |
TREVWAY, INC.($341,288) |
|
0917-29-133 |
BRAZOS |
BRYAN |
$1,258,455 |
CS |
STP 2019(462)TAPS |
06/05/2020 |
11/15/2023 |
CONC SIDEWALKS AND BIKE LANES |
TI-ZACK CONCRETE, INC.($1,198,244) |
|
0917-18-085 |
ROBERTSON |
BRYAN |
$731,249 |
CS |
BR 2021(236) |
05/05/2023 |
11/15/2023 |
BRIDGE REPL |
FUQUA CONSTRUCTION CO., INC.($722,351) |
|
0917-17-081 |
GRIMES |
BRYAN |
$732,188 |
CS |
STP 2023(205)TAPS |
08/02/2023 |
11/15/2023 |
CONSTRUCT PEDESTRIAN INFRASTRUCT |
FUQUA CONSTRUCTION CO., INC.($854,655) |
|
0917-18-082 |
ROBERTSON |
BRYAN |
$481,799 |
CS |
BR 2021(235) |
08/03/2023 |
11/15/2023 |
BRIDGE REPL |
FUQUA CONSTRUCTION CO., INC.($663,959) |
|
0917-31-031 |
MADISON |
BRYAN |
$777,206 |
CS |
BR 2022(281) |
06/01/2023 |
11/27/2023 |
BRIDGE REPL |
R CONSTRUCTION CIVIL, LLC($649,994) |
|
6337-79-001 |
LEON |
BRYAN |
$150,345 |
FM0039 |
RMC - 633779001 |
10/01/2018 |
11/15/2023 |
TREE TRIM |
DEKALB TREE SPECIALIST($176,460) |
|
6362-18-001 |
LEON |
BRYAN |
$150,521 |
FM0039 |
RMC - 636218001 |
05/14/2020 |
09/26/2024 |
TREE TRIM & BRUSH RMVL |
WESTGATE GROUP, LLC($104,775) |
|
6337-77-001 |
ROBERTSON |
BRYAN |
$131,500 |
FM0046 |
RMC - 633777001 |
10/01/2018 |
11/15/2023 |
TREE TRIM |
DEKALB TREE SPECIALIST($153,375) |
|
6344-96-001 |
ROBERTSON |
BRYAN |
$145,590 |
FM0046 |
RMC - 634496001 |
06/18/2019 |
09/27/2024 |
TREE TRIM & BRUSH RMVL |
WESTGATE GROUP, LLC($155,439) |
|
6388-17-001 |
BURLESON |
BRYAN |
$410,320 |
FM0050 |
RMC - 638817001 |
12/01/2021 |
11/15/2023 |
BRIDGE PREVENT MAINT |
FUQUA CONSTRUCTION CO., INC.($404,499) |
|
6341-99-001 |
WASHINGTON |
BRYAN |
$54,850 |
FM0050 |
BPM - 634199001 |
02/11/2020 |
09/26/2024 |
BRIDGE SCOUR REPAIR, ETC. |
LELAND & BRADLEE CONSTRUCTION, INC.($54,050) |
|
6363-46-001 |
WASHINGTON |
BRYAN |
$238,895 |
FM0050 |
RMC - 636346001 |
07/14/2020 |
09/26/2024 |
CLEANING AND SEALING CRACKS |
GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY($198,360) |
|
6409-63-001 |
BRAZOS |
BRYAN |
$212,757 |
FM0060 |
RMC - 640963001 |
07/13/2022 |
11/15/2023 |
CRACK SEAL |
D & M CONTRACTORS, LLC($198,344) |
|
6319-04-001 |
BURLESON |
BRYAN |
$1,275,881 |
FM0060 |
RMC - 631904001 |
10/03/2017 |
11/15/2023 |
SEAL COAT AND HMA OVERLAY |
BIG CREEK CONSTRUCTION, LTD.($1,023,190) |
|
6319-91-001 |
BURLESON |
BRYAN |
$133,481 |
FM0060 |
RMC - 631991001 |
12/11/2018 |
11/15/2023 |
ROADSIDE MOW |
WELLMANN ENTERPRISES($128,367) |
|
6392-84-001 |
BURLESON |
BRYAN |
$156,853 |
FM0060 |
RMC - 639284001 |
12/08/2021 |
11/15/2023 |
MOW HWY RIGHT OF WAY |
WELLMANN ENTERPRISES($186,762) |
|
6350-62-001 |
BURLESON |
BRYAN |
$191,547 |
FM0060 |
RMC - 635062001 |
12/17/2019 |
11/15/2023 |
ROADSIDE MOW |
WELLMANN ENTERPRISES($171,799) |
|
6338-94-001 |
BURLESON |
BRYAN |
$2,971,217 |
FM0060 |
RMC - 633894001 |
03/05/2019 |
11/15/2023 |
HMA OVERLAY, BASE REPAIR, MBGF STRIPING |
KNIFE RIVER CORPORATION - SOUTH($2,580,121) |
|
6317-54-001 |
BRAZOS |
BRYAN |
$2,037,904 |
FM0060 |
RMC - 631754001 |
07/12/2017 |
11/15/2023 |
SEAL COAT AND HMA OVERLAY |
BIG CREEK CONSTRUCTION, LTD.($1,487,658) |
|
6412-09-001 |
BURLESON |
BRYAN |
$114,923 |
FM0060 |
RMC - 641209001 |
09/20/2022 |
09/24/2024 |
BRIDGE REPAIR |
CROSS PLUS CONSTRUCTION, LLC($121,130) |
|
6460-80-001 |
BURLESON |
BRYAN |
$237,443 |
FM0060 |
RMC - 646080001 |
01/08/2024 |
11/28/2023 |
MOW HWY RIGHT OF WAY |
ABESCAPE LANDSCAPING, LLC($176,623) |
|
6363-44-001 |
BRAZOS |
BRYAN |
$230,243 |
FM0060 |
RMC - 636344001 |
07/14/2020 |
09/26/2024 |
CLEANING AND SEALING CRACKS |
CRACKSEAL OF TEXAS, LLC($195,717) |
|
6344-91-001 |
FREESTONE |
BRYAN |
$193,700 |
FM0080 |
RMC - 634491001 |
08/13/2019 |
11/15/2023 |
TREE TRIM & BRUSH RMVL |
K & R CONTRACTORS($182,190) |
|
6382-17-001 |
FREESTONE |
BRYAN |
$148,260 |
FM0080 |
RMC - 638217001 |
06/08/2021 |
11/15/2023 |
TREE TRIM AND BRUSH RMVL |
TERRY ENTERPRISES($94,063) |
|
6369-07-001 |
FREESTONE |
BRYAN |
$88,430 |
FM0080 |
BPM - 636907001 |
12/17/2020 |
11/15/2023 |
SCOUR REPAIR & PILE REPAIR |
GV LANDSCAPE AND CONSTRUCTION LLC($70,040) |
|
6415-86-001 |
WALKER |
BRYAN |
$100,710 |
FM0230 |
BPM - 641586001 |
09/20/2022 |
09/24/2024 |
BRIDGE PREVENT MAINT |
SHALOM SERVICES CORPORATION($99,755) |
|
6337-80-001 |
WALKER |
BRYAN |
$82,800 |
FM0247 |
RMC - 633780001 |
10/01/2018 |
11/15/2023 |
TREE TRIM |
ROY LEE WALKER($96,213) |
|
6313-74-001 |
WALKER |
BRYAN |
$496,628 |
FM0247 |
RMC - 631374001 |
03/07/2017 |
11/15/2023 |
MILL AND INLAY |
BIG CREEK CONSTRUCTION, LTD.($477,154) |
|
6362-58-001 |
WALKER |
BRYAN |
$233,390 |
FM0247 |
RMC - 636258001 |
05/14/2020 |
09/26/2024 |
TREE TRIM & BRUSH RMVL |
DIAMOND JK CONSTRUCTION LLC($175,043) |
|
6344-98-001 |
WASHINGTON |
BRYAN |
$101,100 |
FM0389 |
RMC - 634498001 |
08/13/2019 |
11/15/2023 |
TREE TRIM & BRUSH RMVL |
GEORGE MEEKS LANDPRO, INC.($96,270) |
|
6334-96-001 |
WASHINGTON |
BRYAN |
$195,448 |
FM0389 |
RMC - 633496001 |
09/11/2018 |
11/15/2023 |
CLEANING AND SEALING CRACKS |
L & M MOWING CONTRACTORS, LLC($178,875) |
|
6385-56-001 |
MILAM |
BRYAN |
$232,651 |
FM0485 |
RMC - 638556001 |
10/13/2021 |
11/15/2023 |
BRIDGE REPAIR |
KNIFE RIVER CORPORATION - SOUTH($309,280) |
|
6430-91-001 |
ROBERTSON |
BRYAN |
$208,711 |
FM0485 |
RMC - 643091001 |
06/13/2023 |
11/15/2023 |
BRIDGE SCOUR REPAIR |
GARRET SHIELDS INFRASTRUCTURE($222,417) |
|
6319-92-001 |
MILAM |
BRYAN |
$173,833 |
FM0486 |
RMC - 631992001 |
12/11/2018 |
11/15/2023 |
ROADSIDE MOW |
R&M INCORPORATED($196,538) |
|
6350-63-001 |
MILAM |
BRYAN |
$235,340 |
FM0486 |
RMC - 635063001 |
12/17/2019 |
11/15/2023 |
ROADSIDE MOW |
R&M INCORPORATED($186,024) |
|
6363-64-001 |
MILAM |
BRYAN |
$196,200 |
FM0486 |
RMC - 636364001 |
06/09/2020 |
11/15/2023 |
TREE RMVL |
K & R CONTRACTORS($206,225) |
|
6392-85-001 |
MILAM |
BRYAN |
$200,264 |
FM0486 |
RMC - 639285001 |
12/07/2021 |
11/15/2023 |
MOW HWY RIGHT OF WAY |
R&M INCORPORATED($191,054) |
|
6391-10-001 |
MILAM |
BRYAN |
$196,200 |
FM0486 |
RMC - 639110001 |
12/08/2021 |
11/15/2023 |
TREE RMVL |
TEXAS ROAD CONSTRUCTION, LLC($387,220) |
|
6459-21-001 |
MILAM |
BRYAN |
$301,416 |
FM0486 |
RMC - 645921001 |
12/06/2023 |
11/15/2023 |
MOW HWY RIGHT OF WAY |
ABESCAPE LANDSCAPING, LLC($226,589) |
|
6370-12-001 |
MILAM |
BRYAN |
$101,579 |
FM0486 |
BPM - 637012001 |
12/17/2020 |
11/15/2023 |
STONE RIP RAP AND SCOUR COUNTERMEASURES |
DOUBLE L CONTRACTING, LLC($72,031) |
|
6343-94-001 |
MILAM |
BRYAN |
$218,747 |
FM0486 |
RMC - 634394001 |
05/14/2019 |
09/27/2024 |
TREE RMVL |
HAMP'S TRANSPORT, INC($285,850) |
|
6443-50-001 |
FREESTONE |
BRYAN |
$219,333 |
FM0488 |
RMC - 644350001 |
06/13/2023 |
11/15/2023 |
CRACK SEAL |
CRACKSEAL OF TEXAS, LLC($271,813) |
|
6337-74-001 |
FREESTONE |
BRYAN |
$58,800 |
FM0489 |
RMC - 633774001 |
10/01/2018 |
11/15/2023 |
TREE TRIM |
WESTGATE GROUP, LLC($52,228) |
|
6362-11-001 |
FREESTONE |
BRYAN |
$200,109 |
FM0489 |
RMC - 636211001 |
05/13/2020 |
09/26/2024 |
TREE TRIM & BRUSH RMVL |
DIAMOND JK CONSTRUCTION LLC($150,399) |
|
6379-00-001 |
WASHINGTON |
BRYAN |
$98,300 |
FM0577 |
BPM - 637900001 |
10/13/2021 |
11/15/2023 |
CULVERT REPAIR |
STRUCTURAL INTEGRITY GROUP LLC($83,775) |
|
6383-98-001 |
FREESTONE |
BRYAN |
$283,502 |
FM0833 |
RMC - 638398001 |
07/13/2021 |
11/15/2023 |
CRACK SEAL |
SCOUT 5 CONSTRUCTION LLC($239,537) |
|
6344-89-001 |
BRAZOS |
BRYAN |
$117,800 |
FM0974 |
RMC - 634489001 |
08/13/2019 |
11/15/2023 |
TREE TRIM & BRUSH RMVL |
ROAD SOLUTIONS L.L.C.($120,890) |
|
6384-07-001 |
BRAZOS |
BRYAN |
$58,820 |
FM0974 |
RMC - 638407001 |
07/15/2021 |
11/15/2023 |
TREE TRIM AND BRUSH RMVL |
TERRY ENTERPRISES($37,841) |
|
6344-90-001 |
BURLESON |
BRYAN |
$77,060 |
FM0975 |
RMC - 634490001 |
08/13/2019 |
11/15/2023 |
TREE TRIM & BRUSH RMVL |
JBM IRRIGATION($72,689) |
|
6382-18-001 |
LEON |
BRYAN |
$111,595 |
FM0977 |
RMC - 638218001 |
06/01/2021 |
11/15/2023 |
TREE TRIM AND BRUSH RMVL |
ROAD SOLUTIONS L.L.C.($75,786) |
|
6362-14-001 |
MADISON |
BRYAN |
$135,999 |
FM0978 |
RMC - 636214001 |
05/13/2020 |
09/26/2024 |
TREE TRIM & BRUSH RMVL |
PATHFIELD INVESTMENTS LLC($109,260) |
|
6286-32-001 |
MADISON |
BRYAN |
$1,456,912 |
FM1119 |
RMC - 628632001 |
12/01/2016 |
11/15/2023 |
ROADWAY RESTOR |
GLENN FUQUA, INC.($1,331,517) |
|
6430-83-001 |
LEON |
BRYAN |
$135,738 |
FM1119 |
RMC - 643083001 |
06/14/2023 |
11/15/2023 |
BRIDGE SCOUR REPAIR |
AMERICAN INFRASTRUCTURE MAINTENANCE MANAGEMENT LLC($148,173) |
|
6362-13-001 |
LEON |
BRYAN |
$210,878 |
FM1119 |
RMC - 636213001 |
05/12/2020 |
09/26/2024 |
TREE TRIM & BRUSH RMVL |
PATHFIELD INVESTMENTS LLC($170,192) |
|
0315-12-016 |
WASHINGTON |
BRYAN |
$1,271,590 |
FM 1155 |
STP 1902(115) |
07/09/2019 |
09/27/2024 |
WIDEN NON-FREEWAY |
KNIFE RIVER CORPORATION - SOUTH($1,296,208) |
|
6383-99-001 |
WASHINGTON |
BRYAN |
$263,100 |
FM1155 |
RMC - 638399001 |
07/13/2021 |
11/15/2023 |
CRACK SEAL |
SCOUT 5 CONSTRUCTION LLC($171,731) |
|
1316-01-067 |
BRAZOS |
BRYAN |
$1,349,105 |
FM 1179 |
STP 2021(771)HES |
08/04/2021 |
11/15/2023 |
INSTL RAISED MEDIAN |
LARRY YOUNG PAVING, INC.($1,423,097) |