0919-19-087 |
BOWIE |
ATLANTA |
$1,969,249 |
3023 019 |
STP 2022(679)TAPS |
09/06/2023 |
11/15/2023 |
BICYCLE AND PEDESTRIAN IMPRVS |
GARRET SHIELDS INFRASTRUCTURE($1,958,509) |
|
0221-09-029 |
TITUS |
ATLANTA |
$685,349 |
BU 271E |
STP 2020(475)HES |
01/10/2020 |
09/26/2024 |
IMPROVING TRAF SIG |
STRIPING TECHNOLOGY, L.P.($609,994) |
|
0246-02-049 |
PANOLA |
ATLANTA |
$951,227 |
BU 79-G |
STP 2017(884) |
03/07/2017 |
11/15/2023 |
PLANE ACP, ACP SURF, & PAV MARK |
DREWERY CONSTRUCTION COMPANY, INCORPORATED($876,859) |
|
0919-22-034 |
MARION |
ATLANTA |
$373,737 |
CR |
BR 2020(063) |
03/03/2022 |
11/15/2023 |
REPLACE BRIDGE AND APPROACHES |
THK CONSTRUCTION LLC($324,589) |
|
0919-30-062 |
TITUS |
ATLANTA |
$653,810 |
CR |
BR 2019(354) |
07/02/2021 |
11/15/2023 |
BRIDGE REPL |
HODGES AND SON CONSTRUCTION COMPANY, INC.($558,400) |
|
0919-13-017 |
PANOLA |
ATLANTA |
$803,558 |
CR |
BR 1902(367) |
06/27/2023 |
11/15/2023 |
BRIDGE REPL |
TRUE ROADS CONSTRUCTION, LLC($968,857) |
|
0919-30-061 |
TITUS |
ATLANTA |
$1,131,509 |
CR |
BR 2019(353) |
06/05/2024 |
04/24/2024 |
BRIDGE REPL |
THK CONSTRUCTION LLC($723,297) |
|
0919-13-018 |
PANOLA |
ATLANTA |
$450,451 |
CR |
BR 1902(372) |
03/03/2022 |
11/15/2023 |
BRIDGE REPL |
RAYFORD'S TRUCK & TRACTOR($489,998) |
|
0919-03-057 |
HARRISON |
ATLANTA |
$461,936 |
CR |
BR 2017(296) |
07/12/2017 |
11/15/2023 |
REPLACE BRIDGE AND APPROACHES |
STATELINE CONSTRUCTION, LLC($444,411) |
|
0919-03-059 |
HARRISON |
ATLANTA |
$369,828 |
CR |
BR 2019(351) |
08/06/2019 |
11/15/2023 |
BRIDGE REPL |
LONGVIEW BRIDGE AND ROAD, LTD.($398,057) |
|
0919-03-060 |
HARRISON |
ATLANTA |
$502,641 |
CR |
BR 2019(352) |
03/04/2022 |
11/15/2023 |
REPLACE BRIDGE AND APPROACHES |
THK CONSTRUCTION LLC($481,045) |
|
0919-03-063 |
HARRISON |
ATLANTA |
$121,034 |
CS |
STP 2021(657)FRS1 |
05/05/2021 |
11/15/2023 |
RAILROAD CROSSING UPGRADES |
EAST TEXAS BRIDGE, INC.($313,319) |
|
0919-19-085 |
BOWIE |
ATLANTA |
$2,287,179 |
CS |
STP 2B22(006)TAPS |
12/03/2024 |
11/10/2024 |
PEDESTRIAN, SIDEWALKS & CURB RAMPS |
|
|
0919-21-029 |
CAMP |
ATLANTA |
$324,906 |
CS |
STP 2017(200)TAPS |
10/04/2017 |
11/15/2023 |
CONSTRUCT SIDEWALKS |
HIGHWAY 19 CONSTRUCTION LLC($309,168) |
|
0919-03-063 |
HARRISON |
ATLANTA |
$300,214 |
CS |
STP 2021(657)FRS1 |
05/05/2022 |
08/31/2024 |
RAILROAD CROSSING UPGRADES |
RAYFORD'S TRUCK & TRACTOR($309,960) |
|
0919-03-064 |
HARRISON |
ATLANTA |
$519,325 |
CS |
STP 2021(277)TAPS |
04/07/2022 |
09/24/2024 |
BICYCLE AND PEDESTRIAN IMPRVS |
THK CONSTRUCTION LLC($457,811) |
|
0919-03-062 |
HARRISON |
ATLANTA |
$546,582 |
CS |
STP 2020(163)TAPS |
05/06/2021 |
11/15/2023 |
CONSTRUCT SIDEWALKS AND CURB RAMPS |
BLACKSTONE CONCRETE VENTURES, LLC($477,174) |
|
6330-15-001 |
PANOLA |
ATLANTA |
$412,476 |
FM0031 |
RMC - 633015001 |
09/06/2019 |
11/15/2023 |
CULVERT REPL - DISTRICTWIDE |
SJ&J CONSTRUCTION, LLC($472,593) |
|
6319-22-001 |
BOWIE |
ATLANTA |
$1,914,000 |
FM0044 |
RMC - 631922001 |
11/02/2017 |
11/15/2023 |
SEAL COAT AND PAVMT MRK |
CDM HOLDINGS, LLC($1,841,385) |
|
6470-64-001 |
TITUS |
ATLANTA |
$478,250 |
FM0071 |
RMC - 647064001 |
09/04/2024 |
07/24/2024 |
CRACK SEAL |
D & M CONTRACTORS, LLC($624,941) |
|
6309-02-001 |
MORRIS |
ATLANTA |
$131,760 |
FM0161 |
RMC - 630902001 |
11/16/2016 |
11/15/2023 |
FULL WIDTH MOW (TRACT 2 - MORRIS) |
TERRY ENTERPRISES($138,055) |
|
6391-22-001 |
MORRIS |
ATLANTA |
$146,400 |
FM0161 |
RMC - 639122001 |
11/17/2021 |
11/15/2023 |
MOW HWY RIGHT OF WAY |
TERRY ENTERPRISES($180,560) |
|
6475-72-001 |
MORRIS |
ATLANTA |
$193,596 |
FM0161 |
RMC - 647572001 |
11/20/2024 |
10/21/2024 |
MOW HWY RIGHT OF WAY |
SCOUT 5 CONSTRUCTION LLC($168,280) |
|
6366-00-001 |
MORRIS |
ATLANTA |
$146,400 |
FM0161 |
RMC - 636600001 |
11/18/2020 |
11/15/2023 |
FULL WIDTH MOW (TRACT 2 - MORRIS) |
CLASSIC IRRIGATION & LANDSCAPE LLC($146,400) |
|
6453-73-001 |
MORRIS |
ATLANTA |
$188,632 |
FM0161 |
RMC - 645373001 |
01/10/2024 |
11/29/2023 |
MOW HWY RIGHT OF WAY |
TERRY ENTERPRISES($193,596) |
|
6391-25-001 |
CASS |
ATLANTA |
$179,850 |
FM0251 |
RMC - 639125001 |
11/17/2021 |
11/15/2023 |
MOW HWY RIGHT OF WAY |
TERRY ENTERPRISES($227,810) |
|
6453-79-001 |
CASS |
ATLANTA |
$227,924 |
FM0251 |
RMC - 645379001 |
01/10/2024 |
11/29/2023 |
MOW HWY RIGHT OF WAY |
HX FARMS, INC.($227,204) |
|
6365-95-001 |
CASS |
ATLANTA |
$179,850 |
FM0251 |
RMC - 636595001 |
11/18/2020 |
11/15/2023 |
FULL WIDTH MOW (TRACT 5 - CASS) |
TERRY ENTERPRISES($175,354) |
|
6475-75-001 |
CASS |
ATLANTA |
$227,924 |
FM0251 |
RMC - 647575001 |
11/20/2024 |
10/21/2024 |
MOW HWY RIGHT OF WAY |
CROSS PLUS CONSTRUCTION, LLC($227,864) |
|
6309-05-001 |
CASS |
ATLANTA |
$149,607 |
FM0251 |
RMC - 630905001 |
11/16/2016 |
11/15/2023 |
FULL WIDTH MOW (TRACT 5 - CASS) |
TERRY ENTERPRISES($149,053) |
|
6309-03-001 |
UPSHUR |
ATLANTA |
$130,634 |
FM0556 |
RMC - 630903001 |
11/16/2016 |
11/15/2023 |
FULL WIDTH MOW (TRACT 3 - UPSHUR) |
HX FARMS, INC.($149,136) |
|
6391-23-001 |
UPSHUR |
ATLANTA |
$163,960 |
FM0556 |
RMC - 639123001 |
11/17/2021 |
11/15/2023 |
MOW HWY RIGHT OF WAY |
SOUTHERN EDGE CONTRACTORS LLC($174,321) |
|
6365-93-001 |
UPSHUR |
ATLANTA |
$163,960 |
FM0556 |
RMC - 636593001 |
11/18/2020 |
11/15/2023 |
FULL WIDTH MOW (TRACT 3 - UPSHUR) |
CLASSIC IRRIGATION & LANDSCAPE LLC($161,760) |
|
6453-75-001 |
UPSHUR |
ATLANTA |
$206,616 |
FM0556 |
RMC - 645375001 |
01/10/2024 |
11/29/2023 |
MOW HWY RIGHT OF WAY |
SERVIN MOWING($188,016) |
|
6475-73-001 |
UPSHUR |
ATLANTA |
$206,616 |
FM0556 |
RMC - 647573001 |
11/20/2024 |
10/21/2024 |
MOW HWY RIGHT OF WAY |
SCOUT 5 CONSTRUCTION LLC($177,689) |
|
6304-13-001 |
CAMP |
ATLANTA |
$665,850 |
FM0993 |
BPM - 630413001 |
02/02/2017 |
11/15/2023 |
BRIDGE PROTECTIVE MAINT |
STATELINE CONSTRUCTION, LLC($743,841) |
|
0063-01-094 |
HARRISON |
ATLANTA |
$2,187,578 |
FM 1186 |
STP 2020(439)HES |
03/04/2020 |
11/15/2023 |
SAFETY TREAT FIXED OBJECTS |
LONGVIEW BRIDGE AND ROAD, LTD.($1,847,140) |
|
0063-01-092 |
HARRISON |
ATLANTA |
$926,589 |
FM 1186 |
STP 2017(336)HESG |
12/01/2016 |
11/15/2023 |
PROFILE EDGELINE MRK |
STRIPE-A-ZONE, INC.($814,705) |
|
2879-01-010 |
BOWIE |
ATLANTA |
$2,503,450 |
FM 1297 |
STP 1602(316) |
01/04/2017 |
11/15/2023 |
GR,BS,SURF & PAV MRKS |
H. V. CAVER, INC.($2,668,802) |
|
6305-92-001 |
BOWIE |
ATLANTA |
$3,469,000 |
FM1397 |
RMC - 630592001 |
11/04/2016 |
11/15/2023 |
SEAL COAT |
CDM HOLDINGS, LLC($3,109,249) |
|
1574-01-018 |
MORRIS |
ATLANTA |
$3,914,751 |
FM 161 |
C 1574-1-18 |
04/05/2024 |
02/23/2024 |
WIDEN ROAD - ADD SHOULDERS |
A. K. GILLIS & SONS, LLC($3,791,092) |
|
1226-02-016 |
TITUS |
ATLANTA |
$14,221,495 |
FM 1735 |
C 1226-2-16 |
01/05/2023 |
11/15/2023 |
RECON EXIST 2-LANE HWY |
H. H. HOWARD & SONS, INC.($11,920,528) |
|
0428-03-012 |
PANOLA |
ATLANTA |
$1,815,536 |
FM 1970 |
STP 2B20(271)HES |
09/04/2020 |
11/15/2023 |
PROFILE EDGELINE AND CENTERLINE MRK |
STRIPING TECHNOLOGY, L.P.($1,764,541) |
|
6361-92-001 |
CAMP |
ATLANTA |
$530,645 |
FM1975 |
RMC - 636192001 |
06/05/2020 |
11/15/2023 |
INSTL OF PAVMT MRK |
STRIPING TECHNOLOGY, L.P.($549,004) |
|
1919-02-037 |
HARRISON |
ATLANTA |
$859,170 |
FM 1997 |
STP 1702(400) |
06/07/2017 |
11/15/2023 |
SIDEWALKS, CURB RAMPS AND RET WALL |
MADDEN CONTRACTING COMPANY, LLC.($823,437) |
|
2879-02-014 |
BOWIE |
ATLANTA |
$636,712 |
FM 2240 |
F 2022(301) |
01/07/2022 |
11/15/2023 |
RESURF EXIST ROADWAY |
RK HALL, LLC($651,270) |
|
0138-11-032 |
MARION |
ATLANTA |
$1,288,999 |
FM 248 |
STP 2021(148) |
12/02/2020 |
11/15/2023 |
INSTLING SAFETY LIGHTING |
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC.($1,138,921) |
|
0138-10-029 |
CASS |
ATLANTA |
$3,270,636 |
FM 248 |
STP 2021(287)HES |
04/07/2021 |
11/15/2023 |
SAFETY TREAT FIXED OBJECTS |
H. V. CAVER, INC.($2,714,171) |
|
0843-07-016 |
HARRISON |
ATLANTA |
$2,544,726 |
FM 2625 |
CC 843-7-16 |
08/09/2017 |
11/15/2023 |
GR,STR,BASE,SURF |
LONGVIEW BRIDGE AND ROAD, LTD.($2,284,633) |
|
0085-03-017 |
BOWIE |
ATLANTA |
$1,759,581 |
FM 2735 |
STP 2021(299)HES |
06/03/2021 |
11/15/2023 |
SAFETY TREAT FIXED OBJECTS |
HX FARMS, INC.($1,493,308) |
|
0946-03-027 |
UPSHUR |
ATLANTA |
$6,430,510 |
FM 2796 |
F 2B24(111) |
06/05/2024 |
04/24/2024 |
WIDEN ROAD - ADD SHOULDERS |
TRUE ROADS, LLC($5,101,063) |
|
3041-03-012 |
HARRISON |
ATLANTA |
$4,206,747 |
FM 3001 |
BR 2022(504) |
05/05/2022 |
08/31/2024 |
BRIDGE REPL |
HIGHWAY 19 CONSTRUCTION LLC($4,618,853) |
|
0945-03-009 |
CASS |
ATLANTA |
$11,124,878 |
FM 3129 |
STP 1802(436)HES |
06/06/2018 |
11/15/2023 |
UPGRADE MBGF & SAFETY END TREATMENT |
RK HALL, LLC($9,147,322) |
|
2526-02-010 |
BOWIE |
ATLANTA |
$1,125,000 |
FM 3378 |
STP 2017(723)HESG |
02/03/2017 |
11/15/2023 |
BASE, SURF & PAVMT MRK |
CDM HOLDINGS, LLC($897,911) |
|
3404-01-016 |
TITUS |
ATLANTA |
$3,899,961 |
FM 3417 |
SSW 3404-1-16 |
04/03/2018 |
11/15/2023 |
GR,BS,SURF & PAV MRKS |
H. V. CAVER, INC.($3,193,652) |
|
0843-06-019 |
HARRISON |
ATLANTA |
$445,191 |
FM 450 |
STP 2017(508)HESG |
01/05/2017 |
11/15/2023 |
BASE, SURF & PAVMT MRK |
FRITCHER CONSTRUCTION SERVICES($474,177) |
|
0632-04-032 |
HARRISON |
ATLANTA |
$5,357,557 |
FM 451 |
SSW 632-4-32 |
03/05/2019 |
11/15/2023 |
GR, BS, STRS, SURF & PAV MRKS |
H. V. CAVER, INC.($4,798,327) |
|
2030-01-011 |
UPSHUR |
ATLANTA |
$4,301,743 |
FM 556 |
BR 2B24(032) |
05/03/2024 |
03/22/2024 |
REPLACE BRIDGE AND APPROACHES |
EAST TEXAS BRIDGE, INC.($3,343,733) |
|
1020-01-057 |
BOWIE |
ATLANTA |
$183,330 |
FM 559 |
STP 2023(373)HES |
01/05/2023 |
11/15/2023 |
INSTL TRAF SIGNAL |
WG ENGINEERING & CONSTRUCTION, LLC($225,790) |
|
0394-03-040 |
PANOLA |
ATLANTA |
$1,214,917 |
FM 699 |
STP 1802(213) |
06/05/2018 |
11/15/2023 |
PLANING,ACP,CPCD & PAV MRKS |
EAST TEXAS BRIDGE, INC.($1,204,986) |
|
1895-02-013 |
HARRISON |
ATLANTA |
$2,423,931 |
FM 726 |
BR 2B23(016) |
08/03/2023 |
11/15/2023 |
REPLACE BRIDGE AND APPROACHES |
THK CONSTRUCTION LLC($3,496,301) |
|
0843-03-015 |
MARION |
ATLANTA |
$1,241,076 |
FM 728 |
STP 2021(300)HES |
02/04/2021 |
11/15/2023 |
SAFETY TREAT FIXED OBJECTS |
R & G CONSTRUCTION, LLC($856,033) |
|
1176-02-019 |
TITUS |
ATLANTA |
$1,260,464 |
FM 899 |
BR 2019(691) |
03/05/2019 |
11/15/2023 |
REPLACE BRIDGE AND APPROACHES |
EAST TEXAS BRIDGE, INC.($1,121,133) |
|
0632-04-034 |
HARRISON |
ATLANTA |
$3,051,282 |
FM 9 |
STP 2019(262) |
12/06/2018 |
11/15/2023 |
FOAMED ASPH TRT,ACP SURF & PAV MRKS |
MADDEN CONTRACTING COMPANY, LLC.($2,792,495) |
|
1231-01-073 |
BOWIE |
ATLANTA |
$2,583,733 |
FM 989 |
C 1231-1-73 |
10/02/2024 |
08/21/2024 |
OV |
RK HALL, LLC($2,429,230) |
|
1231-01-069 |
BOWIE |
ATLANTA |
$1,574,414 |
FM 989 |
F 2023(683) |
05/04/2023 |
11/15/2023 |
RESURF EXIST 4-LANE HWY |
RK HALL, LLC($1,902,108) |
|
0010-19-014 |
BOWIE |
ATLANTA |
$11,110,112 |
FM 991 |
F 2024(073) |
10/05/2023 |
11/15/2023 |
SEAL COAT AND PAVMT MRK |
CDM HOLDINGS($11,823,241) |
|
0010-19-013 |
BOWIE |
ATLANTA |
$641,365 |
FM 991 |
STP 2020(786)HES |
03/04/2020 |
11/15/2023 |
INSTL OF ADVANCE WARN SIGNS AND CHEVRONS |
CHAMPION INFRASTRUCTURE, LLC($659,420) |
|
0010-19-012 |
BOWIE |
ATLANTA |
$1,965,619 |
FM 991 |
STP 2018(645)HES |
03/06/2018 |
11/15/2023 |
SAFETY TREAT FIXED OBJECTS |
CDM HOLDINGS, LLC($1,463,551) |
|
0010-19-010 |
BOWIE |
ATLANTA |
$2,925,668 |
FM 991 |
STP 2018(037)HESG |
09/07/2017 |
11/15/2023 |
PROFILE CENTERLINE & EDGELINE MRKS |
STRIPE-A-ZONE, INC.($2,282,447) |
|
1511-01-013 |
UPSHUR |
ATLANTA |
$2,229,422 |
FM 993 |
BR 2024(791) |
03/06/2024 |
01/24/2024 |
REPLACE BRIDGE AND APPROACHES |
THK CONSTRUCTION LLC($1,790,148) |
|
1216-01-010 |
CASS |
ATLANTA |
$3,043,209 |
FM 994 |
C 1216-1-10 |
12/04/2024 |
11/10/2024 |
REHAB OF EXIST ROAD |
|
|
6324-03-001 |
HARRISON |
ATLANTA |
$37,000 |
IH0020 |
RMC - 632403001 |
11/16/2017 |
11/15/2023 |
DEBRIS RMVL - SOUTH |
HOLMES AND HOLMES CONTRACTING($59,200) |
|
6419-78-001 |
HARRISON |
ATLANTA |
$293,500 |
IH0020 |
MMC - 641978001 |
10/12/2022 |
11/15/2023 |
HOT MIX |
LONGVIEW ASPHALT, INC.($329,410) |
|
6380-05-001 |
HARRISON |
ATLANTA |
$4,077,500 |
IH0020 |
RMC - 638005001 |
07/02/2021 |
11/15/2023 |
MILL AND INLAY |
MADDEN CONTRACTING COMPANY, LLC.($3,880,504) |
|
6354-80-001 |
HARRISON |
ATLANTA |
$276,900 |
IH0020 |
MMC - 635480001 |
02/19/2020 |
09/26/2024 |
MATERIALS ONLY, HMAC |
LONGVIEW ASPHALT, INC.($262,200) |
|
6356-70-001 |
HARRISON |
ATLANTA |
$207,950 |
IH0020 |
RMC - 635670001 |
02/19/2020 |
09/26/2024 |
CALLOUT CABLE SAFETY SYSTEM REPAIR |
H. V. CAVER, INC.($238,975) |
|
6374-82-001 |
HARRISON |
ATLANTA |
$253,700 |
IH0020 |
MMC - 637482001 |
02/17/2021 |
09/26/2024 |
MATERIALS ONLY, HMAC |
LONGVIEW ASPHALT, INC.($253,700) |
|
6473-69-001 |
HARRISON |
ATLANTA |
$972,639 |
IH0020 |
MMC - 647369001 |
10/09/2024 |
09/02/2024 |
AGGREGATE |
RK HALL, LLC($1,118,576) |
|
6396-56-001 |
HARRISON |
ATLANTA |
$279,000 |
IH0020 |
MMC - 639656001 |
02/16/2022 |
11/15/2023 |
HOT MIX |
LONGVIEW ASPHALT, INC.($266,000) |
|
6417-68-001 |
HARRISON |
ATLANTA |
$511,159 |
IH0020 |
MMC - 641768001 |
11/02/2022 |
11/15/2023 |
AGGREGATE |
RK HALL, LLC($727,489) |
|
6310-93-001 |
HARRISON |
ATLANTA |
$37,000 |
IH0020 |
RMC - 631093001 |
11/16/2016 |
11/15/2023 |
DEBRIS RMVL (SOUTH) |
HOLMES AND HOLMES CONTRACTING($35,823) |
|
6457-57-001 |
HARRISON |
ATLANTA |
$356,625 |
IH0020 |
MMC - 645757001 |
11/01/2023 |
11/15/2023 |
AGGREGATE |
RK HALL, LLC($314,430) |
|
6462-16-001 |
HARRISON |
ATLANTA |
$4,454,500 |
IH0020 |
RMC - 646216001 |
03/06/2024 |
01/26/2024 |
MILL AND INLAY |
MADDEN CONTRACTING COMPANY, LLC.($6,136,950) |
|
6352-46-001 |
HARRISON |
ATLANTA |
$108,975 |
IH0020 |
RMC - 635246001 |
11/19/2019 |
11/15/2023 |
DEBRIS RMVL - SOUTH |
HOLMES AND HOLMES CONTRACTING($101,752) |
|
6324-85-001 |
HARRISON |
ATLANTA |
$3,795,200 |
IH0020 |
RMC - 632485001 |
09/07/2018 |
11/15/2023 |
CALLOUT MILL & INLAY (SOUTH) |
MADDEN CONTRACTING COMPANY, LLC.($3,931,850) |
|
6462-19-001 |
HARRISON |
ATLANTA |
$510,800 |
IH0020 |
RMC - 646219001 |
02/02/2024 |
12/25/2023 |
CABLE BARRIER REPAIR |
ROSS SA ENTERPRISE LLC($478,435) |
|
6328-37-001 |
HARRISON |
ATLANTA |
$212,950 |
IH0020 |
RMC - 632837001 |
04/11/2018 |
11/15/2023 |
CALLOUT CABLE SAFETY SYSTEM REPAIR |
HX FARMS, INC.($239,896) |
|
6455-01-001 |
HARRISON |
ATLANTA |
$204,250 |
IH0020 |
RMC - 645501001 |
10/17/2023 |
11/15/2023 |
DEBRIS RMVL |
HOLMES AND HOLMES CONTRACTING($213,679) |
|
6387-46-001 |
HARRISON |
ATLANTA |
$108,975 |
IH0020 |
RMC - 638746001 |
10/26/2021 |
11/15/2023 |
DEBRIS RMVL |
HOLMES AND HOLMES CONTRACTING($101,752) |
|
6309-11-001 |
HARRISON |
ATLANTA |
$82,380 |
IH0020 |
RMC - 630911001 |
11/16/2016 |
11/15/2023 |
FULL WIDTH MOW (TRACT 16 - HARRISON) |
DBI SERVICES, LLC($97,840) |
|
6454-95-001 |
BOWIE |
ATLANTA |
$204,250 |
IH0030 |
RMC - 645495001 |
10/17/2023 |
11/15/2023 |
DEBRIS RMVL |
MORTON ENTERPRISE($191,919) |
|
6308-16-001 |
TITUS |
ATLANTA |
$340,700 |
IH0030 |
RMC - 630816001 |
12/01/2016 |
11/15/2023 |
TREE TRIM - ATLANTA DISTRICTWIDE |
TEXAS TREE & LANDSCAPE, LTD.($391,870) |
|
6348-25-001 |
BOWIE |
ATLANTA |
$305,500 |
IH0030 |
RMC - 634825001 |
09/06/2019 |
11/15/2023 |
TREE & STUMP RMVL (N) |
CATOCON, INC.($316,004) |
|
6365-99-001 |
BOWIE |
ATLANTA |
$123,690 |
IH0030 |
RMC - 636599001 |
11/18/2020 |
11/15/2023 |
RIGHT OF WAY MOW (TRACT 9-BOWIE) |
PERRY WEST($122,659) |
|
6419-84-001 |
BOWIE |
ATLANTA |
$293,500 |
IH0030 |
MMC - 641984001 |
10/12/2022 |
11/15/2023 |
HOT MIX |
RK HALL, LLC($321,335) |
|
6419-80-001 |
TITUS |
ATLANTA |
$293,500 |
IH0030 |
MMC - 641980001 |
10/12/2022 |
11/15/2023 |
HOT MIX |
RK HALL, LLC($307,962) |
|
6309-12-001 |
BOWIE |
ATLANTA |
$86,548 |
IH0030 |
RMC - 630912001 |
11/16/2016 |
11/15/2023 |
FULL WIDTH MOW (TRACT 18-BOWIE) |
PERRY WEST($99,839) |
|
6324-02-001 |
BOWIE |
ATLANTA |
$37,000 |
IH0030 |
RMC - 632402001 |
11/16/2017 |
11/15/2023 |
DEBRIS RMVL (NORTH) |
MORTON ENTERPRISE($48,803) |
|
6369-70-001 |
BOWIE |
ATLANTA |
$360,500 |
IH0030 |
RMC - 636970001 |
11/04/2020 |
11/15/2023 |
TREE & STUMP RMVL (NORTH) |
H. V. CAVER, INC.($296,454) |