6370-09-001 |
BORDEN |
ABILENE |
$15,000 |
US0180 |
MMC - 637009001 |
11/12/2020 |
11/15/2023 |
BRINE WATER PICKUP |
MAHAN FOUNDATION & CONTRACTORS, LLC($25,000) |
|
6393-47-001 |
BORDEN |
ABILENE |
$123,610 |
US0180 |
RMC - 639347001 |
11/18/2021 |
11/15/2023 |
MOW HWY RIGHT OF WAY |
DESERT LUXURY TRANSPORTATION, LLC($106,760) |
|
1155-04-013 |
BORDEN |
ABILENE |
$3,266,877 |
FM 1785 |
STP 2022(830)HES |
08/03/2022 |
11/15/2023 |
WIDEN ROAD - ADD SHOULDERS |
GILVIN-TERRILL, LTD.($4,392,391) |
|
0558-03-028 |
BORDEN |
ABILENE |
$2,422,086 |
FM 669 |
STP 2B23(132)HES |
08/02/2023 |
11/15/2023 |
WIDEN ROAD - ADD SHOULDERS |
DUININCK, INC.($3,149,254) |
|
6320-39-001 |
BORDEN |
ABILENE |
$156,034 |
US0180 |
RMC - 632039001 |
12/12/2023 |
11/15/2023 |
MOW HWY RIGHT OF WAY |
|
|
6358-20-001 |
BORDEN |
ABILENE |
$79,468 |
US0180 |
MMC - 635820001 |
04/29/2020 |
11/15/2023 |
MATERIALS ONLY |
VULCAN CONSTRUCTION MATERIALS, LLC($77,830) |
|
6376-03-001 |
BORDEN |
ABILENE |
$134,421 |
US0180 |
RMC - 637603001 |
04/20/2021 |
11/15/2023 |
MOW HWY RIGHT OF WAY |
KENNETH THOMASON($94,883) |
|
3276-01-020 |
BORDEN |
ABILENE |
$10,493,857 |
FM 1054 |
STP 2020(359) |
12/03/2019 |
11/15/2023 |
SEAL COAT |
RONALD R. WAGNER & CO., LP($9,612,826) |
|
6457-11-001 |
BORDEN |
ABILENE |
$120,148 |
US0180 |
RMC - 645711001 |
02/20/2024 |
11/21/2023 |
MOW HWY RIGHT OF WAY |
THE ROLLING GROUP LLC($99,736) |
|
6358-38-001 |
BORDEN |
ABILENE |
$87,448 |
US0180 |
MMC - 635838001 |
04/20/2020 |
11/15/2023 |
MATERIALS ONLY |
VULCAN CONSTRUCTION MATERIALS, LLC($92,840) |
|
6358-42-001 |
CALLAHAN |
ABILENE |
$283,100 |
IH0020 |
MMC - 635842001 |
04/16/2020 |
11/15/2023 |
MATERIALS ONLY |
VULCAN CONSTRUCTION MATERIALS, LLC($268,964) |
|
0007-01-056 |
CALLAHAN |
ABILENE |
$9,271,227 |
IH 20 |
NH 2017(364) |
12/01/2016 |
11/15/2023 |
SEAL COAT |
LIPHAM ASPHALT AND PAVING COMPANY, LLC($8,458,527) |
|
0437-02-016 |
CALLAHAN |
ABILENE |
$2,814,100 |
US 283 |
STP 2017(857) |
03/08/2017 |
11/15/2023 |
RESTOR |
IOC COMPANY LLC($1,793,914) |
|
0007-01-054 |
CALLAHAN |
ABILENE |
$10,397,195 |
IH 20 |
NH 2017(855) |
04/04/2017 |
11/15/2023 |
OVERLAY |
J. H. STRAIN & SONS, INC.($8,248,492) |
|
0908-34-022 |
CALLAHAN |
ABILENE |
$1,449,479 |
CR |
BR 2016(763) |
08/08/2017 |
11/15/2023 |
BRIDGE REPL |
ELLIS-MCGINNIS CONSTRUCTION CO.($1,472,448) |
|
0006-11-022 |
CALLAHAN |
ABILENE |
$2,250,625 |
FM 18 |
STP 2018(554)HESG |
02/01/2018 |
11/15/2023 |
PROFILE EDGELINE MRK |
SURFACE PREPARATION TECHNOLOGIES, LLC($1,810,775) |
|
0006-07-079 |
CALLAHAN |
ABILENE |
$7,390,695 |
IH 20 |
C 6-7-79 |
06/06/2018 |
11/15/2023 |
MILL AND OVERLAY |
J. H. STRAIN & SONS, INC.($7,087,728) |
|
0437-02-017 |
CALLAHAN |
ABILENE |
$3,681,738 |
US 283 |
STP 2019(394) |
01/09/2019 |
11/15/2023 |
3"OVERLAY |
J. H. STRAIN & SONS, INC.($3,259,093) |
|
0181-03-025 |
CALLAHAN |
ABILENE |
$1,948,115 |
SH 36 |
STP 2019(443)HES |
02/05/2019 |
11/15/2023 |
MILLED EDGELINE RUMBLE STRIPS |
FLAT LINE, INC.($1,298,585) |
|
0006-07-080 |
CALLAHAN |
ABILENE |
$9,844,142 |
IH 20 |
NH 2019(920) |
05/07/2019 |
11/15/2023 |
MILL & SMA OVRLAY |
A. L. HELMCAMP, INC.($10,684,705) |
|
0181-02-032 |
CALLAHAN |
ABILENE |
$1,441,061 |
SH 36 |
C 181-2-32 |
08/05/2020 |
11/15/2023 |
ADD TURN , ACCEL AND DECEL LANES |
CONTRACT PAVING CO.($1,433,561) |
|
0006-07-085 |
CALLAHAN |
ABILENE |
$4,421,987 |
IH 20 |
C 6-7-85 |
08/06/2020 |
11/15/2023 |
CONC MEDIAN BARRIER |
HJC FARMS, INC.($4,097,727) |
|
6360-80-001 |
CALLAHAN |
ABILENE |
$322,603 |
IH0020 |
RMC - 636080001 |
04/08/2020 |
11/15/2023 |
MOW HWY RIGHT OF WAY CALLAHAN COUNTY |
ABESCAPE LANDSCAPING, LLC($354,020) |
|
0974-02-017 |
CALLAHAN |
ABILENE |
$10,924,178 |
FM 604 |
F 2022(147) |
12/01/2021 |
11/15/2023 |
SEAL COAT |
LIPHAM ASPHALT AND PAVING COMPANY, LLC($12,420,201) |
|
2638-03-012 |
CALLAHAN |
ABILENE |
$1,871,987 |
SH 206 |
F 2B23(258) |
09/06/2023 |
11/15/2023 |
PREVENT MAINT |
J. H. STRAIN & SONS, INC.($1,595,478) |
|
0974-06-016 |
CALLAHAN |
ABILENE |
$3,802,153 |
FM 604 |
F 2022(614) |
06/02/2022 |
09/03/2024 |
REHAB EXIST ROADWAY |
J. H. STRAIN & SONS, INC.($3,777,686) |
|
0007-01-062 |
CALLAHAN |
ABILENE |
$6,463,181 |
IH 20 |
BR 2019(388) |
04/04/2023 |
09/24/2024 |
BRIDGE MAINT |
ALTUS CONSTRUCTION LLC($7,267,838) |
|
6371-00-001 |
CALLAHAN |
ABILENE |
$565,882 |
US0283 |
RMC - 637100001 |
10/02/2020 |
11/15/2023 |
CLEANING AND SEALING CRACKS AND JOINTS (ASPH CONC) |
D & M CONTRACTORS, LLC($544,431) |
|
6379-38-001 |
CALLAHAN |
ABILENE |
$346,620 |
IH0020 |
RMC - 637938001 |
04/08/2021 |
11/15/2023 |
MOW HWY RIGHT OF WAY |
CROSS PLUS CONSTRUCTION, LLC($340,442) |
|
6389-58-001 |
CALLAHAN |
ABILENE |
$902,063 |
FM0880 |
RMC - 638958001 |
10/07/2021 |
11/15/2023 |
MILL AND INLAY |
FOUTSCO PAVING COMPANY, LLC($841,350) |
|
6423-80-001 |
CALLAHAN |
ABILENE |
$398,641 |
IH0020 |
RMC - 642380001 |
03/08/2023 |
11/15/2023 |
MOW HWY RIGHT OF WAY |
GREG SCRUGGS($495,705) |
|
6359-16-001 |
CALLAHAN |
ABILENE |
$218,400 |
FM3217 |
MMC - 635916001 |
12/18/2023 |
11/15/2023 |
ROADWAY MATERIALS_AGGREGATES |
ZACK BURKETT CO.($239,745) |
|
0437-02-014 |
CALLAHAN |
ABILENE |
$3,782,032 |
US 283 |
STP 2018(312) |
12/05/2017 |
11/15/2023 |
REHAB |
CONTRACT PAVING CO.($3,117,046) |
|
6311-00-001 |
CALLAHAN |
ABILENE |
$304,310 |
IH0020 |
RMC - 631100001 |
03/08/2017 |
11/15/2023 |
MOW HWY RIGHT OF WAY |
CROSS PLUS CONSTRUCTION, LLC($321,323) |
|
6390-31-001 |
CALLAHAN |
ABILENE |
$329,410 |
IH0020 |
RMC - 639031001 |
12/01/2021 |
11/15/2023 |
MOW HWY RIGHT OF WAY |
CROSS PLUS CONSTRUCTION, LLC($408,249) |
|
6457-41-001 |
CALLAHAN |
ABILENE |
$417,308 |
IH0020 |
RMC - 645741001 |
02/02/2024 |
11/27/2023 |
MOW HWY RIGHT OF WAY |
JOSE ERNESTO SALAZAR, LLC($391,555) |
|
0437-04-034 |
CALLAHAN |
ABILENE |
$3,172,327 |
US 283 |
BR 2023(912) |
06/02/2023 |
11/28/2023 |
BRIDGE REPL |
PROJECT ALLIED RESOURCES, LLC($3,377,698) |
|
0181-03-031 |
CALLAHAN |
ABILENE |
$8,134,561 |
SH 36 |
C 181-3-31 |
03/05/2024 |
01/23/2024 |
WIDEN ROAD - ADD LANES |
FOUTSCO PAVING COMPANY, LLC($7,369,773) |
|
0007-02-057 |
CALLAHAN |
ABILENE |
$6,217,446 |
IH 20 |
BR 2023(488) |
03/08/2023 |
08/21/2024 |
REPLACE BRIDGE |
ALTUS CONSTRUCTION LLC($5,593,534) |
|
0908-00-131 |
CALLAHAN |
ABILENE |
$1,232,782 |
IH 20 |
BR 2024(777) |
03/06/2024 |
01/24/2024 |
BRIDGE MAINT |
SCOUT 5 CONSTRUCTION LLC($562,853) |
|
0007-01-062 |
CALLAHAN |
ABILENE |
$3,639,411 |
IH 20 |
BR 2019(388) |
09/05/2019 |
11/15/2023 |
BRIDGE MAINT |
STATELINE CONSTRUCTION, LLC($5,575,722) |
|
0007-02-051 |
CALLAHAN |
ABILENE |
$9,406,068 |
IH 20 |
C 7-2-51 |
05/02/2024 |
03/21/2024 |
PREVENT MAINT |
J. H. STRAIN & SONS, INC.($10,411,767) |
|
6358-40-001 |
CALLAHAN |
ABILENE |
$36,180 |
US0283 |
MMC - 635840001 |
06/29/2020 |
09/26/2024 |
ROADWAY MATERIALS |
WRIGHT ASPHALT PRODUCTS COMPANY LLC($38,160) |
|
6358-39-001 |
CALLAHAN |
ABILENE |
$105,500 |
US0283 |
MMC - 635839001 |
05/14/2020 |
09/26/2024 |
ROADWAY MATERIALS |
VULCAN CONSTRUCTION MATERIALS, LLC($107,188) |
|
6358-19-001 |
FISHER |
ABILENE |
$20,478 |
US0180 |
MMC - 635819001 |
04/20/2020 |
11/15/2023 |
MATERIALS ONLY |
VULCAN CONSTRUCTION MATERIALS, LLC($21,485) |
|
6358-17-001 |
FISHER |
ABILENE |
$224,080 |
US0180 |
MMC - 635817001 |
04/29/2020 |
11/15/2023 |
MATERIALS ONLY |
VULCAN CONSTRUCTION MATERIALS, LLC($221,350) |
|
6379-96-001 |
FISHER |
ABILENE |
$216,984 |
US0180 |
RMC - 637996001 |
04/20/2021 |
11/15/2023 |
MOW HWY RIGHT OF WAY |
KENNETH THOMASON($150,894) |
|
6423-72-001 |
FISHER |
ABILENE |
$218,480 |
US0180 |
RMC - 642372001 |
02/28/2023 |
11/15/2023 |
MOW HWY RIGHT OF WAY |
KENKO CONTRACTORS PRO LLC($188,680) |
|
0317-01-037 |
FISHER |
ABILENE |
$15,042,021 |
FM 57 |
STP 2019(985) |
06/04/2019 |
11/15/2023 |
WIDEN NON-FREEWAY & REPLACE BRIDGE AND APROACHES |
FNF CONSTRUCTION, INC.($18,577,371) |
|
0983-02-022 |
FISHER |
ABILENE |
$1,473,540 |
FM 419 |
BR 2021(580) |
06/04/2021 |
11/15/2023 |
BRIDGE REPL |
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.($1,468,421) |
|
1652-01-015 |
FISHER |
ABILENE |
$717,310 |
FM 419 |
BR 2024(303) |
11/02/2023 |
11/15/2023 |
BRIDGE REPL |
ICOS MANAGEMENT, LLC($684,071) |
|
6390-55-001 |
FISHER |
ABILENE |
$2,450,000 |
US0180 |
MMC - 639055001 |
11/04/2021 |
11/15/2023 |
HOT-MIX COLD-LAID (MATERIAL ONLY) |
ZACK BURKETT CO.($2,717,000) |
|
0296-02-033 |
FISHER |
ABILENE |
$2,051,214 |
US 180 |
BR 2018(951) |
06/06/2018 |
11/15/2023 |
BRIDGE REPL |
J. H. STRAIN & SONS, INC.($1,763,519) |
|
6358-18-001 |
FISHER |
ABILENE |
$51,812 |
US0180 |
MMC - 635818001 |
04/16/2020 |
11/15/2023 |
MATERIALS ONLY |
VULCAN CONSTRUCTION MATERIALS, LLC($49,381) |
|
6457-19-001 |
FISHER |
ABILENE |
$223,604 |
US0180 |
RMC - 645719001 |
02/20/2024 |
11/21/2023 |
MOW HWY RIGHT OF WAY |
KENNETH THOMASON($206,466) |
|
0317-01-043 |
FISHER |
ABILENE |
$3,902,364 |
FM 57 |
STP 2024(775)HES |
03/05/2024 |
01/23/2024 |
WIDEN ROAD - ADD SHOULDERS |
GILVIN-TERRILL, LTD.($3,763,383) |
|
0908-23-053 |
FISHER |
ABILENE |
$714,308 |
CR |
BR 2023(945) |
06/27/2023 |
11/15/2023 |
BRIDGE REPL |
DELGADO'S CONTRACTORS, LLC($917,198) |
|
0263-05-024 |
FISHER |
ABILENE |
$3,124,040 |
SH 70 |
BR 2B20(044) |
06/29/2022 |
11/15/2023 |
BRIDGE REPL |
STATELINE CONSTRUCTION, LLC($3,716,744) |
|
6358-33-001 |
FISHER |
ABILENE |
$44,855 |
US0180 |
MMC - 635833001 |
06/29/2020 |
09/26/2024 |
ROADWAY MATERIALS |
ZACK BURKETT CO.($40,388) |
|
6358-02-001 |
HASKELL |
ABILENE |
$3,818 |
US0380 |
MMC - 635802001 |
03/31/2020 |
11/15/2023 |
MATERIALS ONLY: FLEXIBLE BASE |
ZACK BURKETT CO.($4,800) |
|
6357-46-001 |
HASKELL |
ABILENE |
$284,547 |
US0380 |
MMC - 635746001 |
04/16/2020 |
11/15/2023 |
PURCHASE OF MATERIAL DENSE GRADED HOT MIX ASPH |
VULCAN CONSTRUCTION MATERIALS, LLC($239,840) |
|
6390-27-001 |
HASKELL |
ABILENE |
$233,890 |
US0380 |
RMC - 639027001 |
11/18/2021 |
11/15/2023 |
MOW HWY RIGHT OF WAY |
GREG SCRUGGS($209,064) |
|
6423-74-001 |
HASKELL |
ABILENE |
$268,175 |
US0380 |
RMC - 642374001 |
02/28/2023 |
11/15/2023 |
MOW HWY RIGHT OF WAY |
KENKO CONTRACTORS PRO LLC($202,316) |
|
6423-74-001 |
HASKELL |
ABILENE |
$268,175 |
US0380 |
RMC - 642374001 |
04/18/2023 |
11/15/2023 |
MOW HWY RIGHT OF WAY |
LIGHT & FOLIAGE SUPPLY, LLC($254,356) |
|
0157-09-004 |
HASKELL |
ABILENE |
$6,870,784 |
US 277 |
F 2023(083) |
10/06/2022 |
11/15/2023 |
RESURF ROADWAY |
A. L. HELMCAMP, INC.($5,949,106) |
|
0982-07-013 |
HASKELL |
ABILENE |
$9,286,709 |
FM 1720 |
STP 2021(031) |
10/01/2020 |
11/15/2023 |
WIDEN AND REHAB ROADWAY |
A. L. HELMCAMP, INC.($9,371,184) |
|
0157-04-057 |
HASKELL |
ABILENE |
$5,647,939 |
US 277 |
C 157-4-57 |
01/06/2022 |
11/15/2023 |
PREVENT MAINT |
ZACK BURKETT CO.($5,473,497) |
|
0106-07-030 |
HASKELL |
ABILENE |
$1,754,559 |
SH 6 |
BR 2022(761) |
08/03/2022 |
11/15/2023 |
BRIDGE MAINT |
SCOTT TUCKER CONSTRUCTION COMPANY, LLC($1,729,617) |
|
0972-06-015 |
HASKELL |
ABILENE |
$2,994,755 |
FM 600 |
F 2023(915) |
06/01/2023 |
11/27/2023 |
WIDEN ROAD - ADD SHOULDERS |
A. L. HELMCAMP, INC.($2,844,985) |
|
6383-87-001 |
HASKELL |
ABILENE |
$672,649 |
US0277 |
BPM - 638387001 |
11/03/2021 |
11/15/2023 |
BRIDGE PREVENT MAINT |
12TWELVE ROAD AND BRIDGE LLC($523,857) |
|
6390-54-001 |
HASKELL |
ABILENE |
$1,661,040 |
US0277 |
MMC - 639054001 |
11/04/2021 |
11/15/2023 |
EMULSION (MATERIAL ONLY) |
WRIGHT ASPHALT PRODUCTS COMPANY LLC($1,762,800) |
|
6416-37-001 |
HASKELL |
ABILENE |
$954,784 |
US0380 |
RMC - 641637001 |
09/07/2022 |
11/15/2023 |
MILL AND INLAY |
ZACK BURKETT CO.($1,170,303) |
|
0360-04-033 |
HASKELL |
ABILENE |
$7,735,157 |
US 380 |
C 360-4-33 |
12/05/2023 |
11/15/2023 |
PREVENT MAINT |
A. L. HELMCAMP, INC.($7,148,853) |
|
6358-00-001 |
HASKELL |
ABILENE |
$174,840 |
US0380 |
MMC - 635800001 |
03/31/2020 |
11/15/2023 |
MATERIALS ONLY: EMULSION |
WRIGHT ASPHALT PRODUCTS COMPANY LLC($155,580) |
|
6360-85-001 |
HASKELL |
ABILENE |
$251,688 |
US0380 |
RMC - 636085001 |
04/14/2020 |
11/15/2023 |
MOW HWY RIGHT OF WAY |
GREG SCRUGGS($228,769) |
|
6358-01-001 |
HASKELL |
ABILENE |
$132,000 |
US0380 |
MMC - 635801001 |
04/20/2020 |
11/15/2023 |
MATERIALS ONLY |
WRIGHT ASPHALT PRODUCTS COMPANY LLC($108,480) |
|
0157-04-051 |
HASKELL |
ABILENE |
$720,859 |
US 277 |
NH 1702(247) |
06/06/2017 |
11/15/2023 |
UPGRADE SAFETY LIGHTING |
F & W ELECTRICAL CONTRACTORS, INC.($708,783) |
|
0157-09-005 |
HASKELL |
ABILENE |
$301,070 |
US 277 |
F 2021(847) |
08/05/2021 |
11/15/2023 |
INSTL FLASHING BEACON |
WILLIS ELECTRIC CO., LP($348,082) |
|
6358-04-001 |
HASKELL |
ABILENE |
$240,784 |
US0380 |
MMC - 635804001 |
03/31/2020 |
11/15/2023 |
MATERIALS ONLY: LIMESTONE ROCK ASPH |
VULCAN CONSTRUCTION MATERIALS, LLC($249,530) |
|
6359-17-001 |
HASKELL |
ABILENE |
$2,824,915 |
US0277 |
RMC - 635917001 |
07/08/2020 |
11/15/2023 |
CALL OUT TRAF CONTROL |
AREA WIDE PROTECTIVE, INC.($2,744,047) |
|
6457-21-001 |
HASKELL |
ABILENE |
$278,258 |
US0380 |
RMC - 645721001 |
02/20/2024 |
11/21/2023 |
MOW HWY RIGHT OF WAY |
TRIPLE T MAINTENANCE INC.($241,889) |
|
0157-04-056 |
HASKELL |
ABILENE |
$4,657,679 |
US 277 |
BR 2024(842) |
04/04/2024 |
02/22/2024 |
BRIDGE REPL |
COPPELL CONSTRUCTION CO., INC.($4,673,134) |
|
6460-97-001 |
HASKELL |
ABILENE |
$1,189,925 |
FM0600 |
BPM - 646097001 |
07/10/2024 |
06/05/2024 |
BRIDGE PREVENT MAINT |
PATHFIELD INVESTMENTS LLC($1,009,653) |
|
6379-60-001 |
HASKELL |
ABILENE |
$6,136,463 |
US0277 |
EMC - 637960001 |
03/18/2021 |
09/26/2024 |
FLEX PAV STR REPAIR |
J. H. STRAIN & SONS, INC.($4,055,227) |
|
6309-48-001 |
HOWARD |
ABILENE |
$206,370 |
IH0020 |
RMC - 630948001 |
11/08/2016 |
11/15/2023 |
CLEAN AND SEAL CRACKS AND JOINTS |
D & M CONTRACTORS, LLC($175,455) |
|
6324-68-001 |
HOWARD |
ABILENE |
$286,854 |
IH0020 |
RMC - 632468001 |
11/20/2017 |
11/15/2023 |
CRACK POUR |
JASCO($258,149) |
|
6358-59-001 |
HOWARD |
ABILENE |
$291,980 |
IH0020 |
MMC - 635859001 |
04/29/2020 |
11/15/2023 |
MATERIALS ONLY |
VULCAN CONSTRUCTION MATERIALS, LLC($294,548) |
|
6370-94-001 |
HOWARD |
ABILENE |
$92,800 |
IH0020 |
MMC - 637094001 |
11/12/2020 |
11/15/2023 |
MATERIALS ONLY: BRINE SALT |
UNITED SALT CORPORATION($63,524) |
|
6370-97-001 |
HOWARD |
ABILENE |
$296,160 |
IH0020 |
MMC - 637097001 |
11/12/2020 |
11/15/2023 |
MATERIALS ONLY: ROAD SALT |
UNITED SALT CORPORATION($161,465) |
|
6369-99-001 |
HOWARD |
ABILENE |
$172,320 |
IH0020 |
MMC - 636999001 |
12/29/2020 |
11/15/2023 |
MATERIALS ONLY AC20-5TR |
WRIGHT ASPHALT PRODUCTS COMPANY LLC($157,440) |
|
6370-02-001 |
HOWARD |
ABILENE |
$232,000 |
IH0020 |
MMC - 637002001 |
12/29/2020 |
11/15/2023 |
MATERIALS ONLY FLEX BASE |
DORADO CONSTRUCTION GROUP($190,280) |
|
6370-03-001 |
HOWARD |
ABILENE |
$141,525 |
IH0020 |
MMC - 637003001 |
12/29/2020 |
11/15/2023 |
BRINE WATER DELIVERY |
DUNAGIN TRANSPORT COMPANY($129,975) |
|
6423-09-001 |
HOWARD |
ABILENE |
$267,581 |
IH0020 |
MMC - 642309001 |
11/15/2022 |
11/15/2023 |
HOT MIX |
RK HALL, LLC($299,900) |
|
6452-63-001 |
HOWARD |
ABILENE |
$258,700 |
IH0020 |
MMC - 645263001 |
09/12/2023 |
11/15/2023 |
HOT MIX |
RK HALL, LLC($327,250) |
|
1872-02-017 |
HOWARD |
ABILENE |
$10,710,570 |
FM 846 |
STP 1502(216) |
05/05/2015 |
11/15/2023 |
EMB, EXC, STRS, SET, SURF, MBGF |
SBBI, INC.($9,519,744) |
|
0005-05-110 |
HOWARD |
ABILENE |
$6,397,011 |
IH 20 |
NH 2017(833) |
03/07/2017 |
11/15/2023 |
OVERLAY |
PRICE CONSTRUCTION, LTD.($5,321,335) |
|
0005-05-112 |
HOWARD |
ABILENE |
$6,107,331 |
IH 20 |
BR 1702(476) |
07/12/2017 |
11/15/2023 |
INSTL CRASHWALLS |
SCR CIVIL CONSTRUCTION, LLC($7,767,028) |
|
0005-06-119 |
HOWARD |
ABILENE |
$2,368,600 |
IH 20 |
STP 1702(599)HES |
08/08/2017 |
11/15/2023 |
INSTL MEDIAN BARRIER |
MASSANA CONSTRUCTION INC.($1,664,669) |
|
0005-06-116 |
HOWARD |
ABILENE |
$1,091,973 |
IH 20 |
STP 2018(314)HES |
11/03/2017 |
11/15/2023 |
FLASH BEACON,SIG,SIGNS,PAV MARK |
AMERICAN LIGHTING AND SIGNALIZATION, LLC($1,092,203) |
|
0005-05-109 |
HOWARD |
ABILENE |
$7,326,676 |
IH 20 |
NH 2018(341) |
12/05/2017 |
11/15/2023 |
SPOT BASE REPAIR, 1-CST, 2"SMA-D OVERLAY |
PRICE CONSTRUCTION, LTD.($6,798,902) |