|
0010-08-056 |
MORRIS |
ATLANTA |
$5,691,960 |
US 67 |
STP 2019(770)HES |
04/03/2019 |
11/15/2023 |
IMPROVE GUARDRAIL TO DESIGN STANDAR |
CDM HOLDINGS, LLC($4,509,224) |
|
0039-02-070 |
HIDALGO |
PHARR |
$8,135,944 |
US 83 |
NH 2019(954) |
04/03/2019 |
11/15/2023 |
REHAB ROADWAY |
FOREMOST PAVING, INC.($8,019,897) |
|
0045-18-038 |
GRAYSON |
PARIS |
$7,649,585 |
US 82 |
NH 2019(723) |
04/03/2019 |
11/15/2023 |
OVERLAY |
AUSTIN BRIDGE & ROAD SERVICES, LP($7,390,533) |
|
0047-18-086 |
GRAYSON |
PARIS |
$4,419,625 |
US 75 |
NH 2019(618) |
04/03/2019 |
11/15/2023 |
FREEWAY OPERATIONAL IMPRVS |
ED BELL CONSTRUCTION COMPANY($4,623,050) |
|
0049-06-079 |
ROBERTSON |
BRYAN |
$8,634,712 |
SH 6 |
NH 2019(977) |
04/03/2019 |
11/15/2023 |
OVERLAY |
BIG CREEK CONSTRUCTION, LTD.($7,687,391) |
|
0051-02-101 |
HARRIS |
HOUSTON |
$12,575,141 |
SH 3 |
STP 2019(765)TAP |
04/03/2019 |
11/15/2023 |
ADD BIKE LANES |
ANGEL BROTHERS HOLDINGS CORP.($13,951,960) |
|
0051-03-111 |
GALVESTON |
HOUSTON |
$1,578,431 |
SH 3 |
NH 2019(766) |
04/03/2019 |
11/15/2023 |
BASE REP, SC, O/L & TRAF SIGNAL UP |
ANGEL BROTHERS HOLDINGS CORP.($1,662,372) |
|
0070-03-049 |
CONCHO |
SAN ANGELO |
$2,183,538 |
US 87 |
NH 2000(292) |
04/03/2019 |
11/15/2023 |
RENOVATION OF SAFETY REST AREA |
DCI CONTRACTING, INC.($3,089,889) |
|
0072-06-074 |
KENDALL |
SAN ANTONIO |
$18,670,375 |
IH 10 |
NH 2019(776) |
04/03/2019 |
11/15/2023 |
RECONFG RAMPS & WIDEN FR TO CONVERT TO ONE WAY OP |
AUSTIN BRIDGE & ROAD SERVICES, LP($18,335,085) |
|
0076-01-029 |
PECOS |
ODESSA |
$46,872,979 |
US 67 |
NH 1802(325) |
04/03/2019 |
11/15/2023 |
ROADWAY WIDENING TO A MODIFIED SUPER 2 |
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY($48,936,556) |
|
0086-05-018 |
DUVAL |
LAREDO |
$1,213,985 |
SH 359 |
STP 2019(749)HES |
04/03/2019 |
11/15/2023 |
PROFILE EDGELINE MRK,PROFILE CENTERLINE MRKGS |
PAVEMENT MARKINGS INC.($877,188) |
|
0133-02-025 |
KNOX |
CHILDRESS |
$10,556,028 |
US 82 |
NH 2019(590) |
04/03/2019 |
11/15/2023 |
SUPER 2 |
A. L. HELMCAMP, INC.($11,182,988) |
|
0133-07-029 |
ARCHER |
WICHITA FALLS |
$6,915,676 |
SH 114 |
NH 2019(736) |
04/03/2019 |
11/15/2023 |
OVERLAY |
ZACK BURKETT CO.($7,554,038) |
|
0145-05-032 |
HALE |
LUBBOCK |
$14,105,189 |
US 70 |
STP 2019(750) |
04/03/2019 |
11/15/2023 |
PAVMT REPAIR, LEVEL-UP, OVERLAY |
DUININCK, INC.($18,510,115) |
|
0172-05-115 |
ELLIS |
DALLAS |
$36,969,721 |
US 287 |
NH 2019(978) |
04/03/2019 |
11/15/2023 |
GR, RV, DR, BR, RET WALL, CUL, SIGN, PV MK |
OHL USA, INC.($37,276,577) |
|
0220-05-075 |
CAMERON |
PHARR |
$2,878,918 |
SH 48 |
NH 2019(774) |
04/03/2019 |
11/15/2023 |
PROPOSED RAISED MEDIAN |
TEXAS CORDIA CONSTRUCTION, LLC($3,422,327) |
|
0220-07-064 |
CAMERON |
PHARR |
$1,395,276 |
SH 48 |
STP 2019(897) |
04/03/2019 |
11/15/2023 |
REPLACE RAIL AT BRIDGE AND REPAIR APPROACHES |
SCR CIVIL CONSTRUCTION, LLC($2,475,986) |
|
0247-01-057 |
PANOLA |
ATLANTA |
$9,847,685 |
US 79 |
NH 2019(679) |
04/03/2019 |
11/15/2023 |
PLANE ACP, ACP SURF, & PAV MARK |
MADDEN CONTRACTING COMPANY, LLC.($8,993,197) |
|
0320-01-072 |
BELL |
WACO |
$5,231,397 |
SH 95 |
STP 2019(598) |
04/03/2019 |
11/15/2023 |
MILL/OVLY |
TEXAS MATERIALS GROUP, INC.($3,571,167) |
|
0348-03-030 |
KARNES |
CORPUS CHRISTI |
$14,368,033 |
SH 80 |
C 348-3-30 |
04/03/2019 |
11/15/2023 |
REHAB ROADWAY AND ADD PASSING LANES |
HUNTER INDUSTRIES, LTD.($13,738,005) |
|
0353-04-106 |
DALLAS |
DALLAS |
$9,273,287 |
SS 348 |
NH 2019(718) |
04/03/2019 |
11/15/2023 |
MILL, CONC FULL DEPTH REPAIR, OVERLAY & PVMNT MRK |
AUSTIN BRIDGE & ROAD SERVICES, LP($12,971,191) |
|
0354-02-027 |
WARD |
ODESSA |
$692,779 |
SH 115 |
STP 2019(751)HES |
04/03/2019 |
11/15/2023 |
SAFETY LIGHTING AT INTERS |
WILLIS ELECTRIC CO., LP($679,704) |
|
0561-01-024 |
KAUFMAN |
DALLAS |
$3,733,825 |
SH 274 |
STP 2019(719) |
04/03/2019 |
11/15/2023 |
REHAB EXIST PAVMENT AND SLOPE FAIL RPR |
TEXAS MATERIALS GROUP, INC.($3,753,155) |
|
0683-02-075 |
TRAVIS |
AUSTIN |
$600,302 |
RM 620 |
NH 2019(754) |
04/03/2019 |
11/15/2023 |
INSTL CONC TRAF BARRIERS |
DAN WILLIAMS COMPANY($556,063) |
|
0825-02-021 |
MCCULLOCH |
BROWNWOOD |
$1,186,168 |
US 190 |
STP 2019(894)HES |
04/03/2019 |
11/15/2023 |
UPGRADE GUARDRAIL AND SAFETY TREAT FIXED OBJECTS |
SJ&J CONSTRUCTION, LLC($1,191,746) |
|
0889-04-078 |
SMITH |
TYLER |
$805,303 |
FM 346 |
STP 2019(734)HES |
04/03/2019 |
11/15/2023 |
IMPROVE DRAINAGE, UPGRADE GUARD RAIL |
LONGVIEW BRIDGE AND ROAD, LTD.($799,066) |
|
0904-00-186 |
POTTER |
AMARILLO |
$761,550 |
VA |
STP 2019(728) |
04/03/2019 |
11/15/2023 |
UPGRADE EXIST ROADWAY ILLUM TO LED |
CDM HOLDINGS, LLC($748,100) |
|
0904-08-004 |
HANSFORD |
AMARILLO |
$1,515,660 |
CR |
BR 2018(472) |
04/03/2019 |
11/15/2023 |
REPLACE EXIST OFF SYSTEM BRIDGE |
EARTH BUILDERS, L.P.($1,745,583) |
|
0905-00-106 |
LUBBOCK |
LUBBOCK |
$945,295 |
VA |
C 905-00-106 |
04/03/2019 |
11/15/2023 |
RAISED PAVMT MARKERS |
BRYDL CONTRACTING, INC.($987,438) |
|
0907-15-006 |
CONCHO |
SAN ANGELO |
$612,546 |
CS |
STP 2017(287)TAPS |
04/03/2019 |
11/15/2023 |
PEDESTRIAN IMPRVS-SIDEWALKS AND LIGHTING |
ENCINO LANDSCAPE, INC.($676,560) |
|
0912-72-363 |
HARRIS |
HOUSTON |
$16,135,786 |
CS |
STP 2017(407)MM |
04/03/2019 |
11/15/2023 |
RECON ROADWAY INCLUDING CURB, GUTTER SIDEWALKS, |
HARPER BROTHERS CONSTRUCTION LLC($17,999,505) |
|
0915-00-221 |
BEXAR |
SAN ANTONIO |
$1,505,516 |
VA |
STP 2019(684) |
04/03/2019 |
11/15/2023 |
DISTRICTWIDE TRAF CONTROL DEVICE |
D&G ENERGY CORPORATION($1,539,906) |
|
0916-00-215 |
NUECES |
CORPUS CHRISTI |
$2,572,317 |
VA |
STP 2019(780) |
04/03/2019 |
11/15/2023 |
DISTRICT WIDE PAVMT MRK AND MARKERS |
PAVEMENT MARKINGS INC.($2,803,253) |
|
0918-47-178 |
DALLAS |
DALLAS |
$1,024,877 |
CS |
STP 2019(720)HES |
04/03/2019 |
11/15/2023 |
IMPRV OF TRAF SIG |
DURABLE SPECIALTIES, INC.($1,330,000) |
|
1024-01-076 |
CHAMBERS |
BEAUMONT |
$951,302 |
FM 565 |
STP 2019(761)HES |
04/03/2019 |
11/15/2023 |
GR, BS, ACP, RUMBLE STRIPS |
ANGEL BROTHERS HOLDINGS CORP.($1,057,947) |
|
2250-02-017 |
DENTON |
DALLAS |
$3,192,171 |
SL 288 |
STP 2019(798)HES |
04/03/2019 |
11/15/2023 |
INSTL MEDIAN CONC BARRIERS |
ED BELL CONSTRUCTION COMPANY($3,179,441) |
|
3417-02-032 |
WILLIAMSON |
AUSTIN |
$146,289 |
FM 734 |
CC 3417-2-32 |
04/03/2019 |
11/15/2023 |
GR, BASE, HMACP & PVMT MKS |
AARON CONCRETE CONTRACTORS, L.P.($248,350) |
|
3532-02-011 |
WEBB |
LAREDO |
$22,551,599 |
FM 3338 |
C 3532-2-11 |
04/03/2019 |
11/15/2023 |
BASE,ACP,GRAD,STR,PAV MRK |
ANDERSON COLUMBIA CO., INC.($23,429,429) |
|
6334-20-001 |
JEFF DAVIS |
EL PASO |
$410,308 |
SH0017 |
BPM - 633420001 |
04/03/2019 |
11/15/2023 |
BRIDGE PREVENT MAINT (BPM) |
DAN WILLIAMS COMPANY($460,470) |
|
6336-60-001 |
EL PASO |
EL PASO |
$693,005 |
IH0010 |
RMC - 633660001 |
04/03/2019 |
11/15/2023 |
TRAF MGT SYSTEM |
TRI STATE ELECTRIC, LTD.($692,028) |
|
6338-98-001 |
CHILDRESS |
CHILDRESS |
$234,190 |
US0287 |
RMC - 633898001 |
04/03/2019 |
11/15/2023 |
UPGRADE SCHOOL ZONES |
MARCOM'S MOWING SERVICE, LLC($236,128) |
|
6339-66-001 |
UPTON |
ODESSA |
$554,836 |
SH0329 |
BPM - 633966001 |
04/03/2019 |
11/15/2023 |
STRUCT REPAIR |
SCR CIVIL CONSTRUCTION, LLC($619,968) |
|
6341-47-001 |
KAUFMAN |
DALLAS |
$4,148,604 |
US0080 |
RMC - 634147001 |
04/03/2019 |
11/15/2023 |
FLEXIBLE PAVMT REPAIR |
FOUTSCO PAVING COMPANY, LLC($4,205,488) |
|
6342-30-001 |
RAINS |
PARIS |
$699,160 |
SH0276 |
RMC - 634230001 |
04/03/2019 |
11/15/2023 |
RIPRAP REPAIR |
FNH CONSTRUCTION, LLC($1,022,250) |
|
6342-31-001 |
CULBERSON |
EL PASO |
$564,650 |
RM0652 |
RMC - 634231001 |
04/03/2019 |
11/15/2023 |
ROADWAY POTHOLE REPAIR |
DOUBLE H CONTRACTING INC.($648,250) |
|
6342-39-001 |
CULBERSON |
EL PASO |
$319,600 |
US0062 |
RMC - 634239001 |
04/03/2019 |
11/15/2023 |
INSTL OF EMERGENCY GENERATOR |
C. F. MCDONALD ELECTRIC, INC.($484,469) |
|
6342-88-001 |
ECTOR |
ODESSA |
$401,504 |
IH0020 |
RMC - 634288001 |
04/03/2019 |
11/15/2023 |
STREET SWEEPING |
J-MEN CONCRETE CONSTRUCTION($370,044) |
|
6343-38-001 |
MIDLAND |
ODESSA |
$500,000 |
IH0020 |
RMC - 634338001 |
04/03/2019 |
11/15/2023 |
STRIPING (CALLOUT) |
L&L COMPANY($366,600) |
|
6343-43-001 |
ECTOR |
ODESSA |
$500,000 |
IH0020 |
RMC - 634343001 |
04/03/2019 |
11/15/2023 |
STRIPING (CALLOUT) |
L&L COMPANY($366,600) |
|
6343-65-001 |
DEWITT |
YOAKUM |
$2,834,232 |
US0183 |
RMC - 634365001 |
04/03/2019 |
11/15/2023 |
CALL OUT ASPHIC CONC PAVMT OVERLAY |
HUNTER INDUSTRIES, LTD.($3,029,377) |
|
6343-70-001 |
DENTON |
DALLAS |
$301,106 |
FM0455 |
RMC - 634370001 |
04/03/2019 |
11/15/2023 |
ROADSIDE MOW |
BRYDL CONTRACTING, INC.($346,636) |
|
6344-08-001 |
ECTOR |
ODESSA |
$397,725 |
IH0020 |
RMC - 634408001 |
04/03/2019 |
11/15/2023 |
EMERGENCY MBGF REPAIR_(CALLOUT) |
K-BAR SERVICES, INC.($443,850) |
|
6344-10-001 |
MIDLAND |
ODESSA |
$458,240 |
IH0020 |
RMC - 634410001 |
04/03/2019 |
11/15/2023 |
EMERGENCY MBGF REPAIR (CALLOUT) |
K-BAR SERVICES, INC.($488,850) |