|
0259-05-077 |
JOHNSON |
FORT WORTH |
$198,990 |
US 67 |
NH 1802(595) |
07/11/2018 |
11/15/2023 |
LANDSCAPING |
AALC, INC.($167,004) |
|
2657-01-031 |
LAMAR |
PARIS |
$4,717,429 |
FM 2648 |
C 2657-1-31 |
07/11/2018 |
11/15/2023 |
REHAB OF EXIST ROAD |
A. K. GILLIS & SONS, INC.($4,044,599) |
|
3199-01-008 |
ANDERSON |
TYLER |
$2,849,016 |
FM 2054 |
SSW 3199-1-8 |
07/11/2018 |
11/15/2023 |
GR, BS, OCST, ACP SURF, STRS, PV MK |
A. L. HELMCAMP, INC.($2,573,742) |
|
0751-02-026 |
KAUFMAN |
DALLAS |
$9,233,560 |
FM 148 |
STP 1802(747) |
07/11/2018 |
11/15/2023 |
RECON, ADD SHOULDERS, AND TEXTURIZE ROADWAY |
A. L. HELMCAMP, INC.($7,818,547) |
|
3572-01-006 |
EL PASO |
EL PASO |
$838,324 |
SS 6 |
C 3572-1-6 |
07/11/2018 |
11/15/2023 |
MILL AND OVERLAY |
ALLIED PAVING CO.($735,010) |
|
6329-54-001 |
GREGG |
TYLER |
$1,124,470 |
US0259 |
RMC - 632954001 |
07/11/2018 |
11/15/2023 |
TRAF CONTROL |
AREA WIDE PROTECTIVE, INC.($942,173) |
|
6329-53-001 |
SMITH |
TYLER |
$1,224,950 |
US0069 |
RMC - 632953001 |
07/11/2018 |
11/15/2023 |
TRAF CONTROL |
AREA WIDE PROTECTIVE, INC.($1,019,948) |
|
0720-03-133 |
HARRIS |
HOUSTON |
$400,495 |
SH 249 |
NH 2018(964) |
07/11/2018 |
11/15/2023 |
RESTRIPE TO 8 MNLNS & RE-ALIGNING CTB |
BATTERSON, LLP($361,038) |
|
3026-01-026 |
SAN PATRICIO |
CORPUS CHRISTI |
$19,105,024 |
FM 2986 |
STP 2018(633) |
07/11/2018 |
11/15/2023 |
UPGRADE TO 5-LANE URBAN ROADWAY |
BAY LTD.($17,126,620) |
|
0176-03-131 |
ANGELINA |
LUFKIN |
$1,671,568 |
US 59 |
STP 1802(326)HES |
07/11/2018 |
11/15/2023 |
IMPROVE GUARDRAIL TO DES STANDARDS |
B & E CONSTRUCTION INC($1,620,249) |
|
0751-02-025 |
KAUFMAN |
DALLAS |
$3,151,752 |
FM 148 |
BR 1802(375) |
07/11/2018 |
11/15/2023 |
REPLACE BRIDGE AND APPROACHES |
B & E CONSTRUCTION INC($2,718,728) |
|
0320-05-015 |
BELL |
WACO |
$3,072,993 |
SL 363 |
C 320-5-15 |
07/11/2018 |
11/15/2023 |
MILL/SEAL/OVLY |
BIG CREEK CONSTRUCTION, LTD.($2,938,131) |
|
0184-01-063 |
CORYELL |
WACO |
$12,492,719 |
SH 36 |
C 184-1-63 |
07/11/2018 |
11/15/2023 |
WDN RDWY & ADD PASS LNS |
BIG CREEK CONSTRUCTION, LTD.($11,187,471) |
|
6330-19-001 |
BELL |
WACO |
$384,329 |
US0190 |
RMC - 633019001 |
07/11/2018 |
11/15/2023 |
RAISED PAVMT MARKER MAINT |
BRYDL CONTRACTING, INC.($298,470) |
|
0909-39-127 |
CORYELL |
WACO |
$978,729 |
CR |
BR 1502(366) |
07/11/2018 |
11/15/2023 |
REPL BR & APPRS |
CAPITAL EXCAVATION COMPANY($1,020,198) |
|
0015-08-140 |
WILLIAMSON |
AUSTIN |
$7,792,810 |
IH 35 |
NH 1802(398) |
07/11/2018 |
11/15/2023 |
STRCT, GRADING, HMACP |
CAPITAL EXCAVATION COMPANY($6,748,949) |
|
2100-01-054 |
TRAVIS |
AUSTIN |
$20,429,914 |
RM 2222 |
NH 1802(401) |
07/11/2018 |
11/15/2023 |
RECON 4-LN ROADWAY TO 6-LN DIVIDED_ROADWAY |
CAPITAL EXCAVATION COMPANY($23,618,553) |
|
1068-01-219 |
TARRANT |
FORT WORTH |
$461,482 |
IH 30 |
NH 1802(381) |
07/11/2018 |
11/15/2023 |
LANDSCAPING |
CENTRAL NORTH CONSTRUCTION, LLC($435,496) |
|
6329-38-001 |
TARRANT |
FORT WORTH |
$339,439 |
IH0030 |
RMC - 632938001 |
07/11/2018 |
11/15/2023 |
CLEANING AND SEALING JOINTS AND CRACKS |
CHAMPION INFRASTRUCTURE, LLC($420,941) |
|
0925-08-019 |
CHILDRESS |
CHILDRESS |
$1,482,948 |
CR |
BR 1702(581) |
07/11/2018 |
11/15/2023 |
REPL OF EXIST BRIDGE FACILITY |
COPPELL CONSTRUCTION CO., INC.($1,306,718) |
|
0114-08-035 |
FAYETTE |
YOAKUM |
$2,020,953 |
US 290 |
STP 1802(396)HES |
07/11/2018 |
11/15/2023 |
SAFETY TREAT FIXED OBJECTS |
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.($2,098,141) |
|
6329-92-001 |
NAVARRO |
DALLAS |
$955,303 |
SH0031 |
RMC - 632992001 |
07/11/2018 |
11/15/2023 |
VEGETATION MGT |
CROSS PLUS CONSTRUCTION, LLC($836,996) |
|
2121-04-086 |
EL PASO |
EL PASO |
$2,429,473 |
IH 10 |
C 2121-4-86 |
07/11/2018 |
11/15/2023 |
REHAB |
DAN WILLIAMS COMPANY($1,988,430) |
|
0164-04-160 |
SMITH |
TYLER |
$3,982,129 |
SH 31 |
C 164-4-160 |
07/11/2018 |
11/15/2023 |
PLANING, PAVMT REPAIR, OCST, PV MK |
DREWERY CONSTRUCTION COMPANY, INCORPORATED($3,587,845) |
|
0027-06-051 |
FORT BEND |
HOUSTON |
$15,750,592 |
US 90A |
STP 2013(736) |
07/11/2018 |
11/15/2023 |
ADD 10-FT SHLDRS, O/L & REPLACE BRIDGE CULVERTS |
DURWOOD GREENE CONSTRUCTION CO.($13,229,156) |
|
0392-01-073 |
MORRIS |
ATLANTA |
$6,789,000 |
US 259 |
STP 1802(323) |
07/11/2018 |
11/15/2023 |
PLANING, ACP & PAVMT MRK |
EAST TEXAS BRIDGE, INC.($7,028,105) |
|
1091-03-012 |
ROCKWALL |
DALLAS |
$3,968,492 |
FM 1140 |
STP 1802(376) |
07/11/2018 |
11/15/2023 |
RESTORE EXIST PAVMT AND ADD SHOULDERS |
ED BELL CONSTRUCTION COMPANY($4,349,077) |
|
6329-48-001 |
NAVARRO |
DALLAS |
$1,166,881 |
SH0031 |
RMC - 632948001 |
07/11/2018 |
11/15/2023 |
GUARD FENCE REPAIR |
ELITE CASTLE RESOURCES LLC($1,000,391) |
|
0017-10-286 |
BEXAR |
SAN ANTONIO |
$551,722 |
IH 35 |
NH 1802(386) |
07/11/2018 |
11/15/2023 |
LANDSCAPE PLANTING AND IRRIGATION |
ENCINO LANDSCAPE, INC.($542,994) |
|
0039-16-066 |
CAMERON |
PHARR |
$3,981,852 |
IH 69E |
C 39-16-66 |
07/11/2018 |
11/15/2023 |
OVERLAY (FRONTAGE ROADS) |
FOREMOST PAVING, INC.($3,781,272) |
|
6331-37-001 |
LAMAR |
PARIS |
$617,160 |
FM0137 |
RMC - 633137001 |
07/11/2018 |
11/15/2023 |
ABUTMENT EROSION REPAIR |
HARTBEAT CONSTRUCTION($587,100) |
|
0357-05-025 |
ARMSTRONG |
AMARILLO |
$2,343,864 |
SH 207 |
STP 1802(471)HES |
07/11/2018 |
11/15/2023 |
GUARDRAIL IMPRVS |
HJC FARMS, INC.($2,257,957) |
|
0215-06-039 |
KENDALL |
SAN ANTONIO |
$11,152,199 |
SH 46 |
NH 1802(389) |
07/11/2018 |
11/15/2023 |
EXPAND 2 LANES TO 4 LANES WITH MEDIAN OR CLTL |
HUNTER INDUSTRIES, LTD.($11,999,322) |
|
0421-01-045 |
MEDINA |
SAN ANTONIO |
$2,223,438 |
SH 173 |
STP 1802(403) |
07/11/2018 |
11/15/2023 |
GRD, BSE,SURF, PAV'T MRK |
HUNTER INDUSTRIES, LTD.($2,041,003) |
|
0143-10-052 |
VICTORIA |
YOAKUM |
$2,248,288 |
US 87 |
NH 1802(473) |
07/11/2018 |
11/15/2023 |
PAVMT REPAIR AND RESURF |
HUNTER INDUSTRIES, LTD.($2,084,720) |
|
6328-10-001 |
DALLAS |
DALLAS |
$411,641 |
US0067 |
RMC - 632810001 |
07/11/2018 |
11/15/2023 |
MISCELLANEOUS CONC REPAIR |
IIPL USA LLC($324,270) |
|
6330-90-001 |
CHAMBERS |
BEAUMONT |
$421,945 |
IH0010 |
RMC - 633090001 |
07/11/2018 |
11/15/2023 |
MBGF/GUARDRAIL REPAIRS |
ISI CONTRACTING, INC.($407,595) |
|
6290-00-001 |
HARRIS |
HOUSTON |
$519,050 |
SL0008 |
RMC - 629000001 |
07/11/2018 |
11/15/2023 |
GRAFFITI RMVL |
ISI CONTRACTING, INC.($471,400) |
|
0194-01-014 |
COOKE |
WICHITA FALLS |
$1,786,213 |
IH 35 |
STP 1802(316)HESG |
07/11/2018 |
11/15/2023 |
INCREASE SUPERELEVATION, EDGELINE RUMBLE STRIPS |
JAGOE-PUBLIC COMPANY($2,349,139) |
|
0739-02-162 |
JEFFERSON |
BEAUMONT |
$131,944,009 |
IH 10 |
NH 1802(413) |
07/11/2018 |
11/15/2023 |
WIDEN FREEWAY FROM 4 TO 6 LANES |
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY($128,399,060) |
|
0050-01-080 |
BRAZOS |
BRYAN |
$935,617 |
BS 6-R |
STP 1802(407)HES |
07/11/2018 |
11/15/2023 |
INSTL RAISED MEDIAN |
KNIFE RIVER CORPORATION - SOUTH($1,137,292) |
|
2362-01-036 |
MCLENNAN |
WACO |
$1,847,786 |
SL 340 |
C 2362-1-36 |
07/11/2018 |
11/15/2023 |
SEAL & OVERLAY |
KNIFE RIVER CORPORATION - SOUTH($2,101,672) |
|
0533-01-020 |
BURNET |
AUSTIN |
$2,239,341 |
PR 4 |
C 533-1-20 |
07/11/2018 |
11/15/2023 |
LEVEL-UP AND SEAL COAT |
LONE STAR PAVING COMPANY($1,963,010) |
|
2654-01-022 |
SMITH |
TYLER |
$3,220,825 |
FM 2661 |
SSW 2654-1-22 |
07/11/2018 |
11/15/2023 |
GR, FLX BS, OCST, STRS, PVT MRK |
LONGVIEW BRIDGE AND ROAD, LTD.($2,792,589) |
|
0164-01-071 |
HENDERSON |
TYLER |
$1,128,125 |
BS 31H |
C 164-1-71 |
07/11/2018 |
11/15/2023 |
PFC SURF,BRG RAIL,MBGF,PVT MRKG |
LONGVIEW BRIDGE AND ROAD, LTD.($1,161,999) |
|
1685-05-118 |
HARRIS |
HOUSTON |
$2,688,366 |
SH 6 |
NH 1802(411) |
07/11/2018 |
11/15/2023 |
ADA CURB RAMPS AND SIDEWALKS |
MBN ENTERPRISES LLC($2,270,623) |
|
0120-01-019 |
HAMILTON |
WACO |
$1,725,935 |
SH 22 |
C 120-1-19 |
07/11/2018 |
11/15/2023 |
MISC SPOT PAVMT REPAIR |
OLDCASTLE MATERIALS TEXAS, INC.($1,642,122) |
|
0014-05-039 |
HILL |
WACO |
$1,956,234 |
SH 81 |
C 14-5-39 |
07/11/2018 |
11/15/2023 |
MISC SPOT PAVMT REPAIRS |
OLDCASTLE MATERIALS TEXAS, INC.($1,999,585) |
|
0064-08-057 |
JASPER |
BEAUMONT |
$10,834,992 |
US 96 |
NH 1802(032) |
07/11/2018 |
11/15/2023 |
OVERLAY EXIST ROADWAY |
OLDCASTLE MATERIALS TEXAS, INC.($11,208,279) |
|
0092-13-028 |
NAVARRO |
DALLAS |
$1,990,109 |
BI 45-F |
NH 1802(373) |
07/11/2018 |
11/15/2023 |
FLEXIBLE PAVMT REPAIR |
O. TREVINO CONSTRUCTION, LLC($2,108,967) |
|
0902-20-111 |
WISE |
FORT WORTH |
$548,439 |
CR |
BR 1502(023) |
07/11/2018 |
11/15/2023 |
REPLACE BRIDGE AND APPROACHES |
PIERCE R & B LLC($516,000) |
|
6326-42-001 |
MONTGOMERY |
HOUSTON |
$747,228 |
IH0045 |
RMC - 632642001 |
07/11/2018 |
11/15/2023 |
REFL PAV MRKGS (LONG LINE) |
PMI PAVEMENT MARKING, INC.($696,524) |
|
0005-15-088 |
MIDLAND |
ODESSA |
$4,647,164 |
IH 20 |
NH 2018(619) |
07/11/2018 |
11/15/2023 |
REVERSAL OF EB ON/OFF RAMPS |
REECE ALBERT, INC.($4,875,448) |
|
0922-00-064 |
WEBB |
LAREDO |
$2,121,686 |
VA |
STP 1802(313) |
07/11/2018 |
11/15/2023 |
BRIDGE RAIL,SET,MBGF,SGT |
RELMCO, INC.($2,482,190) |
|
0907-00-170 |
TOM GREEN |
SAN ANGELO |
$8,633,139 |
VA |
STP 1802(384) |
07/11/2018 |
11/15/2023 |
BRIDGE SAFETY IMPRVS AND MAINT |
RELMCO, INC.($6,779,028) |
|
0463-04-026 |
GLASSCOCK |
SAN ANGELO |
$19,682,228 |
SH 158 |
NH 1802(312) |
07/11/2018 |
11/15/2023 |
ACP OVERLAY |
RK HALL, LLC($20,119,919) |
|
6319-77-001 |
TARRANT |
FORT WORTH |
$868,752 |
SH0180 |
BPM - 631977001 |
07/11/2018 |
11/15/2023 |
BRIDGE PREVENT MAINT |
SCOTT TUCKER CONSTRUCTION COMPANY, LLC($798,330) |
|
2374-02-147 |
DALLAS |
DALLAS |
$7,643,991 |
IH 635 |
BR 1802(379) |
07/11/2018 |
11/15/2023 |
REPLACE BRIDGE DECK & REPAIR BRIDGE DECK |
SEMA CONSTRUCTION, INC.($9,213,870) |
|
0543-02-065 |
FORT BEND |
HOUSTON |
$18,935,772 |
FM 359 |
C 543-2-65 |
07/11/2018 |
11/15/2023 |
WIDEN FROM 2 TO 4 LANES DIVIDED ROADWAY |
SER CONSTRUCTION PARTNERS, LLC($18,950,220) |
|
0045-08-038 |
LAMAR |
PARIS |
$173,471 |
US 82 |
STP 2018(808)HES |
07/11/2018 |
11/15/2023 |
SAFETY RELATED PROJECT - HSIP |
SJ&J CONSTRUCTION, LLC($200,076) |
|
1986-01-063 |
MONTGOMERY |
HOUSTON |
$2,113,840 |
FM 1314 |
C 1986-1-63 |
07/11/2018 |
11/15/2023 |
BASE REPAIR, OCST, LEVEL UP, OVERLAY |
SMITH & COMPANY($1,738,187) |
|
0403-02-019 |
SAN JACINTO |
LUFKIN |
$516,054 |
FM 224 |
STP 1802(329)HES |
07/11/2018 |
11/15/2023 |
IMPROVE GUARDRAIL TO DES STANDARDS |
STATELINE CONSTRUCTION, LLC($516,228) |
|
6329-35-001 |
GRAYSON |
PARIS |
$729,050 |
US0075 |
RMC - 632935001 |
07/11/2018 |
11/15/2023 |
BRIDGE REPAIR AND FULL DEPTH CONC REPAIR |
STATELINE CONSTRUCTION, LLC($876,910) |
|
6316-09-001 |
GALVESTON |
HOUSTON |
$15,170,822 |
SH0087 |
RMC - 631609001 |
07/11/2018 |
11/15/2023 |
FERRY LANDING MAINT |
TEXAS GULF CONSTRUCTION COMPANY, INC.($12,737,490) |
|
0915-00-206 |
BEXAR |
SAN ANTONIO |
$428,253 |
VA |
STP 2018(899) |
07/11/2018 |
11/15/2023 |
DISTRICTWIDE NON-SITE SPECIFIC TRAF SIG-FY2018 |
THE LEVY COMPANY, INC.($391,447) |
|
6333-31-001 |
JEFFERSON |
BEAUMONT |
$1,648,500 |
IH0010 |
RMC - 633331001 |
07/11/2018 |
11/15/2023 |
CALLOUT DEBRIS RMVL AND DISPOSAL |
TOM-MAC, INC.($1,481,351) |
|
6328-28-001 |
COLLIN |
DALLAS |
$1,192,916 |
US0075 |
RMC - 632828001 |
07/11/2018 |
11/15/2023 |
REFLECTORIZED PAVMT MRK & MARKERS |
TOTAL HIGHWAY MAINTENANCE, LLC($1,142,381) |
|
0914-04-229 |
TRAVIS |
AUSTIN |
$643,896 |
CS |
BR 1502(360) |
07/11/2018 |
11/15/2023 |
REPLACE BRIDGE AND APPROACHES |
TREVWAY, INC.($571,595) |
|
6331-68-001 |
WICHITA |
WICHITA FALLS |
$789,383 |
US0082 |
RMC - 633168001 |
07/11/2018 |
11/15/2023 |
DW ONCALL STRIPING |
TRP CONSTRUCTION GROUP, LLC($781,010) |
|
0683-07-008 |
TRAVIS |
AUSTIN |
$2,847,869 |
SH 45 |
NH 1802(399) |
07/11/2018 |
11/15/2023 |
LANDSCAPING AND IRRIGATION |
YELLOWSTONE LANDSCAPE - CENTRAL, INC.($2,711,897) |
|
0114-12-011 |
HARRIS |
HOUSTON |
$2,262,392 |
US 290 |
NH 2018(900) |
07/11/2018 |
11/15/2023 |
LANDSCAPE ENHANS |
YELLOWSTONE LANDSCAPE - CENTRAL, INC.($1,742,751) |
|
0102-16-001 |
NUECES |
CORPUS CHRISTI |
$120,620,670 |
US 77 |
STP 2018(201) |
07/11/2018 |
11/15/2023 |
CONSTRUCT RELIEF ROUTE AROUND DRISCOLL |
ZACHRY CONSTRUCTION CORPORATION($118,322,898) |