0912-00-577 |
HARRIS |
HOUSTON |
$1,722,891 |
VA |
STP 2020(504) |
01/09/2020 |
09/26/2024 |
INSTL TRAF SIG |
VACA UNDERGROUND UTILITIES INC($1,438,223) |
|
0914-00-440 |
TRAVIS |
AUSTIN |
$986,386 |
VA |
STP 2020(513) |
01/09/2020 |
09/26/2024 |
TRAF CONTROL DEVICES |
THE LEVY COMPANY, INC.($979,739) |
|
0911-00-081 |
ANGELINA |
LUFKIN |
$1,315,318 |
VA |
STP 2020(175) |
01/10/2020 |
09/26/2024 |
CONSTRUCT PEDESTRIAN INFRASTRUCT |
HIGHWAY 19 CONSTRUCTION LLC($1,262,425) |
|
0910-07-079 |
GREGG |
TYLER |
$309,095 |
VA |
NH 2020(494) |
01/10/2020 |
09/26/2024 |
RECONRCT PIPE ENTRANCE, ADD LNDSCPING & LIGHTIN |
ENCINO LANDSCAPE, INC.($298,629) |
|
0910-00-106 |
SMITH |
TYLER |
$2,343,971 |
VA |
C 910-00-106 |
01/10/2020 |
09/26/2024 |
THERMOPLASTIC & PROFILE PAVMT MRK |
STRIPE-A-ZONE, INC.($2,074,842) |
|
0907-00-186 |
TOM GREEN |
SAN ANGELO |
$1,833,018 |
VA |
STP 2020(480) |
01/10/2020 |
09/26/2024 |
PAVMT MRK |
VIZCAINO, L.P.($1,506,527) |
|
0902-00-362 |
TARRANT |
FORT WORTH |
$5,761,254 |
VA |
C 902-00-362 |
11/07/2024 |
09/26/2024 |
REHAB BRIDGE |
SCOTT TUCKER CONSTRUCTION COMPANY, LLC($5,157,490) |
|
0912-72-801 |
HARRIS |
HOUSTON |
$4,715,636 |
VA |
C 912-72-801 |
11/07/2024 |
09/26/2024 |
REHAB BRIDGE |
GARRET SHIELDS INFRASTRUCTURE($3,348,460) |
|
0919-19-088 |
BOWIE |
ATLANTA |
$1,848,088 |
VA |
STP 2022(680)TAPS |
11/07/2024 |
09/26/2024 |
BICYCLE AND PEDESTRIAN IMPRVS |
THK CONSTRUCTION LLC($1,777,958) |
|
0910-00-142 |
SMITH |
TYLER |
$4,536,200 |
VA |
C 910-00-142 |
11/07/2024 |
09/26/2024 |
BRIDGE MAINT |
OLYMPUS PAINTING CONTRACTORS, INC.($3,108,496) |
|
0910-16-180 |
SMITH |
TYLER |
$326,139 |
VA |
STP 2025(155)HES |
11/07/2024 |
09/26/2024 |
INSTL ILLUM |
TEXAS TRAFFIC CONTROL SYSTEMS, INC.($299,533) |
|
0901-19-197 |
GRAYSON |
PARIS |
$1,499,900 |
VA |
NH 2020(470) |
01/10/2020 |
09/26/2024 |
CONC PAVMT REPAIR |
WINDING ROAD CONSTRUCTION, INC.($1,246,711) |
|
0925-00-071 |
CHILDRESS |
CHILDRESS |
$1,272,367 |
VA |
C 925-00-71 |
01/10/2020 |
09/26/2024 |
MISCELLANEOUS WORK |
TEXAS PANHANDLE CONSTRUCTION, INC.($1,225,792) |
|
0026-03-049 |
FAYETTE |
YOAKUM |
$23,742,983 |
US 90 |
C 26-3-49 |
11/07/2024 |
09/26/2024 |
SEAL COAT |
CLARK CONSTRUCTION OF TEXAS, INC.($20,248,016) |
|
0144-01-075 |
VICTORIA |
YOAKUM |
$892,591 |
US 87 |
F 2025(221) |
11/07/2024 |
09/26/2024 |
INSTL TRAF SIGNAL |
FLORIDA TRAFFIC CONTROL DEVICES, INC.($919,919) |
|
0071-01-060 |
MCCULLOCH |
BROWNWOOD |
$3,270,392 |
US 87 |
C 71-1-60 |
11/07/2024 |
09/26/2024 |
PREVENT MAINT |
RONALD R. WAGNER & CO., LP($3,936,577) |
|
0066-05-081 |
MOORE |
AMARILLO |
$20,015,412 |
US 87 |
C 66-5-81 |
11/07/2024 |
09/26/2024 |
SEAL COAT |
MISSOURI PETROLEUM PRODUCTS COMPANY LLC($18,664,181) |
|
0123-04-021 |
RUSK |
TYLER |
$1,267,012 |
US 84 |
STP 2020(483)HES |
01/09/2020 |
09/26/2024 |
INSTL PROFILE EDGELINE & CENTERLINE MRK |
STRIPE-A-ZONE, INC.($1,024,467) |
|
0035-03-047 |
CONCHO |
SAN ANGELO |
$9,625,756 |
US 83 |
F 2B24(364) |
11/07/2024 |
09/26/2024 |
GRADING, BASE, PAVING, STORM SEWER, TRAF SIGNAL |
3LW CIVIL LLC($14,120,525) |
|
0033-06-116 |
TAYLOR |
ABILENE |
$444,055 |
US 83 |
NH 2020(532) |
01/09/2020 |
09/26/2024 |
INSTL/UPGRADE ROADWAY LIGHTING |
WILLIS ELECTRIC CO., LP($267,513) |
|
0204-09-045 |
ROBERTSON |
BRYAN |
$19,385,141 |
US 79 |
BR 2B24(086) |
11/07/2024 |
09/26/2024 |
BRIDGE REPL |
LARRY YOUNG PAVING, INC.($18,997,916) |
|
0370-04-033 |
VICTORIA |
YOAKUM |
$10,285,894 |
US 77 |
STP 2020(435) |
01/09/2020 |
09/26/2024 |
ACP OVERLAY |
HUNTER INDUSTRIES, LTD.($9,370,793) |
|
0047-13-033 |
GRAYSON |
PARIS |
$124,606,663 |
US 75 |
F 2025(066) |
11/07/2024 |
09/26/2024 |
WIDEN ROAD - ADD LANES |
RPM XCONSTRUCTION, LLC($116,632,321) |
|
0147-01-022 |
WILBARGER |
WICHITA FALLS |
$3,238,824 |
US 70 |
STP 2020(453) |
01/09/2020 |
09/26/2024 |
PAVMT REPAIR AND OVERLAY |
DUININCK, INC.($3,558,575) |
|
0089-08-098 |
WHARTON |
YOAKUM |
$195,525,806 |
US 59 |
NH 2020(496) |
01/10/2020 |
09/26/2024 |
UPGRADE TO RURAL FREEWAY |
WILLIAMS BROTHERS CONSTRUCTION CO., INC.($191,395,295) |
|
0176-05-196 |
POLK |
LUFKIN |
$4,517,250 |
US 59 |
NH 2020(495) |
01/09/2020 |
09/26/2024 |
RESURF ROADWAY |
MOORE BROTHERS CONSTRUCTION COMPANY($3,764,702) |
|
0114-09-080 |
WASHINGTON |
BRYAN |
$2,621,179 |
US 290 |
BR 2020(481) |
01/09/2020 |
09/26/2024 |
DECK REHAB |
JAMES CONSTRUCTION GROUP, L.L.C.($2,499,111) |
|
0252-01-082 |
BURNET |
AUSTIN |
$1,796,288 |
US 281 |
STP 2020(464)MM |
01/10/2020 |
09/26/2024 |
INTERS & OPERATIONAL IMPRV |
AARON CONCRETE CONTRACTORS, L.P.($2,904,405) |
|
0117-03-024 |
MADISON |
BRYAN |
$278,418,500 |
US 190 |
NH 2B20(290) |
11/07/2024 |
09/26/2024 |
WIDEN ROAD - ADD LANES |
JAMES CONSTRUCTION GROUP, LLC($190,371,163) |
|
0011-06-049 |
SHACKELFORD |
ABILENE |
$8,813,158 |
US 180 |
STP 2020(172) |
01/09/2020 |
09/26/2024 |
MILLING, SPOT REPAIR, 2"OVERLAY, STRUCT WORK |
J. H. STRAIN & SONS, INC.($8,259,120) |
|
6357-95-001 |
WISE |
FORT WORTH |
$166,648 |
US0380 |
RMC - 635795001 |
07/16/2020 |
09/26/2024 |
CLEANING AND SEALING CRACKS |
D & M CONTRACTORS, LLC($164,669) |
|
6358-57-001 |
STONEWALL |
ABILENE |
$36,180 |
US0380 |
MMC - 635857001 |
05/01/2020 |
09/26/2024 |
MATERIALS ONLY |
WRIGHT ASPHALT PRODUCTS COMPANY LLC($36,180) |
|
6358-71-001 |
KENT |
ABILENE |
$50,274 |
US0380 |
MMC - 635871001 |
05/01/2020 |
09/26/2024 |
MATERIALS ONLY |
WRIGHT ASPHALT PRODUCTS COMPANY LLC($51,120) |
|
6359-01-001 |
KENT |
ABILENE |
$11,361 |
US0380 |
MMC - 635901001 |
06/29/2020 |
09/26/2024 |
ROADWAY MATERIALS |
ZACK BURKETT CO.($11,213) |
|
6352-33-001 |
COLLIN |
DALLAS |
$205,661 |
US0380 |
RMC - 635233001 |
02/19/2020 |
09/26/2024 |
VEGETATION MGT |
AARON A CRUZ($206,805) |
|
6357-89-001 |
ERATH |
FORT WORTH |
$234,050 |
US0377 |
RMC - 635789001 |
07/15/2020 |
09/26/2024 |
CLEANING AND SEALING JOINTS AND CRACKS |
GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY($165,665) |
|
6373-92-001 |
WASHINGTON |
BRYAN |
$97,200 |
US0290 |
MMC - 637392001 |
02/09/2021 |
09/26/2024 |
CEMENT & FLOWABLE FILL (READY MIX)(MATERIALS ONLY |
KNIFE RIVER CORPORATION - SOUTH($42,720) |
|
6378-94-001 |
WALLER |
HOUSTON |
$106,595 |
US0290 |
RMC - 637894001 |
05/11/2021 |
09/26/2024 |
PAVMT MRK |
STRIPE LINES, INC.($98,481) |
|
6368-97-001 |
TRAVIS |
AUSTIN |
$235,260 |
US0290 |
RMC - 636897001 |
05/11/2021 |
09/26/2024 |
MOW HWY ROW |
AARON A CRUZ($160,592) |
|
6364-42-001 |
WALLER |
HOUSTON |
$156,075 |
US0290 |
RMC - 636442001 |
07/17/2020 |
09/26/2024 |
DITCH CLEANING AND RESHAPING |
RELIANT SAND AND CONSTRUCTION, INC.($113,700) |
|
6374-96-001 |
ARMSTRONG |
AMARILLO |
$218,661 |
US0287 |
MMC - 637496001 |
02/16/2021 |
09/26/2024 |
SURF TREATMENT AGGREGATE(MATERIALS ON |
VOLCANIC STONE CO.($217,036) |
|
6381-50-001 |
WILBARGER |
WICHITA FALLS |
$134,050 |
US0287 |
MMC - 638150001 |
05/10/2021 |
09/26/2024 |
HOT MIX |
ZACK BURKETT CO.($124,041) |
|
6381-51-001 |
WICHITA |
WICHITA FALLS |
$256,900 |
US0287 |
MMC - 638151001 |
05/10/2021 |
09/26/2024 |
HOT MIX |
ZACK BURKETT CO.($227,091) |
|
6361-74-001 |
WICHITA |
WICHITA FALLS |
$262,500 |
US0287 |
RMC - 636174001 |
07/16/2020 |
09/26/2024 |
ON-CALL TMA |
NIXON ENGINEERING($220,000) |
|
6362-41-001 |
TRINITY |
LUFKIN |
$134,025 |
US0287 |
MMC - 636241001 |
07/16/2020 |
09/26/2024 |
AGGREGATE, GRADE 4 & 5 (MATERIALS ONLY) |
ARCOSA LWS, LLC($138,800) |
|
6348-11-001 |
TARRANT |
FORT WORTH |
$220,519 |
US0287 |
RMC - 634811001 |
07/16/2020 |
09/26/2024 |
ROADSIDE MOW |
JASCO($271,580) |
|
6353-51-001 |
HOUSTON |
LUFKIN |
$163,232 |
US0287 |
RMC - 635351001 |
07/22/2020 |
09/26/2024 |
CLEANING AND SEALING CRACKS |
D & M CONTRACTORS, LLC($117,998) |
|
6355-00-001 |
TRINITY |
LUFKIN |
$114,958 |
US0287 |
MMC - 635500001 |
05/12/2020 |
09/26/2024 |
HYDRAULIC CEMENT BAGS/BULK (MATERIALS ONLY) |
AKA-MATERIALS($128,814) |
|
6357-81-001 |
CLAY |
WICHITA FALLS |
$139,800 |
US0287 |
MMC - 635781001 |
04/07/2020 |
09/26/2024 |
HOT MIX (MATERIALS ONLY) |
EUROVIA ATLANTIC COAST LLC($120,775) |
|
6330-11-001 |
HOUSTON |
LUFKIN |
$187,630 |
US0287 |
RMC - 633011001 |
02/12/2020 |
09/26/2024 |
MOW OF RIGHT-OF-WAY AND LITTER RMVL |
DON YATES, INC.($180,381) |
|
6358-36-001 |
SHACKELFORD |
ABILENE |
$111,060 |
US0283 |
MMC - 635836001 |
06/29/2020 |
09/26/2024 |
ROADWAY MATERIALS |
ZACK BURKETT CO.($111,000) |
|
6358-37-001 |
SHACKELFORD |
ABILENE |
$287,008 |
US0283 |
MMC - 635837001 |
05/14/2020 |
09/26/2024 |
ROADWAY MATERIALS |
VULCAN CONSTRUCTION MATERIALS, LLC($287,840) |
|
6358-34-001 |
SHACKELFORD |
ABILENE |
$36,720 |
US0283 |
MMC - 635834001 |
05/01/2020 |
09/26/2024 |
MATERIALS ONLY |
WRIGHT ASPHALT PRODUCTS COMPANY LLC($35,460) |
|
6358-39-001 |
CALLAHAN |
ABILENE |
$105,500 |
US0283 |
MMC - 635839001 |
05/14/2020 |
09/26/2024 |
ROADWAY MATERIALS |
VULCAN CONSTRUCTION MATERIALS, LLC($107,188) |
|
6358-40-001 |
CALLAHAN |
ABILENE |
$36,180 |
US0283 |
MMC - 635840001 |
06/29/2020 |
09/26/2024 |
ROADWAY MATERIALS |
WRIGHT ASPHALT PRODUCTS COMPANY LLC($38,160) |
|
6468-09-001 |
BURNET |
AUSTIN |
$3,010,905 |
US0281 |
RMC - 646809001 |
11/07/2024 |
09/26/2024 |
METAL BEAM GUARD FENCE REPAIR |
BK FIELD OPERATIONS LLC($1,125,884) |
|
6352-22-001 |
ATASCOSA |
SAN ANTONIO |
$146,758 |
US0281 |
BPM - 635222001 |
05/13/2020 |
09/26/2024 |
INSTL RIPRAP AND GABION MATTRESSES |
DELGADO'S CONTRACTORS, LLC($125,205) |
|
6363-93-001 |
JIM WELLS |
CORPUS CHRISTI |
$292,000 |
US0281 |
MMC - 636393001 |
06/29/2020 |
09/26/2024 |
PURCH.& DEL. OF DENSE-GRADE HOT-MIX ASPH |
HAAS-ANDERSON CONSTRUCTION, LTD.($403,800) |
|
6379-60-001 |
HASKELL |
ABILENE |
$6,136,463 |
US0277 |
EMC - 637960001 |
03/18/2021 |
09/26/2024 |
FLEX PAV STR REPAIR |
J. H. STRAIN & SONS, INC.($4,055,227) |
|
6377-22-001 |
DIMMIT |
LAREDO |
$88,330 |
US0277 |
MMC - 637722001 |
05/19/2021 |
09/26/2024 |
AGGREGATE |
DIGG COMMERCIAL, LLC($88,330) |
|
6364-58-001 |
MAVERICK |
LAREDO |
$296,000 |
US0277 |
MMC - 636458001 |
07/15/2020 |
09/26/2024 |
LIMESTONE ROCK ASPH (MATERIAL ONLY) |
VULCAN CONSTRUCTION MATERIALS, LLC($196,603) |
|
6364-06-001 |
DIMMIT |
LAREDO |
$280,000 |
US0277 |
MMC - 636406001 |
07/15/2020 |
09/26/2024 |
LIMESTONE ROCK ASPH (MATERIAL ONLY) |
VULCAN CONSTRUCTION MATERIALS, LLC($193,740) |
|
6362-27-001 |
VAL VERDE |
LAREDO |
$299,051 |
US0277 |
RMC - 636227001 |
05/14/2020 |
09/26/2024 |
INSTL OF PAVMT MRK & MARK |
PAVEMENT MARKINGS INC.($288,908) |
|
6374-79-001 |
UPSHUR |
ATLANTA |
$246,088 |
US0271 |
MMC - 637479001 |
02/17/2021 |
09/26/2024 |
MATERIALS ONLY, HMAC |
LONGVIEW ASPHALT, INC.($246,088) |
|
6354-77-001 |
UPSHUR |
ATLANTA |
$273,950 |
US0271 |
MMC - 635477001 |
02/19/2020 |
09/26/2024 |
MATERIALS ONLY, HMAC |
LONGVIEW ASPHALT, INC.($246,088) |
|
6354-36-001 |
SMITH |
TYLER |
$298,175 |
US0271 |
MMC - 635436001 |
02/11/2020 |
09/26/2024 |
HOT MIX MATERIALS |
TEXAS MATERIALS GROUP, INC.($313,700) |
|
6374-78-001 |
MORRIS |
ATLANTA |
$246,035 |
US0259 |
MMC - 637478001 |
02/17/2021 |
09/26/2024 |
MATERIALS ONLY, HMAC |
RK HALL, LLC($253,140) |
|
6355-61-001 |
RUSK |
TYLER |
$113,750 |
US0259 |
MMC - 635561001 |
05/12/2020 |
09/26/2024 |
LIQUID ASPH-MATERIALS ONLY |
MARTIN RESOURCE MANAGEMENT CORPORATION($66,100) |
|
6354-31-001 |
RUSK |
TYLER |
$298,175 |
US0259 |
MMC - 635431001 |
02/11/2020 |
09/26/2024 |
HOT MIX MATERIALS |
LONGVIEW ASPHALT, INC.($317,700) |
|
6354-76-001 |
MORRIS |
ATLANTA |
$273,950 |
US0259 |
MMC - 635476001 |
02/19/2020 |
09/26/2024 |
MATERIALS ONLY, HMAC |
RK HALL, LLC($246,035) |
|
6373-91-001 |
MADISON |
BRYAN |
$97,200 |
US0190 |
MMC - 637391001 |
02/09/2021 |
09/26/2024 |
CEMENT & FLOWABLE FILL (READY MIX)(MATERIALS ONLY |
KNIFE RIVER CORPORATION - SOUTH($42,720) |
|
6368-99-001 |
TRAVIS |
AUSTIN |
$153,224 |
US0183 |
RMC - 636899001 |
05/11/2021 |
09/26/2024 |
MOW HWY ROW |
AARON A CRUZ($128,862) |
|
6382-23-001 |
THROCKMORTON |
WICHITA FALLS |
$81,700 |
US0183 |
MMC - 638223001 |
05/20/2021 |
09/26/2024 |
HOT MIX |
ZACK BURKETT CO.($79,675) |
|
6381-73-001 |
BEE |
CORPUS CHRISTI |
$277,150 |
US0181 |
MMC - 638173001 |
05/18/2021 |
09/26/2024 |
HYDRAULIC CEMENT |
AKA-MATERIALS($299,650) |
|
6362-74-001 |
KARNES |
CORPUS CHRISTI |
$292,748 |
US0181 |
RMC - 636274001 |
07/21/2020 |
09/26/2024 |
SPOT BASE REPAIR |
LONE STAR PAVING COMPANY($342,445) |
|
6363-94-001 |
SAN PATRICIO |
CORPUS CHRISTI |
$292,000 |
US0181 |
MMC - 636394001 |
06/29/2020 |
09/26/2024 |
PURCH.& DEL. OF DENSE-GRADE HOT-MIX ASPH |
CENTURY ASPHALT, LTD.($327,800) |
|
6475-08-001 |
STEPHENS |
BROWNWOOD |
$267,309 |
US0180 |
MMC - 647508001 |
10/25/2024 |
09/26/2024 |
LIMESTONE ROCK ASPH |
|
|
6358-33-001 |
FISHER |
ABILENE |
$44,855 |
US0180 |
MMC - 635833001 |
06/29/2020 |
09/26/2024 |
ROADWAY MATERIALS |
ZACK BURKETT CO.($40,388) |
|
6358-14-001 |
JONES |
ABILENE |
$130,224 |
US0180 |
MMC - 635814001 |
03/31/2020 |
09/26/2024 |
MATERIALS ONLY: ASPH CEMENT |
MARTIN RESOURCE MANAGEMENT CORPORATION($111,360) |
|
6358-12-001 |
JONES |
ABILENE |
$50,000 |
US0180 |
MMC - 635812001 |
03/31/2020 |
09/26/2024 |
MATERIALS ONLY: D-GR HOT-MIX ASPH (SQ) |
ZACK BURKETT CO.($40,075) |
|
6358-13-001 |
JONES |
ABILENE |
$97,440 |
US0180 |
MMC - 635813001 |
05/01/2020 |
09/26/2024 |
MATERIALS ONLY |
WRIGHT ASPHALT PRODUCTS COMPANY LLC($95,040) |
|
6374-99-001 |
KAUFMAN |
DALLAS |
$24,000 |
US0175 |
MMC - 637499001 |
02/09/2021 |
09/26/2024 |
LIME(MATERIAL ONLY) |
DIGG COMMERCIAL, LLC($20,800) |
|
6359-62-001 |
HENDERSON |
TYLER |
$285,000 |
US0175 |
MMC - 635962001 |
05/11/2021 |
09/26/2024 |
AGGREGATE MATERIALS ONLY |
DIGG COMMERCIAL, LLC($739,800) |
|
6359-61-001 |
HENDERSON |
TYLER |
$298,375 |
US0175 |
MMC - 635961001 |
07/14/2020 |
09/26/2024 |
PORTLAND CONC IN BULK MATERIALS ONLY |
KLP COMMERCIAL, L.L.C.($334,950) |
|
6357-33-001 |
KAUFMAN |
DALLAS |
$16,100 |
US0175 |
MMC - 635733001 |
05/05/2020 |
09/26/2024 |
OILS AND EMULSIONS (MATERIAL ONLY) |
MARTIN RESOURCE MANAGEMENT CORPORATION($13,900) |
|
6355-88-001 |
KAUFMAN |
DALLAS |
$22,200 |
US0175 |
MMC - 635588001 |
05/05/2020 |
09/26/2024 |
OILS AND EMULSIONS (MATERIALS ONLY) |
MARTIN RESOURCE MANAGEMENT CORPORATION($23,500) |
|
6355-59-001 |
HENDERSON |
TYLER |
$113,750 |
US0175 |
MMC - 635559001 |
05/12/2020 |
09/26/2024 |
LIQUID ASPH-MATERIALS ONLY |
MARTIN RESOURCE MANAGEMENT CORPORATION($66,250) |
|
6354-29-001 |
HENDERSON |
TYLER |
$298,175 |
US0175 |
MMC - 635429001 |
02/11/2020 |
09/26/2024 |
HOT MIX MATERIALS |
AUSTIN ASPHALT, INC.($285,650) |
|
6362-40-001 |
SAN AUGUSTINE |
LUFKIN |
$117,175 |
US0096 |
MMC - 636240001 |
07/16/2020 |
09/26/2024 |
AGGREGATE, GRADE 4 & 5 (MATERIALS ONLY) |
ARCOSA LWS, LLC($125,900) |
|
6361-16-001 |
SAN AUGUSTINE |
LUFKIN |
$75,300 |
US0096 |
MMC - 636116001 |
07/14/2020 |
09/26/2024 |
EMULSIONS CRS2P (MATERIAL ONLY) |
ERGON ASPHALT & EMULSIONS, INC.($68,700) |
|
6361-06-001 |
SAN AUGUSTINE |
LUFKIN |
$207,030 |
US0096 |
MMC - 636106001 |
07/07/2020 |
09/26/2024 |
HOTMIX ASPH TYPE C & D (MATERIAL ONLY) |
EAST TEXAS ASPHALT CO., LTD.($229,500) |
|
6353-50-001 |
SABINE |
LUFKIN |
$159,101 |
US0096 |
RMC - 635350001 |
07/22/2020 |
09/26/2024 |
CLEANING AND SEALING CRACKS |
D & M CONTRACTORS, LLC($120,920) |
|
6359-21-001 |
JASPER |
BEAUMONT |
$197,347 |
US0096 |
RMC - 635921001 |
07/14/2020 |
09/26/2024 |
CRACK SEAL |
ICOS MANAGEMENT, LLC($244,587) |
|
6345-34-001 |
LIBERTY |
BEAUMONT |
$244,860 |
US0090 |
RMC - 634534001 |
07/14/2020 |
09/26/2024 |
CRACK SEAL |
GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY($162,939) |
|
6375-85-001 |
KINNEY |
LAREDO |
$245,000 |
US0090 |
MMC - 637585001 |
02/18/2021 |
09/26/2024 |
LIMESTONE ROCK AND ASPH |
VULCAN CONSTRUCTION MATERIALS, LLC($192,480) |
|
6354-21-001 |
VAL VERDE |
LAREDO |
$114,827 |
US0090 |
RMC - 635421001 |
02/11/2020 |
09/26/2024 |
SIDEWALK AND CONC RIPRAP DITCH |
4WARD CONSTRUCTION LLC($110,000) |
|
6363-19-001 |
MEDINA |
SAN ANTONIO |
$240,993 |
US0090 |
RMC - 636319001 |
06/17/2020 |
09/26/2024 |
CRACK SEAL |
ICOS MANAGEMENT, LLC($240,502) |
|
6379-61-001 |
HOWARD |
ABILENE |
$943,230 |
US0087 |
EMC - 637961001 |
03/22/2021 |
09/26/2024 |
MILL AND INLAY |
BONTKE BROTHERS CONSTRUCTION COMPANY($1,074,690) |
|
6366-07-001 |
POTTER |
AMARILLO |
$198,343 |
US0087 |
RMC - 636607001 |
07/14/2020 |
09/26/2024 |
CLEANING & SWEEPING HWYS |
PANHANDLE SWEEPING & MAINTENANCE, LLC($178,037) |
|
6358-91-001 |
MOORE |
AMARILLO |
$8,400 |
US0087 |
MMC - 635891001 |
07/14/2020 |
09/26/2024 |
FLEXIBLE BASE (MATERIAL ONLY) |
B & G ELECTRIC($9,133) |