6311-28-001 |
WALKER |
BRYAN |
$107,070 |
SH0030 |
BPM - 631128001 |
03/14/2017 |
11/15/2023 |
BRIDGE JOINT REPAIR |
FUQUA CONSTRUCTION CO., INC.($91,577) |
|
6345-89-001 |
WALKER |
BRYAN |
$163,658 |
FM1791 |
BPM - 634589001 |
10/08/2019 |
11/15/2023 |
BRIDGE RAIL AND DECK REPAIR |
KNIFE RIVER CORPORATION - SOUTH($142,717) |
|
6415-86-001 |
WALKER |
BRYAN |
$100,710 |
FM0230 |
BPM - 641586001 |
09/20/2022 |
09/24/2024 |
BRIDGE PREVENT MAINT |
SHALOM SERVICES CORPORATION($99,755) |
|
6438-51-001 |
WALKER |
BRYAN |
$136,579 |
US0190 |
BPM - 643851001 |
08/13/2024 |
11/15/2023 |
BRIDGE PREVENT MAINT |
|
|
6447-48-001 |
WALKER |
BRYAN |
$140,357 |
SH0019 |
BPM - 644748001 |
08/13/2024 |
07/02/2024 |
BRIDGE PREVENT MAINT |
CROSS PLUS CONSTRUCTION, LLC($163,498) |
|
0917-27-044 |
WALKER |
BRYAN |
$504,815 |
CR |
BR 2016(317) |
06/06/2017 |
11/15/2023 |
REPLACE EXIST BRIDGE FACILITY |
TREVWAY, INC.($504,030) |
|
0917-27-047 |
WALKER |
BRYAN |
$645,072 |
CR |
BR 2022(283) |
08/02/2023 |
11/15/2023 |
BRIDGE REPL |
TREVWAY, INC.($832,940) |
|
0917-27-046 |
WALKER |
BRYAN |
$1,770,438 |
CR |
BR 2023(082) |
05/04/2023 |
11/15/2023 |
BRIDGE REPL |
R CONSTRUCTION CIVIL, LLC($1,498,227) |
|
0213-01-048 |
WALKER |
BRYAN |
$1,118,922 |
US 190 |
C 213-1-48 |
02/02/2024 |
12/22/2023 |
INTERS IMPRVS WITH LEFT TURN LANE |
KNIFE RIVER CORPORATION - SOUTH($1,036,981) |
|
0675-06-096 |
WALKER |
BRYAN |
$8,390,404 |
IH 45 |
C 675-6-96 |
03/07/2018 |
11/15/2023 |
HMA OVERLAY |
KNIFE RIVER CORPORATION - SOUTH($6,333,634) |
|
0110-01-049 |
WALKER |
BRYAN |
$908,262 |
SH 75 |
F 2021(717) |
07/01/2021 |
11/15/2023 |
INTERS IMPRVS WITH TURN LANES |
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.($946,422) |
|
0675-07-097 |
WALKER |
BRYAN |
$198,856,064 |
IH 45 |
F 2022(009) |
09/02/2021 |
11/15/2023 |
WIDEN ROAD - ADD LANES |
WILLIAMS BROTHERS CONSTRUCTION CO., INC.($202,938,415) |
|
0109-09-066 |
WALKER |
BRYAN |
$21,395,130 |
SH 19 |
F 2023(144) |
10/06/2022 |
11/15/2023 |
SEAL COAT |
D. I. J. CONSTRUCTION, INC.($23,496,229) |
|
0578-03-055 |
WALKER |
BRYAN |
$1,502,575 |
SH 150 |
F 2024(940) |
04/05/2024 |
02/23/2024 |
INTERS IMPRVS W/ TURN LANES |
LARRY YOUNG PAVING, INC.($1,514,151) |
|
0109-09-068 |
WALKER |
BRYAN |
$4,971,039 |
SH 19 |
F 2B23(022) |
08/03/2023 |
11/15/2023 |
PROFILE MRK |
D. I. J. CONSTRUCTION, INC.($4,204,818) |
|
6369-86-001 |
WALKER |
BRYAN |
$291,500 |
IH0045 |
MMC - 636986001 |
09/15/2020 |
11/15/2023 |
LIMESTONE ROCK ASPH(MATERIALS ONLY) |
VULCAN CONSTRUCTION MATERIALS, LLC($241,220) |
|
6371-26-001 |
WALKER |
BRYAN |
$102,400 |
IH0045 |
MMC - 637126001 |
09/23/2020 |
11/15/2023 |
CUTBACK ASPH(MATERIALS ONLY) |
MARTIN RESOURCE MANAGEMENT CORPORATION($94,960) |
|
6372-60-001 |
WALKER |
BRYAN |
$178,824 |
IH0045 |
MMC - 637260001 |
10/27/2020 |
11/15/2023 |
HYDRAULIC CEMENT (MATERIALS ONLY) |
AKA-MATERIALS($143,208) |
|
6372-73-001 |
WALKER |
BRYAN |
$270,000 |
IH0045 |
MMC - 637273001 |
10/27/2020 |
11/15/2023 |
DENSE-GRADED HOT-MIX ASPH(MATERIALS ONLY) |
BIG CREEK CONSTRUCTION, LTD.($255,000) |
|
6373-11-001 |
WALKER |
BRYAN |
$31,175 |
IH0045 |
MMC - 637311001 |
11/10/2020 |
11/15/2023 |
ASPHIC CONC PATCHING(MATERIALS ONLY) |
WALLER COUNTY ASPHALT INC.($23,689) |
|
6373-32-001 |
WALKER |
BRYAN |
$97,688 |
IH0045 |
MMC - 637332001 |
11/17/2020 |
11/15/2023 |
FLEXIBLE BASE(STOCKPILE)(MATERIALS ONLY) |
KNIFE RIVER CORPORATION - SOUTH($81,588) |
|
6373-35-001 |
WALKER |
BRYAN |
$45,710 |
IH0045 |
MMC - 637335001 |
11/17/2020 |
11/15/2023 |
AGGREGATE SURF(STOCKPILE)(MATERIALS ONLY) |
KNIFE RIVER CORPORATION - SOUTH($38,360) |
|
6375-72-001 |
WALKER |
BRYAN |
$40,190 |
IH0045 |
MMC - 637572001 |
02/09/2021 |
09/26/2024 |
EMULSION |
ERGON ASPHALT & EMULSIONS, INC.($41,024) |
|
6375-88-001 |
WALKER |
BRYAN |
$117,700 |
IH0045 |
MMC - 637588001 |
02/09/2021 |
09/26/2024 |
AGGREGATE |
ARCOSA LWS, LLC($105,090) |
|
6380-00-001 |
WALKER |
BRYAN |
$268,000 |
IH0045 |
MMC - 638000001 |
06/08/2021 |
11/15/2023 |
ROCK/RIPRAP |
KNIFE RIVER CORPORATION - SOUTH($218,500) |
|
6383-21-001 |
WALKER |
BRYAN |
$262,500 |
IH0045 |
MMC - 638321001 |
06/01/2021 |
11/15/2023 |
LIMESTONE ROCK AND ASPH |
MARTIN MARIETTA MATERIALS, INC.($247,325) |
|
6385-24-001 |
WALKER |
BRYAN |
$70,699 |
IH0045 |
MMC - 638524001 |
08/10/2021 |
11/15/2023 |
AGGREGATE |
COLORADO MATERIALS, LTD.($76,759) |
|
6388-13-001 |
WALKER |
BRYAN |
$248,000 |
IH0045 |
MMC - 638813001 |
09/07/2021 |
09/24/2024 |
WINTER WEATHER MATERIAL |
SOUTHWEST ENVIROTX PARTNERS, LLC($128,640) |
|
6388-60-001 |
WALKER |
BRYAN |
$262,500 |
IH0045 |
MMC - 638860001 |
09/14/2021 |
09/24/2024 |
LIMESTONE ROCK AND ASPH |
VULCAN CONSTRUCTION MATERIALS, LLC($268,850) |
|
6389-20-001 |
WALKER |
BRYAN |
$286,000 |
IH0045 |
MMC - 638920001 |
11/09/2021 |
11/15/2023 |
ASPH |
BIG CREEK CONSTRUCTION, LTD.($378,600) |
|
6389-61-001 |
WALKER |
BRYAN |
$94,272 |
IH0045 |
MMC - 638961001 |
10/12/2021 |
11/15/2023 |
HYDRAULIC CEMENT |
MESA D CORP.($94,611) |
|
6392-14-001 |
WALKER |
BRYAN |
$10,000 |
IH0045 |
MMC - 639214001 |
11/09/2021 |
11/15/2023 |
ASPHIC PATCHING MATERIAL |
WALLER COUNTY ASPHALT INC.($10,928) |
|
6393-03-001 |
WALKER |
BRYAN |
$93,750 |
IH0045 |
MMC - 639303001 |
12/08/2021 |
11/15/2023 |
FLEXIBLE BASE |
DIGG COMMERCIAL, LLC($111,285) |
|
6394-56-001 |
WALKER |
BRYAN |
$182,000 |
IH0045 |
MMC - 639456001 |
03/15/2022 |
11/15/2023 |
EMULSION |
CLEVELAND ASPHALT PRODUCTS, INC.($211,400) |
|
6395-12-001 |
WALKER |
BRYAN |
$149,000 |
IH0045 |
MMC - 639512001 |
02/15/2022 |
11/15/2023 |
FLOWABLE FILL |
KNIFE RIVER CORPORATION - SOUTH($197,400) |
|
6395-24-001 |
WALKER |
BRYAN |
$134,000 |
IH0045 |
MMC - 639524001 |
04/05/2022 |
11/15/2023 |
AGGREGATE |
ARCOSA LWS, LLC($131,830) |
|
6395-43-001 |
WALKER |
BRYAN |
$110,900 |
IH0045 |
MMC - 639543001 |
02/10/2022 |
11/15/2023 |
AGGREGATE |
KNIFE RIVER CORPORATION - SOUTH($138,480) |
|
6395-49-001 |
WALKER |
BRYAN |
$207,200 |
IH0045 |
MMC - 639549001 |
10/25/2022 |
11/15/2023 |
WINTER WEATHER MATERIAL |
NSG LOGISTICS, LLC($167,690) |
|
6395-54-001 |
WALKER |
BRYAN |
$210,000 |
IH0045 |
MMC - 639554001 |
02/15/2022 |
11/15/2023 |
LIMESTONE ROCK AND ASPH |
MARTIN MARIETTA MATERIALS, INC.($236,440) |
|
6398-47-001 |
WALKER |
BRYAN |
$140,000 |
IH0045 |
MMC - 639847001 |
03/15/2022 |
11/15/2023 |
CUTBACK |
MARTIN RESOURCE MANAGEMENT CORPORATION($134,700) |
|
6403-10-001 |
WALKER |
BRYAN |
$112,000 |
IH0045 |
MMC - 640310001 |
05/17/2022 |
11/15/2023 |
FLEXIBLE BASE |
TOUCHSTONE RESOURCES, LLC($132,000) |
|
6403-12-001 |
WALKER |
BRYAN |
$241,800 |
IH0045 |
MMC - 640312001 |
05/17/2022 |
11/15/2023 |
ROCK/RIPRAP |
TOUCHSTONE RESOURCES, LLC($247,900) |
|
6403-38-001 |
WALKER |
BRYAN |
$100,672 |
IH0045 |
MMC - 640338001 |
05/17/2022 |
11/15/2023 |
HYDRAULIC CEMENT |
AKA-MATERIALS($111,780) |
|
6407-93-001 |
WALKER |
BRYAN |
$176,000 |
IH0045 |
MMC - 640793001 |
06/14/2022 |
11/15/2023 |
FLOWABLE FILL |
TOUCHSTONE RESOURCES, LLC($268,000) |
|
6408-30-001 |
WALKER |
BRYAN |
$288,000 |
IH0045 |
MMC - 640830001 |
06/21/2022 |
11/15/2023 |
LIMESTONE ROCK ASPH |
VULCAN CONSTRUCTION MATERIALS, LLC($306,750) |
|
6409-21-001 |
WALKER |
BRYAN |
$156,000 |
IH0045 |
MMC - 640921001 |
07/12/2022 |
11/15/2023 |
AGGREGATE |
COLORADO MATERIALS, LTD.($239,250) |
|
6412-79-001 |
WALKER |
BRYAN |
$142,400 |
IH0045 |
MMC - 641279001 |
08/09/2022 |
11/15/2023 |
CUTBACK |
MARTIN RESOURCE MANAGEMENT CORPORATION($138,160) |
|
6412-83-001 |
WALKER |
BRYAN |
$218,000 |
IH0045 |
MMC - 641283001 |
08/09/2022 |
11/15/2023 |
EMULSION |
CLEVELAND ASPHALT PRODUCTS, INC.($246,000) |
|
6413-55-001 |
WALKER |
BRYAN |
$12,500 |
IH0045 |
MMC - 641355001 |
08/09/2022 |
11/15/2023 |
ASPHIC PATCHING MATERIAL |
WALLER COUNTY ASPHALT INC.($13,610) |
|
6414-57-001 |
WALKER |
BRYAN |
$269,000 |
IH0045 |
MMC - 641457001 |
08/10/2022 |
11/15/2023 |
HOT MIX |
BIG CREEK CONSTRUCTION, LTD.($322,750) |
|
6414-59-001 |
WALKER |
BRYAN |
$225,000 |
IH0045 |
MMC - 641459001 |
08/16/2022 |
11/15/2023 |
ROCK/RIPRAP |
TOUCHSTONE RESOURCES, LLC($207,900) |
|
6414-61-001 |
WALKER |
BRYAN |
$153,500 |
IH0045 |
MMC - 641461001 |
08/16/2022 |
11/15/2023 |
AGGREGATE |
ARCOSA LWS, LLC($140,875) |
|
6415-36-001 |
WALKER |
BRYAN |
$152,000 |
IH0045 |
MMC - 641536001 |
10/25/2022 |
11/15/2023 |
FLEXIBLE BASE |
DIGG COMMERCIAL, LLC($160,000) |
|
6416-26-001 |
WALKER |
BRYAN |
$246,000 |
IH0045 |
MMC - 641626001 |
09/12/2022 |
11/15/2023 |
FLOWABLE FILL |
TOUCHSTONE RESOURCES, LLC($290,000) |
|
6417-26-001 |
WALKER |
BRYAN |
$268,000 |
IH0045 |
MMC - 641726001 |
09/12/2022 |
09/24/2024 |
WINTER WEATHER MATERIAL |
THE BARGAIN SOURCE($211,346) |
|
6417-32-001 |
WALKER |
BRYAN |
$278,880 |
IH0045 |
MMC - 641732001 |
12/06/2022 |
11/15/2023 |
WINTER WEATHER MATERIAL |
SOUTHWEST ENVIROTX PARTNERS, LLC($216,096) |
|
6417-60-001 |
WALKER |
BRYAN |
$72,000 |
IH0045 |
MMC - 641760001 |
09/20/2022 |
09/24/2024 |
WINTER WEATHER MATERIAL |
UNITED SALT CORPORATION($65,886) |
|
6418-17-001 |
WALKER |
BRYAN |
$248,000 |
IH0045 |
MMC - 641817001 |
09/13/2022 |
09/24/2024 |
LIMESTONE ROCK ASPH |
VULCAN CONSTRUCTION MATERIALS, LLC($240,064) |
|
6420-37-001 |
WALKER |
BRYAN |
$118,464 |
IH0045 |
MMC - 642037001 |
10/12/2022 |
11/15/2023 |
HYDRAULIC CEMENT |
AKA-MATERIALS($121,868) |
|
6421-67-001 |
WALKER |
BRYAN |
$206,000 |
IH0045 |
MMC - 642167001 |
10/11/2022 |
11/15/2023 |
AGGREGATE |
KNIFE RIVER CORPORATION - SOUTH($167,000) |
|
6422-42-001 |
WALKER |
BRYAN |
$192,000 |
IH0045 |
MMC - 642242001 |
11/15/2022 |
11/15/2023 |
CUTBACK |
MARTIN RESOURCE MANAGEMENT CORPORATION($181,320) |
|
6422-63-001 |
WALKER |
BRYAN |
$753,000 |
IH0045 |
MMC - 642263001 |
12/01/2022 |
11/15/2023 |
HOT MIX |
VULCAN CONSTRUCTION MATERIALS, LLC($678,200) |
|
6422-73-001 |
WALKER |
BRYAN |
$50,000 |
IH0045 |
MMC - 642273001 |
11/09/2022 |
11/15/2023 |
ASPHIC PATCHING MATERIAL |
WALLER COUNTY ASPHALT INC.($55,445) |
|
6422-77-001 |
WALKER |
BRYAN |
$186,000 |
IH0045 |
MMC - 642277001 |
11/15/2022 |
11/15/2023 |
ROCK/RIPRAP |
TOUCHSTONE RESOURCES, LLC($193,900) |
|
6425-70-001 |
WALKER |
BRYAN |
$174,480 |
IH0045 |
MMC - 642570001 |
11/16/2022 |
11/15/2023 |
EMULSION |
MARTIN RESOURCE MANAGEMENT CORPORATION($154,200) |
|
6425-86-001 |
WALKER |
BRYAN |
$300,000 |
IH0045 |
MMC - 642586001 |
12/01/2022 |
11/15/2023 |
LIMESTONE ROCK ASPH |
MARTIN MARIETTA MATERIALS, INC.($288,400) |
|
6426-02-001 |
WALKER |
BRYAN |
$266,400 |
IH0045 |
MMC - 642602001 |
12/14/2022 |
11/15/2023 |
FLOWABLE FILL |
TOUCHSTONE RESOURCES, LLC($272,800) |
|
6426-80-001 |
WALKER |
BRYAN |
$72,160 |
IH0045 |
MMC - 642680001 |
12/13/2022 |
11/15/2023 |
WINTER WEATHER MATERIAL |
THE BARGAIN SOURCE($64,747) |
|
6426-85-001 |
WALKER |
BRYAN |
$248,000 |
IH0045 |
MMC - 642685001 |
12/07/2022 |
11/15/2023 |
WINTER WEATHER MATERIAL |
THE BARGAIN SOURCE($186,844) |
|
6427-82-001 |
WALKER |
BRYAN |
$198,000 |
IH0045 |
MMC - 642782001 |
01/10/2023 |
11/15/2023 |
FLEXIBLE BASE |
TOUCHSTONE RESOURCES, LLC($220,500) |
|
6428-02-001 |
WALKER |
BRYAN |
$558,166 |
IH0045 |
MMC - 642802001 |
01/05/2023 |
11/15/2023 |
HYDRAULIC CEMENT |
AKA-MATERIALS($531,726) |
|
6428-48-001 |
WALKER |
BRYAN |
$160,000 |
IH0045 |
MMC - 642848001 |
01/11/2023 |
11/15/2023 |
AGGREGATE |
DIGG COMMERCIAL, LLC($181,500) |
|
6432-50-001 |
WALKER |
BRYAN |
$177,600 |
IH0045 |
MMC - 643250001 |
05/11/2023 |
11/15/2023 |
CUTBACK |
MARTIN RESOURCE MANAGEMENT CORPORATION($199,560) |
|
6432-74-001 |
WALKER |
BRYAN |
$157,600 |
IH0045 |
MMC - 643274001 |
05/11/2023 |
11/15/2023 |
EMULSION |
MARTIN RESOURCE MANAGEMENT CORPORATION($148,120) |
|
6433-30-001 |
WALKER |
BRYAN |
$258,720 |
IH0045 |
MMC - 643330001 |
08/09/2023 |
11/15/2023 |
WINTER WEATHER MATERIAL |
UNITED SALT CORPORATION($279,962) |
|
6439-90-001 |
WALKER |
BRYAN |
$190,000 |
IH0045 |
MMC - 643990001 |
05/11/2023 |
11/15/2023 |
ROCK/RIPRAP |
TEXCON GENERAL CONTRACTORS($191,835) |
|
6442-24-001 |
WALKER |
BRYAN |
$612,400 |
IH0045 |
MMC - 644224001 |
12/05/2023 |
11/15/2023 |
HOT MIX |
KNIFE RIVER CORPORATION - SOUTH($623,600) |
|
6447-60-001 |
WALKER |
BRYAN |
$226,240 |
IH0045 |
MMC - 644760001 |
08/08/2023 |
11/15/2023 |
WINTER WEATHER MATERIAL |
NSG LOGISTICS, LLC($205,688) |
|
6454-31-001 |
WALKER |
BRYAN |
$185,400 |
IH0045 |
MMC - 645431001 |
10/25/2023 |
11/15/2023 |
ROCK/RIPRAP |
TOUCHSTONE RESOURCES, LLC($184,900) |
|
6455-57-001 |
WALKER |
BRYAN |
$160,000 |
IH0045 |
MMC - 645557001 |
10/23/2023 |
11/15/2023 |
EMULSION |
CLEVELAND ASPHALT PRODUCTS, INC.($167,600) |
|
6460-67-001 |
WALKER |
BRYAN |
$300,000 |
IH0045 |
MMC - 646067001 |
12/05/2023 |
11/15/2023 |
LIMESTONE ROCK ASPH |
VULCAN CONSTRUCTION MATERIALS, LLC($281,900) |
|
6466-06-001 |
WALKER |
BRYAN |
$240,000 |
IH0045 |
MMC - 646606001 |
07/23/2024 |
06/11/2024 |
FLEXIBLE BASE |
TOUCHSTONE RESOURCES, LLC($228,000) |
|
6466-08-001 |
WALKER |
BRYAN |
$543,866 |
IH0045 |
MMC - 646608001 |
06/05/2024 |
04/30/2024 |
HYDRAULIC CEMENT |
TOUCHSTONE RESOURCES, LLC($529,715) |
|
6469-67-001 |
WALKER |
BRYAN |
$180,000 |
IH0045 |
MMC - 646967001 |
07/23/2024 |
06/11/2024 |
AGGREGATE |
KNIFE RIVER CORPORATION - SOUTH($191,625) |
|
6470-38-001 |
WALKER |
BRYAN |
$224,640 |
IH0045 |
MMC - 647038001 |
08/13/2024 |
07/02/2024 |
WINTER WEATHER MATERIAL |
NSG LOGISTICS, LLC($202,387) |
|
6471-02-001 |
WALKER |
BRYAN |
$285,200 |
IH0045 |
MMC - 647102001 |
08/14/2024 |
07/03/2024 |
WINTER WEATHER MATERIAL |
NSG LOGISTICS, LLC($245,488) |
|
6474-24-001 |
WALKER |
BRYAN |
$204,000 |
IH0045 |
MMC - 647424001 |
10/08/2024 |
09/04/2024 |
CUTBACK |
MARTIN RESOURCE MANAGEMENT CORPORATION($174,960) |
|
0212-02-039 |
WALKER |
BRYAN |
$1,113,822 |
US 190 |
NH 1702(083) |
05/02/2017 |
11/15/2023 |
OVERLAY |
KNIFE RIVER CORPORATION - SOUTH($862,850) |
|
0675-07-101 |
WALKER |
BRYAN |
$118,265,746 |
IH 45 |
NH 1702(696) |
08/09/2017 |
11/15/2023 |
WIDEN FREEWAY (SIX LANES) |
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY($122,051,473) |
|
0675-07-096 |
WALKER |
BRYAN |
$139,199,260 |
IH 45 |
NH 2017(241) |
01/04/2017 |
11/15/2023 |
WIDEN FREEWAY (SIX LANES) |
WEBBER, LLC($128,204,638) |
|
6238-22-001 |
WALKER |
BRYAN |
$166,902 |
SH0030 |
RMC - 623822001 |
02/14/2012 |
11/15/2023 |
INSTL SHORTLINE MRK |
FLASHER EQUIPMENT COMPANY($173,690) |
|
6282-02-001 |
WALKER |
BRYAN |
$172,663 |
SH0030 |
RMC - 628202001 |
06/01/2021 |
09/26/2024 |
MBGF & CABLE BARRIER REPAIR |
ROY LEE WALKER($198,527) |
|
6310-17-001 |
WALKER |
BRYAN |
$371,425 |
SH0030 |
RMC - 631017001 |
02/02/2017 |
11/15/2023 |
MBGF & CABLE BARRIER REPAIR |
P-VILLE, INCORPORATED($269,255) |
|
6310-81-001 |
WALKER |
BRYAN |
$853,600 |
SH0030 |
RMC - 631081001 |
01/05/2017 |
11/15/2023 |
HMA MILL AND INLAY |
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.($616,698) |
|
6312-28-001 |
WALKER |
BRYAN |
$296,630 |
SH0030 |
RMC - 631228001 |
09/12/2017 |
11/15/2023 |
INSTL SHORTLINE AND SPECIALTY MRK |
INTERSTATE BARRICADES & MARKINGS, INC.($227,313) |
|
6313-74-001 |
WALKER |
BRYAN |
$496,628 |
FM0247 |
RMC - 631374001 |
03/07/2017 |
11/15/2023 |
MILL AND INLAY |
BIG CREEK CONSTRUCTION, LTD.($477,154) |
|
6314-91-001 |
WALKER |
BRYAN |
$268,388 |
SH0030 |
RMC - 631491001 |
05/09/2017 |
11/15/2023 |
INSTL/REMOVE RAISED PAVMT MARKERS |
BRYDL CONTRACTING, INC.($243,381) |
|
6315-30-001 |
WALKER |
BRYAN |
$895,855 |
SH0030 |
RMC - 631530001 |
07/12/2017 |
11/15/2023 |
HMA MILL AND INLAY |
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.($672,700) |
|
6317-38-001 |
WALKER |
BRYAN |
$1,020,068 |
SH0030 |
RMC - 631738001 |
07/11/2017 |
11/15/2023 |
SPOT BASE REPAIR |
KNIFE RIVER CORPORATION - SOUTH($878,328) |
|
6319-27-001 |
WALKER |
BRYAN |
$402,470 |
SH0030 |
RMC - 631927001 |
07/11/2017 |
11/15/2023 |
SPOT PAVMT MRK |
BATTERSON, LLP($311,200) |