6476-77-001 |
VAN ZANDT |
TYLER |
$290,000 |
US0080 |
MMC - 647677001 |
11/21/2024 |
10/29/2024 |
LIMESTONE ROCK ASPH |
MARTIN MARIETTA MATERIALS, INC.($318,600) |
|
6472-16-001 |
VAN ZANDT |
TYLER |
$70,450 |
SH0064 |
RMC - 647216001 |
10/15/2024 |
09/03/2024 |
TREE TRIM |
S FOWLER SERVICES LLC($45,360) |
|
1671-02-012 |
VAN ZANDT |
TYLER |
$12,355,638 |
FM 1651 |
C 1671-2-12 |
05/03/2024 |
03/22/2024 |
REHAB EXIST ROADWAY |
BAKER & COMPANY CONSTRUCTION, LLC($10,542,339) |
|
0910-12-141 |
VAN ZANDT |
TYLER |
$472,400 |
VA |
STP 2024(855)HES |
04/04/2024 |
02/22/2024 |
HAZARD ELIM & SAFETY |
MARCOM'S MOWING SERVICE, LLC($450,860) |
|
0495-03-071 |
VAN ZANDT |
TYLER |
$2,817,248 |
IH 20 |
C 495-3-71 |
03/06/2024 |
11/15/2023 |
CONSTRUCT RAMPS |
REYNOLDS & KAY, LTD.($1,435,639) |
|
6451-13-001 |
VAN ZANDT |
TYLER |
$740,354 |
FM2339 |
BPM - 645113001 |
11/02/2023 |
11/15/2023 |
BRIDGE PREVENT MAINT |
RED BARON BUILDING COMPANY, LLC($739,193) |
|
6440-57-001 |
VAN ZANDT |
TYLER |
$946,081 |
FM0773 |
RMC - 644057001 |
11/01/2023 |
11/15/2023 |
BASE FAILURE PAVMT REPAIR |
BIG CREEK CONSTRUCTION, LTD.($1,085,594) |
|
6450-83-001 |
VAN ZANDT |
TYLER |
$276,804 |
SH0064 |
RMC - 645083001 |
09/12/2023 |
11/15/2023 |
TREE TRIM AND BRUSH RMVL |
S FOWLER SERVICES LLC($179,720) |
|
1322-02-017 |
VAN ZANDT |
TYLER |
$22,915,167 |
FM 1255 |
F 2024(023) |
09/07/2023 |
11/15/2023 |
REHAB EXIST ROADWAY |
REYNOLDS & KAY, LTD.($17,084,796) |
|
0245-01-037 |
VAN ZANDT |
TYLER |
$1,653,300 |
SH 64 |
F 2024(038) |
09/06/2023 |
11/15/2023 |
INSTL TRAF SIGNAL |
EAST TEXAS BRIDGE, INC.($2,231,132) |
|
0522-02-040 |
VAN ZANDT |
TYLER |
$394,149 |
SH 243 |
F 2024(039) |
09/06/2023 |
11/15/2023 |
INSTL TRAF SIGNAL |
WG ENGINEERING & CONSTRUCTION, LLC($500,566) |
|
6447-06-001 |
VAN ZANDT |
TYLER |
$235,735 |
FM0751 |
RMC - 644706001 |
08/09/2023 |
11/15/2023 |
CRACK SEAL |
SCOUT 5 CONSTRUCTION LLC($147,299) |
|
6446-42-001 |
VAN ZANDT |
TYLER |
$275,000 |
US0080 |
MMC - 644642001 |
08/08/2023 |
11/15/2023 |
HYDRAULIC CEMENT |
AKA-MATERIALS($317,500) |
|
0495-02-064 |
VAN ZANDT |
TYLER |
$31,709,757 |
IH 20 |
BR 2B23(276) |
08/03/2023 |
11/15/2023 |
BRIDGE REPL |
INDUS ROAD & BRIDGE, INC.($39,144,960) |
|
6444-58-001 |
VAN ZANDT |
TYLER |
$5,012,428 |
FM0016 |
RMC - 644458001 |
08/03/2023 |
11/15/2023 |
MILL AND INLAY |
EAST TEXAS BRIDGE, INC.($7,319,995) |
|
0910-12-140 |
VAN ZANDT |
TYLER |
$785,460 |
VA |
STP 2B23(065)HES |
08/02/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
MARCOM'S MOWING SERVICE, LLC($671,280) |
|
0910-12-139 |
VAN ZANDT |
TYLER |
$1,984,136 |
CR |
BR 2023(449) |
06/27/2023 |
11/15/2023 |
BRIDGE REPL |
TRUE ROADS CONSTRUCTION, LLC($1,393,630) |
|
0443-01-034 |
VAN ZANDT |
TYLER |
$236,957 |
SH 198 |
STP 2023(827)HES |
06/01/2023 |
11/27/2023 |
HAZARD ELIM & SAFETY |
GARRET SHIELDS INFRASTRUCTURE($234,450) |
|
6439-47-001 |
VAN ZANDT |
TYLER |
$289,075 |
US0080 |
RMC - 643947001 |
05/09/2023 |
11/15/2023 |
TREE RMVL |
ALLIES LAND CLEARING($229,136) |
|
0910-12-142 |
VAN ZANDT |
TYLER |
$501,070 |
CR |
BR 2022(578) |
03/08/2023 |
08/21/2024 |
BRIDGE REPL |
THK CONSTRUCTION LLC($521,961) |
|
6430-96-001 |
VAN ZANDT |
TYLER |
$1,056,650 |
US0080 |
MMC - 643096001 |
03/07/2023 |
11/15/2023 |
HOT MIX |
TEXAS MATERIALS GROUP, INC.($1,016,100) |
|
0495-02-069 |
VAN ZANDT |
TYLER |
$6,031,827 |
IH 20 |
C 495-2-69 |
03/07/2023 |
08/21/2024 |
REHAB EXIST ROADWAY |
H. V. CAVER, INC.($5,701,600) |
|
6434-06-001 |
VAN ZANDT |
TYLER |
$213,000 |
US0080 |
MMC - 643406001 |
02/14/2023 |
11/15/2023 |
EMULSION |
WRIGHT ASPHALT PRODUCTS COMPANY LLC($231,000) |
|
6426-22-001 |
VAN ZANDT |
TYLER |
$192,000 |
US0080 |
MMC - 642622001 |
12/13/2022 |
11/15/2023 |
LIMESTONE ROCK ASPH |
VULCAN CONSTRUCTION MATERIALS, LLC($199,488) |
|
6414-35-001 |
VAN ZANDT |
TYLER |
$150,088 |
SH0198 |
RMC - 641435001 |
09/13/2022 |
09/24/2024 |
TREE TRIM |
FOWLER CONSTRUCTION($128,713) |
|
6414-33-001 |
VAN ZANDT |
TYLER |
$250,000 |
US0080 |
MMC - 641433001 |
08/16/2022 |
11/15/2023 |
HYDRAULIC CEMENT |
AKA-MATERIALS($275,000) |
|
1171-01-022 |
VAN ZANDT |
TYLER |
$3,198,530 |
FM 859 |
STP 2022(813)HES |
08/04/2022 |
11/15/2023 |
HAZARD ELIM & SAFETY |
BAKER & COMPANY CONSTRUCTION, LLC($3,629,409) |
|
0108-12-018 |
VAN ZANDT |
TYLER |
$8,429,563 |
SH 19 |
F 2022(423) |
04/06/2022 |
08/22/2024 |
HWY IMPRV |
A. L. HELMCAMP, INC.($8,769,309) |
|
6397-41-001 |
VAN ZANDT |
TYLER |
$147,600 |
US0080 |
MMC - 639741001 |
02/17/2022 |
11/15/2023 |
LIMESTONE ROCK AND ASPH |
MARTIN MARIETTA MATERIALS, INC.($168,300) |
|
6395-98-001 |
VAN ZANDT |
TYLER |
$302,500 |
US0080 |
MMC - 639598001 |
02/03/2022 |
11/15/2023 |
HOT MIX |
TEXAS MATERIALS GROUP, INC.($270,500) |
|
6387-80-001 |
VAN ZANDT |
TYLER |
$168,488 |
FM0047 |
RMC - 638780001 |
10/12/2021 |
11/15/2023 |
DITCH CLEANING AND RESHAPING |
TEXAS DRAINAGE INC.($135,448) |
|
0108-02-033 |
VAN ZANDT |
TYLER |
$13,424,556 |
SH 19 |
F 2021(821) |
08/05/2021 |
11/15/2023 |
HWY IMPRV |
BIG CREEK CONSTRUCTION, LTD.($12,108,566) |
|
6378-20-001 |
VAN ZANDT |
TYLER |
$61,400 |
US0080 |
MMC - 637820001 |
04/13/2021 |
11/15/2023 |
MATERIALS ONLY: HYDRAULIC CEMENT CONC |
DIGG COMMERCIAL, LLC($58,200) |
|
6377-72-001 |
VAN ZANDT |
TYLER |
$243,500 |
US0080 |
MMC - 637772001 |
03/16/2021 |
11/15/2023 |
HOT MIX |
TEXAS MATERIALS GROUP, INC.($262,750) |
|
0910-12-134 |
VAN ZANDT |
TYLER |
$1,349,295 |
CR |
BR 2019(360) |
03/05/2021 |
11/15/2023 |
BRIDGE REPL |
EAST TEXAS BRIDGE, INC.($1,247,129) |
|
0495-03-065 |
VAN ZANDT |
TYLER |
$7,015,842 |
IH 20 |
STP 2021(170)HES |
02/04/2021 |
11/15/2023 |
REPLACE GUARDRAIL |
SEFBO PIPELINE BRIDGE, INCORPORATED($4,990,253) |
|
0495-03-065 |
VAN ZANDT |
TYLER |
$7,015,842 |
IH 20 |
STP 2021(170)HES |
12/03/2020 |
11/15/2023 |
REPLACE GUARDRAIL |
SEFBO PIPELINE BRIDGE, INCORPORATED($3,660,941) |
|
0095-06-074 |
VAN ZANDT |
TYLER |
$13,215,240 |
US 80 |
STP 2021(169) |
12/03/2020 |
11/15/2023 |
SEAL COAT |
BRANNAN PAVING CO., LTD.($11,795,598) |
|
6372-92-001 |
VAN ZANDT |
TYLER |
$644,317 |
SH0019 |
RMC - 637292001 |
12/02/2020 |
11/15/2023 |
ROW MOW |
SERNA CONTRACTORS, LLC($517,663) |
|
6370-15-001 |
VAN ZANDT |
TYLER |
$256,760 |
SH0064 |
RMC - 637015001 |
10/06/2020 |
11/15/2023 |
TREE TRIM & BRUSH RMVL |
CATOCON, INC.($219,402) |
|
0495-02-066 |
VAN ZANDT |
TYLER |
$303,760 |
IH 20 |
NH 2021(094) |
10/01/2020 |
11/15/2023 |
UPGRADING EXIST ILLUM |
VACA UNDERGROUND UTILITIES INC($285,600) |
|
6359-57-001 |
VAN ZANDT |
TYLER |
$79,370 |
US0080 |
MMC - 635957001 |
09/08/2020 |
11/15/2023 |
LIME (MATERIALS ONLY) |
DIGG COMMERCIAL, LLC($101,370) |
|
6364-63-001 |
VAN ZANDT |
TYLER |
$237,500 |
US0080 |
MMC - 636463001 |
09/08/2020 |
11/15/2023 |
LIQUID ASPH MATERIALS ONLY |
MARTIN RESOURCE MANAGEMENT CORPORATION($240,500) |
|
6355-60-001 |
VAN ZANDT |
TYLER |
$113,750 |
US0080 |
MMC - 635560001 |
05/12/2020 |
09/26/2024 |
LIQUID ASPH-MATERIALS ONLY |
MARTIN RESOURCE MANAGEMENT CORPORATION($66,700) |
|
0910-12-021 |
VAN ZANDT |
TYLER |
$1,092,615 |
CR |
BR 0096(509) |
03/05/2020 |
11/15/2023 |
REPLACE BRIDGE & APPROACHES |
EAST TEXAS BRIDGE, INC.($1,069,893) |
|
0910-12-138 |
VAN ZANDT |
TYLER |
$499,749 |
CR |
BR 1902(398) |
03/04/2020 |
11/15/2023 |
BRIDGE REPL |
STATELINE CONSTRUCTION, LLC($552,443) |
|
6354-30-001 |
VAN ZANDT |
TYLER |
$298,175 |
US0080 |
MMC - 635430001 |
02/11/2020 |
09/26/2024 |
HOT MIX MATERIALS |
TEXAS MATERIALS GROUP, INC.($262,400) |
|
0495-03-063 |
VAN ZANDT |
TYLER |
$6,817,962 |
IH 20 |
NH 2020(301) |
02/07/2020 |
11/15/2023 |
PLANING, PAVMT REPAIR, OCST, OV, MBGF, PV MK |
AUSTIN BRIDGE & ROAD SERVICES, LP($6,622,009) |
|
0095-06-073 |
VAN ZANDT |
TYLER |
$2,971,188 |
US 80 |
STP 2020(560)HES |
02/06/2020 |
11/15/2023 |
IMPROVING DRAINAGE, CULVERTS, UPGRADE GUARD RAIL |
BAKER & COMPANY CONSTRUCTION, LLC($2,544,981) |
|
0646-02-029 |
VAN ZANDT |
TYLER |
$5,095,340 |
FM 47 |
STP 2020(329)HES |
12/03/2019 |
11/15/2023 |
GUARD RAIL, DRAINAGE STRUCTS, BRIDGE RAIL |
HIGHWAY 19 CONSTRUCTION LLC($4,537,224) |
|
6349-66-001 |
VAN ZANDT |
TYLER |
$201,300 |
FM0279 |
RMC - 634966001 |
11/12/2019 |
11/15/2023 |
TREE TRIM |
CATOCON, INC.($236,264) |
|
0108-02-034 |
VAN ZANDT |
TYLER |
$598,630 |
SH 19 |
STP 1902(030)HES |
06/04/2019 |
11/15/2023 |
INSTL SAFETY LIGHTING |
TEXAS TRAFFIC CONTROL SYSTEMS, INC.($508,063) |
|
0095-06-071 |
VAN ZANDT |
TYLER |
$557,547 |
US 80 |
STP 2019(853)HESG |
05/07/2019 |
11/15/2023 |
CENTERLINE & EDGELINE PROFILE PAVMENT MRK |
TOTAL HIGHWAY MAINTENANCE, LLC($499,197) |
|
6341-12-001 |
VAN ZANDT |
TYLER |
$289,497 |
SH0110 |
RMC - 634112001 |
02/12/2019 |
11/15/2023 |
GUARDRAIL |
R & G CONSTRUCTION, LLC($265,678) |
|
6339-33-001 |
VAN ZANDT |
TYLER |
$486,800 |
SH0019 |
RMC - 633933001 |
01/09/2019 |
11/15/2023 |
TREE RMVL |
CATOCON, INC.($359,400) |
|
0245-04-022 |
VAN ZANDT |
TYLER |
$627,779 |
FM 279 |
STP 2019(326)HESG |
01/08/2019 |
11/15/2023 |
LED FLASHING CHEVRONS |
L. UNITED BUILDING COMPANY($257,510) |
|
6336-86-001 |
VAN ZANDT |
TYLER |
$177,750 |
SH0243 |
RMC - 633686001 |
12/11/2018 |
11/15/2023 |
TREE TRIM/BRUSH RMVL |
CATOCON, INC.($157,147) |
|
6336-92-001 |
VAN ZANDT |
TYLER |
$221,104 |
SH0019 |
RMC - 633692001 |
12/11/2018 |
11/15/2023 |
ROW MOW |
SERNA CONTRACTORS, LLC($250,242) |
|
0095-07-060 |
VAN ZANDT |
TYLER |
$11,566,707 |
US 80 |
STP 2019(334) |
12/06/2018 |
11/15/2023 |
SEAL COAT AND PAVMT MRK |
CLARK CONSTRUCTION OF TEXAS, INC.($14,140,387) |
|
6336-57-001 |
VAN ZANDT |
TYLER |
$90,103 |
US0080 |
RMC - 633657001 |
11/12/2018 |
11/15/2023 |
GUARDRAIL |
THOMAS 11 DEVELOPMENT LLC($88,980) |
|
0245-02-031 |
VAN ZANDT |
TYLER |
$11,101,486 |
SH 64 |
C 245-2-31 |
04/03/2018 |
11/15/2023 |
FLX BS,LVL-UP,OCST,HMAC,STRS,PV MRK |
BIG CREEK CONSTRUCTION, LTD.($9,587,788) |
|
0522-03-026 |
VAN ZANDT |
TYLER |
$468,471 |
FM 16 |
STP 2018(612) |
03/07/2018 |
11/15/2023 |
GR, STRS, ACP BS & SURF, C&G |
REYNOLDS & KAY, LTD.($496,651) |
|
0910-12-125 |
VAN ZANDT |
TYLER |
$999,557 |
CR |
BR 1602(651) |
03/06/2018 |
11/15/2023 |
REPLACE BRIDGE AND APPROACHES |
B & E CONSTRUCTION INC($904,835) |
|
0095-07-059 |
VAN ZANDT |
TYLER |
$9,975,779 |
US 80 |
STP 2018(257) |
12/06/2017 |
11/15/2023 |
SEAL COAT AND PAVMT MRK |
MISSOURI PETROLEUM PRODUCTS COMPANY LLC($10,067,448) |
|
6321-18-001 |
VAN ZANDT |
TYLER |
$165,810 |
FM0047 |
RMC - 632118001 |
11/07/2017 |
11/15/2023 |
TREE TRIM |
CATOCON, INC.($157,245) |
|
6298-16-001 |
VAN ZANDT |
TYLER |
$493,455 |
FM0047 |
RMC - 629816001 |
10/03/2017 |
11/15/2023 |
CULVERT REPAIR |
RED BARON BUILDING COMPANY, L.L.C.($430,297) |
|
1673-01-008 |
VAN ZANDT |
TYLER |
$3,920,876 |
FM 1653 |
SSW 1673-1-8 |
07/12/2017 |
11/15/2023 |
GR, FLX BS, TCST, STRS, PV MK |
DREWERY CONSTRUCTION COMPANY, INCORPORATED($3,972,777) |
|
1672-01-004 |
VAN ZANDT |
TYLER |
$4,883,864 |
FM 1652 |
SSW 1672-1-4 |
07/11/2017 |
11/15/2023 |
GR, FLX BS, TCST, STRS, PVT MRKG |
HIGHWAY 19 CONSTRUCTION LLC($4,481,849) |
|
0522-02-037 |
VAN ZANDT |
TYLER |
$6,558,717 |
SH 243 |
STP 1702(386) |
06/07/2017 |
11/15/2023 |
GR, STRS, WDNG, OCST, ACP, PVT MRKG |
LONGVIEW BRIDGE AND ROAD, LTD.($6,654,770) |
|
0495-02-063 |
VAN ZANDT |
TYLER |
$5,728,608 |
IH 20 |
STP 1702(381)HES |
06/06/2017 |
11/15/2023 |
UPGRADE MBGF AND MOW STRIP |
FNH CONSTRUCTION, LLC($5,703,542) |
|
6315-99-001 |
VAN ZANDT |
TYLER |
$5,035,341 |
IH0020 |
RMC - 631599001 |
06/06/2017 |
11/15/2023 |
TOTAL MAINT |
FIREMAN EXCAVATING, INC.($4,102,824) |
|
0910-12-066 |
VAN ZANDT |
TYLER |
$1,400,412 |
CR |
BR 2013(723) |
06/06/2017 |
11/15/2023 |
REPLACE RAILROAD OVERPASS & APPROACHES |
LONGVIEW BRIDGE AND ROAD, LTD.($1,498,798) |
|
1673-02-017 |
VAN ZANDT |
TYLER |
$2,575,467 |
FM 1861 |
STP 2017(929) |
04/04/2017 |
11/15/2023 |
SCARIFY,FLEX BS,TCST,STRS,PV MK |
A. L. HELMCAMP, INC.($2,436,392) |
|
0108-12-017 |
VAN ZANDT |
TYLER |
$1,148,757 |
SH 19 |
STP 2017(517)HES |
01/05/2017 |
11/15/2023 |
CENTERLINE PROFILE PAVMT MRK |
STRIPE-A-ZONE, INC.($716,586) |
|
6307-97-001 |
VAN ZANDT |
TYLER |
$155,581 |
SH0064 |
RMC - 630797001 |
11/08/2016 |
11/15/2023 |
TREE TRIM |
FOWLER CONSTRUCTION($134,209) |
|
6307-33-001 |
VAN ZANDT |
TYLER |
$297,356 |
SH0064 |
RMC - 630733001 |
09/06/2016 |
11/15/2023 |
TREE RMVL |
CATOCON, INC.($209,992) |
|
6305-75-001 |
VAN ZANDT |
TYLER |
$80,145 |
US0080 |
RMC - 630575001 |
09/06/2016 |
11/15/2023 |
REPAIR OF RETAINING WALL |
RED BARON BUILDING COMPANY, L.L.C.($65,000) |