1902-01-033 |
TRAVIS |
AUSTIN |
$92,113 |
FM 1825 |
STP 2022(052)HES |
10/07/2021 |
11/15/2023 |
HAZARD ELIM & SAFETY |
TRP CONSTRUCTION GROUP, LLC($83,707) |
|
6327-09-001 |
TRAVIS |
AUSTIN |
$126,060 |
US0183 |
RMC - 632709001 |
07/17/2018 |
11/15/2023 |
CRACK SEALING OF ASPH PAVMT |
FYL ENTERPRISES, LLC($111,842) |
|
6314-88-001 |
TRAVIS |
AUSTIN |
$132,770 |
US0183 |
RMC - 631488001 |
09/12/2017 |
11/15/2023 |
GRADING, RIPRAP, DRAINAGE STRUCTS |
LANAT ENTERPRISES LLC($130,633) |
|
6307-55-001 |
TRAVIS |
AUSTIN |
$269,785 |
IH0035 |
RMC - 630755001 |
01/17/2017 |
11/15/2023 |
REPLACE SMALL SIGNS |
NNA CONSTRUCTION & CONTRACTING($282,300) |
|
6347-33-001 |
TRAVIS |
AUSTIN |
$126,208 |
IH0035 |
RMC - 634733001 |
10/29/2019 |
11/15/2023 |
PEDESTRIAN IMPRVS |
FNH CONSTRUCTION, LLC($226,096) |
|
6340-44-001 |
TRAVIS |
AUSTIN |
$126,868 |
FM0973 |
RMC - 634044001 |
08/11/2020 |
11/15/2023 |
CRACK SEALING OF ASPH PAVMT |
FYL ENTERPRISES, LLC($113,385) |
|
6334-09-001 |
TRAVIS |
AUSTIN |
$136,930 |
FM3177 |
RMC - 633409001 |
09/11/2018 |
11/15/2023 |
REPLACE RCP |
TEXCON GENERAL CONTRACTORS($132,299) |
|
6351-31-001 |
TRAVIS |
AUSTIN |
$6,130,030 |
IH0035 |
TMC - 635131001 |
11/06/2019 |
11/15/2023 |
MATERIALS ONLY (ROADSIGN ASSEMBLIES) |
CENTERLINE SUPPLY, INC.($5,990,802) |
|
6346-87-001 |
TRAVIS |
AUSTIN |
$55,237 |
FM0969 |
RMC - 634687001 |
10/15/2019 |
11/15/2023 |
TREE TRIM AND BRUSH RMVL |
ROAD SOLUTIONS L.L.C.($63,595) |
|
6370-84-001 |
TRAVIS |
AUSTIN |
$166,180 |
US0183 |
RMC - 637084001 |
03/09/2021 |
11/15/2023 |
MOW HWY ROW |
RP SERVICES, LLC($156,064) |
|
6377-95-001 |
TRAVIS |
AUSTIN |
$168,000 |
IH0035 |
MMC - 637795001 |
06/16/2021 |
11/15/2023 |
ASPH |
LONE STAR PAVING COMPANY($129,850) |
|
6378-05-001 |
TRAVIS |
AUSTIN |
$58,277 |
IH0035 |
MMC - 637805001 |
06/16/2021 |
11/15/2023 |
HYDRAULIC CEMENT CONC |
DIGG COMMERCIAL, LLC($69,200) |
|
6346-83-001 |
TRAVIS |
AUSTIN |
$527,402 |
SL0001 |
RMC - 634683001 |
12/04/2019 |
11/15/2023 |
SKIDABRASION TEXTURING |
TOTAL HIGHWAY MAINTENANCE, LLC($635,803) |
|
6391-34-001 |
TRAVIS |
AUSTIN |
$176,434 |
SL0001 |
RMC - 639134001 |
05/11/2022 |
11/15/2023 |
PARKING LOT REPAIR - SEAL COAT AND STRIPING |
DIGG COMMERCIAL, LLC($543,324) |
|
6353-05-001 |
TRAVIS |
AUSTIN |
$124,080 |
US0183 |
BPM - 635305001 |
09/15/2020 |
11/15/2023 |
BRIDGE PREVENT MAINT |
BECK-REIT & SONS, LTD.($127,635) |
|
6386-67-001 |
TRAVIS |
AUSTIN |
$225,000 |
IH0035 |
MMC - 638667001 |
06/15/2022 |
11/15/2023 |
FLEX BASE - MATERIAL ONLY |
TOUCHSTONE RESOURCES, LLC($190,000) |
|
6386-78-001 |
TRAVIS |
AUSTIN |
$72,872 |
FM0969 |
RMC - 638678001 |
07/13/2022 |
11/15/2023 |
TREE TRIM AND BRUSH RMVL |
BA NEWTON'S ENTERPRISES LLC($64,043) |
|
6386-84-001 |
TRAVIS |
AUSTIN |
$118,005 |
FM0973 |
RMC - 638684001 |
08/10/2022 |
11/15/2023 |
CRACK SEAL |
FYL ENTERPRISES, LLC($94,010) |
|
6405-60-001 |
TRAVIS |
AUSTIN |
$229,688 |
US0290 |
RMC - 640560001 |
02/08/2023 |
11/15/2023 |
MOW HWY RIGHT OF WAY |
YELLOWSTONE LANDSCAPE - CENTRAL, INC.($363,318) |
|
6346-84-001 |
TRAVIS |
AUSTIN |
$645,307 |
IH0035 |
RMC - 634684001 |
12/03/2019 |
11/15/2023 |
ILLUM MAINT RMVL DISTRICTWIDE |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.($658,520) |
|
6405-86-001 |
TRAVIS |
AUSTIN |
$89,765 |
FM0973 |
RMC - 640586001 |
08/09/2023 |
11/15/2023 |
CRACK SEAL |
NO EGO INC.($89,545) |
|
0015-10-060 |
TRAVIS |
AUSTIN |
$6,553,466 |
IH 35 |
NH 2017(275) |
11/03/2016 |
11/15/2023 |
MILL, SEAL & THIN OVERLAY OF FRONTAGE ROADS |
LONE STAR PAVING COMPANY($4,749,992) |
|
0914-00-391 |
TRAVIS |
AUSTIN |
$10,000,776 |
VA |
NH 1602(493) |
11/04/2016 |
11/15/2023 |
TRAF MGT SYSTEM |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.($11,464,497) |
|
0114-01-060 |
TRAVIS |
AUSTIN |
$932,564 |
SS 69 |
STP 2017(550)HES |
01/04/2017 |
11/15/2023 |
IMPROVE TRF SIG &_HIGH FRICTION SURF TRT |
THE LEVY COMPANY, L.P.($985,635) |
|
0113-13-155 |
TRAVIS |
AUSTIN |
$1,604,476 |
SL 360 |
NH 2017(470) |
01/05/2017 |
11/15/2023 |
SEAL AND THIN OVERLAY |
LONE STAR PAVING COMPANY($1,306,470) |
|
0015-11-063 |
TRAVIS |
AUSTIN |
$167,902 |
SL 275 |
BR 2017(787) |
03/07/2017 |
11/15/2023 |
UPGRADE BRIDGE AND APPROACH RAILING |
OPPORTUNITY EXCAVATION/CONCRETE, LLC($213,086) |
|
0914-00-395 |
TRAVIS |
AUSTIN |
$1,549,805 |
VA |
STP 2017(791) |
03/08/2017 |
11/15/2023 |
FY 17 NON-SITE SPECIFIC SIG |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.($1,439,774) |
|
0114-02-103 |
TRAVIS |
AUSTIN |
$3,248,297 |
US 290 |
NH 2017(941) |
04/04/2017 |
11/15/2023 |
OVERLAY, CLEANING & SEALING JOINTS |
OLDCASTLE MATERIALS TEXAS, INC.($3,108,528) |
|
0151-09-145 |
TRAVIS |
AUSTIN |
$2,686,728 |
US 183 |
NH 2017(946) |
04/05/2017 |
11/15/2023 |
REPAIR, MILL,SEAL & OVERLAY NB & SB FRONTAGE ROADS |
LONE STAR PAVING COMPANY($2,711,158) |
|
0015-13-377 |
TRAVIS |
AUSTIN |
$6,576,552 |
IH 35 |
C 15-13-377 |
06/06/2017 |
11/15/2023 |
MILL, SEAL AND INLAY ON MAINLANES |
LONE STAR PAVING COMPANY($5,984,426) |
|
0683-02-068 |
TRAVIS |
AUSTIN |
$170,395 |
RM 620 |
CC 683-2-68 |
06/07/2017 |
11/15/2023 |
INSTL TRAF SIGNAL |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.($181,557) |
|
0914-00-396 |
TRAVIS |
AUSTIN |
$1,489,195 |
VA |
STP 1702(554) |
07/12/2017 |
11/15/2023 |
FY 2017 SITE SPECIFIC SIG |
AMERICAN LIGHTING AND SIGNALIZATION, INC.($1,663,381) |
|
0914-00-406 |
TRAVIS |
AUSTIN |
$1,189,262 |
VA |
NH 1702(582) |
07/12/2017 |
11/15/2023 |
CONC PAVMT REPAIRS |
ROY JORGENSEN ASSOCIATES, INC.($1,116,909) |
|
0914-00-407 |
TRAVIS |
AUSTIN |
$2,103,934 |
VA |
NH 1702(583) |
07/12/2017 |
11/15/2023 |
ASPHIC PAVMT REPAIRS |
AUSTIN MATERIALS, LLC($2,168,168) |
|
2689-01-026 |
TRAVIS |
AUSTIN |
$388,510 |
FM 2304 |
STP 1702(681)HES |
08/08/2017 |
11/15/2023 |
CHANNELIZATION(STRIPING) |
DAN WILLIAMS COMPANY($355,909) |
|
0914-00-393 |
TRAVIS |
AUSTIN |
$515,635 |
VA |
STP 2017(768)TP |
10/03/2017 |
11/15/2023 |
INSTL SIDEWALKS |
TREVWAY, INC.($496,481) |
|
3417-03-023 |
TRAVIS |
AUSTIN |
$257,674 |
FM 734 |
CC 3417-3-23 |
12/05/2017 |
11/15/2023 |
CONSTURCTION OF MEDIAN AND LEFT TURN LANE |
AARON CONCRETE CONTRACTORS, L.P.($248,444) |
|
0440-06-017 |
TRAVIS |
AUSTIN |
$39,118,063 |
SH 130 |
CC 440-6-17 |
12/06/2017 |
11/15/2023 |
ADD ONE LANE IN EACH DIRECTION |
OHL USA, INC.($36,726,431) |
|
0114-20-011 |
TRAVIS |
AUSTIN |
$1,396,812 |
SL 212 |
STP 2018(529) |
02/02/2018 |
11/15/2023 |
MILL AND INLAY |
LONE STAR PAVING COMPANY($1,158,086) |
|
0914-00-397 |
TRAVIS |
AUSTIN |
$1,449,796 |
VA |
STP 2018(597) |
03/06/2018 |
11/15/2023 |
FY 2018 NON-SITE SPECIFIC SIG |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.($1,469,946) |
|
0914-04-305 |
TRAVIS |
AUSTIN |
$428,254 |
CR |
BR 2018(328) |
04/04/2018 |
11/15/2023 |
REPLACE BRIDGE AND APPROACHES |
SB CONTRACTORS LLC($329,781) |
|
1200-03-055 |
TRAVIS |
AUSTIN |
$379,763 |
FM 973 |
CC 1200-3-55 |
05/01/2018 |
11/15/2023 |
CONSTRUCT RIGHT AND LEFT TURN LANES |
DENBOW COMPANY INC.($339,645) |
|
0440-06-018 |
TRAVIS |
AUSTIN |
$70,540,747 |
SH 130 |
CC 440-6-18 |
06/06/2018 |
11/15/2023 |
ADD ONE LANE IN EACH DIRECTION |
WEBBER, LLC($69,910,317) |
|
0700-03-142 |
TRAVIS |
AUSTIN |
$4,043,779 |
SH 71 |
NH 1802(500) |
06/06/2018 |
11/15/2023 |
TOM AND PFC OVERLAY |
LONE STAR PAVING COMPANY($4,059,393) |
|
1186-01-098 |
TRAVIS |
AUSTIN |
$234,642 |
FM 969 |
STP 1802(400)HES |
07/10/2018 |
11/15/2023 |
SAFETY LIGHTING |
THE LEVY COMPANY, INC.($199,994) |
|
0265-02-035 |
TRAVIS |
AUSTIN |
$181,548 |
SH 71 |
CC 265-2-35 |
07/10/2018 |
11/15/2023 |
EXTEND WESTBOUND LEFT TURN LANE |
AARON CONCRETE CONTRACTORS, L.P.($184,201) |
|
0914-04-229 |
TRAVIS |
AUSTIN |
$643,896 |
CS |
BR 1502(360) |
07/11/2018 |
11/15/2023 |
REPLACE BRIDGE AND APPROACHES |
TREVWAY, INC.($571,595) |
|
6336-08-001 |
TRAVIS |
AUSTIN |
$27,449,730 |
SH0130 |
RMC - 633608001 |
02/07/2020 |
11/15/2023 |
PERFORMANCE BASED CONTRACT |
ROY JORGENSEN ASSOCIATES, INC.($22,626,610) |
|
0113-13-175 |
TRAVIS |
AUSTIN |
$4,521,576 |
SH 71 |
C 113-13-175 |
08/07/2018 |
11/15/2023 |
MILL & INLAY |
LONE STAR PAVING COMPANY($3,958,942) |
|
0914-00-413 |
TRAVIS |
AUSTIN |
$2,478,872 |
VA |
NH 1802(786) |
08/07/2018 |
11/15/2023 |
ROUTINE MAINT OF PVMT MRK |
STRIPE-A-ZONE, INC.($2,193,468) |
|
3417-01-029 |
TRAVIS |
AUSTIN |
$2,741,778 |
FM 734 |
C 3417-1-29 |
08/08/2018 |
11/15/2023 |
PAVMT REPAIR, UNDERSEAL & OVERLAY |
AUSTIN MATERIALS, LLC($2,822,373) |
|
0440-06-018 |
TRAVIS |
AUSTIN |
$69,988,411 |
SH 130 |
CC 440-6-18 |
10/03/2018 |
11/15/2023 |
ADD ONE LANE IN EACH DIRECTION |
OHL USA, INC.($65,209,105) |
|
1378-01-038 |
TRAVIS |
AUSTIN |
$597,501 |
RM 1431 |
STP 2019(198)HES |
11/06/2018 |
11/15/2023 |
INSTL CONTINUOUS LTL & SHOULDERS |
DAN WILLIAMS COMPANY($617,105) |
|
0914-00-418 |
TRAVIS |
AUSTIN |
$1,908,150 |
VA |
C 914-00-418 |
11/06/2018 |
11/15/2023 |
ASPH PAVMT REPAIR |
LONE STAR PAVING COMPANY($2,145,700) |
|
0914-00-414 |
TRAVIS |
AUSTIN |
$1,988,359 |
VA |
C 914-00-414 |
11/07/2018 |
11/15/2023 |
ROUTINE MAINT OF PAVMT MRK |
TRP CONSTRUCTION GROUP, LLC($1,954,799) |
|
0914-00-416 |
TRAVIS |
AUSTIN |
$808,826 |
VA |
C 914-00-416 |
12/06/2018 |
11/15/2023 |
ROUTINE MAINT OF PAVMT MRK |
PMI PAVEMENT MARKING, LLC($873,622) |
|
0152-01-083 |
TRAVIS |
AUSTIN |
$2,817,396 |
US 183 |
NH 2019(379) |
01/08/2019 |
11/15/2023 |
TOM OVERLAY |
AUSTIN MATERIALS, LLC($2,568,400) |
|
0914-00-411 |
TRAVIS |
AUSTIN |
$2,258,762 |
VA |
STP 2019(381) |
01/09/2019 |
11/15/2023 |
INSTL OR REBUILD TRAF SIG |
THE LEVY COMPANY, INC.($2,524,409) |
|
1186-01-097 |
TRAVIS |
AUSTIN |
$367,128 |
FM 969 |
STP 2019(493)HES |
01/09/2019 |
11/15/2023 |
IMPROVE TRAF SIGNAL,INST FLASHING YELLOW ARROW |
THE LEVY COMPANY, INC.($360,089) |
|
0914-00-399 |
TRAVIS |
AUSTIN |
$1,807,893 |
VA |
STP 2019(614) |
03/05/2019 |
11/15/2023 |
FY 2019 NON-SITE SPECIFIC SIG |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.($1,784,883) |
|
0015-13-396 |
TRAVIS |
AUSTIN |
$22,225,185 |
IH 35 |
NH 2018(907) |
04/02/2019 |
11/15/2023 |
GR, BASE, STRUCT, HMACP & PVMT MKS |
JAMES CONSTRUCTION GROUP, L.L.C.($24,590,929) |
|
0683-02-075 |
TRAVIS |
AUSTIN |
$600,302 |
RM 620 |
NH 2019(754) |
04/03/2019 |
11/15/2023 |
INSTL CONC TRAF BARRIERS |
DAN WILLIAMS COMPANY($556,063) |
|
0914-00-419 |
TRAVIS |
AUSTIN |
$572,049 |
VA |
NH 2019(829) |
05/07/2019 |
11/15/2023 |
CONSTRUCT ADA RAMPS & SIDEWALKS |
TREVWAY, INC.($609,304) |
|
2102-01-074 |
TRAVIS |
AUSTIN |
$251,382 |
RM 2244 |
NH 2019(826) |
05/07/2019 |
11/15/2023 |
LANDSCAPING AND IRRIGATION |
HAM-BAR, L.L.C.($229,999) |
|
0113-13-178 |
TRAVIS |
AUSTIN |
$2,181,581 |
SL 360 |
BR 2019(828) |
05/08/2019 |
11/15/2023 |
REHAB BRIDGE |
SCR CIVIL CONSTRUCTION, LLC($2,484,393) |
|
2689-01-023 |
TRAVIS |
AUSTIN |
$10,214,980 |
FM 2304 |
STP 1902(245)MM |
08/06/2019 |
11/15/2023 |
RECON EXIST 2LN RDWY TO 4 LN DIVIDED W/CLTL |
DAN WILLIAMS COMPANY($12,151,984) |
|
0914-04-309 |
TRAVIS |
AUSTIN |
$157,563 |
CS |
C 914-4-309 |
08/07/2019 |
11/15/2023 |
STATE PARK IMPRVS |
FNH CONSTRUCTION, LLC($185,709) |
|
2100-01-066 |
TRAVIS |
AUSTIN |
$1,498,395 |
RM 2222 |
CC 2100-1-66 |
10/02/2019 |
11/15/2023 |
GRADING,FLEX BASE,PAV,PAV MRK,SIGN,RETAIN WALL |
ANGEL BROTHERS HOLDINGS CORP.($2,136,363) |
|
0914-00-442 |
TRAVIS |
AUSTIN |
$150,883 |
VA |
STP 2020(297) |
10/03/2019 |
11/15/2023 |
LANDSCAPING & WILDFLOWER SEEDING |
TIGHT LINE CONSTRUCTION, LLC($235,560) |
|
0914-00-428 |
TRAVIS |
AUSTIN |
$1,034,301 |
VA |
C 914-00-428 |
11/05/2019 |
11/15/2023 |
RESTRIP & REPLACING OF RAISED PAVMT MRK |
D. I. J. CONSTRUCTION, INC.($541,569) |
|
0914-00-426 |
TRAVIS |
AUSTIN |
$705,732 |
VA |
C 914-00-426 |
11/06/2019 |
11/15/2023 |
TRAF CONTROL DEVICES |
D. I. J. CONSTRUCTION, INC.($667,922) |
|
0113-13-177 |
TRAVIS |
AUSTIN |
$2,051,619 |
US 290 |
NH 2020(542) |
02/06/2020 |
11/15/2023 |
MILL, SEAL & THIN OV FRONTAGE ROADS |
AUSTIN MATERIALS, LLC($1,998,096) |
|
1149-01-028 |
TRAVIS |
AUSTIN |
$1,102,943 |
FM 812 |
STP 2020(547) |
02/06/2020 |
11/15/2023 |
LEVEL UP, FDR AND OVERLAY |
AUSTIN MATERIALS, LLC($931,784) |
|
0015-13-416 |
TRAVIS |
AUSTIN |
$1,371,966 |
IH 35 |
NH 2020(586) |
02/06/2020 |
11/15/2023 |
OVERLAY |
AUSTIN MATERIALS, LLC($1,367,724) |
|
0914-00-438 |
TRAVIS |
AUSTIN |
$86,250 |
VA |
C 914-00-438 |
02/07/2020 |
11/15/2023 |
TRAF CONTROL DEVICES |
TRP CONSTRUCTION GROUP, LLC($72,573) |
|
0914-00-437 |
TRAVIS |
AUSTIN |
$111,640 |
VA |
STP 2020(590) |
02/07/2020 |
11/15/2023 |
TRAF CONTROL DEVICES |
STRIPE-A-ZONE, INC.($117,922) |
|
0914-00-401 |
TRAVIS |
AUSTIN |
$1,455,898 |
VA |
STP 2020(623) |
03/04/2020 |
11/15/2023 |
CONSTRUCTION OF TRAF SIG |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.($1,378,704) |
|
2100-01-064 |
TRAVIS |
AUSTIN |
$588,757 |
RM 2222 |
NH 2020(648) |
03/05/2020 |
11/15/2023 |
ADDING A RAISED CNTR MEDIAN & REPL TRAF SIGNAL |
LONE STAR SITEWORK, LLC($865,195) |
|
0015-11-066 |
TRAVIS |
AUSTIN |
$704,943 |
SL 275 |
STP 2020(620)HES |
03/05/2020 |
11/15/2023 |
HWY IMPRV |
AARON CONCRETE CONTRACTORS, L.P.($867,419) |
|
0151-06-149 |
TRAVIS |
AUSTIN |
$3,963,719 |
US 183 |
NH 2020(757) |
04/08/2020 |
11/15/2023 |
OPERATIONAL IMPRVS |
GIBSON & ASSOCIATES, INC.($5,815,911) |
|
0015-10-063 |
TRAVIS |
AUSTIN |
$8,794,190 |
IH 35 |
NH 2020(754) |
04/09/2020 |
11/15/2023 |
REVERSE NB RAMPS & ADD 1 AUXILIARY LANE |
JORDAN FOSTER CONSTRUCTION, LLC($8,674,931) |
|
0914-00-427 |
TRAVIS |
AUSTIN |
$597,642 |
VA |
C 914-00-427 |
06/04/2020 |
11/15/2023 |
LARGE SIGN REPL |
BATTERSON, LLP($523,663) |
|
0114-01-063 |
TRAVIS |
AUSTIN |
$2,131,694 |
US 290 |
NH 2B20(025) |
07/09/2020 |
11/15/2023 |
OVERLAY, MILL AND INLAY TOM FR ONLY |
LONE STAR PAVING COMPANY($1,949,774) |
|
0914-00-452 |
TRAVIS |
AUSTIN |
$4,462,196 |
VA |
STP 2B20(137)HES |
08/05/2020 |
11/15/2023 |
UPGRADE GUARDRAIL |
ELITE CASTLE RESOURCES LLC($3,887,918) |
|
0914-00-453 |
TRAVIS |
AUSTIN |
$2,146,953 |
VA |
STP 2B20(138)HES |
08/05/2020 |
11/15/2023 |
HAZARD ELIM & SAFETY |
DBI SERVICES, LLC($2,181,872) |
|
3417-03-030 |
TRAVIS |
AUSTIN |
$417,699 |
FM 734 |
STP 2B20(135)HES |
08/06/2020 |
11/15/2023 |
SAFETY IMPRV PROJECT |
JOE BLAND CONSTRUCTION, L.P.($552,367) |
|
0914-00-451 |
TRAVIS |
AUSTIN |
$357,844 |
VA |
STP 2B20(136)HES |
08/06/2020 |
11/15/2023 |
SAFETY IMPRV PROJECT |
ROADWAY SPECIALTIES, INC.($390,744) |
|
0914-00-450 |
TRAVIS |
AUSTIN |
$4,368,577 |
VA |
STP 2B20(210)HES |
08/06/2020 |
11/15/2023 |
SAFETY IMPRV PROJECTS |
FNH CONSTRUCTION, LLC($5,650,620) |
|
0265-02-036 |
TRAVIS |
AUSTIN |
$50,709,809 |
SH 71 |
C 265-2-36 |
09/03/2020 |
11/15/2023 |
CONSTRUCT 4-LANE OVERPASSES AT ROSS RD AND KELLAM |
ZACHRY CONSTRUCTION CORPORATION($61,227,248) |
|
2100-01-067 |
TRAVIS |
AUSTIN |
$1,546,004 |
RM 2222 |
NH 2021(036) |
10/01/2020 |
11/15/2023 |
PREVENT MAINT |
ANGEL BROTHERS HOLDINGS CORP.($1,434,746) |
|
0914-00-432 |
TRAVIS |
AUSTIN |
$430,147 |
VA |
STP 2021(112) |
11/05/2020 |
11/15/2023 |
HAZARD ELIM & SAFETY |
TRP CONSTRUCTION GROUP, LLC($393,903) |
|
0914-00-434 |
TRAVIS |
AUSTIN |
$805,539 |
VA |
C 914-00-434 |
12/02/2020 |
11/15/2023 |
HAZARD ELIM & SAFETY |
D. I. J. CONSTRUCTION, INC.($498,991) |
|
0914-00-433 |
TRAVIS |
AUSTIN |
$824,967 |
VA |
C 914-00-433 |
12/03/2020 |
11/15/2023 |
RESTRIP & REPL OF RAISED PAVMT MARKER |
PMI PAVEMENT MARKING, LLC($601,620) |
|
3136-01-194 |
TRAVIS |
AUSTIN |
$1,905,731 |
SL 1 |
C 3136-1-194 |
04/08/2021 |
11/15/2023 |
LANDSCAPING AND IRRIGATION |
APEX LANDSCAPE & IRRIGATION, LLC($1,369,464) |
|
3136-01-191 |
TRAVIS |
AUSTIN |
$1,384,918 |
SL 1 |
C 3136-1-191 |
04/08/2021 |
11/15/2023 |
CONSTRUCTION OF NEW RAMP & INTERS IMPROVEMTS |
DAN WILLIAMS COMPANY($1,525,579) |
|
0152-01-080 |
TRAVIS |
AUSTIN |
$3,169,832 |
US 183 |
CC 152-1-80 |
05/05/2021 |
11/15/2023 |
INTERS IMPRVS WITH RIGHT AND/OR LEFT T |
COX COMMERCIAL CONSTRUCTION LLC($2,851,509) |
|
0683-04-022 |
TRAVIS |
AUSTIN |
$14,520,825 |
RM 3238 |
F 2021(619) |
06/03/2021 |
11/15/2023 |
REHAB EXIST ROADWAY |
HUNTER INDUSTRIES, LTD.($15,859,607) |
|
0015-10-071 |
TRAVIS |
AUSTIN |
$4,256,955 |
IH 35 |
F 2021(681) |
08/04/2021 |
11/15/2023 |
CONSTRUCT PEDESTRIAN INFRASTRUCT |
DBI SERVICES, LLC($2,895,230) |
|
1186-01-091 |
TRAVIS |
AUSTIN |
$9,593,311 |
FM 969 |
PTF 2022(045) |
09/02/2021 |
11/15/2023 |
WIDEN ROAD - ADD LANES |
DAN WILLIAMS COMPANY($8,953,610) |
|
0113-13-166 |
TRAVIS |
AUSTIN |
$70,407,210 |
SL 360 |
F 2022(160) |
12/01/2021 |
11/15/2023 |
CONSTRUCT BRIDGE |
COPASA INC($72,138,916) |