0191-03-083 |
SMITH |
TYLER |
$51,794,226 |
FM 2493 |
C 191-3-83 |
04/04/2023 |
08/22/2024 |
WIDEN ROAD - ADD LANES |
LONGVIEW BRIDGE AND ROAD, LTD.($69,493,846) |
|
0522-04-032 |
SMITH |
TYLER |
$35,671,840 |
FM 16 |
F 2022(811) |
08/03/2022 |
11/15/2023 |
WIDEN ROAD - ADD LANES |
HIGHWAY 19 CONSTRUCTION LLC($44,362,527) |
|
0191-03-089 |
SMITH |
TYLER |
$24,876,254 |
FM 2493, ETC |
F 2025(255), ETC |
12/04/2024 |
11/10/2024 |
SEAL COAT |
|
|
0095-08-021 |
SMITH |
TYLER |
$23,747,209 |
US 80 |
F 2024(697) |
12/06/2023 |
11/15/2023 |
SEAL COAT |
RONALD R. WAGNER & CO., LP($21,313,599) |
|
0520-06-043 |
SMITH |
TYLER |
$19,743,675 |
SH 155 |
C 520-6-43 |
03/05/2021 |
11/15/2023 |
SURF/ROADWAY RESTOR |
MADDEN CONTRACTING COMPANY, LLC.($16,954,295) |
|
0191-01-063 |
SMITH |
TYLER |
$16,519,021 |
US 69 |
NH 2013(216) |
08/08/2018 |
11/15/2023 |
GR,STRS,ACP BS&SURF,MBGF,SIG,PV MK |
LONGVIEW BRIDGE AND ROAD, LTD.($16,738,120) |
|
0191-03-081 |
SMITH |
TYLER |
$14,297,208 |
FM 2493 |
STP 2013(215) |
07/10/2018 |
11/15/2023 |
GR,FLX BS,ACP,CULV EXT&RPLCMT,SIGNS,PV MK |
HIGHWAY 19 CONSTRUCTION LLC($14,458,790) |
|
0495-04-065 |
SMITH |
TYLER |
$14,229,479 |
IH 20 |
NH 2018(425) |
06/05/2018 |
11/15/2023 |
EXCVT,EMBNK,DRN STRS,RTN WL,BRDG WDN,ACP,PV MK |
LONGVIEW BRIDGE AND ROAD, LTD.($14,842,183) |
|
0165-02-065 |
SMITH |
TYLER |
$12,539,380 |
US 271 |
F 2021(509) |
05/05/2021 |
11/15/2023 |
ROADWAY REHAB/RECON WITH NO ADDE |
MADDEN CONTRACTING COMPANY, LLC.($12,377,401) |
|
0495-04-081 |
SMITH |
TYLER |
$12,538,227 |
IH 20 |
F 2024(722) |
02/02/2024 |
12/22/2023 |
RESURF ROADWAY |
DREWERY CONSTRUCTION COMPANY, INCORPORATED($13,106,221) |
|
0378-03-017 |
SMITH |
TYLER |
$7,884,833 |
SH 135 |
STP 1902(170) |
08/07/2019 |
11/15/2023 |
BS RPR,TRT SUBGRD,ACP,OCST,PFC SURF,STRS,PV MK |
DREWERY CONSTRUCTION COMPANY, INCORPORATED($8,695,777) |
|
0910-16-156 |
SMITH |
TYLER |
$6,215,471 |
CR |
BR 2022(748) |
06/27/2023 |
11/15/2023 |
BRIDGE REPL |
BAKER & COMPANY CONSTRUCTION, LLC($4,280,740) |
|
0165-01-107 |
SMITH |
TYLER |
$5,785,892 |
SH 110 |
F 2024(022) |
09/06/2023 |
11/15/2023 |
PREVENT MAINT |
FNH CONSTRUCTION, LLC($6,495,390) |
|
0191-01-094 |
SMITH |
TYLER |
$5,780,392 |
US 69 |
C 191-1-94 |
02/02/2023 |
11/15/2023 |
REHAB EXIST ROADWAY |
DREWERY CONSTRUCTION COMPANY, INCORPORATED($7,798,138) |
|
0910-16-135 |
SMITH |
TYLER |
$5,317,504 |
CS |
STP 2017(443)TAPS |
11/03/2017 |
11/15/2023 |
CONSTRUCT HIKE & BIKE TRAIL |
REYNOLDS & KAY, LTD.($4,606,677) |
|
6456-39-001 |
SMITH |
TYLER |
$5,233,466 |
US0069 |
RMC - 645639001 |
11/01/2023 |
11/15/2023 |
PAVMT MRK |
REYNOLDS & KAY, LTD.($4,944,538) |
|
6367-43-001 |
SMITH |
TYLER |
$5,044,222 |
IH0020 |
RMC - 636743001 |
03/04/2021 |
11/15/2023 |
IH-20 TOTAL MAINT |
FIREMAN EXCAVATING, INC.($4,603,064) |
|
0495-04-076 |
SMITH |
TYLER |
$5,034,660 |
IH 20 |
C 495-4-76 |
02/03/2022 |
11/15/2023 |
RESURF ROADWAY |
TEXAS MATERIALS GROUP, INC.($6,035,178) |
|
6342-80-001 |
SMITH |
TYLER |
$4,924,948 |
IH0020 |
RMC - 634280001 |
06/05/2019 |
11/15/2023 |
IH-20 TOTAL MAINT |
FIREMAN EXCAVATING, INC.($4,687,552) |
|
6453-97-001 |
SMITH |
TYLER |
$4,623,568 |
SL0323 |
RMC - 645397001 |
01/04/2024 |
11/29/2023 |
MILL AND INLAY |
BIG CREEK CONSTRUCTION, LTD.($4,469,287) |
|
2075-02-065 |
SMITH |
TYLER |
$4,555,867 |
SL 323 |
NH 1902(022) |
05/08/2019 |
11/15/2023 |
PLN,BS RPR,SUPERPV,MEMB UNDRSL,PFC O/L,PV MK |
DREWERY CONSTRUCTION COMPANY, INCORPORATED($4,993,647) |
|
0910-00-142 |
SMITH |
TYLER |
$4,536,200 |
VA |
C 910-00-142 |
11/07/2024 |
09/26/2024 |
BRIDGE MAINT |
OLYMPUS PAINTING CONTRACTORS, INC.($3,108,496) |
|
0910-00-142 |
SMITH |
TYLER |
$4,486,200 |
VA |
BR 2B24(231) |
07/10/2024 |
05/29/2024 |
BRIDGE MAINT |
CROSS PLUS CONSTRUCTION, LLC($4,387,550) |
|
6444-56-001 |
SMITH |
TYLER |
$4,172,917 |
FM2493 |
RMC - 644456001 |
08/02/2023 |
11/15/2023 |
MILL AND INLAY |
FNH CONSTRUCTION, LLC($5,896,776) |
|
0910-00-127 |
SMITH |
TYLER |
$4,112,570 |
VA |
STP 2B20(022) |
07/08/2020 |
11/15/2023 |
SIDEWALKS & ADA PED RAMPS |
HIGHWAY 19 CONSTRUCTION LLC($3,512,939) |
|
0245-06-081 |
SMITH |
TYLER |
$4,092,402 |
SH 64 |
STP 1702(585) |
07/12/2017 |
11/15/2023 |
PLNING,BASE REPAIR,MEMB UNDRSL,SUPER PAV,PV MK |
MADDEN CONTRACTING COMPANY, LLC.($3,624,096) |
|
0164-04-160 |
SMITH |
TYLER |
$3,982,129 |
SH 31 |
C 164-4-160 |
07/11/2018 |
11/15/2023 |
PLANING, PAVMT REPAIR, OCST, PV MK |
DREWERY CONSTRUCTION COMPANY, INCORPORATED($3,587,845) |
|
2075-01-058 |
SMITH |
TYLER |
$3,764,244 |
SL 323 |
C 2075-1-58 |
02/01/2023 |
11/15/2023 |
RESURF ROADWAY |
DREWERY CONSTRUCTION COMPANY, INCORPORATED($4,548,987) |
|
0191-01-085 |
SMITH |
TYLER |
$3,729,276 |
US 69 |
NH 1702(418) |
03/06/2018 |
11/15/2023 |
PLNG,BS RPR,OCST,PFC,SPRPV,MBGF,SHLDR TXT,PV MK |
DREWERY CONSTRUCTION COMPANY, INCORPORATED($3,628,777) |
|
2654-01-022 |
SMITH |
TYLER |
$3,220,825 |
FM 2661 |
SSW 2654-1-22 |
07/11/2018 |
11/15/2023 |
GR, FLX BS, OCST, STRS, PVT MRK |
LONGVIEW BRIDGE AND ROAD, LTD.($2,792,589) |
|
6306-16-001 |
SMITH |
TYLER |
$3,207,857 |
SH0064 |
RMC - 630616001 |
11/03/2016 |
11/15/2023 |
EAST MILL & INLAY |
MADDEN CONTRACTING COMPANY, LLC.($2,872,971) |
|
6341-13-001 |
SMITH |
TYLER |
$3,143,855 |
SH0064 |
RMC - 634113001 |
02/05/2019 |
11/15/2023 |
MILL & INLAY |
LONGVIEW BRIDGE AND ROAD, LTD.($3,363,242) |
|
0495-04-067 |
SMITH |
TYLER |
$3,117,335 |
IH 20 |
NH 2017(747) |
02/02/2017 |
11/15/2023 |
TBPFC&ACP SURF,PLG,BRG JNTS,SHDR TXT,PV MK |
CLARK CONSTRUCTION OF TEXAS, INC.($2,876,797) |
|
0910-16-162 |
SMITH |
TYLER |
$3,104,945 |
VA |
STP 2023(201)TAPS |
08/03/2023 |
11/15/2023 |
CONSTRUCT PEDESTRIAN INFRASTRUCT |
THK CONSTRUCTION LLC($2,988,319) |
|
1934-02-006 |
SMITH |
TYLER |
$3,042,382 |
FM 2015 |
STP 2019(017) |
09/07/2018 |
11/15/2023 |
GR,CMT TRT SBGRD,ACP,OCST,STRS,MBGF,PV MK |
LONGVIEW BRIDGE AND ROAD, LTD.($3,017,503) |
|
0191-01-092 |
SMITH |
TYLER |
$2,825,315 |
US 69 |
NH 2020(705) |
04/08/2020 |
11/15/2023 |
REPAIR AND RESURF ROADWAY |
DREWERY CONSTRUCTION COMPANY, INCORPORATED($2,060,600) |
|
0910-00-114 |
SMITH |
TYLER |
$2,585,271 |
VA |
STP 2021(215) |
01/07/2021 |
11/15/2023 |
PREVENT MAINT |
STRIPE-A-ZONE, INC.($2,322,961) |
|
0492-05-026 |
SMITH |
TYLER |
$2,475,603 |
FM 346 |
BR 2018(611) |
03/07/2018 |
11/15/2023 |
REPLACE BRIDGE & APPROACHES |
STATELINE CONSTRUCTION, LLC($2,029,446) |
|
0910-00-115 |
SMITH |
TYLER |
$2,453,269 |
VA |
F 2022(095) |
09/01/2021 |
11/15/2023 |
PREVENT MAINT |
TOTAL HIGHWAY MAINTENANCE, LLC($2,493,890) |
|
0495-04-070 |
SMITH |
TYLER |
$2,434,559 |
IH 20 |
NH 2020(707) |
04/09/2020 |
11/15/2023 |
TBPFC SURF, ACP SURF, PLANING, SHLDR TEXT, PV MK |
TEXAS MATERIALS GROUP, INC.($3,079,236) |
|
0910-00-106 |
SMITH |
TYLER |
$2,343,971 |
VA |
C 910-00-106 |
01/10/2020 |
09/26/2024 |
THERMOPLASTIC & PROFILE PAVMT MRK |
STRIPE-A-ZONE, INC.($2,074,842) |
|
0606-01-007 |
SMITH |
TYLER |
$2,289,001 |
PR 16 |
C 606-1-7 |
08/05/2021 |
11/15/2023 |
STATE PARK IMPRVS |
ENCINO LANDSCAPE, INC.($2,399,846) |
|
6431-60-001 |
SMITH |
TYLER |
$2,278,080 |
US0069 |
MMC - 643160001 |
02/01/2023 |
11/15/2023 |
HOT MIX |
TEXAS MATERIALS GROUP, INC.($2,527,200) |
|
0910-00-131 |
SMITH |
TYLER |
$2,240,791 |
VA |
C 910-00-131 |
08/04/2022 |
11/15/2023 |
BICYCLE AND PEDESTRIAN IMPRVS |
CROSS PLUS CONSTRUCTION, LLC($2,538,364) |
|
0910-16-130 |
SMITH |
TYLER |
$2,162,859 |
VA |
STP 1602(439) |
03/08/2017 |
11/15/2023 |
GR,SGNL,ACP BS&SURF,C&G,STM SWR,PED RMP,PV MK |
L. S. EQUIPMENT CO., INC.($2,355,456) |
|
0910-00-121 |
SMITH |
TYLER |
$2,103,159 |
VA |
F 2022(551) |
06/01/2022 |
09/03/2024 |
PREVENT MAINT |
TRP CONSTRUCTION GROUP, LLC($1,937,247) |
|
0927-01-030 |
SMITH |
TYLER |
$2,068,568 |
FM 344 |
STP 2B20(056)HES |
08/06/2020 |
11/15/2023 |
IMPROVE DRAINAGE, UPGRADE GUARD RAIL |
A R BROTHERS CONSTRUCTION SERVICES, INC.($1,833,548) |
|
6386-92-001 |
SMITH |
TYLER |
$2,023,754 |
US0069 |
RMC - 638692001 |
09/02/2021 |
11/15/2023 |
REFLECTORIZED PAVMT MRK & MARKERS |
STRIPE-A-ZONE, INC.($1,739,859) |
|
0245-05-047 |
SMITH |
TYLER |
$1,960,204 |
SH 64 |
STP 2017(910) |
03/08/2017 |
11/15/2023 |
PLANING, BS RPR, OCST, PFC SURF, PV MK |
IOC COMPANY LLC($1,789,205) |
|
0910-00-107 |
SMITH |
TYLER |
$1,947,371 |
VA |
STP 2019(324) |
01/09/2019 |
11/15/2023 |
THERMOPLASTIC PAVMT MRK |
CENTERLINE TECHNOLOGIES, LLC($1,530,350) |
|
0910-00-122 |
SMITH |
TYLER |
$1,908,487 |
VA |
F 2023(724) |
05/05/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
INTERSTATE BARRICADES & MARKINGS, INC.($1,698,785) |
|
0910-16-130 |
SMITH |
TYLER |
$1,897,070 |
VA |
STP 1602(439) |
11/04/2016 |
11/15/2023 |
GR,SGNL,ACP BS&SURF,C&G,STM SWR,PED RMP,PV MK |
EAST TEXAS BRIDGE, INC.($2,469,057) |
|
0424-01-058 |
SMITH |
TYLER |
$1,858,650 |
SH 31 |
C 424-1-58 |
06/06/2018 |
11/15/2023 |
PFC SURF, BRG RAIL, MBGF, PV MK |
DREWERY CONSTRUCTION COMPANY, INCORPORATED($1,834,285) |
|
6321-04-001 |
SMITH |
TYLER |
$1,831,640 |
US0069 |
RMC - 632104001 |
09/07/2017 |
11/15/2023 |
LONG LINE THERMO |
STRIPING TECHNOLOGY, L.P.($1,805,280) |
|
0910-00-137 |
SMITH |
TYLER |
$1,774,650 |
VA |
STP 2024(629)VRU |
01/05/2024 |
11/24/2023 |
HAZARD ELIM & SAFETY |
TEXAS TRAFFIC CONTROL SYSTEMS, INC.($1,755,175) |
|
0245-06-087 |
SMITH |
TYLER |
$1,767,280 |
SH 64 |
STP 2022(809)HES |
08/03/2022 |
11/15/2023 |
INTERS IMPRVS WITH RIGHT AND/OR LEFT T |
L. S. EQUIPMENT CO., INC.($2,208,247) |
|
6347-95-001 |
SMITH |
TYLER |
$1,744,395 |
US0069 |
RMC - 634795001 |
11/06/2019 |
11/15/2023 |
STRIPING AND PAVMT MRK |
STRIPING TECHNOLOGY, L.P.($1,898,132) |
|
0910-00-123 |
SMITH |
TYLER |
$1,721,002 |
VA |
F 2024(958) |
04/04/2024 |
02/22/2024 |
HAZARD ELIM & SAFETY |
STRIPE-A-ZONE, LLC($1,144,488) |
|
0910-16-178 |
SMITH |
TYLER |
$1,658,455 |
VA |
STP 2024(808)VRU |
03/05/2024 |
01/23/2024 |
HAZARD ELIM & SAFETY |
SYNERGY SIGNS & SERVICES LLC($1,451,085) |
|
0910-16-185 |
SMITH |
TYLER |
$1,555,500 |
VA |
F 2B24(309), ETC |
11/07/2024 |
10/15/2024 |
TRAF CONTROL DEVICES |
|
|
0910-16-185 |
SMITH |
TYLER |
$1,555,500 |
VA |
F 2B24(309) |
11/06/2024 |
09/25/2024 |
TRAF SIGNAL IMPRVS |
3LW CIVIL LLC($1,685,438) |
|
6465-86-001 |
SMITH |
TYLER |
$1,450,375 |
US0069 |
RMC - 646586001 |
09/05/2024 |
07/31/2024 |
TRAF CONTROL SERVICES |
PROFESSIONAL TRAFFIC CONTROL LLC($1,341,365) |
|
0165-01-109 |
SMITH |
TYLER |
$1,449,886 |
US 271 |
STP 2B24(305)VRU |
08/02/2024 |
06/21/2024 |
TRAF SIGNAL IMPRVS |
TEXAS TRAFFIC CONTROL SYSTEMS, INC.($1,416,148) |
|
0165-01-109 |
SMITH |
TYLER |
$1,449,886 |
US 271 |
STP 2B24(305)VRU |
11/06/2024 |
09/25/2024 |
TRAF SIGNAL IMPRVS |
3LW CIVIL LLC($1,734,105) |
|
0910-00-105 |
SMITH |
TYLER |
$1,440,422 |
VA |
STP 2016(366) |
12/01/2016 |
11/15/2023 |
CONSTRUCT ADA COMPLIANT CURB RAMPS |
TI-ZACK CONCRETE, INC.($1,419,691) |
|
0910-16-121 |
SMITH |
TYLER |
$1,428,298 |
PW |
C 910-16-121 |
03/07/2017 |
11/15/2023 |
BASE REPAIR, CRAC SEAL, HMAC OVERLAY |
A. L. HELMCAMP, INC.($1,269,696) |
|
0495-06-034 |
SMITH |
TYLER |
$1,375,050 |
IH 20 |
C 495-6-34 |
03/04/2021 |
11/15/2023 |
WIDEN ROAD - ADD SHOULDERS |
LONGVIEW BRIDGE AND ROAD, LTD.($1,495,512) |
|
0190-05-074 |
SMITH |
TYLER |
$1,278,488 |
US 69 |
STP 2022(808)HES |
08/04/2022 |
11/15/2023 |
INTERS IMPRV |
TEXAS TRAFFIC CONTROL SYSTEMS, INC.($1,606,198) |
|
0910-16-147 |
SMITH |
TYLER |
$1,258,233 |
CS |
BR 2020(895) |
01/07/2022 |
11/15/2023 |
BRIDGE REPL |
THK CONSTRUCTION LLC($1,258,294) |
|
6329-53-001 |
SMITH |
TYLER |
$1,224,950 |
US0069 |
RMC - 632953001 |
07/11/2018 |
11/15/2023 |
TRAF CONTROL |
AREA WIDE PROTECTIVE, INC.($1,019,948) |
|
1163-01-022 |
SMITH |
TYLER |
$1,206,584 |
FM 850 |
BR 1702(756) |
08/09/2017 |
11/15/2023 |
RPLC BR&APPR,GRADING,ACP BS&SURF,MBGF,PV MK |
STATELINE CONSTRUCTION, LLC($1,077,661) |
|
0203-08-016 |
SMITH |
TYLER |
$1,178,936 |
FM 1253 |
STP 2019(619)HES |
03/06/2019 |
11/15/2023 |
CENTERLINE & EDGELINE PROFILE PAV MRK |
CENTERLINE TECHNOLOGIES, LLC($706,777) |
|
0910-16-122 |
SMITH |
TYLER |
$1,147,247 |
PW |
C 910-16-122 |
06/02/2023 |
11/28/2023 |
STATE PARK IMPRVS |
SCOUT 5 CONSTRUCTION LLC($855,381) |
|
0910-00-111 |
SMITH |
TYLER |
$1,037,301 |
VA |
C 910-00-111 |
07/10/2018 |
11/15/2023 |
THERMOPLASTIC PAVMT MRK |
TOTAL HIGHWAY MAINTENANCE, LLC($958,013) |
|
0164-04-163 |
SMITH |
TYLER |
$1,025,662 |
SH 31 |
STP 2023(572)HES |
04/05/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
FNH CONSTRUCTION, LLC($1,235,384) |
|
0910-16-166 |
SMITH |
TYLER |
$1,017,280 |
VA |
STP 2023(729)HES |
05/05/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
CROSS PLUS CONSTRUCTION, LLC($925,714) |
|
0190-06-012 |
SMITH |
TYLER |
$999,888 |
US 69 |
NH 2021(033) |
09/03/2020 |
11/15/2023 |
PLANING, PAVMT REPAIR, OCST, ACP, PV MRK |
EAST TEXAS BRIDGE, INC.($1,333,004) |
|
0910-00-136 |
SMITH |
TYLER |
$921,525 |
VA |
STP 2023(518)HES |
03/07/2023 |
08/21/2024 |
HAZARD ELIM & SAFETY |
VACA UNDERGROUND UTILITIES INC($932,150) |
|
0910-16-125 |
SMITH |
TYLER |
$895,229 |
CR |
BR 1602(655) |
03/07/2018 |
11/15/2023 |
REPLACE BRIDGE & APPROACHES |
STATELINE CONSTRUCTION, LLC($833,389) |
|
0910-16-152 |
SMITH |
TYLER |
$893,749 |
VA |
STP 2B20(142)HES |
08/06/2020 |
11/15/2023 |
REPLACE GUARDRAIL |
3LW CIVIL LLC($833,358) |
|
0910-00-126 |
SMITH |
TYLER |
$892,205 |
VA |
C 910-00-126 |
06/05/2019 |
11/15/2023 |
THERMOPLASTIC & PROFILE PAVMT MRK |
TOTAL HIGHWAY MAINTENANCE, LLC($738,214) |
|
6359-37-001 |
SMITH |
TYLER |
$837,125 |
US0069 |
RMC - 635937001 |
05/07/2020 |
11/15/2023 |
TRAF CONTROL |
FIREMAN EXCAVATING, INC.($832,200) |
|
0910-16-187 |
SMITH |
TYLER |
$820,888 |
VA |
F 2B24(310) |
08/02/2024 |
06/21/2024 |
PEDESTRIAN, SIDEWALKS & CURB RAMPS |
|
|
0910-16-187 |
SMITH |
TYLER |
$820,888 |
VA |
F 2B24(310) |
11/06/2024 |
09/25/2024 |
CONSTRUCT PEDESTRIAN INFRASTRUCT |
TIGHT LINE CONSTRUCTION, LLC($865,454) |
|
0889-04-078 |
SMITH |
TYLER |
$805,303 |
FM 346 |
STP 2019(734)HES |
04/03/2019 |
11/15/2023 |
IMPROVE DRAINAGE, UPGRADE GUARD RAIL |
LONGVIEW BRIDGE AND ROAD, LTD.($799,066) |
|
0910-00-120 |
SMITH |
TYLER |
$796,864 |
VA |
F 2021(600) |
06/04/2021 |
11/15/2023 |
HAZARD ELIM & SAFETY |
PROFESSIONAL TRAFFIC CONTROL LLC($471,302) |
|
0910-16-168 |
SMITH |
TYLER |
$796,631 |
VA |
C 910-16-168 |
12/01/2022 |
09/24/2024 |
STATE PARK IMPRVS |
EAST TEXAS BRIDGE, INC.($921,723) |
|
6339-03-001 |
SMITH |
TYLER |
$782,280 |
SH0155 |
RMC - 633903001 |
01/08/2019 |
11/15/2023 |
TREE RMVL |
K & R CONTRACTORS($691,100) |
|
0910-16-140 |
SMITH |
TYLER |
$781,466 |
CR |
BR 2018(258) |
03/05/2019 |
11/15/2023 |
REPLACE BRIDGE AND APPROACHES |
EAST TEXAS BRIDGE, INC.($719,185) |
|
0505-02-047 |
SMITH |
TYLER |
$757,616 |
SH 110 |
CC 505-2-47 |
06/01/2023 |
11/27/2023 |
INSTL TRAF SIGNAL |
L. S. EQUIPMENT CO., INC.($787,821) |
|
0910-00-113 |
SMITH |
TYLER |
$734,375 |
VA |
STP 2020(891) |
06/04/2020 |
11/15/2023 |
THERMOPLASTIC & PROFILE PAVMT MRK |
STRIPE-A-ZONE, INC.($668,551) |
|
0910-16-163 |
SMITH |
TYLER |
$703,911 |
CS |
STP 2023(726)HES |
05/04/2023 |
11/15/2023 |
BICYCLE AND PEDESTRIAN IMPRVS |
TIGHT LINE CONSTRUCTION, LLC($739,937) |
|
6451-11-001 |
SMITH |
TYLER |
$671,656 |
FM3341 |
BPM - 645111001 |
11/02/2023 |
11/15/2023 |
BRIDGE PREVENT MAINT |
GARRET SHIELDS INFRASTRUCTURE($527,250) |
|
6372-94-001 |
SMITH |
TYLER |
$662,331 |
US0271 |
RMC - 637294001 |
12/03/2020 |
11/15/2023 |
ROW MOW |
HX FARMS, INC.($527,979) |
|
0910-00-135 |
SMITH |
TYLER |
$653,255 |
VA |
F 2022(965) |
08/03/2022 |
11/15/2023 |
BICYCLE AND PEDESTRIAN IMPRVS |
REYNOLDS & KAY, LTD.($783,828) |
|
6420-89-001 |
SMITH |
TYLER |
$637,000 |
SH0031 |
RMC - 642089001 |
03/07/2023 |
11/15/2023 |
LARGE SIGN REPL |
CROSS PLUS CONSTRUCTION, LLC($577,920) |
|
6423-24-001 |
SMITH |
TYLER |
$615,897 |
US0271 |
RMC - 642324001 |
12/01/2022 |
11/15/2023 |
MOW HWY RIGHT OF WAY |
JASCO($898,125) |
|
0910-00-132 |
SMITH |
TYLER |
$610,402 |
VA |
F 2022(579) |
04/07/2022 |
09/24/2024 |
INSTL/UPGRADE ROADWAY LIGHTING |
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC.($402,136) |
|
6420-81-001 |
SMITH |
TYLER |
$608,050 |
US0069 |
RMC - 642081001 |
11/03/2022 |
11/15/2023 |
TRAF SIGNAL MAINT |
TEXAS TRAFFIC CONTROL SYSTEMS, INC.($832,600) |
|
6426-20-001 |
SMITH |
TYLER |
$593,980 |
US0069 |
RMC - 642620001 |
12/01/2022 |
11/15/2023 |
TREE RMVL |
PATTERSON'S COMPLETE TREE SERVICE LLC($586,800) |