6224-18-001 |
SMITH |
TYLER |
$24,115 |
SH0031 |
RMC - 622418001 |
04/12/2011 |
11/15/2023 |
TREE TRIM AND BRUSH RMVL |
TEXAS TREE & LANDSCAPE, LTD.($22,260) |
|
6321-17-001 |
SMITH |
TYLER |
$120,740 |
FM0015 |
RMC - 632117001 |
10/10/2017 |
11/15/2023 |
TREE TRIM |
TERRY ENTERPRISES($125,582) |
|
6333-65-001 |
SMITH |
TYLER |
$141,166 |
US0069 |
RMC - 633365001 |
12/11/2018 |
11/15/2023 |
ILLUM MAINT |
TEXAS TRAFFIC CONTROL SYSTEMS, INC.($156,560) |
|
6341-24-001 |
SMITH |
TYLER |
$71,139 |
IH0020 |
RMC - 634124001 |
04/04/2019 |
11/15/2023 |
BRIDGE REPAIR |
GIBSON & ASSOCIATES, INC.($74,575) |
|
6346-91-001 |
SMITH |
TYLER |
$233,500 |
IH0020 |
BPM - 634691001 |
12/10/2019 |
11/15/2023 |
BPM |
RED BARON BUILDING COMPANY, L.L.C.($221,840) |
|
6355-74-001 |
SMITH |
TYLER |
$30,000 |
US0069 |
MMC - 635574001 |
04/07/2020 |
11/15/2023 |
CONC_MATERIALS ONLY |
849 RED BARON SUPPLY COMPANY, LLC($31,820) |
|
6364-69-001 |
SMITH |
TYLER |
$237,500 |
US0069 |
MMC - 636469001 |
09/08/2020 |
11/15/2023 |
LIQUID ASPH MATERIALS ONLY |
MARTIN RESOURCE MANAGEMENT CORPORATION($239,500) |
|
6359-56-001 |
SMITH |
TYLER |
$43,200 |
US0069 |
MMC - 635956001 |
11/10/2020 |
11/15/2023 |
BRINE SALT WINTER WEATHER MATERIALS ONLY |
UNITED SALT CORPORATION($69,655) |
|
6371-90-001 |
SMITH |
TYLER |
$38,880 |
US0069 |
MMC - 637190001 |
11/10/2020 |
11/15/2023 |
COMPLEX CHLORIDE WINTER WEATHER MAT ONLY |
GMCO COMMODITIES CORPORATION($244,080) |
|
6371-91-001 |
SMITH |
TYLER |
$30,000 |
US0069 |
MMC - 637191001 |
11/10/2020 |
11/15/2023 |
5 MOD AGG WINTER WEATHER MAT ONLY |
DIGG COMMERCIAL, LLC($40,000) |
|
6347-95-001 |
SMITH |
TYLER |
$1,744,395 |
US0069 |
RMC - 634795001 |
11/06/2019 |
11/15/2023 |
STRIPING AND PAVMT MRK |
STRIPING TECHNOLOGY, L.P.($1,898,132) |
|
6364-34-001 |
SMITH |
TYLER |
$290,850 |
US0069 |
MMC - 636434001 |
12/08/2020 |
11/15/2023 |
ASPHIC CONC PATCHING MATERIAL ONLY |
WALLER COUNTY ASPHALT INC.($246,410) |
|
6360-98-001 |
SMITH |
TYLER |
$288,500 |
US0069 |
MMC - 636098001 |
12/08/2020 |
11/15/2023 |
HOT MIX COLD LAY MATERIALS ONLY |
LONGVIEW ASPHALT, INC.($337,000) |
|
6359-64-001 |
SMITH |
TYLER |
$173,635 |
US0069 |
MMC - 635964001 |
12/08/2020 |
11/15/2023 |
REINFORCED CONC PIPE MATERIALS ONLY |
RED BARON BUILDING COMPANY, LLC($190,499) |
|
6374-91-001 |
SMITH |
TYLER |
$167,500 |
US0069 |
MMC - 637491001 |
01/12/2021 |
11/15/2023 |
FLEXBASE MATERIALS ONLY |
DIGG COMMERCIAL, LLC($171,270) |
|
6377-73-001 |
SMITH |
TYLER |
$264,600 |
US0069 |
MMC - 637773001 |
03/16/2021 |
11/15/2023 |
HOT MIX |
TEXAS MATERIALS GROUP, INC.($323,000) |
|
6378-26-001 |
SMITH |
TYLER |
$32,200 |
US0069 |
MMC - 637826001 |
04/13/2021 |
11/15/2023 |
MATERIALS ONLY: HYDRAULIC CEMENT CONC |
849 RED BARON SUPPLY COMPANY, LLC($36,680) |
|
6378-15-001 |
SMITH |
TYLER |
$296,000 |
US0069 |
MMC - 637815001 |
04/13/2021 |
11/15/2023 |
ROCK/RIPRAP |
A. L. HELMCAMP, INC.($237,983) |
|
6379-80-001 |
SMITH |
TYLER |
$63,756 |
SH0031 |
MMC - 637980001 |
06/15/2021 |
11/15/2023 |
WINTER WEATHER MATERIAL |
SOUTHWEST ENVIROTX PARTNERS, LLC($115,500) |
|
6379-82-001 |
SMITH |
TYLER |
$100,000 |
SH0031 |
MMC - 637982001 |
06/15/2021 |
11/15/2023 |
WINTER WEATHER MATERIAL |
DIGG COMMERCIAL, LLC($139,600) |
|
6388-29-001 |
SMITH |
TYLER |
$131,750 |
US0069 |
MMC - 638829001 |
12/08/2021 |
11/15/2023 |
EMULSION |
ERGON ASPHALT & EMULSIONS, INC.($140,840) |
|
6394-94-001 |
SMITH |
TYLER |
$240,000 |
US0069 |
MMC - 639494001 |
02/08/2022 |
11/15/2023 |
ASPH |
MARTIN RESOURCE MANAGEMENT CORPORATION($213,000) |
|
6398-84-001 |
SMITH |
TYLER |
$272,920 |
US0069 |
MMC - 639884001 |
07/12/2022 |
11/15/2023 |
SNOW AND ICE CONTROL |
SOUTHWEST ENVIROTX PARTNERS, LLC($208,320) |
|
6420-87-001 |
SMITH |
TYLER |
$258,935 |
SH0064 |
RMC - 642087001 |
11/08/2022 |
11/15/2023 |
ILLUM MAINT |
STRIPING TECHNOLOGY, L.P.($336,850) |
|
6427-70-001 |
SMITH |
TYLER |
$210,880 |
US0069 |
MMC - 642770001 |
12/13/2022 |
11/15/2023 |
EMULSION |
WRIGHT ASPHALT PRODUCTS COMPANY LLC($161,340) |
|
6431-92-001 |
SMITH |
TYLER |
$285,100 |
US0069 |
MMC - 643192001 |
02/14/2023 |
11/15/2023 |
ASPH |
MARTIN RESOURCE MANAGEMENT CORPORATION($228,300) |
|
6435-06-001 |
SMITH |
TYLER |
$199,358 |
SH0110 |
RMC - 643506001 |
04/11/2023 |
11/15/2023 |
PAVMT MRK |
TRP CONSTRUCTION GROUP, LLC($274,540) |
|
6448-29-001 |
SMITH |
TYLER |
$265,588 |
US0069 |
MMC - 644829001 |
08/08/2023 |
11/15/2023 |
SNOW AND ICE CONTROL |
THE BARGAIN SOURCE($207,170) |
|
0191-03-089 |
SMITH |
TYLER |
$24,876,254 |
FM 2493, ETC |
F 2025(255), ETC |
12/04/2024 |
11/10/2024 |
SEAL COAT |
|
|
0910-16-130 |
SMITH |
TYLER |
$1,897,070 |
VA |
STP 1602(439) |
11/04/2016 |
11/15/2023 |
GR,SGNL,ACP BS&SURF,C&G,STM SWR,PED RMP,PV MK |
EAST TEXAS BRIDGE, INC.($2,469,057) |
|
0910-00-105 |
SMITH |
TYLER |
$1,440,422 |
VA |
STP 2016(366) |
12/01/2016 |
11/15/2023 |
CONSTRUCT ADA COMPLIANT CURB RAMPS |
TI-ZACK CONCRETE, INC.($1,419,691) |
|
0910-00-100 |
SMITH |
TYLER |
$311,113 |
VA |
STP 2017(230) |
01/04/2017 |
11/15/2023 |
THERMOPLASTIC STRIPING |
STRIPE-A-ZONE, INC.($209,930) |
|
0495-04-067 |
SMITH |
TYLER |
$3,117,335 |
IH 20 |
NH 2017(747) |
02/02/2017 |
11/15/2023 |
TBPFC&ACP SURF,PLG,BRG JNTS,SHDR TXT,PV MK |
CLARK CONSTRUCTION OF TEXAS, INC.($2,876,797) |
|
0910-16-121 |
SMITH |
TYLER |
$1,428,298 |
PW |
C 910-16-121 |
03/07/2017 |
11/15/2023 |
BASE REPAIR, CRAC SEAL, HMAC OVERLAY |
A. L. HELMCAMP, INC.($1,269,696) |
|
0245-05-047 |
SMITH |
TYLER |
$1,960,204 |
SH 64 |
STP 2017(910) |
03/08/2017 |
11/15/2023 |
PLANING, BS RPR, OCST, PFC SURF, PV MK |
IOC COMPANY LLC($1,789,205) |
|
0910-16-138 |
SMITH |
TYLER |
$141,497 |
VA |
STP 2017(928) |
04/05/2017 |
11/15/2023 |
CONSTRUCT SIDEWALKS & ADA CURB RAMPS |
M & M STRIPING & POWER WASHING, LLC($97,066) |
|
0910-00-108 |
SMITH |
TYLER |
$276,650 |
VA |
STP 1702(466) |
08/08/2017 |
11/15/2023 |
PLANT TREES & SHRUBS, IRRIGATION |
CENTRAL NORTH CONSTRUCTION, LLC($224,600) |
|
1163-01-022 |
SMITH |
TYLER |
$1,206,584 |
FM 850 |
BR 1702(756) |
08/09/2017 |
11/15/2023 |
RPLC BR&APPR,GRADING,ACP BS&SURF,MBGF,PV MK |
STATELINE CONSTRUCTION, LLC($1,077,661) |
|
0910-16-143 |
SMITH |
TYLER |
$133,671 |
VA |
STP 2018(481) |
12/05/2017 |
11/15/2023 |
CONSTRUCT SIDEWALKS AND CURB RAMPS |
ENCINO LANDSCAPE, INC.($126,560) |
|
0191-01-085 |
SMITH |
TYLER |
$3,729,276 |
US 69 |
NH 1702(418) |
03/06/2018 |
11/15/2023 |
PLNG,BS RPR,OCST,PFC,SPRPV,MBGF,SHLDR TXT,PV MK |
DREWERY CONSTRUCTION COMPANY, INCORPORATED($3,628,777) |
|
0492-05-026 |
SMITH |
TYLER |
$2,475,603 |
FM 346 |
BR 2018(611) |
03/07/2018 |
11/15/2023 |
REPLACE BRIDGE & APPROACHES |
STATELINE CONSTRUCTION, LLC($2,029,446) |
|
0910-16-125 |
SMITH |
TYLER |
$895,229 |
CR |
BR 1602(655) |
03/07/2018 |
11/15/2023 |
REPLACE BRIDGE & APPROACHES |
STATELINE CONSTRUCTION, LLC($833,389) |
|
0424-01-058 |
SMITH |
TYLER |
$1,858,650 |
SH 31 |
C 424-1-58 |
06/06/2018 |
11/15/2023 |
PFC SURF, BRG RAIL, MBGF, PV MK |
DREWERY CONSTRUCTION COMPANY, INCORPORATED($1,834,285) |
|
0910-00-111 |
SMITH |
TYLER |
$1,037,301 |
VA |
C 910-00-111 |
07/10/2018 |
11/15/2023 |
THERMOPLASTIC PAVMT MRK |
TOTAL HIGHWAY MAINTENANCE, LLC($958,013) |
|
2654-01-022 |
SMITH |
TYLER |
$3,220,825 |
FM 2661 |
SSW 2654-1-22 |
07/11/2018 |
11/15/2023 |
GR, FLX BS, OCST, STRS, PVT MRK |
LONGVIEW BRIDGE AND ROAD, LTD.($2,792,589) |
|
0164-04-160 |
SMITH |
TYLER |
$3,982,129 |
SH 31 |
C 164-4-160 |
07/11/2018 |
11/15/2023 |
PLANING, PAVMT REPAIR, OCST, PV MK |
DREWERY CONSTRUCTION COMPANY, INCORPORATED($3,587,845) |
|
0910-16-145 |
SMITH |
TYLER |
$169,546 |
VA |
STP 1802(757) |
08/07/2018 |
11/15/2023 |
PLANTING TREES AND SHRUBS |
TIGHT LINE CONSTRUCTION, LLC($131,480) |
|
0203-08-016 |
SMITH |
TYLER |
$1,178,936 |
FM 1253 |
STP 2019(619)HES |
03/06/2019 |
11/15/2023 |
CENTERLINE & EDGELINE PROFILE PAV MRK |
CENTERLINE TECHNOLOGIES, LLC($706,777) |
|
0910-00-126 |
SMITH |
TYLER |
$892,205 |
VA |
C 910-00-126 |
06/05/2019 |
11/15/2023 |
THERMOPLASTIC & PROFILE PAVMT MRK |
TOTAL HIGHWAY MAINTENANCE, LLC($738,214) |
|
0164-04-159 |
SMITH |
TYLER |
$519,779 |
SH 31 |
STP 2020(100)HES |
10/02/2019 |
11/15/2023 |
IMPROVE & INTERCON SIG, INSTL ADV WARN SIG |
TEXAS TRAFFIC CONTROL SYSTEMS, INC.($457,481) |
|
0191-01-092 |
SMITH |
TYLER |
$2,825,315 |
US 69 |
NH 2020(705) |
04/08/2020 |
11/15/2023 |
REPAIR AND RESURF ROADWAY |
DREWERY CONSTRUCTION COMPANY, INCORPORATED($2,060,600) |
|
0495-04-070 |
SMITH |
TYLER |
$2,434,559 |
IH 20 |
NH 2020(707) |
04/09/2020 |
11/15/2023 |
TBPFC SURF, ACP SURF, PLANING, SHLDR TEXT, PV MK |
TEXAS MATERIALS GROUP, INC.($3,079,236) |
|
0910-00-113 |
SMITH |
TYLER |
$734,375 |
VA |
STP 2020(891) |
06/04/2020 |
11/15/2023 |
THERMOPLASTIC & PROFILE PAVMT MRK |
STRIPE-A-ZONE, INC.($668,551) |
|
0203-08-017 |
SMITH |
TYLER |
$92,513 |
FM 1253 |
STP 2020(877)HES |
06/05/2020 |
11/15/2023 |
INSTL LED FLASHING CHEVRONS ON CURVE |
STRIPING TECHNOLOGY, L.P.($99,072) |
|
0910-00-127 |
SMITH |
TYLER |
$4,112,570 |
VA |
STP 2B20(022) |
07/08/2020 |
11/15/2023 |
SIDEWALKS & ADA PED RAMPS |
HIGHWAY 19 CONSTRUCTION LLC($3,512,939) |
|
0910-16-151 |
SMITH |
TYLER |
$149,744 |
VA |
C 910-16-151 |
07/09/2020 |
11/15/2023 |
DRAINAGE IMPRVS, STRS, EMBANKMENT & SEEDING |
BAKER & COMPANY CONSTRUCTION, LLC($177,736) |
|
0927-01-031 |
SMITH |
TYLER |
$166,672 |
FM 344 |
STP 2B20(166)HES |
08/05/2020 |
11/15/2023 |
THERMOPLASTIC & PROFILE PAVMT MRK |
STRIPING TECHNOLOGY, L.P.($151,353) |
|
0927-01-030 |
SMITH |
TYLER |
$2,068,568 |
FM 344 |
STP 2B20(056)HES |
08/06/2020 |
11/15/2023 |
IMPROVE DRAINAGE, UPGRADE GUARD RAIL |
A R BROTHERS CONSTRUCTION SERVICES, INC.($1,833,548) |
|
0190-06-012 |
SMITH |
TYLER |
$999,888 |
US 69 |
NH 2021(033) |
09/03/2020 |
11/15/2023 |
PLANING, PAVMT REPAIR, OCST, ACP, PV MRK |
EAST TEXAS BRIDGE, INC.($1,333,004) |
|
0889-04-080 |
SMITH |
TYLER |
$126,660 |
FM 346 |
STP 2021(126) |
11/04/2020 |
11/15/2023 |
FLASHING CHEVRONS |
JASCO($103,274) |
|
0910-00-114 |
SMITH |
TYLER |
$2,585,271 |
VA |
STP 2021(215) |
01/07/2021 |
11/15/2023 |
PREVENT MAINT |
STRIPE-A-ZONE, INC.($2,322,961) |
|
0495-06-034 |
SMITH |
TYLER |
$1,375,050 |
IH 20 |
C 495-6-34 |
03/04/2021 |
11/15/2023 |
WIDEN ROAD - ADD SHOULDERS |
LONGVIEW BRIDGE AND ROAD, LTD.($1,495,512) |
|
0520-06-043 |
SMITH |
TYLER |
$19,743,675 |
SH 155 |
C 520-6-43 |
03/05/2021 |
11/15/2023 |
SURF/ROADWAY RESTOR |
MADDEN CONTRACTING COMPANY, LLC.($16,954,295) |
|
0165-02-065 |
SMITH |
TYLER |
$12,539,380 |
US 271 |
F 2021(509) |
05/05/2021 |
11/15/2023 |
ROADWAY REHAB/RECON WITH NO ADDE |
MADDEN CONTRACTING COMPANY, LLC.($12,377,401) |
|
0245-05-051 |
SMITH |
TYLER |
$394,396 |
SH 64 |
BR 2021(512) |
05/06/2021 |
11/15/2023 |
BRIDGE MAINT |
HIGHWAY 19 CONSTRUCTION LLC($332,397) |
|
0927-01-033 |
SMITH |
TYLER |
$428,400 |
FM 344 |
F 2021(818) |
08/04/2021 |
11/15/2023 |
HAZARD ELIM & SAFETY |
SYNERGY SIGNS & SERVICES LLC($329,522) |
|
0606-01-007 |
SMITH |
TYLER |
$2,289,001 |
PR 16 |
C 606-1-7 |
08/05/2021 |
11/15/2023 |
STATE PARK IMPRVS |
ENCINO LANDSCAPE, INC.($2,399,846) |
|
0910-00-115 |
SMITH |
TYLER |
$2,453,269 |
VA |
F 2022(095) |
09/01/2021 |
11/15/2023 |
PREVENT MAINT |
TOTAL HIGHWAY MAINTENANCE, LLC($2,493,890) |
|
0910-16-169 |
SMITH |
TYLER |
$157,515 |
VA |
F 2022(028) |
09/02/2021 |
11/15/2023 |
LANDSCAPE DEVELOPMENT |
TIGHT LINE CONSTRUCTION, LLC($157,495) |
|
0910-16-146 |
SMITH |
TYLER |
$39,800 |
VA |
F 2022(021) |
10/08/2021 |
11/15/2023 |
REPL OF MISSING SMALL ROADSIDE SIGNS |
HX FARMS, INC.($34,806) |
|
0910-16-147 |
SMITH |
TYLER |
$1,258,233 |
CS |
BR 2020(895) |
01/07/2022 |
11/15/2023 |
BRIDGE REPL |
THK CONSTRUCTION LLC($1,258,294) |
|
0495-04-076 |
SMITH |
TYLER |
$5,034,660 |
IH 20 |
C 495-4-76 |
02/03/2022 |
11/15/2023 |
RESURF ROADWAY |
TEXAS MATERIALS GROUP, INC.($6,035,178) |
|
0191-01-093 |
SMITH |
TYLER |
$394,309 |
US 69 |
STP 2022(677)HES |
06/29/2022 |
11/15/2023 |
INTERS IMPRV |
TEXAS TRAFFIC CONTROL SYSTEMS, INC.($444,558) |
|
0245-06-087 |
SMITH |
TYLER |
$1,767,280 |
SH 64 |
STP 2022(809)HES |
08/03/2022 |
11/15/2023 |
INTERS IMPRVS WITH RIGHT AND/OR LEFT T |
L. S. EQUIPMENT CO., INC.($2,208,247) |
|
0910-00-134 |
SMITH |
TYLER |
$435,667 |
VA |
F 2022(964) |
08/03/2022 |
11/15/2023 |
BICYCLE AND PEDESTRIAN IMPRVS |
TI-ZACK CONCRETE, INC.($470,055) |
|
0910-16-165 |
SMITH |
TYLER |
$163,757 |
CS |
STP 2022(812)HES |
08/04/2022 |
11/15/2023 |
INTERS IMPRV |
STRIPING TECHNOLOGY, L.P.($233,589) |
|
6321-04-001 |
SMITH |
TYLER |
$1,831,640 |
US0069 |
RMC - 632104001 |
09/07/2017 |
11/15/2023 |
LONG LINE THERMO |
STRIPING TECHNOLOGY, L.P.($1,805,280) |
|
2075-01-058 |
SMITH |
TYLER |
$3,764,244 |
SL 323 |
C 2075-1-58 |
02/01/2023 |
11/15/2023 |
RESURF ROADWAY |
DREWERY CONSTRUCTION COMPANY, INCORPORATED($4,548,987) |
|
0191-01-094 |
SMITH |
TYLER |
$5,780,392 |
US 69 |
C 191-1-94 |
02/02/2023 |
11/15/2023 |
REHAB EXIST ROADWAY |
DREWERY CONSTRUCTION COMPANY, INCORPORATED($7,798,138) |
|
0164-04-163 |
SMITH |
TYLER |
$1,025,662 |
SH 31 |
STP 2023(572)HES |
04/05/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
FNH CONSTRUCTION, LLC($1,235,384) |
|
0910-16-166 |
SMITH |
TYLER |
$1,017,280 |
VA |
STP 2023(729)HES |
05/05/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
CROSS PLUS CONSTRUCTION, LLC($925,714) |
|
6359-37-001 |
SMITH |
TYLER |
$837,125 |
US0069 |
RMC - 635937001 |
05/07/2020 |
11/15/2023 |
TRAF CONTROL |
FIREMAN EXCAVATING, INC.($832,200) |
|
0910-16-183 |
SMITH |
TYLER |
$113,961 |
CS |
STP 2B23(179)HESG |
08/02/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
MARCOM'S MOWING SERVICE, LLC($108,506) |
|
0910-16-162 |
SMITH |
TYLER |
$3,104,945 |
VA |
STP 2023(201)TAPS |
08/03/2023 |
11/15/2023 |
CONSTRUCT PEDESTRIAN INFRASTRUCT |
THK CONSTRUCTION LLC($2,988,319) |
|
0495-05-061 |
SMITH |
TYLER |
$577,549 |
IH 20 |
F 2B23(180) |
08/03/2023 |
11/15/2023 |
RESURF ROADWAY |
FNH CONSTRUCTION, LLC($693,237) |
|
0165-01-107 |
SMITH |
TYLER |
$5,785,892 |
SH 110 |
F 2024(022) |
09/06/2023 |
11/15/2023 |
PREVENT MAINT |
FNH CONSTRUCTION, LLC($6,495,390) |
|
6306-16-001 |
SMITH |
TYLER |
$3,207,857 |
SH0064 |
RMC - 630616001 |
11/03/2016 |
11/15/2023 |
EAST MILL & INLAY |
MADDEN CONTRACTING COMPANY, LLC.($2,872,971) |
|
6308-87-001 |
SMITH |
TYLER |
$354,000 |
FM0344 |
RMC - 630887001 |
12/01/2016 |
11/15/2023 |
CULVERT REPL |
RED BARON BUILDING COMPANY, L.L.C.($348,000) |
|
6311-30-001 |
SMITH |
TYLER |
$356,675 |
SH0110 |
RMC - 631130001 |
01/04/2017 |
11/15/2023 |
TREE RMVL |
CATOCON, INC.($361,244) |
|
6328-53-001 |
SMITH |
TYLER |
$304,875 |
US0271 |
RMC - 632853001 |
06/05/2018 |
11/15/2023 |
MAINT OF LARGE SIGNS |
IIPL USA LLC($344,750) |
|
6330-93-001 |
SMITH |
TYLER |
$475,622 |
US0069 |
RMC - 633093001 |
06/06/2018 |
11/15/2023 |
GUARDRAIL REPAIR |
CATOCON, INC.($400,142) |
|
6367-43-001 |
SMITH |
TYLER |
$5,044,222 |
IH0020 |
RMC - 636743001 |
03/04/2021 |
11/15/2023 |
IH-20 TOTAL MAINT |
FIREMAN EXCAVATING, INC.($4,603,064) |
|
6333-64-001 |
SMITH |
TYLER |
$377,385 |
US0069 |
RMC - 633364001 |
01/08/2019 |
11/15/2023 |
SIGNAL MAINT |
TEXAS TRAFFIC CONTROL SYSTEMS, INC.($428,400) |
|
6341-13-001 |
SMITH |
TYLER |
$3,143,855 |
SH0064 |
RMC - 634113001 |
02/05/2019 |
11/15/2023 |
MILL & INLAY |
LONGVIEW BRIDGE AND ROAD, LTD.($3,363,242) |
|
6329-53-001 |
SMITH |
TYLER |
$1,224,950 |
US0069 |
RMC - 632953001 |
07/11/2018 |
11/15/2023 |
TRAF CONTROL |
AREA WIDE PROTECTIVE, INC.($1,019,948) |
|
6383-74-001 |
SMITH |
TYLER |
$480,588 |
US0069 |
RMC - 638374001 |
08/05/2021 |
11/15/2023 |
CRACK SEAL |
CRACKSEAL OF TEXAS, LLC($452,694) |
|
6386-92-001 |
SMITH |
TYLER |
$2,023,754 |
US0069 |
RMC - 638692001 |
09/02/2021 |
11/15/2023 |
REFLECTORIZED PAVMT MRK & MARKERS |
STRIPE-A-ZONE, INC.($1,739,859) |
|
6396-20-001 |
SMITH |
TYLER |
$334,300 |
US0069 |
MMC - 639620001 |
02/04/2022 |
11/15/2023 |
HOT MIX |
TEXAS MATERIALS GROUP, INC.($350,500) |
|
6426-20-001 |
SMITH |
TYLER |
$593,980 |
US0069 |
RMC - 642620001 |
12/01/2022 |
11/15/2023 |
TREE RMVL |
PATTERSON'S COMPLETE TREE SERVICE LLC($586,800) |
|
6420-89-001 |
SMITH |
TYLER |
$637,000 |
SH0031 |
RMC - 642089001 |
03/07/2023 |
11/15/2023 |
LARGE SIGN REPL |
CROSS PLUS CONSTRUCTION, LLC($577,920) |