6356-12-001 |
POTTER |
AMARILLO |
$203,442 |
IH0040 |
MMC - 635612001 |
08/24/2020 |
11/15/2023 |
HYDAULIC CEMENT BAG/BULK (MATERIAL ONLY) |
AKA-MATERIALS($180,794) |
|
6446-82-001 |
POTTER |
AMARILLO |
$452,656 |
IH0040 |
MMC - 644682001 |
08/02/2023 |
11/15/2023 |
HYDRAULIC CEMENT |
AKA-MATERIALS($429,380) |
|
0275-01-199 |
POTTER |
AMARILLO |
$47,476,789 |
IH 40 |
NH 2020(549) |
02/06/2020 |
11/15/2023 |
B-2 PHASE II: RECON IH 40 2ND LEVEL MAINLANE |
ALLEN BUTLER CONSTRUCTION, INC.($50,032,708) |
|
6328-67-001 |
POTTER |
AMARILLO |
$699,018 |
IH0040 |
RMC - 632867001 |
04/03/2018 |
11/15/2023 |
MOW HWY ROW (URBAN) |
ALL HANDS & DUKE, INC.($613,922) |
|
6328-68-001 |
POTTER |
AMARILLO |
$231,784 |
IH0040 |
RMC - 632868001 |
04/03/2018 |
11/15/2023 |
MOW HWY RIGHT OF WAY |
ALL HANDS & DUKE, INC.($186,400) |
|
6398-05-001 |
POTTER |
AMARILLO |
$139,374 |
IH0040 |
RMC - 639805001 |
09/07/2022 |
11/15/2023 |
MOW HWY RIGHT OF WAY |
ALL HANDS & DUKE, INC.($167,233) |
|
6398-04-001 |
POTTER |
AMARILLO |
$747,706 |
IH0040 |
RMC - 639804001 |
04/06/2022 |
11/15/2023 |
MOW HWY RIGHT OF WAY |
ALL HANDS & DUKE, INC.($731,910) |
|
6358-25-001 |
POTTER |
AMARILLO |
$369,150 |
IH0040 |
RMC - 635825001 |
03/05/2020 |
11/15/2023 |
MOW HWY ROW (URBAN) |
ALL HANDS & DUKE, INC.($331,681) |
|
0090-05-107 |
POTTER |
AMARILLO |
$9,565,794 |
IH 40 |
BR 2024(779) |
03/05/2024 |
01/23/2024 |
BRIDGE REPL |
ALTUS CONSTRUCTION LLC($10,246,890) |
|
6345-60-001 |
POTTER |
AMARILLO |
$257,395 |
IH0040 |
RMC - 634560001 |
06/25/2019 |
09/27/2024 |
ON CALL GUARDRAIL & CABLE BARRIER REPAIR |
AMARILLO RMT ENTERPRISES, LLC($176,400) |
|
0904-00-192 |
POTTER |
AMARILLO |
$1,066,195 |
VA |
STP 2B20(146)HES |
08/05/2020 |
11/15/2023 |
IMPROVE TRAF SIG |
AMERICAN LIGHTING AND SIGNALIZATION, LLC($973,864) |
|
0090-05-095 |
POTTER |
AMARILLO |
$1,447,750 |
SL 279 |
STP 2018(815)HES |
05/02/2018 |
11/15/2023 |
IMPROVE TRAF SIG |
AMERICAN LIGHTING AND SIGNALIZATION, LLC($1,568,719) |
|
0904-00-213 |
POTTER |
AMARILLO |
$584,084 |
VA |
STP 2023(946)HESG |
06/27/2023 |
11/15/2023 |
INSTL TRAF SIGNAL |
APOLLO CONSTRUCTORS, INC.($576,035) |
|
6395-18-001 |
POTTER |
AMARILLO |
$188,641 |
IH0040 |
MMC - 639518001 |
01/18/2022 |
09/24/2024 |
PREFABRICATED PAVMT MRK |
BARRICADES UNLIMITED($152,815) |
|
6385-06-001 |
POTTER |
AMARILLO |
$292,700 |
IH0040 |
RMC - 638506001 |
07/28/2021 |
11/15/2023 |
METAL BEAM GUARD FENCE REPAIR |
BARRICADES UNLIMITED($257,535) |
|
0904-00-164 |
POTTER |
AMARILLO |
$1,256,729 |
VA |
STP 2017(593) |
02/02/2017 |
11/15/2023 |
THERMOPLASTIC STRIPING |
BARRICADES UNLIMITED($1,085,463) |
|
6360-90-001 |
POTTER |
AMARILLO |
$509,650 |
IH0040 |
RMC - 636090001 |
05/07/2020 |
11/15/2023 |
TRAF CONTROL |
BARRICADES UNLIMITED($434,961) |
|
6331-26-001 |
POTTER |
AMARILLO |
$528,225 |
IH0040 |
RMC - 633126001 |
06/06/2018 |
11/15/2023 |
TRAF CONTROL |
BARRICADES UNLIMITED($505,001) |
|
6441-88-001 |
POTTER |
AMARILLO |
$493,000 |
IH0040 |
RMC - 644188001 |
06/01/2023 |
11/28/2023 |
TRAF CONTROL SERVICES |
BARRICADES UNLIMITED($350,850) |
|
6420-19-001 |
POTTER |
AMARILLO |
$339,820 |
IH0040 |
RMC - 642019001 |
11/02/2022 |
11/15/2023 |
CABLE MEDIAN BARRIER SYSTEM REPAIR |
BK FIELD OPERATIONS LLC($285,464) |
|
0904-00-199 |
POTTER |
AMARILLO |
$879,330 |
VA |
F 2022(426) |
04/07/2022 |
09/24/2024 |
BRIDGE MAINT |
BLACKSTONE CONCRETE VENTURES, LLC($843,650) |
|
6381-86-001 |
POTTER |
AMARILLO |
$844,983 |
IH0040 |
BPM - 638186001 |
01/06/2022 |
11/15/2023 |
BRIDGE PREVENT MAINT |
BLACKSTONE CONCRETE VENTURES, LLC($779,934) |
|
0041-07-107 |
POTTER |
AMARILLO |
$8,587,278 |
US 87 |
NH 2019(212) |
11/06/2018 |
11/15/2023 |
SEALCOAT |
BRANNAN PAVING CO., LTD.($12,390,506) |
|
6324-99-001 |
POTTER |
AMARILLO |
$80,499 |
US0287 |
RMC - 632499001 |
02/21/2018 |
11/15/2023 |
INSTL OF RAISED PAVMT MARKERS |
BRYDL CONTRACTING, INC.($76,383) |
|
6352-08-001 |
POTTER |
AMARILLO |
$660,665 |
IH0040 |
RMC - 635208001 |
01/10/2020 |
11/15/2023 |
FY 2020 INSTL OF RAISED PAVMT MARKERS |
BRYDL CONTRACTING, INC.($587,522) |
|
6374-00-001 |
POTTER |
AMARILLO |
$788,817 |
IH0040 |
RMC - 637400001 |
01/08/2021 |
11/15/2023 |
INSTL OF RAISED PAVMT MARKERS |
BRYDL CONTRACTING, INC.($667,451) |
|
0904-00-186 |
POTTER |
AMARILLO |
$761,550 |
VA |
STP 2019(728) |
04/03/2019 |
11/15/2023 |
UPGRADE EXIST ROADWAY ILLUM TO LED |
CDM HOLDINGS, LLC($748,100) |
|
0904-00-207 |
POTTER |
AMARILLO |
$3,583,233 |
VA |
F 2024(137) |
10/06/2023 |
11/15/2023 |
HWY IMPRV |
CENTERLINE TECHNOLOGIES, LLC($3,292,242) |
|
0904-00-198 |
POTTER |
AMARILLO |
$842,609 |
VA |
C 904-00-198 |
01/06/2022 |
11/15/2023 |
HWY IMPRV |
CENTERLINE TECHNOLOGIES, LLC($989,731) |
|
6398-05-001 |
POTTER |
AMARILLO |
$208,858 |
IH0040 |
RMC - 639805001 |
04/06/2022 |
11/15/2023 |
MOW HWY RIGHT OF WAY |
COMPLETION DOSZIER LLC($260,570) |
|
0904-00-208 |
POTTER |
AMARILLO |
$1,584,515 |
VA |
C 904-00-208 |
05/02/2024 |
03/21/2024 |
BRIDGE MAINT |
DCC CONSTRUCTION AND SERVICES, L.L.C.($1,283,633) |
|
0904-00-232 |
POTTER |
AMARILLO |
$1,212,543 |
US 60 |
BR 2024(520) |
01/05/2024 |
11/24/2023 |
BRIDGE MAINT |
DCC CONSTRUCTION AND SERVICES, L.L.C.($1,635,105) |
|
6366-94-001 |
POTTER |
AMARILLO |
$145,142 |
IH0040 |
MMC - 636694001 |
09/09/2020 |
11/15/2023 |
SCREENINGS WINTER (MATERIALS ONLY) |
DIGG COMMERCIAL, LLC($247,611) |
|
6356-15-001 |
POTTER |
AMARILLO |
$84,750 |
IH0040 |
MMC - 635615001 |
07/14/2020 |
09/26/2024 |
HYDRAULIC CEMENT CONC (MATERIALS ONL |
DIGG COMMERCIAL, LLC($109,000) |
|
6382-56-001 |
POTTER |
AMARILLO |
$74,075 |
IH0040 |
MMC - 638256001 |
09/14/2021 |
09/24/2024 |
WINTER WEATHER MATERIAL |
DIGG COMMERCIAL, LLC($81,275) |
|
6366-94-001 |
POTTER |
AMARILLO |
$145,142 |
IH0040 |
MMC - 636694001 |
10/20/2020 |
11/15/2023 |
SCREENINGS WINTER (MATERIALS ONLY) |
DIGG COMMERCIAL, LLC($155,952) |
|
6357-22-001 |
POTTER |
AMARILLO |
$143,789 |
IH0040 |
MMC - 635722001 |
09/09/2020 |
11/15/2023 |
HYDRATED LIME (MATERIALS ONLY) |
DIGG COMMERCIAL, LLC($165,400) |
|
0904-00-169 |
POTTER |
AMARILLO |
$1,223,550 |
VA |
STP 2018(003) |
10/04/2017 |
11/15/2023 |
CRACK SEAL |
D & M CONTRACTORS, LLC($995,742) |
|
6439-64-001 |
POTTER |
AMARILLO |
$1,339,817 |
IH0040 |
RMC - 643964001 |
09/07/2023 |
11/15/2023 |
CRACK SEAL |
D & M CONTRACTORS, LLC($1,224,880) |
|
0904-00-187 |
POTTER |
AMARILLO |
$1,447,028 |
VA |
F 2021(385) |
09/02/2021 |
11/15/2023 |
PREVENT MAINT |
D & M CONTRACTORS, LLC($929,306) |
|
0904-00-173 |
POTTER |
AMARILLO |
$1,428,385 |
VA |
STP 2020(047) |
09/05/2019 |
11/15/2023 |
CRACK SEAL |
D & M CONTRACTORS, LLC($1,169,941) |
|
0904-00-200 |
POTTER |
AMARILLO |
$884,615 |
VA |
F 2023(054) |
09/08/2022 |
11/15/2023 |
PREVENT MAINT |
D & M CONTRACTORS, LLC($781,621) |
|
0904-00-171 |
POTTER |
AMARILLO |
$726,796 |
VA |
STP 2019(055) |
09/07/2018 |
11/15/2023 |
CRACK SEAL |
D & M CONTRACTORS, LLC($611,327) |
|
0904-00-178 |
POTTER |
AMARILLO |
$1,099,001 |
VA |
STP 2B20(259) |
09/03/2020 |
11/15/2023 |
CRACK SEAL |
D & M CONTRACTORS, LLC($1,062,156) |
|
6464-37-001 |
POTTER |
AMARILLO |
$1,729,455 |
IH0040 |
RMC - 646437001 |
09/05/2024 |
07/22/2024 |
CRACK SEAL |
D & M CONTRACTORS, LLC($2,379,130) |
|
6396-09-001 |
POTTER |
AMARILLO |
$6,618,501 |
IH0040 |
MMC - 639609001 |
04/07/2022 |
11/15/2023 |
ASPH |
ERGON ASPHALT & EMULSIONS, INC.($8,273,562) |
|
6384-36-001 |
POTTER |
AMARILLO |
$351,750 |
IH0040 |
RMC - 638436001 |
08/05/2021 |
11/15/2023 |
CABLE MEDIAN BARRIER SYSTEM REPAIR |
E.V.G. ENTERPRISE($335,300) |
|
6382-14-001 |
POTTER |
AMARILLO |
$424,176 |
IH0040 |
RMC - 638214001 |
06/04/2021 |
11/15/2023 |
TRAF CONTROL SERVICES |
FC TRAFFIC CONTROL, INC.($305,000) |
|
6396-14-001 |
POTTER |
AMARILLO |
$721,936 |
US0060 |
RMC - 639614001 |
03/04/2022 |
11/15/2023 |
RAISED PAVMT MRK |
FC TRAFFIC CONTROL, INC.($749,838) |
|
6376-35-001 |
POTTER |
AMARILLO |
$238,060 |
SL0335 |
BPM - 637635001 |
02/17/2021 |
09/26/2024 |
BRIDGE REPAIR |
GIBSON & ASSOCIATES, INC.($130,240) |
|
0275-01-205 |
POTTER |
AMARILLO |
$14,312,032 |
IH 40 |
BR 2020(793) |
05/08/2020 |
11/15/2023 |
BRIDGE MAINT AND REPAIR |
GIBSON & ASSOCIATES, INC.($15,820,659) |
|
0275-01-229 |
POTTER |
AMARILLO |
$11,723,292 |
IH 40 |
BR 2023(596) |
04/04/2023 |
09/24/2024 |
BRIDGE MAINT |
GIBSON & ASSOCIATES, INC.($8,159,181) |
|
0379-03-026 |
POTTER |
AMARILLO |
$5,191,975 |
SH 136 |
STP 2021(190)HES |
09/01/2021 |
11/15/2023 |
HAZARD ELIM & SAFETY |
GILVIN-TERRILL, LTD.($6,694,352) |
|
0275-01-187 |
POTTER |
AMARILLO |
$5,406,076 |
IH 40 |
BR 2017(934) |
04/05/2017 |
11/15/2023 |
REPLACE BRIDGES,FRT RD IMPROVE,REHAB TRAF SIG |
GILVIN-TERRILL, LTD.($7,472,230) |
|
0275-01-215 |
POTTER |
AMARILLO |
$4,447,234 |
IH 40 |
C 275-1-215 |
07/08/2020 |
11/15/2023 |
HAZARD ELIM & SAFETY |
GILVIN-TERRILL, LTD.($4,539,711) |
|
0041-07-117 |
POTTER |
AMARILLO |
$6,231,995 |
US 87 |
BR 2023(503) |
03/07/2023 |
08/21/2024 |
REHAB BRIDGE |
GILVIN-TERRILL, LTD.($6,968,415) |
|
0090-05-109 |
POTTER |
AMARILLO |
$29,748,351 |
BI 40-D |
STP 2025(139)HES |
10/02/2024 |
08/21/2024 |
HAZARD ELIM & SAFETY |
GILVIN-TERRILL, LTD.($30,982,054) |
|
0090-05-108 |
POTTER |
AMARILLO |
$8,578,402 |
IH 40 |
BR 2024(730) |
02/01/2024 |
12/21/2023 |
BRIDGE REPL |
GILVIN-TERRILL, LTD.($9,782,901) |
|
6371-42-001 |
POTTER |
AMARILLO |
$84,000 |
IH0040 |
MMC - 637142001 |
10/20/2020 |
11/15/2023 |
MAG CHLORIDE GRANULAR(MATERIAL ONLY) |
GMCO COMMODITIES CORPORATION($60,552) |
|
0041-05-055 |
POTTER |
AMARILLO |
$4,816,645 |
US 87 |
STP 2024(780)HES |
03/05/2024 |
01/23/2024 |
HAZARD ELIM & SAFETY |
GRATIOT CONSTRUCTION, LTD.($2,894,785) |
|
0904-00-194 |
POTTER |
AMARILLO |
$2,939,758 |
VA |
C 904-00-194 |
06/04/2020 |
11/15/2023 |
SFT - SAFETY IMPRV PROJECTS |
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC.($2,739,961) |
|
0275-01-244 |
POTTER |
AMARILLO |
$12,020,605 |
IH 40 |
F 2B24(154) |
06/06/2024 |
04/25/2024 |
INSTL ILLUM |
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, LLC($11,497,987) |
|
6413-43-001 |
POTTER |
AMARILLO |
$413,245 |
IH0040 |
RMC - 641343001 |
08/04/2022 |
11/15/2023 |
METAL BEAM GUARD FENCE REPAIR |
HJC FARMS, INC.($547,813) |
|
2635-04-042 |
POTTER |
AMARILLO |
$2,548,525 |
SL 335 |
STP 2023(380)HES |
01/05/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
HJC FARMS, INC.($2,622,117) |
|
0904-00-223 |
POTTER |
AMARILLO |
$3,312,264 |
VA |
F 2B24(226) |
06/06/2024 |
04/25/2024 |
INSTL/REPLACE SIGNS |
HJC FARMS, INC.($2,357,140) |
|
0904-00-195 |
POTTER |
AMARILLO |
$4,654,169 |
VA |
C 904-00-195 |
05/07/2020 |
11/15/2023 |
INSTL CABLE MEDIAN BARRIER |
HJC FARMS, INC.($3,940,371) |
|
0090-06-044 |
POTTER |
AMARILLO |
$4,894,339 |
BI 40-D |
BR 2021(281) |
01/07/2021 |
11/15/2023 |
REPLACE EXIST BRIDGES |
INTEGRITY SERVICES, LLC($5,207,276) |
|
0090-05-099 |
POTTER |
AMARILLO |
$1,808,709 |
IH 40 |
BR 1702(431) |
06/06/2017 |
11/15/2023 |
BRIDGE REPL |
J. LEE MILLIGAN, INC.($1,333,511) |
|
0090-05-097 |
POTTER |
AMARILLO |
$1,939,897 |
IH 40 |
NH 2018(284) |
11/02/2017 |
11/15/2023 |
INTERS & SAFETY IMPRVS ADDING TRUN LNS |
J. LEE MILLIGAN, INC.($1,771,161) |
|
6313-53-001 |
POTTER |
AMARILLO |
$2,658,550 |
IH0040 |
RMC - 631353001 |
04/04/2017 |
11/15/2023 |
MISC ROADWAY REPAIRS |
J. LEE MILLIGAN, INC.($2,347,860) |
|
0275-01-221 |
POTTER |
AMARILLO |
$11,234,135 |
IH 40 |
F 2022(166) |
12/01/2021 |
11/15/2023 |
PREVENT MAINT |
J. LEE MILLIGAN, INC.($13,120,890) |
|
6462-58-001 |
POTTER |
AMARILLO |
$6,491,250 |
IH0040 |
RMC - 646258001 |
02/02/2024 |
12/25/2023 |
TOTAL MAINT |
J. LEE MILLIGAN, INC.($6,977,100) |
|
6354-17-001 |
POTTER |
AMARILLO |
$3,487,150 |
IH0040 |
RMC - 635417001 |
01/10/2020 |
11/15/2023 |
MISC ROADWAY REPAIRS |
J. LEE MILLIGAN, INC.($4,994,600) |
|
2494-01-015 |
POTTER |
AMARILLO |
$1,972,567 |
RM 2381 |
F 2021(650) |
06/04/2021 |
11/15/2023 |
INTERS IMPRV |
J. LEE MILLIGAN, INC.($2,407,612) |
|
6358-90-001 |
POTTER |
AMARILLO |
$8,400 |
IH0040 |
MMC - 635890001 |
07/14/2020 |
09/26/2024 |
FLEXIBLE BASE (MATERIAL ONLY) |
J. LEE MILLIGAN, INC.($9,358) |
|
0275-01-163 |
POTTER |
AMARILLO |
$7,545,527 |
IH 40 |
NH 2017(367) |
02/03/2017 |
11/15/2023 |
OVERLAY |
J. LEE MILLIGAN, INC.($6,982,390) |
|
6395-56-001 |
POTTER |
AMARILLO |
$5,234,622 |
IH0040 |
RMC - 639556001 |
02/04/2022 |
11/15/2023 |
TOTAL MAINT ROADWAY REPAIRS |
J. LEE MILLIGAN, INC.($6,290,664) |
|
6324-63-001 |
POTTER |
AMARILLO |
$4,539,110 |
IH0040 |
RMC - 632463001 |
12/05/2017 |
11/15/2023 |
MISC ROADWAY REPAIRS |
J. LEE MILLIGAN, INC.($4,503,545) |
|
0041-07-113 |
POTTER |
AMARILLO |
$12,784,388 |
US 87 |
BR 2023(597) |
04/05/2023 |
11/15/2023 |
BRIDGE REPL |
J. LEE MILLIGAN, INC.($11,665,732) |
|
6357-74-001 |
POTTER |
AMARILLO |
$18,591 |
IH0040 |
MMC - 635774001 |
07/14/2020 |
09/26/2024 |
SEAL COAT AGGR. (MATERIALS ONLY) |
J. LEE MILLIGAN, INC.($22,703) |
|
0041-05-053 |
POTTER |
AMARILLO |
$1,099,559 |
US 87 |
F 2021(391) |
03/04/2021 |
11/15/2023 |
WIDEN ROAD - ADD LANES AND SHOULDERS |
J. LEE MILLIGAN, INC.($1,149,485) |
|
0379-02-032 |
POTTER |
AMARILLO |
$8,577,015 |
SH 136 |
STP 2B20(144)HES |
08/06/2020 |
11/15/2023 |
REHAB EXIST ROADWAY |
KIEWIT INFRASTRUCTURE SOUTH CO.($9,215,103) |
|
1245-02-049 |
POTTER |
AMARILLO |
$11,717,878 |
RM 1061 |
F 2022(374) |
02/04/2022 |
11/15/2023 |
HWY IMPRV |
KIEWIT INFRASTRUCTURE SOUTH CO.($12,755,021) |
|
0042-11-006 |
POTTER |
AMARILLO |
$6,223,592 |
SL 395 |
STP 2023(467)TAPS |
06/05/2024 |
04/24/2024 |
CONSTRUCT PEDESTRIAN INFRASTRUCT |
L A FULLER & SONS CONSTRUCTION, LTD.($5,976,375) |
|
6367-70-001 |
POTTER |
AMARILLO |
$83,520 |
FM0245 |
MMC - 636770001 |
09/09/2020 |
11/15/2023 |
FLEXIBLE BASE (MATERIALS ONLY) |
L A FULLER & SONS CONSTRUCTION, LTD.($62,379) |
|
0169-02-068 |
POTTER |
AMARILLO |
$2,221,786 |
US 60 |
STP 2023(181)HES |
11/03/2022 |
11/15/2023 |
INTERS IMPRVS WITH RIGHT AND/OR LEFT T |
L A FULLER & SONS CONSTRUCTION, LTD.($2,207,755) |
|
0904-00-220 |
POTTER |
AMARILLO |
$3,248,892 |
VA |
F 2B24(460) |
09/06/2024 |
07/26/2024 |
INSTL/REHAB ITS |
LIGHT IT UP ELECTRIC($3,354,583) |
|
6469-34-001 |
POTTER |
AMARILLO |
$2,342,085 |
IH0040 |
RMC - 646934001 |
07/09/2024 |
05/28/2024 |
PAVMT MRK |
L&L COMPANY($2,263,765) |
|
0904-00-180 |
POTTER |
AMARILLO |
$635,882 |
VA |
STP 2018(521) |
02/02/2018 |
11/15/2023 |
THERMOPLASTIC STRIPING |
L&L COMPANY($482,197) |
|
0275-01-204 |
POTTER |
AMARILLO |
$4,330,374 |
IH 40 |
STP 1902(138)HES |
07/10/2019 |
09/27/2024 |
INSTL MEDIAN BARRIER |
MASSANA CONSTRUCTION INC.($4,995,101) |
|
0904-00-197 |
POTTER |
AMARILLO |
$6,057,309 |
VA |
F 2021(874) |
08/05/2021 |
11/15/2023 |
HWY IMPRV |
MASSANA CONSTRUCTION INC.($4,796,527) |
|
0904-00-181 |
POTTER |
AMARILLO |
$1,438,307 |
VA |
F 2023(516) |
03/07/2023 |
08/21/2024 |
FURNISH & INSTL DYNAMIC MESSAGE SIGNS |
MICA CORPORATION($1,771,464) |
|
0090-05-111 |
POTTER |
AMARILLO |
$4,058,835 |
IH 40 |
STP 2023(598)HES |
06/01/2023 |
11/27/2023 |
INSTL ILLUM |
MICA CORPORATION($4,121,379) |
|
0041-08-004 |
POTTER |
AMARILLO |
$12,751,828 |
SL 434 |
STP 2020(202) |
11/05/2019 |
11/15/2023 |
SEAL COAT |
MISSOURI PETROLEUM PRODUCTS COMPANY LLC($12,785,668) |
|
0041-07-111 |
POTTER |
AMARILLO |
$14,775,593 |
US 87 |
F 2022(118) |
11/03/2021 |
11/15/2023 |
SEAL COAT |
MISSOURI PETROLEUM PRODUCTS COMPANY LLC($14,719,116) |
|
6469-92-001 |
POTTER |
AMARILLO |
$157,432 |
IH0040 |
MMC - 646992001 |
08/01/2024 |
06/24/2024 |
WINTER WEATHER MATERIAL |
NSG LOGISTICS, LLC($145,389) |
|
6434-90-001 |
POTTER |
AMARILLO |
$1,237,500 |
IH0040 |
RMC - 643490001 |
03/07/2023 |
11/15/2023 |
FULL DEPTH CONC REPAIR |
O. TREVINO CONSTRUCTION, LLC($1,228,700) |
|
6313-52-001 |
POTTER |
AMARILLO |
$1,001,325 |
IH0040 |
RMC - 631352001 |
02/03/2017 |
11/15/2023 |
FULL DEPTH CONC REPAIR |
O. TREVINO CONSTRUCTION, LLC($950,535) |
|
6366-07-001 |
POTTER |
AMARILLO |
$198,343 |
US0087 |
RMC - 636607001 |
07/14/2020 |
09/26/2024 |
CLEANING & SWEEPING HWYS |
PANHANDLE SWEEPING & MAINTENANCE, LLC($178,037) |
|
6330-88-001 |
POTTER |
AMARILLO |
$298,825 |
IH0040 |
RMC - 633088001 |
04/25/2018 |
11/15/2023 |
CLEANING AND SWEEPING HWYS |
PANHANDLE SWEEPING & MAINTENANCE, LLC($287,050) |