6379-44-001 |
MCLENNAN |
WACO |
$691,038 |
FM1860 |
RMC - 637944001 |
05/05/2021 |
11/15/2023 |
BASE FAILURE PAVMT REPAIR |
TEXAS MATERIALS GROUP, INC.($534,686) |
|
6377-69-001 |
MCLENNAN |
WACO |
$141,131 |
US0077 |
RMC - 637769001 |
04/08/2021 |
11/15/2023 |
FULL DEPTH CONC REPAIR |
CROSS PLUS CONSTRUCTION, LLC($136,233) |
|
6377-88-001 |
MCLENNAN |
WACO |
$433,285 |
FM1860 |
RMC - 637788001 |
04/08/2021 |
11/15/2023 |
MISCELLANEOUS CONC REPAIR |
DBI SERVICES, LLC($386,492) |
|
0909-22-180 |
MCLENNAN |
WACO |
$468,265 |
FD |
BR 1802(502) |
04/07/2021 |
11/15/2023 |
REPLACE BRIDGE AND APPROACHES |
HODGES AND SON CONSTRUCTION COMPANY, INC.($458,027) |
|
0055-07-062 |
MCLENNAN |
WACO |
$2,057,976 |
US 84 |
F 2021(407) |
03/04/2021 |
11/15/2023 |
UPGRADE MBGF |
TALBRAN ENTERPRISES LLC($1,857,025) |
|
6366-45-001 |
MCLENNAN |
WACO |
$651,481 |
FM0185 |
BPM - 636645001 |
12/03/2020 |
11/15/2023 |
BRIDGE PREVENT MAINT |
JAMES CONSTRUCTION GROUP, L.L.C.($623,661) |
|
6369-29-001 |
MCLENNAN |
WACO |
$738,074 |
US0084 |
RMC - 636929001 |
11/05/2020 |
11/15/2023 |
URBAN & RURUAL MOW AND LITTER |
T&L CLEANING SERVICES LLC($747,415) |
|
6369-33-001 |
MCLENNAN |
WACO |
$1,555,000 |
US0084 |
MMC - 636933001 |
11/05/2020 |
11/15/2023 |
HOT MIX - MATERIAL ONLY |
BIG CREEK CONSTRUCTION, LTD.($1,187,500) |
|
6365-05-001 |
MCLENNAN |
WACO |
$1,026,194 |
SH0006 |
RMC - 636505001 |
09/04/2020 |
11/15/2023 |
MBGF,BRIDGE RAIL,CABLE BARRIER REPR&INST |
T&L CLEANING SERVICES LLC($887,302) |
|
6363-17-001 |
MCLENNAN |
WACO |
$1,037,964 |
US0084 |
MMC - 636317001 |
08/06/2020 |
11/15/2023 |
FLBS,AGGR-SURF TREAT,CTB & RR ROCK-MATERIAL ONLY |
BIG CREEK CONSTRUCTION, LTD.($787,158) |
|
0014-08-088 |
MCLENNAN |
WACO |
$379,257 |
IH 35 |
NH 2B20(068) |
08/05/2020 |
11/15/2023 |
INSTLING SIG AND FLASHING BEACONS. |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.($323,521) |
|
0049-01-099 |
MCLENNAN |
WACO |
$9,043,757 |
SH 6 |
STP 2B20(186)HES |
08/05/2020 |
11/15/2023 |
HAZZARD ELIM AND SAFETY |
MASSANA, INC.($6,830,728) |
|
0162-01-098 |
MCLENNAN |
WACO |
$3,874,162 |
SH 31 |
STP 2B20(188)HES |
08/05/2020 |
11/15/2023 |
INSTL CABLE MEDIAN BARRIER AND UPGRADE MBGF |
MASSANA, INC.($3,044,240) |
|
6362-78-001 |
MCLENNAN |
WACO |
$248,991 |
FM0185 |
RMC - 636278001 |
07/09/2020 |
11/15/2023 |
TREE TRIM, BRUSH, DRIFTWOOD & DEBRIS REM |
CEN-TEX IRRIGATION SYSTEMS, INC.($206,653) |
|
6357-28-001 |
MCLENNAN |
WACO |
$95,576 |
SH0006 |
RMC - 635728001 |
05/12/2020 |
09/26/2024 |
DITCH & CULVERT CLEANING(NON-SITE SPEC.) |
BPP HOLDINGS LLC($124,850) |
|
6355-79-001 |
MCLENNAN |
WACO |
$1,416,652 |
SH0006 |
RMC - 635579001 |
05/08/2020 |
11/15/2023 |
BASE FAILURE PAVMT REPAIRS |
TEXAS MATERIALS GROUP, INC.($827,444) |
|
6351-58-001 |
MCLENNAN |
WACO |
$28,080,845 |
IH0035 |
RMC - 635158001 |
05/08/2020 |
11/15/2023 |
ROUTINE MAINT OF IH - 35 CORRIDOR |
CROSS PLUS CONSTRUCTION, LLC($26,575,153) |
|
2506-01-042 |
MCLENNAN |
WACO |
$707,722 |
FM 1695 |
STP 2020(743) |
04/09/2020 |
11/15/2023 |
CONSTRUCTION OF PEDESTRIAN, SIDEWALKS & CURB RAMPS |
TI-ZACK CONCRETE, INC.($862,612) |
|
6357-29-001 |
MCLENNAN |
WACO |
$258,390 |
US0077 |
RMC - 635729001 |
04/09/2020 |
11/15/2023 |
NON-SITE SPEC SPALL & FULL DEPTH REPAIR |
CROSS PLUS CONSTRUCTION, LLC($221,600) |
|
6356-78-001 |
MCLENNAN |
WACO |
$553,785 |
US0084 |
MMC - 635678001 |
03/04/2020 |
11/15/2023 |
EMULSION-MATERIAL ONLY |
ERGON ASPHALT & EMULSIONS, INC.($550,747) |
|
6356-89-001 |
MCLENNAN |
WACO |
$2,836,080 |
US0084 |
MMC - 635689001 |
03/04/2020 |
11/15/2023 |
HOT MIX-MATERIAL ONLY |
TEXAS MATERIALS GROUP, INC.($2,635,350) |
|
6354-19-001 |
MCLENNAN |
WACO |
$219,364 |
US0084 |
RMC - 635419001 |
02/11/2020 |
09/26/2024 |
CLEANING AND SWEEPING HWYS |
STAR SWEEPING USA INC.($215,764) |
|
1187-02-018 |
MCLENNAN |
WACO |
$671,088 |
FM 938 |
BR 2020(397) |
12/04/2019 |
11/15/2023 |
REPL BR & APPRS |
KNIFE RIVER CORPORATION - SOUTH($663,130) |
|
6352-98-001 |
MCLENNAN |
WACO |
$487,975 |
US0084 |
RMC - 635298001 |
12/03/2019 |
11/15/2023 |
URBAN & RURAL MOW, LITTER REM |
CROSS PLUS CONSTRUCTION, LLC($446,521) |
|
0258-10-047 |
MCLENNAN |
WACO |
$943,707 |
SL 396 |
STP 2020(190) |
11/05/2019 |
11/15/2023 |
IMPROVE TRAF SIG |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.($829,994) |
|
6347-55-001 |
MCLENNAN |
WACO |
$2,096,287 |
FM1858 |
RMC - 634755001 |
09/05/2019 |
11/15/2023 |
SEAL COAT |
F. N. PLOCH CONSTRUCTION COMPANY, INC.($1,537,363) |
|
0909-22-183 |
MCLENNAN |
WACO |
$74,240 |
CS |
STP 1902(128)HES |
08/07/2019 |
11/15/2023 |
HAZARD ELIM & SAFETY |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.($109,680) |
|
6342-36-001 |
MCLENNAN |
WACO |
$812,766 |
US0084 |
RMC - 634236001 |
08/06/2019 |
11/15/2023 |
MBGF, CABLE BARRIER, BRIDGE RAIL REP/INS |
T&L CLEANING SERVICES LLC($971,242) |
|
0055-08-122 |
MCLENNAN |
WACO |
$1,177,268 |
US 84 |
STP 1902(127)HES |
08/06/2019 |
11/15/2023 |
INSTL CABLE MEDIAN BARRIER |
MASSANA CONSTRUCTION INC.($986,493) |
|
0909-22-177 |
MCLENNAN |
WACO |
$970,069 |
CR |
BR 2018(221) |
07/10/2019 |
09/27/2024 |
REPL BR & APPRS |
JAMES CONSTRUCTION GROUP, L.L.C.($999,330) |
|
6341-69-001 |
MCLENNAN |
WACO |
$976,504 |
FM3400 |
RMC - 634169001 |
07/10/2019 |
11/15/2023 |
BASE FAILURE PAVMT REPAIR |
TEXAS MATERIALS GROUP, INC.($1,041,147) |
|
2311-01-041 |
MCLENNAN |
WACO |
$201,314 |
SL 340 |
STP 1902(016)HES |
06/05/2019 |
11/15/2023 |
PROVIDE ADDL PAV WIDT |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.($243,475) |
|
6326-49-001 |
MCLENNAN |
WACO |
$326,593 |
US0084 |
RMC - 632649001 |
05/08/2019 |
11/15/2023 |
DISTRICT WIDE MAINT OF ILLUM |
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC.($287,348) |
|
6342-36-001 |
MCLENNAN |
WACO |
$812,766 |
US0084 |
RMC - 634236001 |
05/08/2019 |
11/15/2023 |
MBGF, CABLE BARRIER, BRIDGE RAIL REP/INS |
VANN/ELLI, INC.($1,355,400) |
|
0833-03-045 |
MCLENNAN |
WACO |
$9,385,341 |
FM 1637 |
STP 2019(842)HES |
05/08/2019 |
11/15/2023 |
SFTY TR FX OBJS |
KNIFE RIVER CORPORATION - SOUTH($9,304,002) |
|
0909-22-176 |
MCLENNAN |
WACO |
$942,046 |
CR |
BR 2018(219) |
04/02/2019 |
11/15/2023 |
REPL BR & APPRS |
KNIFE RIVER CORPORATION - SOUTH($863,438) |
|
0209-01-063 |
MCLENNAN |
WACO |
$856,847 |
SL 2 |
NH 2019(440) |
02/05/2019 |
11/15/2023 |
MILL/OVLY |
TEXAS MATERIALS GROUP, INC.($1,014,137) |
|
1192-01-024 |
MCLENNAN |
WACO |
$6,869,586 |
FM 939 |
STP 2017(936) |
01/09/2019 |
11/15/2023 |
WDN, GR, BS, SURF, ADD SHLDRS |
KNIFE RIVER CORPORATION - SOUTH($6,431,694) |
|
6336-61-001 |
MCLENNAN |
WACO |
$1,543,968 |
US0084 |
RMC - 633661001 |
01/09/2019 |
11/15/2023 |
SPALL & FULL DEPTH CONC REPAIR |
CROSS PLUS CONSTRUCTION, LLC($1,496,038) |
|
6332-42-001 |
MCLENNAN |
WACO |
$117,969 |
SH0006 |
BPM - 633242001 |
12/12/2018 |
11/15/2023 |
BRIDGE PREVENT MAINT |
C.E.S. CONTRACTOR($112,065) |
|
6339-79-001 |
MCLENNAN |
WACO |
$153,058 |
US0084 |
RMC - 633979001 |
12/12/2018 |
11/15/2023 |
MOW AND LITTER PICKUP & DISPOSAL |
T&L CLEANING SERVICES LLC($134,654) |
|
6339-80-001 |
MCLENNAN |
WACO |
$265,110 |
SH0006 |
RMC - 633980001 |
12/12/2018 |
11/15/2023 |
MOW AND LITTER PICKUP AND DISPOSAL |
T&L CLEANING SERVICES LLC($248,748) |
|
0162-01-094 |
MCLENNAN |
WACO |
$93,974 |
US 84 |
STP 2019(311)HES |
12/06/2018 |
11/15/2023 |
IMPRV SGNL |
JAMES CONSTRUCTION GROUP, L.L.C.($85,121) |
|
0015-01-243 |
MCLENNAN |
WACO |
$457,835,185 |
IH 35 |
NH 2019(312) |
12/05/2018 |
11/15/2023 |
WDN, GR, STRS, & SURF |
WEBBER, LLC($447,615,000) |
|
6334-22-001 |
MCLENNAN |
WACO |
$1,836,770 |
FM2416 |
RMC - 633422001 |
11/07/2018 |
11/15/2023 |
SEAL COAT (DISTRICT WIDE) |
BRANNAN PAVING CO., LTD.($2,011,340) |
|
2061-02-030 |
MCLENNAN |
WACO |
$9,350,224 |
FM 2114 |
STP 1802(320) |
10/02/2018 |
11/15/2023 |
REHAB & WDN RDWY |
BIG CREEK CONSTRUCTION, LTD.($9,997,468) |
|
6326-46-001 |
MCLENNAN |
WACO |
$1,284,325 |
SH0006 |
RMC - 632646001 |
10/02/2018 |
11/15/2023 |
DISTRIC WIDE PAVMT MRK |
PMI PAVEMENT MARKING, INC.($1,217,231) |
|
6331-59-001 |
MCLENNAN |
WACO |
$117,838 |
SH0317 |
RMC - 633159001 |
09/27/2018 |
11/15/2023 |
TREE TRIM AND RMVL |
VIKOTA SERVICES LLC($70,500) |
|
0049-01-094 |
MCLENNAN |
WACO |
$970,438 |
SH 6 |
STP 1802(508)HES |
08/08/2018 |
11/15/2023 |
IMPROVE TRAF SIG |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.($1,026,074) |
|
6330-69-001 |
MCLENNAN |
WACO |
$174,874 |
US0084 |
RMC - 633069001 |
07/17/2018 |
11/15/2023 |
CLEANING AND SWEEPING HWYS |
ELITE WASTE & CONSTRUCTION SERVICES LLC($155,342) |
|
2362-01-036 |
MCLENNAN |
WACO |
$1,847,786 |
SL 340 |
C 2362-1-36 |
07/11/2018 |
11/15/2023 |
SEAL & OVERLAY |
KNIFE RIVER CORPORATION - SOUTH($2,101,672) |
|
0014-08-084 |
MCLENNAN |
WACO |
$854,053 |
IH 35 |
C 14-8-84 |
07/10/2018 |
11/15/2023 |
MISC SPOT PAVMT REPAIRS |
OLDCASTLE MATERIALS TEXAS, INC.($810,416) |
|
0909-22-175 |
MCLENNAN |
WACO |
$617,209 |
CR |
BR 1602(214) |
04/04/2018 |
11/15/2023 |
REPL BR & APPRS |
PROJECT ALLIED RESOURCES, LLC($586,253) |
|
0055-08-119 |
MCLENNAN |
WACO |
$5,792,174 |
US 84 |
C 55-8-119 |
04/04/2018 |
11/15/2023 |
MILL/PFC OVLY |
KNIFE RIVER CORPORATION - SOUTH($4,721,563) |
|
6316-23-001 |
MCLENNAN |
WACO |
$305,887 |
FM3051 |
RMC - 631623001 |
04/03/2018 |
11/15/2023 |
ADD LEFT TURN LANE |
KNIFE RIVER CORPORATION - SOUTH($342,755) |
|
0833-03-036 |
MCLENNAN |
WACO |
$13,384,546 |
FM 1637 |
STP 2018(766) |
04/03/2018 |
11/15/2023 |
WDN GR, STRS & SURF |
BIG CREEK CONSTRUCTION, LTD.($11,487,770) |
|
0209-07-045 |
MCLENNAN |
WACO |
$1,052,703 |
FM 933 |
STP 2018(589)HES |
03/07/2018 |
11/15/2023 |
SFTY TR FX OBJ |
TTG UTILITIES, LP($1,033,600) |
|
0049-01-090 |
MCLENNAN |
WACO |
$1,112,890 |
SH 6 |
NH 2018(588) |
03/06/2018 |
11/15/2023 |
UNDERSEAL/LEVELUP/OVERLAY |
OLDCASTLE MATERIALS TEXAS, INC.($720,812) |
|
3330-01-010 |
MCLENNAN |
WACO |
$1,141,780 |
FM 3223 |
STP 2018(559) |
02/02/2018 |
11/15/2023 |
SEAL/OVLY |
KNIFE RIVER CORPORATION - SOUTH($845,728) |
|
0909-00-049 |
MCLENNAN |
WACO |
$2,089,094 |
VA |
STP 2018(546) |
02/02/2018 |
11/15/2023 |
CNSTR CURB RMPS |
TI-ZACK CONCRETE, INC.($1,647,633) |
|
0834-04-024 |
MCLENNAN |
WACO |
$1,332,902 |
FM 308 |
STP 2017(896)HES |
02/02/2018 |
11/15/2023 |
SFTY TR FX OBJS |
CDM HOLDINGS, LLC($1,258,844) |
|
0833-03-049 |
MCLENNAN |
WACO |
$345,970 |
FM 1637 |
STP 2018(545) |
02/01/2018 |
11/15/2023 |
TOM OVLY |
KNIFE RIVER CORPORATION - SOUTH($278,607) |
|
6324-94-001 |
MCLENNAN |
WACO |
$737,952 |
US0084 |
RMC - 632494001 |
02/01/2018 |
11/15/2023 |
MISCELLANEOUS CONC REPAIRS |
DBI SERVICES, LLC($648,174) |
|
0055-08-099 |
MCLENNAN |
WACO |
$27,609,767 |
US 84 |
NH 2018(346) |
02/01/2018 |
11/15/2023 |
GR, STRS & SURF |
BIG CREEK CONSTRUCTION, LTD.($20,587,595) |
|
6312-44-001 |
MCLENNAN |
WACO |
$676,502 |
US0084 |
RMC - 631244001 |
11/03/2017 |
11/15/2023 |
MBGF, CABLE BARRIERS & BRIDGE RAIL/REP/I |
T&L CLEANING SERVICES LLC($772,842) |
|
6320-83-001 |
MCLENNAN |
WACO |
$1,319,605 |
FM3529 |
RMC - 632083001 |
10/03/2017 |
11/15/2023 |
SEAL COAT |
F. N. PLOCH CONSTRUCTION COMPANY, INC.($993,658) |
|
6306-31-001 |
MCLENNAN |
WACO |
$117,480 |
SH0006 |
RMC - 630631001 |
07/18/2017 |
11/15/2023 |
TREE TRIM AND RMVL |
RAFTER JK CONSTRUCTION, LLC($105,038) |
|
6316-07-001 |
MCLENNAN |
WACO |
$1,024,202 |
SH0006 |
RMC - 631607001 |
07/11/2017 |
11/15/2023 |
DISTRICT WIDE PAVMT MRK |
D. I. J. CONSTRUCTION, INC.($748,474) |
|
6312-46-001 |
MCLENNAN |
WACO |
$442,766 |
SH0006 |
BPM - 631246001 |
04/04/2017 |
11/15/2023 |
BRIDGE PREVENT MAINT |
BECK-REIT & SONS, LTD.($322,993) |
|
0049-01-092 |
MCLENNAN |
WACO |
$5,446,397 |
SH 6 |
NH 2017(876) |
03/08/2017 |
11/15/2023 |
MILL/PFC OVLY |
BIG CREEK CONSTRUCTION, LTD.($3,877,223) |
|
0909-22-173 |
MCLENNAN |
WACO |
$375,491 |
CS |
STP 2017(464)HES |
03/07/2017 |
11/15/2023 |
INCR SUPRELV |
BIG CREEK CONSTRUCTION, LTD.($372,721) |
|
2311-01-038 |
MCLENNAN |
WACO |
$182,354 |
FM 3051 |
STP 2017(012)HES |
02/02/2017 |
11/15/2023 |
MILLED CL RUMBLE STRIP |
NEWMAN & KENG PAVING COMPANY, INC.($195,682) |
|
0015-21-012 |
MCLENNAN |
WACO |
$831,210 |
FM 3476 |
STP 2017(463) |
01/05/2017 |
11/15/2023 |
MILL/SEAL/INLAY |
KNIFE RIVER CORPORATION - SOUTH($673,249) |
|
0909-22-174 |
MCLENNAN |
WACO |
$481,594 |
CR |
BR 2016(885) |
01/05/2017 |
11/15/2023 |
REPL BR & APPRS |
ELLIS-MCGINNIS CONSTRUCTION CO.($453,594) |
|
2506-01-036 |
MCLENNAN |
WACO |
$785,287 |
FM 1695 |
STP 2017(465) |
01/05/2017 |
11/15/2023 |
MILL/SEAL/INLAY |
OLDCASTLE MATERIALS TEXAS, INC.($717,979) |
|
0909-22-167 |
MCLENNAN |
WACO |
$812,169 |
CR |
BR 2015(489) |
01/04/2017 |
11/15/2023 |
REPLACE BRIDGE AND APPROACHES |
ELLIS-MCGINNIS CONSTRUCTION CO.($697,710) |
|
6306-28-001 |
MCLENNAN |
WACO |
$234,477 |
SH0006 |
RMC - 630628001 |
11/15/2016 |
11/15/2023 |
STORM SEWER & INLET CLEANING |
H. T. S. CONSTRUCTION ENTERPRISES, INC.($239,902) |
|
4704-01-518 |
MCLENNAN |
WACO |
$450,000 |
4222 161 |
CBC - 470401518 |
11/04/2016 |
11/15/2023 |
RENOVATION OR REPAIR |
TD INDUSTRIES, INC.($448,094) |