|
0567-04-022 |
MCLENNAN |
WACO |
$3,605,169 |
FM 185 |
STP 2021(162)HES |
07/02/2021 |
11/15/2023 |
SAFETY TREAT FIXED OBJECTS, PROVIDE ADDITIONAL PAV |
BIG CREEK CONSTRUCTION, LTD.($3,425,177) |
|
6306-31-001 |
MCLENNAN |
WACO |
$117,480 |
SH0006 |
RMC - 630631001 |
07/18/2017 |
11/15/2023 |
TREE TRIM AND RMVL |
RAFTER JK CONSTRUCTION, LLC($105,038) |
|
6331-59-001 |
MCLENNAN |
WACO |
$117,838 |
SH0317 |
RMC - 633159001 |
09/27/2018 |
11/15/2023 |
TREE TRIM AND RMVL |
VIKOTA SERVICES LLC($70,500) |
|
6339-79-001 |
MCLENNAN |
WACO |
$153,058 |
US0084 |
RMC - 633979001 |
12/12/2018 |
11/15/2023 |
MOW AND LITTER PICKUP & DISPOSAL |
T&L CLEANING SERVICES LLC($134,654) |
|
6332-42-001 |
MCLENNAN |
WACO |
$117,969 |
SH0006 |
BPM - 633242001 |
12/12/2018 |
11/15/2023 |
BRIDGE PREVENT MAINT |
C.E.S. CONTRACTOR($112,065) |
|
6381-63-001 |
MCLENNAN |
WACO |
$107,704 |
SH0006 |
RMC - 638163001 |
07/29/2021 |
11/15/2023 |
TREE TRIM AND BRUSH RMVL |
BA NEWTON'S ENTERPRISES LLC($94,715) |
|
6390-82-001 |
MCLENNAN |
WACO |
$293,000 |
US0084 |
MMC - 639082001 |
10/11/2021 |
11/15/2023 |
HOT MIX |
KNIFE RIVER CORPORATION - SOUTH($285,647) |
|
6385-00-001 |
MCLENNAN |
WACO |
$277,451 |
US0084 |
MMC - 638500001 |
10/11/2021 |
11/15/2023 |
DE-ICING SALT |
SOUTHWEST ENVIROTX PARTNERS, LLC($253,215) |
|
6352-98-001 |
MCLENNAN |
WACO |
$487,975 |
US0084 |
RMC - 635298001 |
12/03/2019 |
11/15/2023 |
URBAN & RURAL MOW, LITTER REM |
CROSS PLUS CONSTRUCTION, LLC($446,521) |
|
6393-19-001 |
MCLENNAN |
WACO |
$166,519 |
US0084 |
RMC - 639319001 |
12/14/2021 |
11/15/2023 |
SWEEPING AND DEBRIS RMVL |
SWEEPING CORPORATION OF AMERICA, INC.($297,584) |
|
6396-93-001 |
MCLENNAN |
WACO |
$283,000 |
US0084 |
MMC - 639693001 |
03/15/2022 |
11/15/2023 |
HOT MIX |
BIG CREEK CONSTRUCTION, LTD.($318,250) |
|
6418-31-001 |
MCLENNAN |
WACO |
$277,550 |
US0084 |
MMC - 641831001 |
08/30/2022 |
11/15/2023 |
EMULSION |
WRIGHT ASPHALT PRODUCTS COMPANY LLC($243,150) |
|
0909-22-167 |
MCLENNAN |
WACO |
$812,169 |
CR |
BR 2015(489) |
01/04/2017 |
11/15/2023 |
REPLACE BRIDGE AND APPROACHES |
ELLIS-MCGINNIS CONSTRUCTION CO.($697,710) |
|
0909-22-174 |
MCLENNAN |
WACO |
$481,594 |
CR |
BR 2016(885) |
01/05/2017 |
11/15/2023 |
REPL BR & APPRS |
ELLIS-MCGINNIS CONSTRUCTION CO.($453,594) |
|
0015-21-012 |
MCLENNAN |
WACO |
$831,210 |
FM 3476 |
STP 2017(463) |
01/05/2017 |
11/15/2023 |
MILL/SEAL/INLAY |
KNIFE RIVER CORPORATION - SOUTH($673,249) |
|
2506-01-036 |
MCLENNAN |
WACO |
$785,287 |
FM 1695 |
STP 2017(465) |
01/05/2017 |
11/15/2023 |
MILL/SEAL/INLAY |
OLDCASTLE MATERIALS TEXAS, INC.($717,979) |
|
0909-22-173 |
MCLENNAN |
WACO |
$375,491 |
CS |
STP 2017(464)HES |
03/07/2017 |
11/15/2023 |
INCR SUPRELV |
BIG CREEK CONSTRUCTION, LTD.($372,721) |
|
0049-01-092 |
MCLENNAN |
WACO |
$5,446,397 |
SH 6 |
NH 2017(876) |
03/08/2017 |
11/15/2023 |
MILL/PFC OVLY |
BIG CREEK CONSTRUCTION, LTD.($3,877,223) |
|
0055-08-099 |
MCLENNAN |
WACO |
$27,609,767 |
US 84 |
NH 2018(346) |
02/01/2018 |
11/15/2023 |
GR, STRS & SURF |
BIG CREEK CONSTRUCTION, LTD.($20,587,595) |
|
0833-03-049 |
MCLENNAN |
WACO |
$345,970 |
FM 1637 |
STP 2018(545) |
02/01/2018 |
11/15/2023 |
TOM OVLY |
KNIFE RIVER CORPORATION - SOUTH($278,607) |
|
0834-04-024 |
MCLENNAN |
WACO |
$1,332,902 |
FM 308 |
STP 2017(896)HES |
02/02/2018 |
11/15/2023 |
SFTY TR FX OBJS |
CDM HOLDINGS, LLC($1,258,844) |
|
3330-01-010 |
MCLENNAN |
WACO |
$1,141,780 |
FM 3223 |
STP 2018(559) |
02/02/2018 |
11/15/2023 |
SEAL/OVLY |
KNIFE RIVER CORPORATION - SOUTH($845,728) |
|
0909-00-049 |
MCLENNAN |
WACO |
$2,089,094 |
VA |
STP 2018(546) |
02/02/2018 |
11/15/2023 |
CNSTR CURB RMPS |
TI-ZACK CONCRETE, INC.($1,647,633) |
|
0209-07-045 |
MCLENNAN |
WACO |
$1,052,703 |
FM 933 |
STP 2018(589)HES |
03/07/2018 |
11/15/2023 |
SFTY TR FX OBJ |
TTG UTILITIES, LP($1,033,600) |
|
0833-03-036 |
MCLENNAN |
WACO |
$13,384,546 |
FM 1637 |
STP 2018(766) |
04/03/2018 |
11/15/2023 |
WDN GR, STRS & SURF |
BIG CREEK CONSTRUCTION, LTD.($11,487,770) |
|
0909-22-175 |
MCLENNAN |
WACO |
$617,209 |
CR |
BR 1602(214) |
04/04/2018 |
11/15/2023 |
REPL BR & APPRS |
PROJECT ALLIED RESOURCES, LLC($586,253) |
|
0014-08-084 |
MCLENNAN |
WACO |
$854,053 |
IH 35 |
C 14-8-84 |
07/10/2018 |
11/15/2023 |
MISC SPOT PAVMT REPAIRS |
OLDCASTLE MATERIALS TEXAS, INC.($810,416) |
|
2362-01-036 |
MCLENNAN |
WACO |
$1,847,786 |
SL 340 |
C 2362-1-36 |
07/11/2018 |
11/15/2023 |
SEAL & OVERLAY |
KNIFE RIVER CORPORATION - SOUTH($2,101,672) |
|
2061-02-030 |
MCLENNAN |
WACO |
$9,350,224 |
FM 2114 |
STP 1802(320) |
10/02/2018 |
11/15/2023 |
REHAB & WDN RDWY |
BIG CREEK CONSTRUCTION, LTD.($9,997,468) |
|
0015-01-243 |
MCLENNAN |
WACO |
$457,835,185 |
IH 35 |
NH 2019(312) |
12/05/2018 |
11/15/2023 |
WDN, GR, STRS, & SURF |
WEBBER, LLC($447,615,000) |
|
1192-01-024 |
MCLENNAN |
WACO |
$6,869,586 |
FM 939 |
STP 2017(936) |
01/09/2019 |
11/15/2023 |
WDN, GR, BS, SURF, ADD SHLDRS |
KNIFE RIVER CORPORATION - SOUTH($6,431,694) |
|
0209-01-063 |
MCLENNAN |
WACO |
$856,847 |
SL 2 |
NH 2019(440) |
02/05/2019 |
11/15/2023 |
MILL/OVLY |
TEXAS MATERIALS GROUP, INC.($1,014,137) |
|
0909-22-176 |
MCLENNAN |
WACO |
$942,046 |
CR |
BR 2018(219) |
04/02/2019 |
11/15/2023 |
REPL BR & APPRS |
KNIFE RIVER CORPORATION - SOUTH($863,438) |
|
0833-03-045 |
MCLENNAN |
WACO |
$9,385,341 |
FM 1637 |
STP 2019(842)HES |
05/08/2019 |
11/15/2023 |
SFTY TR FX OBJS |
KNIFE RIVER CORPORATION - SOUTH($9,304,002) |
|
0055-08-122 |
MCLENNAN |
WACO |
$1,177,268 |
US 84 |
STP 1902(127)HES |
08/06/2019 |
11/15/2023 |
INSTL CABLE MEDIAN BARRIER |
MASSANA CONSTRUCTION INC.($986,493) |
|
0909-22-183 |
MCLENNAN |
WACO |
$74,240 |
CS |
STP 1902(128)HES |
08/07/2019 |
11/15/2023 |
HAZARD ELIM & SAFETY |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.($109,680) |
|
1187-02-018 |
MCLENNAN |
WACO |
$671,088 |
FM 938 |
BR 2020(397) |
12/04/2019 |
11/15/2023 |
REPL BR & APPRS |
KNIFE RIVER CORPORATION - SOUTH($663,130) |
|
2506-01-042 |
MCLENNAN |
WACO |
$707,722 |
FM 1695 |
STP 2020(743) |
04/09/2020 |
11/15/2023 |
CONSTRUCTION OF PEDESTRIAN, SIDEWALKS & CURB RAMPS |
TI-ZACK CONCRETE, INC.($862,612) |
|
0014-08-088 |
MCLENNAN |
WACO |
$379,257 |
IH 35 |
NH 2B20(068) |
08/05/2020 |
11/15/2023 |
INSTLING SIG AND FLASHING BEACONS. |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.($323,521) |
|
6431-38-001 |
MCLENNAN |
WACO |
$1,047,750 |
US0084 |
MMC - 643138001 |
03/07/2023 |
11/15/2023 |
HOT MIX |
KNIFE RIVER CORPORATION - SOUTH($957,300) |
|
6432-14-001 |
MCLENNAN |
WACO |
$1,315,571 |
FM3148 |
RMC - 643214001 |
03/08/2023 |
11/15/2023 |
BASE FAILURE PAVMT REPAIR |
TEXAS MATERIALS GROUP, INC.($1,115,329) |
|
6427-15-001 |
MCLENNAN |
WACO |
$1,242,131 |
US0084 |
RMC - 642715001 |
05/04/2023 |
11/15/2023 |
CONC SPALL REPAIR |
ROY JORGENSEN ASSOCIATES, INC.($1,892,905) |
|
6444-36-001 |
MCLENNAN |
WACO |
$141,955 |
FM0185 |
RMC - 644436001 |
06/27/2023 |
11/15/2023 |
TREE TRIM |
BA NEWTON'S ENTERPRISES LLC($94,250) |
|
6445-98-001 |
MCLENNAN |
WACO |
$180,863 |
FM2957 |
RMC - 644598001 |
08/03/2023 |
11/15/2023 |
CULVERT CLEANING |
SHALOM SERVICES CORPORATION($199,083) |
|
6443-82-001 |
MCLENNAN |
WACO |
$1,901,250 |
US0084 |
MMC - 644382001 |
08/03/2023 |
11/15/2023 |
HOT MIX |
TEXAS MATERIALS GROUP, INC.($1,771,123) |
|
6445-96-001 |
MCLENNAN |
WACO |
$804,155 |
FM3148 |
RMC - 644596001 |
09/06/2023 |
11/15/2023 |
CRACK SEAL |
CRACKSEAL OF TEXAS, LLC($889,792) |
|
6455-39-001 |
MCLENNAN |
WACO |
$1,165,923 |
US0077 |
RMC - 645539001 |
11/01/2023 |
11/15/2023 |
MOW HWY RIGHT OF WAY |
T&L CLEANING SERVICES LLC($961,360) |
|
6393-10-001 |
MCLENNAN |
WACO |
$963,714 |
US0084 |
RMC - 639310001 |
11/02/2023 |
11/15/2023 |
ILLUM MAINT |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.($992,173) |
|
0049-01-090 |
MCLENNAN |
WACO |
$1,112,890 |
SH 6 |
NH 2018(588) |
03/06/2018 |
11/15/2023 |
UNDERSEAL/LEVELUP/OVERLAY |
OLDCASTLE MATERIALS TEXAS, INC.($720,812) |
|
0055-08-119 |
MCLENNAN |
WACO |
$5,792,174 |
US 84 |
C 55-8-119 |
04/04/2018 |
11/15/2023 |
MILL/PFC OVLY |
KNIFE RIVER CORPORATION - SOUTH($4,721,563) |
|
2311-01-041 |
MCLENNAN |
WACO |
$201,314 |
SL 340 |
STP 1902(016)HES |
06/05/2019 |
11/15/2023 |
PROVIDE ADDL PAV WIDT |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.($243,475) |
|
0258-10-047 |
MCLENNAN |
WACO |
$943,707 |
SL 396 |
STP 2020(190) |
11/05/2019 |
11/15/2023 |
IMPROVE TRAF SIG |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.($829,994) |
|
0049-01-099 |
MCLENNAN |
WACO |
$9,043,757 |
SH 6 |
STP 2B20(186)HES |
08/05/2020 |
11/15/2023 |
HAZZARD ELIM AND SAFETY |
MASSANA, INC.($6,830,728) |
|
0055-07-062 |
MCLENNAN |
WACO |
$2,057,976 |
US 84 |
F 2021(407) |
03/04/2021 |
11/15/2023 |
UPGRADE MBGF |
TALBRAN ENTERPRISES LLC($1,857,025) |
|
0833-03-051 |
MCLENNAN |
WACO |
$174,957 |
FM 1637 |
STP 2021(785)HES |
08/05/2021 |
11/15/2023 |
INSTL TRAF SIGNAL AND CURB RAMPS |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.($206,817) |
|
6330-69-001 |
MCLENNAN |
WACO |
$174,874 |
US0084 |
RMC - 633069001 |
07/17/2018 |
11/15/2023 |
CLEANING AND SWEEPING HWYS |
ELITE WASTE & CONSTRUCTION SERVICES LLC($155,342) |
|
6339-80-001 |
MCLENNAN |
WACO |
$265,110 |
SH0006 |
RMC - 633980001 |
12/12/2018 |
11/15/2023 |
MOW AND LITTER PICKUP AND DISPOSAL |
T&L CLEANING SERVICES LLC($248,748) |
|
6433-92-001 |
MCLENNAN |
WACO |
$1,400,410 |
IH0035 |
RMC - 643392001 |
11/02/2023 |
11/15/2023 |
INSTL OF TRAF SIG |
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, LLC($1,412,637) |
|
6396-77-001 |
MCLENNAN |
WACO |
$288,166 |
SH0006 |
RMC - 639677001 |
03/08/2022 |
11/15/2023 |
MISCELLANEOUS CONC REPAIR |
CROSS PLUS CONSTRUCTION, LLC($369,927) |
|
0049-01-094 |
MCLENNAN |
WACO |
$970,438 |
SH 6 |
STP 1802(508)HES |
08/08/2018 |
11/15/2023 |
IMPROVE TRAF SIG |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.($1,026,074) |
|
0162-01-094 |
MCLENNAN |
WACO |
$93,974 |
US 84 |
STP 2019(311)HES |
12/06/2018 |
11/15/2023 |
IMPRV SGNL |
JAMES CONSTRUCTION GROUP, L.L.C.($85,121) |
|
0162-01-098 |
MCLENNAN |
WACO |
$3,874,162 |
SH 31 |
STP 2B20(188)HES |
08/05/2020 |
11/15/2023 |
INSTL CABLE MEDIAN BARRIER AND UPGRADE MBGF |
MASSANA, INC.($3,044,240) |
|
3521-01-022 |
MCLENNAN |
WACO |
$304,408 |
FM 2837 |
STP 2022(411)HES |
03/04/2022 |
11/15/2023 |
TRAF SIGNAL IMPRVS |
FLORIDA TRAFFIC CONTROL DEVICES, INC.($290,913) |
|
4704-01-518 |
MCLENNAN |
WACO |
$450,000 |
4222 161 |
CBC - 470401518 |
11/04/2016 |
11/15/2023 |
RENOVATION OR REPAIR |
TD INDUSTRIES, INC.($448,094) |
|
6312-46-001 |
MCLENNAN |
WACO |
$442,766 |
SH0006 |
BPM - 631246001 |
04/04/2017 |
11/15/2023 |
BRIDGE PREVENT MAINT |
BECK-REIT & SONS, LTD.($322,993) |
|
6326-46-001 |
MCLENNAN |
WACO |
$1,284,325 |
SH0006 |
RMC - 632646001 |
10/02/2018 |
11/15/2023 |
DISTRIC WIDE PAVMT MRK |
PMI PAVEMENT MARKING, INC.($1,217,231) |
|
6334-22-001 |
MCLENNAN |
WACO |
$1,836,770 |
FM2416 |
RMC - 633422001 |
11/07/2018 |
11/15/2023 |
SEAL COAT (DISTRICT WIDE) |
BRANNAN PAVING CO., LTD.($2,011,340) |
|
6336-61-001 |
MCLENNAN |
WACO |
$1,543,968 |
US0084 |
RMC - 633661001 |
01/09/2019 |
11/15/2023 |
SPALL & FULL DEPTH CONC REPAIR |
CROSS PLUS CONSTRUCTION, LLC($1,496,038) |
|
6342-36-001 |
MCLENNAN |
WACO |
$812,766 |
US0084 |
RMC - 634236001 |
05/08/2019 |
11/15/2023 |
MBGF, CABLE BARRIER, BRIDGE RAIL REP/INS |
VANN/ELLI, INC.($1,355,400) |
|
0909-22-195 |
MCLENNAN |
WACO |
$280,880 |
VA |
STP 2023(338)HESG |
01/05/2023 |
11/15/2023 |
INSTL REFL BACKPLATES |
THIRD COAST SERVICES LLC($258,695) |
|
6341-69-001 |
MCLENNAN |
WACO |
$976,504 |
FM3400 |
RMC - 634169001 |
07/10/2019 |
11/15/2023 |
BASE FAILURE PAVMT REPAIR |
TEXAS MATERIALS GROUP, INC.($1,041,147) |
|
6362-78-001 |
MCLENNAN |
WACO |
$248,991 |
FM0185 |
RMC - 636278001 |
07/09/2020 |
11/15/2023 |
TREE TRIM, BRUSH, DRIFTWOOD & DEBRIS REM |
CEN-TEX IRRIGATION SYSTEMS, INC.($206,653) |
|
6363-17-001 |
MCLENNAN |
WACO |
$1,037,964 |
US0084 |
MMC - 636317001 |
08/06/2020 |
11/15/2023 |
FLBS,AGGR-SURF TREAT,CTB & RR ROCK-MATERIAL ONLY |
BIG CREEK CONSTRUCTION, LTD.($787,158) |
|
6369-33-001 |
MCLENNAN |
WACO |
$1,555,000 |
US0084 |
MMC - 636933001 |
11/05/2020 |
11/15/2023 |
HOT MIX - MATERIAL ONLY |
BIG CREEK CONSTRUCTION, LTD.($1,187,500) |
|
6384-97-001 |
MCLENNAN |
WACO |
$1,309,768 |
US0084 |
MMC - 638497001 |
08/04/2021 |
11/15/2023 |
FLEXIBLE BASE MATERIAL ONLY |
DIGG COMMERCIAL, LLC($1,077,561) |
|
6399-55-001 |
MCLENNAN |
WACO |
$1,284,554 |
SH0006 |
RMC - 639955001 |
05/04/2022 |
11/15/2023 |
BASE FAILURE PAVMT REPAIR |
KNIFE RIVER CORPORATION - SOUTH($991,979) |
|
6418-45-001 |
MCLENNAN |
WACO |
$1,889,826 |
US0084 |
MMC - 641845001 |
12/02/2022 |
11/15/2023 |
FLEXIBLE BASE |
TOUCHSTONE RESOURCES, LLC($1,237,214) |
|
6425-50-001 |
MCLENNAN |
WACO |
$1,117,500 |
US0084 |
MMC - 642550001 |
12/02/2022 |
11/15/2023 |
HOT MIX |
KNIFE RIVER CORPORATION - SOUTH($1,016,415) |
|
6379-48-001 |
MCLENNAN |
WACO |
$34,944 |
SH0317 |
RMC - 637948001 |
10/05/2023 |
11/15/2023 |
REFL PAVMT MRK (LONG LINE) |
TRP CONSTRUCTION GROUP, LLC($41,110) |
|
0015-01-256 |
MCLENNAN |
WACO |
$227,405 |
IH 35 |
STP 2B23(077)HES |
08/02/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.($341,697) |
|
2311-01-038 |
MCLENNAN |
WACO |
$182,354 |
FM 3051 |
STP 2017(012)HES |
02/02/2017 |
11/15/2023 |
MILLED CL RUMBLE STRIP |
NEWMAN & KENG PAVING COMPANY, INC.($195,682) |
|
0049-01-101 |
MCLENNAN |
WACO |
$950,705 |
SL 484 |
F 2024(113) |
10/05/2023 |
11/15/2023 |
HWY IMPRV |
SCOUT 5 CONSTRUCTION LLC($850,998) |
|
0909-00-089 |
MCLENNAN |
WACO |
$3,582,439 |
VA |
F 2B23(177) |
08/03/2023 |
11/15/2023 |
MAINT & OPERATIONS PROJECT |
D. I. J. CONSTRUCTION, INC.($2,409,826) |
|
6342-36-001 |
MCLENNAN |
WACO |
$812,766 |
US0084 |
RMC - 634236001 |
08/06/2019 |
11/15/2023 |
MBGF, CABLE BARRIER, BRIDGE RAIL REP/INS |
T&L CLEANING SERVICES LLC($971,242) |
|
0909-22-180 |
MCLENNAN |
WACO |
$468,265 |
FD |
BR 1802(502) |
04/07/2021 |
11/15/2023 |
REPLACE BRIDGE AND APPROACHES |
HODGES AND SON CONSTRUCTION COMPANY, INC.($458,027) |
|
0055-15-072 |
MCLENNAN |
WACO |
$10,621,678 |
US 84 |
F 2021(567) |
05/06/2021 |
11/15/2023 |
INTERS AND PEDESTRIAN IMPRVS |
CROSS PLUS CONSTRUCTION, LLC($9,930,694) |
|
6357-29-001 |
MCLENNAN |
WACO |
$258,390 |
US0077 |
RMC - 635729001 |
04/09/2020 |
11/15/2023 |
NON-SITE SPEC SPALL & FULL DEPTH REPAIR |
CROSS PLUS CONSTRUCTION, LLC($221,600) |
|
0209-01-068 |
MCLENNAN |
WACO |
$2,043,512 |
SL 2 |
C 209-1-68 |
07/01/2021 |
11/15/2023 |
CONSTRUCT PEDESTRIAN INFRASTRUCT |
PROJECT ALLIED RESOURCES, LLC($1,886,101) |
|
6306-28-001 |
MCLENNAN |
WACO |
$234,477 |
SH0006 |
RMC - 630628001 |
11/15/2016 |
11/15/2023 |
STORM SEWER & INLET CLEANING |
H. T. S. CONSTRUCTION ENTERPRISES, INC.($239,902) |
|
0162-01-097 |
MCLENNAN |
WACO |
$11,439,533 |
SH 31 |
C 162-1-97 |
08/04/2021 |
11/15/2023 |
CONSTRUCT NEW OVERPASS AND APPROACHES |
WEBBER, LLC($11,321,680) |
|
0258-09-142 |
MCLENNAN |
WACO |
$61,351,329 |
SH 6 |
F 2021(943) |
08/05/2021 |
11/15/2023 |
CONSTRUCT RAMPS |
WEBBER, LLC($62,594,543) |
|
0209-01-073 |
MCLENNAN |
WACO |
$2,043,512 |
SL 2 |
C 209-1-73 |
12/01/2021 |
11/15/2023 |
CONSTRUCT PEDESTRIAN INFRASTRUCT |
CROSS PLUS CONSTRUCTION, LLC($2,132,686) |
|
0258-08-037 |
MCLENNAN |
WACO |
$881,233 |
SH 6 |
STP 2022(264)HES |
01/07/2022 |
11/15/2023 |
SAFETY LIGHTING |
SOUTH TEXAS ILLUMINATION, LLC($770,035) |
|
2060-01-037 |
MCLENNAN |
WACO |
$15,388,383 |
FM 2113 |
F 2021(489) |
01/07/2022 |
11/15/2023 |
WIDEN PAVMT AND ADD CURB & GUTTER |
BIG CREEK CONSTRUCTION, LTD.($15,387,558) |
|
0055-15-067 |
MCLENNAN |
WACO |
$1,625,087 |
US 84 |
F 2022(427) |
03/04/2022 |
11/15/2023 |
CAM AND TOM OVERLAY |
KNIFE RIVER CORPORATION - SOUTH($2,174,993) |
|
0909-00-051 |
MCLENNAN |
WACO |
$480,706 |
VA |
STP 2022(792)HES |
08/03/2022 |
11/15/2023 |
INTERS IMPRV |
VACA UNDERGROUND UTILITIES INC($454,340) |
|
0015-01-252 |
MCLENNAN |
WACO |
$791,881 |
IH 35 |
STP 2022(885)HES |
08/04/2022 |
11/15/2023 |
RESURF ROADWAY |
PINNACLE GRINDING AND GROOVING LLC($1,097,170) |
|
0831-01-019 |
MCLENNAN |
WACO |
$4,388,482 |
FM 939 |
F 2022(696) |
09/07/2022 |
11/15/2023 |
REHAB AND WIDEN ROADWAY |
KNIFE RIVER CORPORATION - SOUTH($4,553,672) |
|
0909-00-062 |
MCLENNAN |
WACO |
$3,831,954 |
VA |
C 909-00-62 |
11/03/2022 |
11/15/2023 |
BRIDGE MAINT |
SCR CIVIL CONSTRUCTION, LLC($3,216,349) |
|
0909-00-067 |
MCLENNAN |
WACO |
$2,284,322 |
VA |
C 909-00-67 |
01/06/2023 |
11/15/2023 |
INSTL OF RUMBLE STRIPS |
CENTERLINE TECHNOLOGIES, LLC($1,849,403) |