0901-29-102 |
LAMAR |
PARIS |
$593,538 |
VA |
C 901-29-102 |
12/06/2023 |
11/15/2023 |
PREVENT MAINT |
12TWELVE ROAD AND BRIDGE LLC($297,263) |
|
0045-09-101 |
LAMAR |
PARIS |
$1,177,038 |
US 82 |
STP 2019(939)HES |
05/08/2019 |
11/15/2023 |
SAFETY RELATED PROJECT - HSIP |
3LW CIVIL LLC($1,229,692) |
|
0435-01-073 |
LAMAR |
PARIS |
$2,235,988 |
FM 38 |
STP 2018(511) |
02/01/2018 |
11/15/2023 |
REHAB OF EXIST ROAD |
A. K. GILLIS & SONS, INC.($2,447,925) |
|
2657-01-031 |
LAMAR |
PARIS |
$4,717,429 |
FM 2648 |
C 2657-1-31 |
07/11/2018 |
11/15/2023 |
REHAB OF EXIST ROAD |
A. K. GILLIS & SONS, INC.($4,044,599) |
|
0688-03-028 |
LAMAR |
PARIS |
$4,021,068 |
FM 1497 |
F 2023(861) |
06/01/2023 |
11/27/2023 |
REHAB EXIST ROADWAY |
A. K. GILLIS & SONS, LLC($3,887,747) |
|
0221-01-084 |
LAMAR |
PARIS |
$2,399,103 |
US 271 |
F 2024(065) |
09/06/2023 |
11/15/2023 |
MAINT & OPERATIONS PROJECT |
A. L. HELMCAMP, INC.($2,221,279) |
|
6330-89-001 |
LAMAR |
PARIS |
$173,150 |
US0082 |
RMC - 633089001 |
06/21/2018 |
11/15/2023 |
ON CALL DITCH AND CULVERT CLEANING |
ANCHOR CONTRACTING, LLC($191,950) |
|
6353-23-001 |
LAMAR |
PARIS |
$180,750 |
US0082 |
RMC - 635323001 |
02/13/2020 |
09/26/2024 |
ON CALL DRAINAGE IMPRV |
ANCHOR CONTRACTING, LLC($199,512) |
|
6379-58-001 |
LAMAR |
PARIS |
$3,240,274 |
US0082 |
RMC - 637958001 |
06/03/2021 |
11/15/2023 |
TRAF CONTROL SERVICES |
AREA WIDE PROTECTIVE, INC.($3,869,574) |
|
6345-63-001 |
LAMAR |
PARIS |
$3,240,274 |
US0082 |
RMC - 634563001 |
07/09/2019 |
11/15/2023 |
ON CALL TRAF CONTROL SERVICES |
AREA WIDE PROTECTIVE, INC.($2,865,010) |
|
6330-97-001 |
LAMAR |
PARIS |
$3,240,274 |
US0082 |
RMC - 633097001 |
07/10/2018 |
11/15/2023 |
ON CALL TRAF CONTROL SERVICES |
AREA WIDE PROTECTIVE, INC.($2,626,187) |
|
6393-40-001 |
LAMAR |
PARIS |
$1,095,500 |
US0082 |
RMC - 639340001 |
06/30/2022 |
11/15/2023 |
TRAF CONTROL SERVICES |
AREA WIDE PROTECTIVE, INC.($1,236,500) |
|
6468-62-001 |
LAMAR |
PARIS |
$2,314,000 |
US0082 |
RMC - 646862001 |
08/02/2024 |
06/24/2024 |
TRAF CONTROL SERVICES |
AWP SAFETY($1,542,915) |
|
0045-15-012 |
LAMAR |
PARIS |
$2,561,241 |
FM 1510 |
STP 2020(394) |
12/03/2019 |
11/15/2023 |
SEAL COAT |
BRANNAN PAVING CO., LTD.($2,390,010) |
|
6351-57-001 |
LAMAR |
PARIS |
$494,080 |
US0082 |
RMC - 635157001 |
01/10/2020 |
11/15/2023 |
ON CALL RAISED PAVMT MARKERS |
BRYDL CONTRACTING, INC.($352,812) |
|
6323-58-001 |
LAMAR |
PARIS |
$433,825 |
US0082 |
RMC - 632358001 |
12/05/2017 |
11/15/2023 |
ON CALL RAISED PAVMT MARKERS |
BRYDL CONTRACTING, INC.($334,862) |
|
6353-22-001 |
LAMAR |
PARIS |
$223,325 |
US0082 |
RMC - 635322001 |
01/16/2020 |
11/15/2023 |
ON CALL TREE TRIM & RMVL |
BRYDL CONTRACTING, INC.($258,677) |
|
6381-35-001 |
LAMAR |
PARIS |
$510,580 |
US0082 |
RMC - 638135001 |
07/02/2021 |
11/15/2023 |
RAISED PAVMT MARKERS |
BRYDL CONTRACTING, INC.($403,212) |
|
6445-37-001 |
LAMAR |
PARIS |
$515,750 |
US0082 |
RMC - 644537001 |
12/05/2023 |
11/15/2023 |
RAISED PAVMT MARKERS |
BRYDL CONTRACTING, LLC($536,512) |
|
6388-89-001 |
LAMAR |
PARIS |
$249,820 |
US0082 |
RMC - 638889001 |
11/18/2021 |
11/15/2023 |
METAL BEAM GUARD FENCE REPAIR |
CATOCON, INC.($293,820) |
|
6443-14-001 |
LAMAR |
PARIS |
$288,625 |
US0082 |
RMC - 644314001 |
08/17/2023 |
11/15/2023 |
METAL BEAM GUARD FENCE REPAIR |
CATOCON, INC.($218,478) |
|
6423-58-001 |
LAMAR |
PARIS |
$250,550 |
US0082 |
RMC - 642358001 |
01/12/2023 |
11/15/2023 |
TREE RMVL |
CATOCON, INC.($244,317) |
|
6346-77-001 |
LAMAR |
PARIS |
$230,735 |
US0082 |
RMC - 634677001 |
11/14/2019 |
11/15/2023 |
ON CALL METAL BEAM GUARD FENCE REPAIR |
CATOCON, INC.($303,516) |
|
6323-69-001 |
LAMAR |
PARIS |
$207,925 |
US0082 |
RMC - 632369001 |
01/18/2018 |
11/15/2023 |
ON CALL TREE TRIM/RMVL |
CATOCON, INC.($146,082) |
|
0901-00-055 |
LAMAR |
PARIS |
$2,448,232 |
VA |
C 901-0-55 |
01/08/2019 |
11/15/2023 |
REPLACE CHEVRONS AND CURVE SIGNS |
CDM HOLDINGS, LLC($1,962,838) |
|
6318-94-001 |
LAMAR |
PARIS |
$305,386 |
US0082 |
RMC - 631894001 |
08/09/2017 |
11/15/2023 |
CRACK SEAL |
CHAMPION INFRASTRUCTURE, LLC($243,225) |
|
0769-02-033 |
LAMAR |
PARIS |
$2,691,911 |
FM 906 |
STP 2020(940) |
07/08/2020 |
11/15/2023 |
REHAB EXIST ROADWAY |
D. L. LENNON INCORPORATED - CONTRACTOR($2,265,146) |
|
1690-01-135 |
LAMAR |
PARIS |
$869,590 |
US 82 |
STP 2022(550)HES |
06/01/2022 |
09/03/2024 |
HAZARD ELIM & SAFETY |
D. L. LENNON INCORPORATED - CONTRACTOR($828,915) |
|
6341-83-001 |
LAMAR |
PARIS |
$1,945,185 |
FM1497 |
RMC - 634183001 |
04/02/2019 |
11/15/2023 |
FLEXIBLE PAVMT STRUCT REPAIR |
D. L. LENNON INCORPORATED - CONTRACTOR($1,477,458) |
|
6333-01-001 |
LAMAR |
PARIS |
$326,530 |
US0082 |
RMC - 633301001 |
08/08/2018 |
11/15/2023 |
CRACK SEAL |
D & M CONTRACTORS, LLC($219,140) |
|
6412-93-001 |
LAMAR |
PARIS |
$219,101 |
FM0195 |
RMC - 641293001 |
09/15/2022 |
09/24/2024 |
CRACK SEAL |
D & M CONTRACTORS, LLC($160,683) |
|
6346-70-001 |
LAMAR |
PARIS |
$258,988 |
FM0079 |
RMC - 634670001 |
08/15/2019 |
11/15/2023 |
CRACK SEAL |
D & M CONTRACTORS, LLC($223,846) |
|
6392-19-001 |
LAMAR |
PARIS |
$219,750 |
US0082 |
RMC - 639219001 |
01/20/2022 |
09/24/2024 |
DITCH CLEANING AND RESHAPING |
EASTGATE SERVICES($182,512) |
|
1690-01-120 |
LAMAR |
PARIS |
$286,674 |
US 271 |
STP 2019(943)HES |
05/08/2019 |
11/15/2023 |
SAFETY RELATED PROJECT - HSIP |
EAST TEXAS BRIDGE, INC.($375,116) |
|
0901-29-087 |
LAMAR |
PARIS |
$631,964 |
VA |
STP 2017(413)TAPS |
09/07/2017 |
11/15/2023 |
CONSTRUCT SHARED USE PATH |
ENCINO LANDSCAPE, INC.($679,839) |
|
6463-20-001 |
LAMAR |
PARIS |
$546,550 |
US0271 |
MMC - 646320001 |
03/05/2024 |
01/24/2024 |
ASPH OIL & EMULSION |
ERGON ASPHALT & EMULSIONS, INC.($512,150) |
|
6376-56-001 |
LAMAR |
PARIS |
$243,700 |
US0271 |
MMC - 637656001 |
03/23/2021 |
11/15/2023 |
ASPH |
ERGON ASPHALT & EMULSIONS, INC.($223,810) |
|
6359-72-001 |
LAMAR |
PARIS |
$247,200 |
BU0271B |
MMC - 635972001 |
04/16/2020 |
11/15/2023 |
ASPH, OIL & EMULSIONS - MATERIALS ONLY |
ERGON ASPHALT & EMULSIONS, INC.($226,150) |
|
6432-34-001 |
LAMAR |
PARIS |
$546,550 |
US0271 |
MMC - 643234001 |
03/07/2023 |
11/15/2023 |
EMULSION |
ERGON ASPHALT & EMULSIONS, INC.($536,790) |
|
6395-57-001 |
LAMAR |
PARIS |
$265,600 |
US0271 |
MMC - 639557001 |
02/17/2022 |
11/15/2023 |
ASPH, OIL & EMULSION |
ERGON ASPHALT & EMULSIONS, INC.($270,710) |
|
0045-08-038 |
LAMAR |
PARIS |
$167,971 |
US 82 |
STP 2018(808)HES |
05/01/2018 |
11/15/2023 |
SAFETY RELATED PROJECT - HSIP |
FNH CONSTRUCTION, LLC($311,966) |
|
0769-01-028 |
LAMAR |
PARIS |
$2,758,638 |
FM 197 |
STP 2018(512) |
02/02/2018 |
11/15/2023 |
REHAB OF EXIST ROAD |
FRITCHER CONSTRUCTION SERVICES($2,376,096) |
|
6331-37-001 |
LAMAR |
PARIS |
$617,160 |
FM0137 |
RMC - 633137001 |
07/11/2018 |
11/15/2023 |
ABUTMENT EROSION REPAIR |
HARTBEAT CONSTRUCTION($587,100) |
|
0045-11-044 |
LAMAR |
PARIS |
$2,228,125 |
US 82 |
STP 2023(236)HES |
12/02/2022 |
09/24/2024 |
HAZARD ELIM & SAFETY |
H. H. HOWARD & SONS, INC.($1,751,101) |
|
0901-29-092 |
LAMAR |
PARIS |
$1,402,853 |
CR |
BR 2022(837) |
06/01/2023 |
11/27/2023 |
BRIDGE REPL |
HIGHWAY 19 CONSTRUCTION LLC($1,489,928) |
|
0435-01-079 |
LAMAR |
PARIS |
$1,027,742 |
FM 137 |
BR 2019(942) |
05/07/2019 |
11/15/2023 |
BRIDGE REPL |
HIGHWAY 19 CONSTRUCTION LLC($1,008,565) |
|
0901-29-081 |
LAMAR |
PARIS |
$767,029 |
CR |
BR 1402(210) |
08/06/2019 |
11/15/2023 |
BRIDGE REPL |
HIGHWAY 19 CONSTRUCTION LLC($777,277) |
|
0901-29-094 |
LAMAR |
PARIS |
$453,962 |
CS |
BR 2B20(161) |
07/01/2021 |
11/15/2023 |
REHAB BRIDGE |
HIGHWAY 19 CONSTRUCTION LLC($499,929) |
|
0901-00-056 |
LAMAR |
PARIS |
$2,467,501 |
VA |
F 2021(794) |
08/05/2021 |
11/15/2023 |
CONSTRUCT PEDESTRIAN INFRASTRUCT |
HIGHWAY 19 CONSTRUCTION LLC($2,201,904) |
|
1452-01-018 |
LAMAR |
PARIS |
$1,863,498 |
FM 1507 |
STP 2023(479)HES |
02/02/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
HIGHWAY 19 CONSTRUCTION LLC($1,480,238) |
|
1690-01-127 |
LAMAR |
PARIS |
$3,115,201 |
US 82 |
STP 2021(612)HES |
06/04/2021 |
11/15/2023 |
HAZARD ELIM & SAFETY |
HIGHWAY 19 CONSTRUCTION LLC($3,192,284) |
|
1690-01-134 |
LAMAR |
PARIS |
$2,496,884 |
US 82 |
F 2022(126) |
11/04/2021 |
11/15/2023 |
PREVENT MAINT |
HIGHWAY 19 CONSTRUCTION LLC($2,962,394) |
|
0045-09-110 |
LAMAR |
PARIS |
$1,961,095 |
US 82 |
STP 2024(382)HES |
11/01/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
HIGHWAY 19 CONSTRUCTION LLC($2,085,076) |
|
0435-01-080 |
LAMAR |
PARIS |
$1,972,306 |
FM 38 |
STP 2021(537)HES |
05/05/2021 |
11/15/2023 |
HAZARD ELIM & SAFETY |
HIGHWAY 19 CONSTRUCTION LLC($1,748,082) |
|
0045-09-116 |
LAMAR |
PARIS |
$2,967,451 |
US 82 |
STP 2024(077)HES |
10/05/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
HIGHWAY 19 CONSTRUCTION LLC($2,609,126) |
|
6394-38-001 |
LAMAR |
PARIS |
$254,782 |
FM0079 |
EMC - 639438001 |
11/16/2021 |
09/26/2024 |
CULVERT REPL |
HIGHWAY 19 CONSTRUCTION LLC($171,994) |
|
0901-29-091 |
LAMAR |
PARIS |
$583,060 |
CR |
BR 2021(303) |
03/04/2022 |
11/15/2023 |
BRIDGE REPL |
HODGES AND SON CONSTRUCTION COMPANY, INC.($579,521) |
|
6371-70-001 |
LAMAR |
PARIS |
$177,484 |
FM0824 |
BPM - 637170001 |
12/17/2020 |
11/15/2023 |
BPM - EROSION AND ROCK RIPRAP REPAIRS |
JC ROAD MAINTENANCE, LLC($121,579) |
|
6333-62-001 |
LAMAR |
PARIS |
$265,360 |
US0082 |
RMC - 633362001 |
09/20/2018 |
11/15/2023 |
ON CALL METAL BEAM GUARD FENCE REPAIR |
JE CASEY, LLC($262,852) |
|
6414-65-001 |
LAMAR |
PARIS |
$109,600 |
US0271 |
RMC - 641465001 |
08/18/2022 |
11/15/2023 |
PICNIC AREA MAINT |
KJRM GENERAL CONTRACTORS, LLC($89,800) |
|
6470-01-001 |
LAMAR |
PARIS |
$114,525 |
US0271 |
RMC - 647001001 |
08/15/2024 |
07/04/2024 |
PICNIC AREA MAINT |
KJRM GENERAL CONTRACTORS, LLC($91,843) |
|
6389-46-001 |
LAMAR |
PARIS |
$60,000 |
BU0271B |
RMC - 638946001 |
09/16/2021 |
09/24/2024 |
JANITORIAL MAINT |
KLEEN SWEEP SERVICES($44,209) |
|
6342-77-001 |
LAMAR |
PARIS |
$60,000 |
BU0271B |
RMC - 634277001 |
02/14/2019 |
11/15/2023 |
JANITORIAL MAINT |
KLEEN SWEEP SERVICES($30,011) |
|
6347-62-001 |
LAMAR |
PARIS |
$177,717 |
FM0137 |
BPM - 634762001 |
03/19/2020 |
11/15/2023 |
RIPRAP/EROSION REPAIR |
LELAND & BRADLEE CONSTRUCTION, INC.($167,089) |
|
6398-32-001 |
LAMAR |
PARIS |
$720,500 |
BU0271B |
MMC - 639832001 |
04/06/2022 |
11/15/2023 |
LIMESTONE ROCK AND ASPH |
MARTIN MARIETTA MATERIALS, INC.($932,775) |
|
6363-72-001 |
LAMAR |
PARIS |
$262,500 |
BU0271B |
MMC - 636372001 |
07/16/2020 |
09/26/2024 |
LRA MATERIAL - MATERIALS ONLY |
MARTIN MARIETTA MATERIALS, INC.($297,280) |
|
6473-99-001 |
LAMAR |
PARIS |
$275,300 |
US0082 |
RMC - 647399001 |
11/21/2024 |
10/14/2024 |
ON CALL TREE TRIM & RMVL |
MERCER TREE SERVICE($200,825) |
|
0045-11-045 |
LAMAR |
PARIS |
$1,205,277 |
US 82 |
STP 2022(800)HES |
05/05/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
NORTH TEXAS TRAFFIC SYSTEMS CONSTRUCTION($1,414,666) |
|
6316-73-001 |
LAMAR |
PARIS |
$191,537 |
US0082 |
RMC - 631673001 |
05/18/2017 |
11/15/2023 |
TRAF SIGNAL MAINT |
NORTH TEXAS TRAFFIC SYSTEMS CONSTRUCTION($258,624) |
|
6462-78-001 |
LAMAR |
PARIS |
$368,728 |
US0082 |
RMC - 646278001 |
03/06/2024 |
01/19/2024 |
TRAF SIGNAL MAINT |
NORTH TEXAS TRAFFIC SYSTEMS CONSTRUCTION($357,322) |
|
6344-26-001 |
LAMAR |
PARIS |
$312,290 |
US0082 |
RMC - 634426001 |
07/10/2019 |
11/15/2023 |
TRAF SIGNAL MAINT |
NORTH TEXAS TRAFFIC SYSTEMS CONSTRUCTION($352,440) |
|
6385-37-001 |
LAMAR |
PARIS |
$316,090 |
US0082 |
RMC - 638537001 |
09/02/2021 |
11/15/2023 |
TRAF SIGNAL MAINT |
NORTH TEXAS TRAFFIC SYSTEMS CONSTRUCTION($334,171) |
|
0045-09-105 |
LAMAR |
PARIS |
$944,050 |
BU 82-H |
STP 2020(939)HES |
07/09/2020 |
11/15/2023 |
HAZARD ELIM & SAFETY |
NORTH TEXAS TRAFFIC SYSTEMS CONSTRUCTION($883,850) |
|
6397-23-001 |
LAMAR |
PARIS |
$137,400 |
US0082 |
BPM - 639723001 |
03/17/2022 |
11/15/2023 |
BRIDGE BEAM REPAIR |
PENHALL COMPANY($127,669) |
|
6425-28-001 |
LAMAR |
PARIS |
$1,010,195 |
US0082 |
RMC - 642528001 |
03/07/2023 |
11/15/2023 |
REFL PAVMT MRK (LONG LINE) |
REYNOLDS & KAY, LTD.($769,090) |
|
6433-52-001 |
LAMAR |
PARIS |
$522,950 |
US0082 |
RMC - 643352001 |
03/07/2023 |
11/15/2023 |
PAVMT MRK |
REYNOLDS & KAY, LTD.($471,520) |
|
6474-92-001 |
LAMAR |
PARIS |
$213,750 |
US0082 |
RMC - 647492001 |
11/21/2024 |
10/14/2024 |
DITCH CLEANING AND RESHAPING |
RHINO EQUITY, LLC($162,950) |
|
6467-91-001 |
LAMAR |
PARIS |
$6,576,017 |
FM0195 |
RMC - 646791001 |
07/09/2024 |
05/20/2024 |
MILL AND INLAY |
RICHARD DRAKE CONSTRUCTION COMPANY, L.P.($6,589,398) |
|
6463-28-001 |
LAMAR |
PARIS |
$1,562,500 |
US0082 |
MMC - 646328001 |
04/04/2024 |
02/27/2024 |
FLEXIBLE BASE / ASPH TREATMENT |
RICHARD DRAKE CONSTRUCTION COMPANY, L.P.($1,592,700) |
|
6401-93-001 |
LAMAR |
PARIS |
$3,743,683 |
BU0271B |
RMC - 640193001 |
06/30/2022 |
11/15/2023 |
MILL AND INLAY |
RICHARD DRAKE CONSTRUCTION COMPANY, L.P.($3,805,754) |
|
6324-93-001 |
LAMAR |
PARIS |
$5,039,828 |
US0082 |
RMC - 632493001 |
02/01/2018 |
11/15/2023 |
ON CALL MILL & INLAY |
RICHARD DRAKE CONSTRUCTION COMPANY, L.P.($4,350,178) |
|
6343-66-001 |
LAMAR |
PARIS |
$3,007,861 |
US0082 |
RMC - 634366001 |
05/07/2019 |
11/15/2023 |
ON CALL MILL & INLAY |
RICHARD DRAKE CONSTRUCTION COMPANY, L.P.($3,130,824) |
|
6377-91-001 |
LAMAR |
PARIS |
$995,000 |
US0082 |
MMC - 637791001 |
04/07/2021 |
11/15/2023 |
FLEXIBLE BASE |
RICHARD DRAKE CONSTRUCTION COMPANY, L.P.($995,475) |
|
1690-01-132 |
LAMAR |
PARIS |
$1,413,729 |
US 271 |
F 2021(497) |
04/07/2021 |
11/15/2023 |
PREVENT MAINT |
RICHARD DRAKE CONSTRUCTION COMPANY, L.P.($1,317,402) |
|
0136-07-050 |
LAMAR |
PARIS |
$1,748,506 |
BU 271B |
NH 2019(304) |
01/08/2019 |
11/15/2023 |
OVERLAY |
RICHARD DRAKE CONSTRUCTION COMPANY, L.P.($1,740,082) |
|
6443-16-001 |
LAMAR |
PARIS |
$5,661,968 |
FM0137 |
RMC - 644316001 |
06/27/2023 |
11/15/2023 |
MILL AND INLAY |
RICHARD DRAKE CONSTRUCTION COMPANY, L.P.($6,031,609) |
|
6400-41-001 |
LAMAR |
PARIS |
$1,045,250 |
US0082 |
MMC - 640041001 |
05/04/2022 |
11/15/2023 |
FLEX BASE & ASPH TREATMENT |
RICHARD DRAKE CONSTRUCTION COMPANY, L.P.($1,271,275) |
|
0688-02-057 |
LAMAR |
PARIS |
$2,614,368 |
FM 79 |
STP 2020(669) |
03/04/2020 |
11/15/2023 |
MILL AND INLAY |
RICHARD DRAKE CONSTRUCTION COMPANY, L.P.($3,050,337) |
|
6455-77-001 |
LAMAR |
PARIS |
$1,127,520 |
BU0271B |
MMC - 645577001 |
11/01/2023 |
11/15/2023 |
HOT-MIX COLD-LAID |
RICHARD DRAKE CONSTRUCTION COMPANY, L.P.($1,525,575) |
|
6471-29-001 |
LAMAR |
PARIS |
$1,610,550 |
BU0271B |
MMC - 647129001 |
10/01/2024 |
08/27/2024 |
HOT-MIX COLD-LAID |
RICHARD DRAKE CONSTRUCTION COMPANY, L.P.($1,624,400) |
|
0045-09-109 |
LAMAR |
PARIS |
$3,775,100 |
US 82 |
F 2024(937) |
04/05/2024 |
02/23/2024 |
PREVENT MAINT |
RICHARD DRAKE CONSTRUCTION COMPANY, L.P.($4,740,741) |
|
6425-26-001 |
LAMAR |
PARIS |
$1,127,520 |
BU0271B |
MMC - 642526001 |
01/06/2023 |
11/15/2023 |
HOT-MIX COLD-LAID |
RICHARD DRAKE CONSTRUCTION COMPANY, L.P.($1,319,550) |
|
6435-78-001 |
LAMAR |
PARIS |
$1,378,000 |
US0082 |
MMC - 643578001 |
05/04/2023 |
11/15/2023 |
FLEXIBLE BASE |
RICHARD DRAKE CONSTRUCTION COMPANY, L.P.($1,533,000) |
|
6458-25-001 |
LAMAR |
PARIS |
$267,636 |
US0082 |
RMC - 645825001 |
12/21/2023 |
11/15/2023 |
MOW HWY RIGHT OF WAY |
RICKEY BAIRD($250,691) |
|
6352-53-001 |
LAMAR |
PARIS |
$233,366 |
US0082 |
RMC - 635253001 |
12/12/2019 |
11/15/2023 |
MOW HWY RIGHT OF WAY |
RICKEY BAIRD($230,301) |
|
6392-76-001 |
LAMAR |
PARIS |
$267,636 |
US0082 |
RMC - 639276001 |
12/16/2021 |
11/15/2023 |
MOW HWY RIGHT OF WAY |
RICKEY BAIRD($226,305) |
|
0221-01-074 |
LAMAR |
PARIS |
$9,586,977 |
US 271 |
NH 2018(127) |
10/03/2017 |
11/15/2023 |
WIDEN NON-FREEWAY |
RK HALL, LLC($8,915,687) |
|
6376-46-001 |
LAMAR |
PARIS |
$242,000 |
BU0271B |
MMC - 637646001 |
04/15/2021 |
11/15/2023 |
DENSE GRADED HOT MIX |
RK HALL, LLC($244,000) |
|
6361-29-001 |
LAMAR |
PARIS |
$799,500 |
BU0271B |
MMC - 636129001 |
05/07/2020 |
11/15/2023 |
FLEX BASE & ASPH TRTMNT - (MATERIALS ONLY) |
RK HALL, LLC($985,245) |
|
6353-10-001 |
LAMAR |
PARIS |
$4,199,738 |
US0082 |
RMC - 635310001 |
01/10/2020 |
11/15/2023 |
SITE SPECIFIC MILL & INLAY |
RK HALL, LLC($4,137,458) |