0495-08-100 |
HARRISON |
ATLANTA |
$18,560,135 |
IH 20 |
NH 2017(236) |
11/04/2016 |
11/15/2023 |
PLANE,CONC PVMT REP,ACP SF,PAV MRK |
MADDEN CONTRACTING COMPANY, LLC.($13,599,303) |
|
0062-07-088 |
HARRISON |
ATLANTA |
$14,389,895 |
US 59 |
NH 2020(066) |
10/02/2019 |
11/15/2023 |
PLANE ACP, CEMENT TREATMENT, ACP SURF, & PAV MARK |
MADDEN CONTRACTING COMPANY, LLC.($13,662,270) |
|
0495-08-136 |
HARRISON |
ATLANTA |
$10,866,754 |
IH 20 |
STP 2022(221)HES |
11/03/2021 |
11/15/2023 |
HAZARD ELIM & SAFETY |
MADDEN CONTRACTING COMPANY, LLC.($11,381,826) |
|
0495-09-056 |
HARRISON |
ATLANTA |
$10,475,734 |
IH 20 |
C 495-9-56 |
08/04/2021 |
11/15/2023 |
REPLACE BRIDGE & APPROACHES |
EAST TEXAS BRIDGE, INC.($11,887,791) |
|
0096-07-054 |
HARRISON |
ATLANTA |
$7,554,020 |
US 80 |
F 2B23(018) |
08/02/2023 |
11/15/2023 |
RESURF ROADWAY |
MADDEN CONTRACTING COMPANY, LLC.($6,333,887) |
|
0632-04-032 |
HARRISON |
ATLANTA |
$5,357,557 |
FM 451 |
SSW 632-4-32 |
03/05/2019 |
11/15/2023 |
GR, BS, STRS, SURF & PAV MRKS |
H. V. CAVER, INC.($4,798,327) |
|
0208-02-045 |
HARRISON |
ATLANTA |
$4,890,559 |
SH 43 |
STP 2019(845) |
05/08/2019 |
11/15/2023 |
GRADING,CEM TRT BASE,ACP & PV MRKS |
H. V. CAVER, INC.($4,592,940) |
|
6316-00-001 |
HARRISON |
ATLANTA |
$4,844,000 |
US0059 |
RMC - 631600001 |
01/04/2018 |
11/15/2023 |
CALLOUT CONC PAVMT REPAIR |
SILVER CREEK CONSTRUCTION, INC.($4,189,000) |
|
1575-05-022 |
HARRISON |
ATLANTA |
$4,700,137 |
SL 390 |
STP 2020(538) |
02/06/2020 |
11/15/2023 |
CEMENT TREAT BASE, ACP AND PAV MRKS |
MADDEN CONTRACTING COMPANY, LLC.($5,981,442) |
|
6462-16-001 |
HARRISON |
ATLANTA |
$4,454,500 |
IH0020 |
RMC - 646216001 |
03/06/2024 |
01/26/2024 |
MILL AND INLAY |
MADDEN CONTRACTING COMPANY, LLC.($6,136,950) |
|
3041-03-012 |
HARRISON |
ATLANTA |
$4,206,747 |
FM 3001 |
BR 2022(504) |
05/05/2022 |
08/31/2024 |
BRIDGE REPL |
HIGHWAY 19 CONSTRUCTION LLC($4,618,853) |
|
0096-10-028 |
HARRISON |
ATLANTA |
$4,161,642 |
US 80 |
F 2B24(109) |
06/06/2024 |
04/25/2024 |
RESURF ROADWAY |
MADDEN CONTRACTING COMPANY, LLC.($3,801,386) |
|
0402-03-042 |
HARRISON |
ATLANTA |
$4,104,966 |
SH 154 |
STP 2023(698)HES |
05/05/2023 |
11/15/2023 |
SAFETY TREAT FIXED OBJECTS |
EAST TEXAS BRIDGE, INC.($3,492,423) |
|
6380-05-001 |
HARRISON |
ATLANTA |
$4,077,500 |
IH0020 |
RMC - 638005001 |
07/02/2021 |
11/15/2023 |
MILL AND INLAY |
MADDEN CONTRACTING COMPANY, LLC.($3,880,504) |
|
0495-08-127 |
HARRISON |
ATLANTA |
$4,057,600 |
IH 20 |
C 495-8-127 |
07/09/2020 |
11/15/2023 |
TREE RMVL ON RIGHT OF WAY |
A. L. HELMCAMP, INC.($2,944,013) |
|
0495-08-138 |
HARRISON |
ATLANTA |
$3,812,278 |
IH 20 |
F 2023(843) |
06/02/2023 |
11/28/2023 |
REHAB OF AN EXIST INTERSTATE |
GHB EQUIPMENT COMPANY, L.L.C.($4,714,765) |
|
6324-85-001 |
HARRISON |
ATLANTA |
$3,795,200 |
IH0020 |
RMC - 632485001 |
09/07/2018 |
11/15/2023 |
CALLOUT MILL & INLAY (SOUTH) |
MADDEN CONTRACTING COMPANY, LLC.($3,931,850) |
|
0495-08-108 |
HARRISON |
ATLANTA |
$3,144,027 |
IH 20 |
C 495-8-108 |
03/04/2021 |
11/15/2023 |
REPLACE BRIDGE & APPROACHES |
EAST TEXAS BRIDGE, INC.($3,399,555) |
|
0632-04-034 |
HARRISON |
ATLANTA |
$3,051,282 |
FM 9 |
STP 2019(262) |
12/06/2018 |
11/15/2023 |
FOAMED ASPH TRT,ACP SURF & PAV MRKS |
MADDEN CONTRACTING COMPANY, LLC.($2,792,495) |
|
0096-09-080 |
HARRISON |
ATLANTA |
$2,920,535 |
US 80 |
F 2022(217) |
11/04/2021 |
11/15/2023 |
OVERLAY OF AN EXIST ROADWAY |
MADDEN CONTRACTING COMPANY, LLC.($2,903,147) |
|
0843-07-016 |
HARRISON |
ATLANTA |
$2,544,726 |
FM 2625 |
CC 843-7-16 |
08/09/2017 |
11/15/2023 |
GR,STR,BASE,SURF |
LONGVIEW BRIDGE AND ROAD, LTD.($2,284,633) |
|
0495-08-116 |
HARRISON |
ATLANTA |
$2,526,187 |
IH 20 |
NH 2019(847) |
05/07/2019 |
11/15/2023 |
CEMENT TREAT BASE, ACP AND PAV MRKS |
EAST TEXAS BRIDGE, INC.($2,388,394) |
|
0569-04-020 |
HARRISON |
ATLANTA |
$2,433,484 |
SH 43 |
BR 2020(725) |
08/06/2020 |
11/15/2023 |
REPLACE BRIDGE AND APPROACHES |
STATELINE CONSTRUCTION, LLC($2,545,188) |
|
1895-02-013 |
HARRISON |
ATLANTA |
$2,423,931 |
FM 726 |
BR 2B23(016) |
08/03/2023 |
11/15/2023 |
REPLACE BRIDGE AND APPROACHES |
THK CONSTRUCTION LLC($3,496,301) |
|
0096-07-052 |
HARRISON |
ATLANTA |
$2,191,042 |
US 80 |
STP 2023(025)HES |
09/08/2022 |
11/15/2023 |
INSTLING MEDIAN BARRIER |
MASSANA CONSTRUCTION INC.($1,862,982) |
|
0063-01-094 |
HARRISON |
ATLANTA |
$2,187,578 |
FM 1186 |
STP 2020(439)HES |
03/04/2020 |
11/15/2023 |
SAFETY TREAT FIXED OBJECTS |
LONGVIEW BRIDGE AND ROAD, LTD.($1,847,140) |
|
0495-08-110 |
HARRISON |
ATLANTA |
$1,955,599 |
IH 20 |
BR 2018(831) |
05/02/2018 |
11/15/2023 |
CONC DECK REPAIR & CONC STR REPAIR |
HIGHWAY 19 CONSTRUCTION LLC($2,087,956) |
|
0495-08-130 |
HARRISON |
ATLANTA |
$1,924,393 |
IH 20 |
F 2021(584) |
06/03/2021 |
11/15/2023 |
IMPROVE GUARDRAILS TO SAFETY STANDARDS |
DBI SERVICES, LLC($2,346,996) |
|
0096-09-076 |
HARRISON |
ATLANTA |
$1,656,153 |
US 80 |
STP 2017(883) |
03/08/2017 |
11/15/2023 |
PLANE ACP, ACP SURF, & PAV MARK |
MADDEN CONTRACTING COMPANY, LLC.($1,295,848) |
|
0062-07-103 |
HARRISON |
ATLANTA |
$1,345,549 |
US 59 |
STP 2B24(045)VRU |
04/04/2024 |
02/22/2024 |
INSTL ILLUM |
VACA UNDERGROUND UTILITIES INC($1,254,209) |
|
6473-69-001 |
HARRISON |
ATLANTA |
$972,639 |
IH0020 |
MMC - 647369001 |
10/09/2024 |
09/02/2024 |
AGGREGATE |
RK HALL, LLC($1,118,576) |
|
0063-01-092 |
HARRISON |
ATLANTA |
$926,589 |
FM 1186 |
STP 2017(336)HESG |
12/01/2016 |
11/15/2023 |
PROFILE EDGELINE MRK |
STRIPE-A-ZONE, INC.($814,705) |
|
0096-07-049 |
HARRISON |
ATLANTA |
$922,000 |
US 80 |
STP 2018(194)HES |
10/03/2017 |
11/15/2023 |
UPGRADE MBGF |
B & E CONSTRUCTION INC($951,648) |
|
1919-02-037 |
HARRISON |
ATLANTA |
$859,170 |
FM 1997 |
STP 1702(400) |
06/07/2017 |
11/15/2023 |
SIDEWALKS, CURB RAMPS AND RET WALL |
MADDEN CONTRACTING COMPANY, LLC.($823,437) |
|
0096-07-045 |
HARRISON |
ATLANTA |
$837,795 |
US 80 |
STP 1802(247)HES |
06/05/2018 |
11/15/2023 |
IMPROVE TRAF SIGNAL & LEFT TRN |
SOUTH TEXAS ILLUMINATION, LLC($877,537) |
|
6333-67-001 |
HARRISON |
ATLANTA |
$712,868 |
US0080 |
RMC - 633367001 |
08/07/2018 |
11/15/2023 |
INSTL OF PAVMT MRK |
STRIPING TECHNOLOGY, L.P.($612,675) |
|
0495-08-098 |
HARRISON |
ATLANTA |
$708,318 |
IH 20 |
STP 1702(695)HESG |
08/08/2017 |
11/15/2023 |
INSTL SAFETY LIGHTING |
SOUTH TEXAS ILLUMINATION, LLC($689,736) |
|
0495-08-121 |
HARRISON |
ATLANTA |
$699,254 |
IH 20 |
BR 2021(433) |
05/06/2021 |
11/15/2023 |
BRIDGE MAINT |
DBI SERVICES, LLC($692,721) |
|
0495-08-121 |
HARRISON |
ATLANTA |
$695,254 |
IH 20 |
BR 2021(433) |
02/04/2022 |
11/15/2023 |
BRIDGE MAINT |
R & G CONSTRUCTION, LLC($639,848) |
|
6357-09-001 |
HARRISON |
ATLANTA |
$589,775 |
US0059 |
RMC - 635709001 |
04/08/2020 |
11/15/2023 |
CALLOUT MBGF REPAIR - SOUTH |
JCW CONSTRUCTION, LLC($852,050) |
|
0062-07-096 |
HARRISON |
ATLANTA |
$566,503 |
US 59 |
STP 2021(332) |
06/04/2021 |
11/15/2023 |
INSTL SAFETY LIGHTING |
STRIPING TECHNOLOGY, L.P.($539,434) |
|
0919-03-062 |
HARRISON |
ATLANTA |
$546,582 |
CS |
STP 2020(163)TAPS |
05/06/2021 |
11/15/2023 |
CONSTRUCT SIDEWALKS AND CURB RAMPS |
BLACKSTONE CONCRETE VENTURES, LLC($477,174) |
|
0919-03-064 |
HARRISON |
ATLANTA |
$519,325 |
CS |
STP 2021(277)TAPS |
04/07/2022 |
09/24/2024 |
BICYCLE AND PEDESTRIAN IMPRVS |
THK CONSTRUCTION LLC($457,811) |
|
0062-07-094 |
HARRISON |
ATLANTA |
$516,818 |
US 59 |
STP 2021(325) |
04/07/2021 |
11/15/2023 |
IMPROVE TRAF SIG |
STRIPING TECHNOLOGY, L.P.($468,446) |
|
6417-68-001 |
HARRISON |
ATLANTA |
$511,159 |
IH0020 |
MMC - 641768001 |
11/02/2022 |
11/15/2023 |
AGGREGATE |
RK HALL, LLC($727,489) |
|
6462-19-001 |
HARRISON |
ATLANTA |
$510,800 |
IH0020 |
RMC - 646219001 |
02/02/2024 |
12/25/2023 |
CABLE BARRIER REPAIR |
ROSS SA ENTERPRISE LLC($478,435) |
|
0919-03-060 |
HARRISON |
ATLANTA |
$502,641 |
CR |
BR 2019(352) |
03/04/2022 |
11/15/2023 |
REPLACE BRIDGE AND APPROACHES |
THK CONSTRUCTION LLC($481,045) |
|
6369-71-001 |
HARRISON |
ATLANTA |
$482,000 |
US0059 |
RMC - 636971001 |
11/04/2020 |
11/15/2023 |
TREE & STUMP RMVL (S) |
H. V. CAVER, INC.($445,429) |
|
6334-44-001 |
HARRISON |
ATLANTA |
$471,500 |
US0059 |
RMC - 633444001 |
10/03/2018 |
11/15/2023 |
TREE & STUMP RMVL (S) |
T.F.R. ENTERPRISES, INC.($454,500) |
|
6351-01-001 |
HARRISON |
ATLANTA |
$470,944 |
US0080 |
RMC - 635101001 |
04/07/2022 |
11/15/2023 |
TREE TRIM - SOUTH |
FOWLER CONSTRUCTION($422,724) |
|
6351-01-001 |
HARRISON |
ATLANTA |
$463,544 |
US0080 |
RMC - 635101001 |
10/07/2021 |
11/15/2023 |
TREE TRIM - SOUTH |
ROAD SOLUTIONS L.L.C.($404,012) |
|
6334-36-001 |
HARRISON |
ATLANTA |
$462,100 |
US0059 |
RMC - 633436001 |
12/05/2018 |
11/15/2023 |
CALLOUT METAL BEAM GUARD FENCE REPAIR(S) |
CATOCON, INC.($412,252) |
|
0919-03-057 |
HARRISON |
ATLANTA |
$461,936 |
CR |
BR 2017(296) |
07/12/2017 |
11/15/2023 |
REPLACE BRIDGE AND APPROACHES |
STATELINE CONSTRUCTION, LLC($444,411) |
|
6348-26-001 |
HARRISON |
ATLANTA |
$454,500 |
US0059 |
RMC - 634826001 |
09/06/2019 |
11/15/2023 |
TREE & STUMP RMVL (S) |
CROSS PLUS CONSTRUCTION, LLC($554,654) |
|
0843-06-019 |
HARRISON |
ATLANTA |
$445,191 |
FM 450 |
STP 2017(508)HESG |
01/05/2017 |
11/15/2023 |
BASE, SURF & PAVMT MRK |
FRITCHER CONSTRUCTION SERVICES($474,177) |
|
0096-09-077 |
HARRISON |
ATLANTA |
$427,824 |
US 80 |
STP 2019(658)HES |
03/06/2019 |
11/15/2023 |
IMPROVE TRAF SIGNAL |
TEXAS TRAFFIC CONTROL SYSTEMS, INC.($381,550) |
|
6351-01-001 |
HARRISON |
ATLANTA |
$391,307 |
US0080 |
RMC - 635101001 |
10/03/2019 |
11/15/2023 |
TREE TRIM - SOUTH |
CROSS PLUS CONSTRUCTION, LLC($560,579) |
|
6473-76-001 |
HARRISON |
ATLANTA |
$380,480 |
US0059 |
MMC - 647376001 |
10/09/2024 |
09/13/2024 |
HOT MIX |
LONGVIEW ASPHALT, INC.($396,480) |
|
0919-03-059 |
HARRISON |
ATLANTA |
$369,828 |
CR |
BR 2019(351) |
08/06/2019 |
11/15/2023 |
BRIDGE REPL |
LONGVIEW BRIDGE AND ROAD, LTD.($398,057) |
|
6457-57-001 |
HARRISON |
ATLANTA |
$356,625 |
IH0020 |
MMC - 645757001 |
11/01/2023 |
11/15/2023 |
AGGREGATE |
RK HALL, LLC($314,430) |
|
0495-08-129 |
HARRISON |
ATLANTA |
$350,800 |
IH 20 |
NH 2020(908) |
07/09/2020 |
11/15/2023 |
PLANT WILDFLOWERS ON R.O.W. |
HX FARMS, INC.($241,346) |
|
0096-07-047 |
HARRISON |
ATLANTA |
$347,635 |
US 80 |
NH 2018(058) |
09/07/2017 |
11/15/2023 |
INSTL TRAF SIGNAL |
EAST TEXAS BRIDGE, INC.($482,089) |
|
6307-91-001 |
HARRISON |
ATLANTA |
$346,125 |
US0059 |
RMC - 630791001 |
01/04/2017 |
11/15/2023 |
TREE & STUMP RMVL (SOUTH) |
DREWERY CONSTRUCTION COMPANY, INCORPORATED($420,575) |
|
6475-76-001 |
HARRISON |
ATLANTA |
$322,772 |
US0080 |
RMC - 647576001 |
11/20/2024 |
10/21/2024 |
MOW HWY RIGHT OF WAY |
CEHAND SERVICES LLC($280,302) |
|
6453-81-001 |
HARRISON |
ATLANTA |
$322,772 |
US0080 |
RMC - 645381001 |
01/05/2024 |
11/28/2023 |
MOW HWY RIGHT OF WAY |
DCC CONSTRUCTION AND SERVICES, L.L.C.($311,645) |
|
0063-01-091 |
HARRISON |
ATLANTA |
$313,227 |
US 59 |
STP 2017(235)HESG |
11/03/2016 |
11/15/2023 |
INSTL TRAF SIGNAL |
TEXAS TRAFFIC CONTROL SYSTEMS, INC.($256,403) |
|
1575-04-017 |
HARRISON |
ATLANTA |
$307,349 |
SL 390 |
STP 2019(587)HES |
01/09/2019 |
11/15/2023 |
INSTL TRAF SIGNAL |
STRIPING TECHNOLOGY, L.P.($284,476) |
|
0919-03-063 |
HARRISON |
ATLANTA |
$300,214 |
CS |
STP 2021(657)FRS1 |
05/05/2022 |
08/31/2024 |
RAILROAD CROSSING UPGRADES |
RAYFORD'S TRUCK & TRACTOR($309,960) |
|
6419-78-001 |
HARRISON |
ATLANTA |
$293,500 |
IH0020 |
MMC - 641978001 |
10/12/2022 |
11/15/2023 |
HOT MIX |
LONGVIEW ASPHALT, INC.($329,410) |
|
0495-08-117 |
HARRISON |
ATLANTA |
$290,550 |
IH 20 |
BR 1902(306) |
08/06/2019 |
11/15/2023 |
CONC STRUCT REPAIR AND JOINT CLEANING |
R & G CONSTRUCTION, LLC($329,387) |
|
6396-56-001 |
HARRISON |
ATLANTA |
$279,000 |
IH0020 |
MMC - 639656001 |
02/16/2022 |
11/15/2023 |
HOT MIX |
LONGVIEW ASPHALT, INC.($266,000) |
|
6354-80-001 |
HARRISON |
ATLANTA |
$276,900 |
IH0020 |
MMC - 635480001 |
02/19/2020 |
09/26/2024 |
MATERIALS ONLY, HMAC |
LONGVIEW ASPHALT, INC.($262,200) |
|
6374-82-001 |
HARRISON |
ATLANTA |
$253,700 |
IH0020 |
MMC - 637482001 |
02/17/2021 |
09/26/2024 |
MATERIALS ONLY, HMAC |
LONGVIEW ASPHALT, INC.($253,700) |
|
6365-96-001 |
HARRISON |
ATLANTA |
$238,770 |
US0080 |
RMC - 636596001 |
11/18/2020 |
11/15/2023 |
FULL WIDTH MOW (TRACT 6 - HARRISON) |
TERRY ENTERPRISES($232,801) |
|
6391-26-001 |
HARRISON |
ATLANTA |
$238,770 |
US0080 |
RMC - 639126001 |
11/17/2021 |
11/15/2023 |
MOW HWY RIGHT OF WAY |
HX FARMS, INC.($298,463) |
|
6453-23-001 |
HARRISON |
ATLANTA |
$228,250 |
US0059 |
MMC - 645323001 |
10/17/2023 |
11/15/2023 |
HOT MIX |
LONGVIEW ASPHALT, INC.($239,800) |
|
6328-37-001 |
HARRISON |
ATLANTA |
$212,950 |
IH0020 |
RMC - 632837001 |
04/11/2018 |
11/15/2023 |
CALLOUT CABLE SAFETY SYSTEM REPAIR |
HX FARMS, INC.($239,896) |
|
6356-70-001 |
HARRISON |
ATLANTA |
$207,950 |
IH0020 |
RMC - 635670001 |
02/19/2020 |
09/26/2024 |
CALLOUT CABLE SAFETY SYSTEM REPAIR |
H. V. CAVER, INC.($238,975) |
|
6455-01-001 |
HARRISON |
ATLANTA |
$204,250 |
IH0020 |
RMC - 645501001 |
10/17/2023 |
11/15/2023 |
DEBRIS RMVL |
HOLMES AND HOLMES CONTRACTING($213,679) |
|
6442-52-001 |
HARRISON |
ATLANTA |
$187,650 |
US0059 |
RMC - 644252001 |
06/14/2023 |
11/15/2023 |
TREE RMVL |
CEHAND SERVICES LLC($142,028) |
|
6410-11-001 |
HARRISON |
ATLANTA |
$176,650 |
US0059 |
RMC - 641011001 |
08/10/2022 |
11/15/2023 |
TREE RMVL |
H. V. CAVER, INC.($194,969) |
|
6389-56-001 |
HARRISON |
ATLANTA |
$159,830 |
US0059 |
RMC - 638956001 |
10/26/2021 |
11/15/2023 |
TREE RMVL |
ROAD SOLUTIONS L.L.C.($155,304) |
|
6309-06-001 |
HARRISON |
ATLANTA |
$135,540 |
US0080 |
RMC - 630906001 |
11/16/2016 |
11/15/2023 |
FULL WIDTH MOW (TRACT 6 - HARRISON) |
HX FARMS, INC.($144,325) |
|
0919-03-063 |
HARRISON |
ATLANTA |
$121,034 |
CS |
STP 2021(657)FRS1 |
05/05/2021 |
11/15/2023 |
RAILROAD CROSSING UPGRADES |
EAST TEXAS BRIDGE, INC.($313,319) |
|
6352-46-001 |
HARRISON |
ATLANTA |
$108,975 |
IH0020 |
RMC - 635246001 |
11/19/2019 |
11/15/2023 |
DEBRIS RMVL - SOUTH |
HOLMES AND HOLMES CONTRACTING($101,752) |
|
6387-46-001 |
HARRISON |
ATLANTA |
$108,975 |
IH0020 |
RMC - 638746001 |
10/26/2021 |
11/15/2023 |
DEBRIS RMVL |
HOLMES AND HOLMES CONTRACTING($101,752) |
|
6309-11-001 |
HARRISON |
ATLANTA |
$82,380 |
IH0020 |
RMC - 630911001 |
11/16/2016 |
11/15/2023 |
FULL WIDTH MOW (TRACT 16 - HARRISON) |
DBI SERVICES, LLC($97,840) |
|
6324-03-001 |
HARRISON |
ATLANTA |
$37,000 |
IH0020 |
RMC - 632403001 |
11/16/2017 |
11/15/2023 |
DEBRIS RMVL - SOUTH |
HOLMES AND HOLMES CONTRACTING($59,200) |
|
6310-93-001 |
HARRISON |
ATLANTA |
$37,000 |
IH0020 |
RMC - 631093001 |
11/16/2016 |
11/15/2023 |
DEBRIS RMVL (SOUTH) |
HOLMES AND HOLMES CONTRACTING($35,823) |